CN203111846U CN201320093645.5U CN201320093645U CN203111846U CN 203111846 U CN203111846 U CN 203111846U CN 201320093645 U CN201320093645 U CN 201320093645U CN 203111846 U CN203111846 U CN 203111846U
Authority
CN
China
Prior art keywords
warehouse
steel plate
coal
storehouse
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320093645.5U
Other languages
Chinese (zh)
Inventor
刘栓金
武治海
王业涛
彭丽园
丰海明
杨艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huajian Storage Equipment Science & Technology Co Ltd
Original Assignee
Shandong Huajian Storage Equipment Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huajian Storage Equipment Science & Technology Co Ltd filed Critical Shandong Huajian Storage Equipment Science & Technology Co Ltd
Priority to CN201320093645.5U priority Critical patent/CN203111846U/en
Application granted granted Critical
Publication of CN203111846U publication Critical patent/CN203111846U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/51Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture specially adapted for storing agricultural or horticultural products

Landscapes

  • Storage Of Harvested Produce (AREA)

Abstract

The utility model provides a steel plate warehouse for storing coal. The steel plate warehouse for storing the coal comprises a barrel-shaped warehouse body formed by connecting a steel plate warehouse wall in a welding mode or a bolted mode, a warehouse top and a warehouse bottom. The warehouse top is arc-shaped, and a breathing hole, a carbon monoxide detector, a radar material level meter, a dust remover and an induced draft fan are arranged on the upper portion of the warehouse top. The warehouse bottom is provided with a plurality of taper hoppers, wherein the bottom of each taper hopper is provided with a discharge outlet, and a loosening device is installed one meter above the discharge outlet and is fixedly connected with the taper hopper. The outer wall of the steel plate warehouse wall is further provided with a heat-insulative layer fixedly connected with the steel plate warehouse wall. The upper portion of the warehouse bottom is provided with a ventilating pipe coiled to be circular, and the lower portion of the ventilating pipe is provided with a plurality of ventilating holes. The steel plate warehouse for storing the coal is simple in structure and stable in warehouse body, can preserve heat, avoids frozen interior coal or interior coal spontaneous combustion, reduces coal-storing consumption, can increase emptying rates of the warehouse, and reduces basic investment costs.

Description

一种煤炭储存钢板库A steel plate warehouse for coal storage

技术领域:Technical field:

本实用新型涉及仓储技术领域,尤其涉及一种煤炭储存钢板库。The utility model relates to the technical field of storage, in particular to a coal storage steel plate warehouse.

背景技术:Background technique:

目前对于煤炭的储存,国内多采用露天储存或仓体储存,煤场堆煤是国内焦化厂储煤的主要形式,但有许多缺点,如煤场的储煤占地面积大;堆煤受风吹雨淋等自然因素影响,不可避免地会产生热量损耗;煤场储煤对周边环境污染较大,刮风扬起的煤粉污染空气和环境,雨后积水外排污染水体,废水处理难度大,还容易造成混煤、塌煤,不利于配煤工作的进行;大直径筒仓形式的封闭煤仓是火力发电厂以及洗煤厂贮煤的发展方向,它具有占地面积小、运行方式简单、系统调度灵活、不会对环境造成影响和有利于降低贮煤损耗等突出的优点,而目前实际应用的煤仓多以钢筋混凝土结构的立筒仓为主,但也存在许多缺点,如施工周期长,建库投资高,库体报废又会对环境造成污染,因此需要对原有的仓体进行改进优化,不利于人员的施工和实际应用。由于钢筋混凝土结构的筒仓存在的种种弊端,迫切需要出现一种结构简单,仓体稳固,能够隔热保温,防止内部煤炭结冻或自燃;降低贮煤损耗,而且能够增大了仓内的卸空率,降低了基础投资费用的一种煤炭储存钢板库。At present, for coal storage, open-air storage or warehouse storage is mostly used in China. Coal piles in coal yards are the main form of coal storage in domestic coking plants, but there are many disadvantages, such as large coal storage areas in coal yards; Influenced by natural factors such as blowing and raining, heat loss will inevitably occur; coal storage in the coal yard pollutes the surrounding environment greatly, coal dust raised by the wind pollutes the air and the environment, accumulated water is discharged outside after the rain pollutes the water body, and waste water treatment It is difficult, and it is easy to cause coal mixing and coal collapse, which is not conducive to the coal blending work; the closed coal bunker in the form of a large-diameter silo is the development direction of coal storage in thermal power plants and coal washing plants. The method is simple, the system scheduling is flexible, it will not affect the environment, and it is beneficial to reduce the loss of coal storage. However, the coal bunkers currently in practical use are mostly vertical silos with reinforced concrete structures, but there are also many shortcomings. For example, the construction period is long, the investment in building the warehouse is high, and the waste of the warehouse will pollute the environment. Therefore, it is necessary to improve and optimize the original warehouse body, which is not conducive to the construction and practical application of personnel. Due to the various disadvantages of reinforced concrete silos, there is an urgent need for a silo with a simple structure, a stable silo body, heat insulation, and heat preservation to prevent internal coal from freezing or spontaneous combustion; reduce coal storage loss, and can increase the storage space in the silo. Unloading rate, a kind of coal storage steel plate warehouse that reduces the basic investment cost.

发明内容:Invention content:

本实用新型的目的在于克服现有技术中存在的缺点,提供一种结构简单,仓体稳固,能够隔热保温,防止内部煤炭结冻或自燃;降低贮煤损耗,而且能够增大了仓内的卸空率,降低了基础投资费用的一种煤炭储存钢板库。The purpose of this utility model is to overcome the shortcomings in the prior art, to provide a simple structure, stable warehouse, heat insulation, to prevent internal coal freezing or spontaneous combustion; reduce coal storage loss, and can increase the size of the warehouse A kind of coal storage steel plate warehouse with high unloading rate and reduced basic investment cost.

为实现上述目的,本实用新型提供了一种煤炭储存钢板库,包括由钢板库壁焊接或螺栓连接而成的筒状的仓体,仓顶和仓底,其中,所述仓顶呈弧状,所述仓顶上部设置有呼吸孔、一氧化碳检测器、雷达式料位计,除尘器和引风机,所述一氧化碳检测器、所述除尘器、所述引风机固定安装在仓顶的外表面,所述雷达式料位计固定安装在所述仓顶的内表面,所述呼吸孔穿过仓顶后使仓体内部与外界相连通,所述仓顶、所述仓底与所述仓体之间固定连接。In order to achieve the above purpose, the utility model provides a coal storage steel silo, which includes a cylindrical silo body, a silo roof and a silo bottom formed by welding or bolting the walls of the steel silo, wherein the silo roof is arc-shaped, The upper part of the warehouse roof is provided with a breathing hole, a carbon monoxide detector, a radar level gauge, a dust collector, and an induced draft fan. The carbon monoxide detector, the dust collector, and the induced draft fan are fixedly installed on the outer surface of the warehouse roof. The radar level gauge is fixedly installed on the inner surface of the warehouse roof, and the breathing hole passes through the warehouse roof to connect the interior of the warehouse body with the outside world, and the warehouse roof, the warehouse bottom and the warehouse body fixed connection between.

所述仓底上设置有若干锥斗,所述锥斗的底部设置有出料口,出料口的上方一米处安装有疏松装置,所述疏松装置与所述锥斗之间固定连接。A plurality of cone buckets are arranged on the bottom of the warehouse, and a discharge port is provided at the bottom of the cone bucket, and a loosening device is installed one meter above the discharge port, and the loosening device is fixedly connected with the cone bucket.

所述钢板库壁的外壁上进一步设置有隔热层,所述隔热层与所述钢板库壁之间固定连接。A heat insulating layer is further provided on the outer wall of the steel plate warehouse wall, and the heat insulating layer is fixedly connected with the steel plate warehouse wall.

所述仓底的上部设置有通风管,所述通风管在仓底上部盘绕成圆状,所述通风管位于仓体的内部,所述通风管的下部的壁上设置有若干透孔,所述透孔与所述通风管在制造时一体成型,所述通风管与所述仓底之间固定连接。The upper part of the bottom of the warehouse is provided with a ventilation pipe, and the ventilation pipe is coiled into a circle at the upper part of the bottom of the warehouse. The through hole and the ventilation pipe are integrally formed during manufacture, and the ventilation pipe is fixedly connected to the bottom of the warehouse.

所述疏松装置为空气炮或流化装置。 The loosening device is an air cannon or a fluidization device.

所述隔热层为彩钢复合保温板。The heat insulation layer is a color steel composite insulation board.

呼吸孔安装在仓顶顶部,且使仓体内部与外界连通,起到平衡库内外压力的作用The breathing hole is installed on the top of the warehouse roof, and connects the inside of the warehouse with the outside world, so as to balance the pressure inside and outside the warehouse

一氧化碳检测器安装在库顶部,适时检测仓内的一氧化碳浓度,当达到所设定的安全浓度上限时,仪器会自动报警,这时需要开启通风系统进行通风换气。A carbon monoxide detector is installed on the top of the warehouse to timely detect the carbon monoxide concentration in the warehouse. When the set safe concentration limit is reached, the instrument will automatically alarm. At this time, the ventilation system needs to be turned on for ventilation.

雷达式料位器安装到筒仓的顶部,与电脑连接,监测仓内储存煤炭的高度。The radar level sensor is installed on the top of the silo and connected to the computer to monitor the height of coal stored in the silo.

除尘器安装在库顶部,在进煤时开启,防止煤粉飘扬到库外影响厂区的环境卫生。The dust collector is installed on the top of the warehouse, and it is turned on when coal is fed in to prevent coal powder from flying out of the warehouse and affecting the environmental sanitation of the factory area.

引风机和通风管组成通风换气系统,当仓内一氧化碳及甲烷浓度高于安全浓度时开启,通风管在库内底部环库底一周,下部开孔,采用高压风机供风,防止可燃气体滞留库内,引起自燃。The induced draft fan and ventilation pipe form a ventilation system. When the concentration of carbon monoxide and methane in the warehouse is higher than the safe concentration, it will be opened. The ventilation pipe is around the bottom of the warehouse and the bottom of the warehouse is opened. The high-pressure fan is used to supply air to prevent the retention of combustible gas. library, causing spontaneous combustion.

仓顶结构采用圆弧形锥顶,从结构上弧形顶比平顶和锥顶承载能力更强,仓体更稳固。The roof structure of the warehouse adopts a circular arc-shaped conical top. From the structural point of view, the arc-shaped top has a stronger load-bearing capacity than the flat top and cone top, and the warehouse body is more stable.

隔热层材料为彩钢复合保温系统,隔热层用来阻止库内外热量交换,防止温度过低煤炭结冻,温度过高引起自燃。The material of the heat insulation layer is color steel composite heat preservation system. The heat insulation layer is used to prevent heat exchange inside and outside the warehouse, to prevent the coal from freezing when the temperature is too low, and to cause spontaneous combustion when the temperature is too high.

疏松装置安装在底部距离出料口上1米处,每个锥斗对角安装多个空气炮或疏松机,当煤炭底部结拱不出料时启动空气炮或流化装置,起到破拱的作用,保证煤炭出料流畅。The loosening device is installed at the bottom 1 meter away from the discharge port. Each cone bucket is equipped with multiple air cannons or loosening machines diagonally. function to ensure smooth coal discharge.

仓底为双廊道四点下料的方式,也可以采用多廊道多点下料的方式,这样降低了煤炭仓锥体的高度,增大了仓内的卸空率,降低了基础投资的费用。所谓四点下料即仓底设置四个锥斗,锥斗底部设置出料口,共计四个出料口。The bottom of the silo is double-corridor and four-point feeding, and the method of multi-corridor and multi-point feeding can also be adopted, which reduces the height of the coal bin cone, increases the emptying rate in the bin, and reduces the basic investment cost of. The so-called four-point feeding means that four cone buckets are set at the bottom of the bin, and the bottom of the cone bucket is set with a discharge port, a total of four discharge ports.

本实用新型的优点为,结构简单,仓体稳固,能够隔热保温,防止内部煤炭结冻或自燃;降低贮煤损耗,而且能够增大了仓内的卸空率,降低了基础投资费用,具体为:The utility model has the advantages of simple structure, stable warehouse body, heat insulation and heat preservation, preventing internal coal freezing or spontaneous combustion; reducing coal storage loss, increasing the emptying rate in the warehouse, and reducing basic investment costs. Specifically:

仓体采用钢板焊接式或螺栓装置式连接,仓顶采用圆弧锥顶,从结构上弧形顶比平顶和锥顶承载能力更强,仓体更稳固;仓外壁包一层彩钢复合保温系统起到隔热保温的作用,防止内部煤炭结冻或自燃;为了降低煤炭仓锥体高度,仓体锥斗采用多廊道多点下料的方式,增大了仓内的卸空率,降低了基础投资的费用;仓底部环库内侧一周安装通风管道,库顶设置引风机,在仓内换气时开启,防止一氧化碳和甲烷可燃气体滞留库内,留下安全隐患,对比充氮保护投资更省;每个锥斗底部距离出料口1米处安装空气炮或流化 装置,在煤炭结拱时开启,起到破拱的作用;煤仓的顶部安装一个插入式除尘器,在进料时启动,防止煤粉飞扬;库顶还安装呼吸孔、一氧化碳检测器和料位器,呼吸孔起到平衡外界与仓内压力的作用,一氧化碳检测器用来检测仓内一氧化碳浓度,当超过安全浓度时,会自动报警,料位计是用来监测仓内存煤高度,利于进仓和出仓的操作。当煤炭进料时开启除尘器,雷达式料位计监测煤炭在仓内的高度,当进料结束时,关闭除尘器。在储存期间,当仓内一氧化碳浓度高于安全浓度值时,一氧化碳检测器会自动报警,工作人员可以开启仓内通风系统进行换气,降低仓内一氧化碳的浓度,降低到安全浓度后关闭通风系统;当煤炭出仓时如发现筒仓结拱不出料,相应的启动空气炮或流化装置进行破拱,使煤炭出料流畅。The warehouse body is connected by steel plate welding or bolt device, and the warehouse roof adopts a circular arc cone roof. From the structural point of view, the arc roof has a stronger bearing capacity than the flat roof and the cone roof, and the warehouse body is more stable; the outer wall of the warehouse is covered with a layer of color steel composite. The heat preservation system plays the role of heat insulation to prevent the internal coal from freezing or spontaneous combustion; in order to reduce the height of the coal bin cone, the bin body cone adopts the method of multi-corridor and multi-point feeding, which increases the emptying rate in the bin , which reduces the cost of basic investment; ventilation ducts are installed around the inner side of the warehouse at the bottom of the warehouse, and induced draft fans are installed on the top of the warehouse, which are turned on during ventilation in the warehouse to prevent carbon monoxide and methane from staying in the warehouse and leaving potential safety hazards. Compared with nitrogen filling The protection of investment is more economical; the bottom of each cone bucket is 1 meter away from the discharge port , and an air cannon or a fluidization device is installed, which is opened when the coal is arched, and plays the role of breaking the arch; the top of the coal bunker is installed with a plug-in dust collector, It is activated when feeding materials to prevent the pulverized coal from flying; a breathing hole, a carbon monoxide detector and a material level sensor are also installed on the top of the warehouse. The breathing hole plays the role of balancing the pressure between the outside world and the warehouse. When the safe concentration is exceeded, it will automatically alarm. The material level gauge is used to monitor the height of coal stored in the warehouse, which is beneficial to the operation of entering and exiting the warehouse. When the coal is fed, the dust collector is turned on, and the radar level gauge monitors the height of the coal in the bin. When the feeding is over, the dust collector is turned off. During the storage period, when the concentration of carbon monoxide in the warehouse is higher than the safe concentration value, the carbon monoxide detector will automatically alarm, and the staff can open the ventilation system in the warehouse for ventilation, reduce the concentration of carbon monoxide in the warehouse, and close the ventilation system after it is reduced to a safe concentration ; When the coal is out of the warehouse, if it is found that the silo is arched and no material is discharged, the air cannon or fluidization device is correspondingly activated to break the arch, so that the coal can be discharged smoothly.

附图说明:Description of drawings:

图1为本实用新型的剖视图。Fig. 1 is a sectional view of the utility model.

图2为本实用新型的通风管的仰视图。Fig. 2 is a bottom view of the ventilation pipe of the present invention.

图3为本实用新型的仓底的俯视图。Fig. 3 is a plan view of the bottom of the warehouse of the present invention.

附图标识:Drawing logo:

1、呼吸孔     2、一氧化碳检测器  3、雷达式料位器1. Breathing hole 2. Carbon monoxide detector 3. Radar level sensor

4、除尘器     5、引风机          6、仓顶.4. Dust collector 5. Induced fan 6. Warehouse roof.

7、仓体       8、隔热层          9、通风管.7. Warehouse body 8. Insulation layer 9. Ventilation pipe.

10、疏松装置  11、仓底           12、透孔10. Loosening device 11. Warehouse bottom 12. Through hole

13、出料口13. Outlet

具体实施方式:Detailed ways:

下面结合附图,对本实用新型进行说明。Below in conjunction with accompanying drawing, the utility model is described.

如图1-图3所示,图1为本实用新型的剖视图。图2为本实用新型的通风管的仰视图。图3为本实用新型的仓底的俯视图。As shown in Figures 1-3, Figure 1 is a cross-sectional view of the utility model. Fig. 2 is a bottom view of the ventilation pipe of the present invention. Fig. 3 is a plan view of the bottom of the warehouse of the present invention.

本实用新型包括由钢板库壁焊接或螺栓连接而成的筒状的仓体7,仓顶6和仓底11,其中,仓顶6呈弧状,仓顶6上部设置有呼吸孔1、一氧化碳检测器2、雷达式料位计3,除尘器4和引风机5,一氧化碳检测器2、除尘器4、引风机5固定安装在仓顶6的外表面,雷达式料位计3固定安装在仓顶6的内表面,呼吸孔1穿过仓顶6后使仓体7内部与外界相连通,仓顶6、仓底11与仓体7之间固定连接。仓底11上设置有若干锥斗,锥斗的底部设置有出料口13,出料口13的上方一米处安装有疏松装置10,疏松装置10与锥斗之间固定连接。钢板库壁的外壁上进一步设置有隔热层8,隔热层8与钢板库壁之间固定连接。仓底11的上部设置有通风管9,通风管9在仓底11上部盘绕成圆状,通风管9位于仓体7的内部,通风管9的下部的壁上设置有若干透孔12,透孔12与通风管9在制造时一体成型,通风管9与仓底11之间固定连接。疏松装置10为空气炮或流化装置。隔热层8为彩钢复合保温板。The utility model includes a cylindrical warehouse body 7 welded or bolted by steel plate warehouse walls, a warehouse roof 6 and a warehouse bottom 11, wherein the warehouse roof 6 is arc-shaped, and the upper part of the warehouse roof 6 is provided with a breathing hole 1, a carbon monoxide detection 2, radar level gauge 3, dust collector 4 and induced draft fan 5, carbon monoxide detector 2, dust collector 4, induced draft fan 5 are fixedly installed on the outer surface of the warehouse roof 6, and radar level gauge 3 is fixedly installed on the warehouse On the inner surface of the top 6, the breathing hole 1 passes through the top 6 so that the interior of the bin body 7 communicates with the outside world, and the top 6, the bottom 11 of the bin and the body 7 are fixedly connected. The bottom of the warehouse 11 is provided with some cone buckets, the bottom of the cone bucket is provided with a discharge port 13, and a loosening device 10 is installed one meter above the discharge port 13, and is fixedly connected between the loosening device 10 and the cone bucket. A heat insulating layer 8 is further arranged on the outer wall of the steel plate warehouse wall, and the heat insulating layer 8 is fixedly connected with the steel plate warehouse wall. The upper part of the warehouse bottom 11 is provided with a ventilation pipe 9, and the ventilation pipe 9 is coiled into a circle at the top of the warehouse bottom 11. The hole 12 and the ventilation pipe 9 are integrally formed during manufacture, and the ventilation pipe 9 is fixedly connected with the bottom 11 of the warehouse. The loosening device 10 is an air cannon or a fluidizing device. The heat insulation layer 8 is a color steel composite insulation board.

本实用新型结构简单,仓体稳固,能够隔热保温,防止内部煤炭结冻或自燃;降低贮煤损耗,而且能够增大了仓内的卸空率,降低了基础投资费用,本实用新型仓体采用钢板焊接式或螺栓装置式连接,仓顶采用圆弧锥顶,从结构上弧形顶比平顶和锥顶承载能力更强,仓体更稳固;仓外壁包一层彩钢复合保温系统起到隔热保温的作用,防止内部煤炭结冻或自燃;为了降低煤炭仓锥体高度,仓体锥斗采用多廊道多点下料的方式,增大了仓内的卸空率,降低了基础投资的费用;仓底部环库内侧一周安装通风管道,库顶设置引风机,在仓内换气时开启,防止一氧化碳和甲烷可燃气体滞留库内,留下安全隐患,对比充氮保护投资更省;每个锥斗底部距离出料口1米处安装空气炮或流化装置,在煤炭结拱时开启,起到破拱的作用;煤仓的顶部安装一个插入式除尘器,在进料时启动,防止煤粉飞扬;库顶还安装呼吸孔、一氧化碳检测器和料位器,呼吸孔起到平衡外界与仓内压力的作用,一氧化碳检测器用来检测仓内一氧化碳浓度,当超过安全浓度时,会自动报警,料位计是用来监测仓内存煤高度,利于进仓和出仓的操作。当煤炭进料时开启除尘器,雷达式料位计监测煤炭在仓内的高度,当进料结束时,关闭除尘器。在储存期间,当仓内一氧化碳浓度高于安全浓度值时,一氧化碳检测器会自动报警,工作人员可以开启仓内通风系统进行换气,降低仓内一氧化碳的浓度,降低到安全浓度后关闭通风系统;当煤炭出仓时如发现筒仓结拱不出料,相应的启动空气炮或流化装置进行破拱,使煤炭出料流畅。The utility model has the advantages of simple structure, stable warehouse body, heat insulation and heat preservation, preventing internal coal freezing or spontaneous combustion; reducing coal storage loss, increasing the emptying rate in the warehouse, and reducing basic investment costs. The body is connected by steel plate welding or bolt installation, and the roof of the warehouse adopts a circular arc cone roof. From the structural point of view, the arc roof has a stronger bearing capacity than the flat roof and the cone roof, and the warehouse body is more stable; the outer wall of the warehouse is covered with a layer of color steel composite insulation The system plays the role of heat insulation to prevent the internal coal from freezing or spontaneous combustion; in order to reduce the height of the coal bin cone, the bin body cone adopts the method of multi-corridor and multi-point feeding, which increases the emptying rate in the bin. The cost of basic investment is reduced; ventilation ducts are installed around the inner side of the warehouse at the bottom of the warehouse, and induced draft fans are installed on the top of the warehouse, which are turned on when the warehouse is ventilated to prevent carbon monoxide and methane from staying in the warehouse and leaving potential safety hazards. Compared with nitrogen filling protection Save investment; install an air cannon or a fluidization device at the bottom of each cone bucket 1 meter away from the discharge port, and open it when the coal arches, and play the role of breaking the arch; install a plug-in dust collector on the top of the coal bunker. Start when feeding to prevent coal powder from flying; breathing holes, carbon monoxide detectors and material level indicators are also installed on the top of the warehouse. The breathing holes play a role in balancing the pressure between the outside world and the warehouse. When the concentration is safe, it will automatically alarm. The material level gauge is used to monitor the height of coal stored in the warehouse, which is beneficial to the operation of entering and exiting the warehouse. When the coal is fed, the dust collector is turned on, and the radar level gauge monitors the height of the coal in the bin. When the feeding is over, the dust collector is turned off. During the storage period, when the concentration of carbon monoxide in the warehouse is higher than the safe concentration value, the carbon monoxide detector will automatically alarm, and the staff can open the ventilation system in the warehouse for ventilation, reduce the concentration of carbon monoxide in the warehouse, and close the ventilation system after it is reduced to a safe concentration ; When the coal is out of the warehouse, if it is found that the silo is arched and no material is discharged, the air cannon or fluidization device is correspondingly activated to break the arch, so that the coal can be discharged smoothly.

Claims (5)

1. a coal stores the steel plate storehouse, the warehouse that comprises the tubular that is formed by connecting by the welding of steel plate storehouse wall or bolt, at the bottom of Cang Ding and the storehouse, it is characterized in that, described Cang Ding is arcuation, described Cang Ding top is provided with spiracle, carbon monoxide detector, the radar type level-sensing device, dust exhaustor and induced draft fan, described carbon monoxide detector, described dust exhaustor, described induced draft fan is fixedly mounted on the outside face of Cang Ding, described radar type level-sensing device is fixedly mounted on the inside face of described Cang Ding, described spiracle makes warehouse inside be connected described Cang Ding with the external world after passing Cang Ding, captive joint at the bottom of the described storehouse with between the described warehouse.
2. store the steel plate storehouse according to the described coal of claim 1, it is characterized in that be provided with some awl buckets at the bottom of the described storehouse, the bottom of described awl bucket is provided with discharging opening, one meter, the top of discharging opening is equipped with loose device, captives joint between described loose device and the described awl bucket.
3. store the steel plate storehouse according to the described coal of claim 1, it is characterized in that, further be provided with thermal insulation layer on the outer wall of described steel plate storehouse wall, captive joint between described thermal insulation layer and the described steel plate storehouse wall.
4. store the steel plate storehouse according to the arbitrary described coal of claim 1-3, it is characterized in that, top at the bottom of the described storehouse is provided with breather pipe, described breather pipe is upper disc coiled circle shape at the bottom of the storehouse, described breather pipe is positioned at the inside of warehouse, the wall of the bottom of described breather pipe is provided with some open-works, and described open-work and described breather pipe are one-body molded during fabrication, described breather pipe with at the bottom of the described storehouse between captive joint.
5. according to right Requirement2 described coals store the steel plate storehouse, it is characterized in that described loose device is air bubble.
CN201320093645.5U 2013-02-24 2013-02-24 Steel plate warehouse for storing coal Expired - Fee Related CN203111846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320093645.5U CN203111846U (en) 2013-02-24 2013-02-24 Steel plate warehouse for storing coal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320093645.5U CN203111846U (en) 2013-02-24 2013-02-24 Steel plate warehouse for storing coal

Publications (1)

Publication Number Publication Date
CN203111846U true CN203111846U (en) 2013-08-07

Family

ID=48892216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320093645.5U Expired - Fee Related CN203111846U (en) 2013-02-24 2013-02-24 Steel plate warehouse for storing coal

Country Status (1)

Country Link
CN (1) CN203111846U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104261015A (en) * 2014-09-19 2015-01-07 中冶长天国际工程有限责任公司 Stock bin for storing granulated materials and desorption tower device with stock bin
CN105501714A (en) * 2015-12-28 2016-04-20 莱歇研磨机械制造(上海)有限公司 Inflammable explosive powder storage system
CN106516545A (en) * 2016-11-12 2017-03-22 山东华建仓储装备科技有限公司 Novel biomass pellet fuel warehousing device system
CN108438562A (en) * 2018-04-10 2018-08-24 厦门环资矿业科技股份有限公司 A kind of material guide device that ore storage bin blocks
CN110104349A (en) * 2018-09-29 2019-08-09 张兆雷 Automatic loaded material radar surveys material position storage equipment
CN110683222A (en) * 2019-11-19 2020-01-14 中冶北方(大连)工程技术有限公司 Double-cone powder bin and process method thereof
CN113023131A (en) * 2021-03-23 2021-06-25 华能国际电力股份有限公司上海石洞口第一电厂 Ventilation and blanking device for coal storage Euro bin

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104261015A (en) * 2014-09-19 2015-01-07 中冶长天国际工程有限责任公司 Stock bin for storing granulated materials and desorption tower device with stock bin
CN105501714A (en) * 2015-12-28 2016-04-20 莱歇研磨机械制造(上海)有限公司 Inflammable explosive powder storage system
CN106516545A (en) * 2016-11-12 2017-03-22 山东华建仓储装备科技有限公司 Novel biomass pellet fuel warehousing device system
CN108438562A (en) * 2018-04-10 2018-08-24 厦门环资矿业科技股份有限公司 A kind of material guide device that ore storage bin blocks
CN110104349A (en) * 2018-09-29 2019-08-09 张兆雷 Automatic loaded material radar surveys material position storage equipment
CN110683222A (en) * 2019-11-19 2020-01-14 中冶北方(大连)工程技术有限公司 Double-cone powder bin and process method thereof
CN113023131A (en) * 2021-03-23 2021-06-25 华能国际电力股份有限公司上海石洞口第一电厂 Ventilation and blanking device for coal storage Euro bin

Similar Documents

Publication Publication Date Title
CN203111846U (en) Steel plate warehouse for storing coal
CN201458374U (en) Combined coal powder storage and supply system
CN101575057B (en) Combined coal powder storage and supply system
CN104944010A (en) Large steel plate coal house
CN202022497U (en) Powdery material unloading and conveying device in silo
CN203359253U (en) Rotary-cut unblocking machine
CN205240475U (en) Combined storage structure of semi-underground row warehouse and wall warehouse
CN202046613U (en) Internal material conveying structure of silo
CN103057876A (en) Large coal ash storage tank and coal ash storage system
CN202767603U (en) Novel multipoint blanking steel plate storage
CN206352413U (en) A kind of new multiple spot multi-pipeline granular material storage steel plate storehouse
CN204907231U (en) Ventilation formula unprocessed food grains storage equipment
CN201458106U (en) Feeding storehouse capable of weighting coal power
CN205441508U (en) Inflammable and explosive powder memory system
CN105501714B (en) A kind of inflammable and explosive powder material storage system
CN204201915U (en) With the fuel boiler dust separation collection facility of thermal insulation layer
CN201152048Y (en) Rectangular storehouse structure
CN207293085U (en) A kind of dredging system for rotating coal scuttle and being combined with air bubble
CN209814808U (en) Flat plate base type discharging pressure-reducing bin bottom air charging device
CN105460440B (en) A kind of powder cabin helps streaming system
CN204776866U (en) Large -scale steel sheet coal -hole
CN105460442B (en) A kind of powder cabin heat tracing helps streaming system
CN205345863U (en) Powder storehouse companion's heat helps a class system
CN207700808U (en) A kind of semi-underground type warehouse of novel carrying device interlayer
CN105151628A (en) Stock yard

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20190618

Granted publication date: 20130807

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20220618

Granted publication date: 20130807

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807