CN203099788U - Horizontal double-furnace pulverized coal boiler - Google Patents

Horizontal double-furnace pulverized coal boiler Download PDF

Info

Publication number
CN203099788U
CN203099788U CN 201220684819 CN201220684819U CN203099788U CN 203099788 U CN203099788 U CN 203099788U CN 201220684819 CN201220684819 CN 201220684819 CN 201220684819 U CN201220684819 U CN 201220684819U CN 203099788 U CN203099788 U CN 203099788U
Authority
CN
China
Prior art keywords
collection case
horizontal
cylindrical shell
membrane wall
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220684819
Other languages
Chinese (zh)
Inventor
吴星
徐慧
潘红秋
周海能
王改
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Juneng Environmental Protection Technology Co ltd
Original Assignee
HANGZHOU JUNENG BOILER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU JUNENG BOILER CO Ltd filed Critical HANGZHOU JUNENG BOILER CO Ltd
Priority to CN 201220684819 priority Critical patent/CN203099788U/en
Application granted granted Critical
Publication of CN203099788U publication Critical patent/CN203099788U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a horizontal double-furnace pulverized coal boiler which comprises a shell barrel and an outer hang barrel. The shell barrel is provided with double furnaces, a front tube plate, a rear tube plate, a front smoke box, a rotary combustor with a membrane wall, an outer wrapping plate and a second return smoke tube, and the second return smoke tube is arranged below the double furnaces; a third return smoke tube is arranged in the outer hang barrel and is communicated with the front smoke box via a flue; a smoke outlet is further arranged on the outer hang barrel; and the outer hang barrel is communicated with a water channel in the shell barrel via an extraction tube. The horizontal double-furnace pulverized coal boiler has the advantages that a horizontal double-furnace structural arrangement mode is adopted, and the double furnaces are arranged on the upper side of the horizontal double-furnace pulverized coil boiler while the smoke tubes are arranged on the lower side of the horizontal double-furnace pulverized coal boiler, so that smoke can be circulated smoothly, and the horizontal double-furnace pulverized coal boiler is compact in integral structure, simple in appearance and arrangement, small in occupied area and low in steel consumption, and can be transported integrally.

Description

A kind of horizontal twin furnace courage pulverized-coal fired boiler
Technical field
The utility model belongs to the coal-burned industrial boiler field, and being specifically related to a kind of is fuel with the coal dust, is used to produce the horizontal internal combustion pulverized-coal fired boiler of steam.
Background technology
The energy resource structure of China is based on coal, and in the following long duration, coal-burned industrial boiler will be the leading products of Industrial Boiler.
Traditional industry coal-boiler is based on grate firing boiler, and shortcoming is that efficiency of combustion is low, and is seriously polluted, is difficult to satisfy energy-saving and emission-reduction and pollutant emission requirement.
Coal dust firing is one of high performance clean burning mode of coal, and its efficiency of combustion can reach more than 96%, is the combustion technology of a maturation.Yet, the boiler that is exclusively used in coal dust firing is not arranged at present as yet.
Existing burning is oil-burning gas-fired boiler normally, is example with the WNS type, is horizontal fast-assembling internal combustion three backhaul multitubular boilers, adopts biasing flue wetting back-type structure, and high-temperature flue gas washes away second and third backhaul smoke pipe successively, enters atmosphere by rear smoke chamber through chimney then.
See figures.1.and.2, its structure comprises shell cylindrical shell 1 ' and boiler foundation 11 ', be provided with corrugated internal furnace 2 ' in the described shell cylindrical shell 1 ', the chamber 3 ' of strile-bacing, front tube sheet 4 ', back tube sheet 5 ', the second backhaul smoke pipe 6 ', the 3rd backhaul smoke pipe 7 ', front smoke box 8 ' and back smoke box 9 ', the two ends of described corrugated internal furnace 2 ' the second backhaul smoke pipe 6 ' and the 3rd backhaul smoke pipe 7 ' are fixed in the described boiler barrel 1 ' with back tube sheet 5 ' by described front tube sheet 4 '; The rear end of described corrugated internal furnace 2 ' is by described chamber 3 ' and the described second backhaul smoke pipe 6 ' UNICOM of strile-bacing; Described second backhaul smoke pipe 6 ' and the 3rd backhaul smoke pipe 7 ' are arranged on the upside of described corrugated internal furnace 2 ', and by described front smoke box 8 ' UNICOM; Described front smoke box 8 ' and back smoke box 9 ' are separately positioned on 1 ' front and back end of described boiler barrel, and described back smoke box 9 ' is provided with outlet flue 10 '; Described boiler foundation 11 ' is arranged on the bottom of shell cylindrical shell 1 '.
Can there be following problem in the oil-burning gas-fired boiler of said structure when carrying out coal dust firing:
1, rated power undercapacity: because the furnace cavity deficiency, the heat exchange effect is bad, and actual power can only reach half of rated power usually.
2, easily coking: when coal dust firing, in carbonisation, can be converted into tar.A large amount of tar is bonded on the furnace wall, can reduce the capacity of flue, thereby reduces the generating capacity of steam, and then reduces heat exchange efficiency.
3 if increase steam production, then must increase the capacity of flue, can increase the volume of boiler thus.Yet when the volume of boiler was increased to a certain degree, difficulty of processing can significantly increase, and can cause and can't transport.
4, collection ash: no soot blower in the drum, produced behind the coal dust firing that a large amount of flying dusts is deposited in flue, strile-back chamber and smoke pipe inside, can cause the flue gas short circuit.
5, wearing and tearing: because of there not being flying dust in the flue gas substantially, velocity of flue gas is very fast, and smoke pipe is not had wearing and tearing during the oil gas boiler design, but produce a large amount of flue gases behind the coal-fired powder, contain flying dust in the flue gas, too soon to the tube interior serious wear, the smoke pipe import will add Antiwear casing as velocity of flue gas.
Summary of the invention
The problems referred to above that prior art to be solved in the utility model exists aim to provide a kind of novel horizontal twin furnace courage pulverized-coal fired boiler.
For solving the problems of the technologies described above, the utility model is by the following technical solutions: a kind of horizontal twin furnace courage pulverized-coal fired boiler, comprise shell cylindrical shell and plug-in cylindrical shell, be provided with twin furnace courage, front tube sheet, back tube sheet, front smoke box, membrane wall strile-back chamber, skin plating and the second backhaul smoke pipe in the described shell cylindrical shell, the described twin furnace courage and the second backhaul smoke pipe are fixed in the described shell cylindrical shell by described front tube sheet and back tube sheet; Described front smoke box and skin plating are separately positioned on described boiler barrel front and back end; The front end of the described second backhaul smoke pipe and described front smoke box UNICOM, the rear end is by described membrane wall strile-back chamber and described twin furnace courage UNICOM; It is characterized in that:
Described membrane wall strile-backs that the chamber comprises vertical collection case, goes up horizontal collection case, left and right sides membrane wall, back membrane wall, horizontal collection case and vertical down collection case down, described vertical collection case is connected with the boiler back tube sheet respectively with the following vertical case that collects, described horizontal collection case is connected with last vertical collection case and conducting, described horizontal collection case down is connected and conducting with down vertical collection case, vertical collection case and vertical down collection case in the membrane wall UNICOM of the described left and right sides, horizontal collection case and horizontal collection case down in the membrane wall UNICOM of described back, described water route UNICOM of vertical collection case and shell cylindrical shell;
Described two return smoke pipe is arranged on the downside of described twin furnace courage; Be provided with the 3rd backhaul smoke pipe in the described plug-in cylindrical shell, described the 3rd backhaul smoke pipe is by flue and described front smoke box UNICOM; Also be provided with outlet flue on the plug-in cylindrical shell; Described plug-in cylindrical shell is by the water route UNICOM of fairlead and shell cylindrical shell.
Horizontal twin furnace courage pulverized-coal fired boiler of the present utility model, coal dust borrow a wind to spray in the twin furnace courage by burner, and simultaneously, tertiary air is spirt twin furnace courage in proportion, have guaranteed that the twin furnace courage has sufficient oxygen and fuel reaction burning.High-temperature flue gas after the heat exchange of twin furnace courage internal combustion enters the membrane wall chamber of strile-bacing and transfers 180 ° again and enter the second backhaul smoke pipe downwards and carry out heat convection, and flue gas is undertaken entering flue gas purification system from outlet flue behind the heat convection by the 3rd backhaul smoke pipe that flue enters the outside again.Solid particle in the flue gas is eliminated, and discharge index meets national standard.
The utlity model has following advantage:
1) the horizontal twin furnace bladder structure layout of employing in the boiler barrel, and twin furnace courage is last, and smoke pipe makes the flue gas circulation smooth and easy down, and compact overall structure, profile are arranged simply, floor space is little, and steel consumes low, can realize whole Transporting.
2) membrane wall structure is adopted in the chamber of strile-bacing, and so-called membrane wall is the water-cooling wall that connects into a sealing with pipe and band steel, so furnace wall only needs insulation material, and integral sealing, good heat insulating are leaked out less.
3) volume of boiler barrel part is less, and the production cycle is short, and is easy for installation, easy to operate and accumulating.
As further improvement of the utility model, described second backhaul smoke pipe and the 3rd backhaul smoke pipe adopt the threaded flue structure.Convection heating surface adopts threaded flue, the heating surface abundance, and sweep of gases is smooth and easy, is difficult for dust stratification, prolonged boiler service life.
Further improve as of the present utility model, the described pattern wall bottom, chamber of strile-bacing also is provided with ash port again.
Further improve as of the present utility model, the strile-back rear end of chamber of described membrane wall also is provided with explosion proof door, makes the utility model safer again.
Further improve as of the present utility model, the strile-back rear end of chamber of described membrane wall also is provided with and blows ash mouthful again.
Further improve as of the present utility model, described plug-in cylindrical shell is set in parallel in the outside of described shell cylindrical shell again.
Further improve as of the present utility model, adopt grading combustion technology, send into tertiary air in the burner hearth successively, whole temperature field is even, can effectively stop the generation of burner hearth coking and reduction nitrogen oxide.
Description of drawings
Fig. 1 is the structural representation of existing WNS type oil-burning gas-fired boiler.
Fig. 2 be Fig. 1 A to B-B to view, wherein a left side half view of Fig. 2 be the A of Fig. 1 to view, the right side half view of Fig. 2 is that the B-B of Fig. 1 is to cutaway view.
Fig. 3 is a horizontal twin furnace courage pulverized-coal fired boiler structure chart of the present utility model.
Fig. 4 be the C of Fig. 3 to view, wherein the bottom support seat and does not show.
Fig. 5 be the D of Fig. 3 to view, wherein the bottom support seat and does not show.
Fig. 6 is the vertical view of Fig. 3.
Fig. 7 is the strile-back structural representation of chamber of membrane wall.
Fig. 8 is the right view of Fig. 7.
Among the figure, strile-back horizontal collection case under membrane wall behind the last vertical collection case in chamber, 7-skin plating, 8-ash port, the 9-second backhaul smoke pipe, 10-flue, the plug-in cylindrical shell of 11-, 12-the 3rd backhaul smoke pipe, 13-outlet flue, 14-front tube sheet, 15-back tube sheet, 16-fairlead, 61-, the last horizontal collection case of 62-, 63-left and right sides membrane wall, the 64-, the 65-, the vertical down collection case of 66-, the explosion-proof doorway of 67-, 68-of 1-shell cylindrical shell, 2-twin furnace courage, 3-front tube sheet, 4-back tube sheet, 5-front smoke box, 6-membrane wall blows the ash mouth.
The specific embodiment
Referring to figs. 1 through Fig. 6, a kind of horizontal twin furnace courage pulverized-coal fired boiler of the present utility model, comprise shell cylindrical shell 1 and plug-in cylindrical shell 11, be provided with twin furnace courage 2, front tube sheet 3, back tube sheet 4, front smoke box 5, membrane wall strile-back chamber 6, skin plating 7 and the second backhaul smoke pipe 9 in the described shell cylindrical shell 1, the described twin furnace courage 2 and the second backhaul smoke pipe 9 are fixed in the described shell cylindrical shell 1 by described front tube sheet 3 and back tube sheet 4; Described front smoke box 6 and skin plating 7 are separately positioned on described boiler barrel 1 front and back end; The front end of the described second backhaul smoke pipe 9 and described front smoke box 5 UNICOMs, the rear end is by described membrane wall strile-back chamber 6 and described twin furnace courage 2 UNICOMs; Described two return smoke pipe 9 is arranged on the downside of described twin furnace courage 2; Described membrane wall 6 bottoms, chamber of strile-bacing also are provided with ash port 8.
With reference to Fig. 7 and Fig. 8, the described membrane wall chamber 6 of strile-bacing comprises vertical collection case 61, go up horizontal collection case 62, left and right sides membrane wall 63, back membrane wall 64, down horizontal collection case 65 and down vertical collection case 66, described vertical collection case 61 is connected with boiler back tube sheet 4 respectively with the following vertical case 66 that collects, described horizontal collection case 62 is connected with last vertical collection case 61 and conducting, described horizontal collection case 65 down is connected and conducting with down vertical collection case 66, vertical collection case 61 and down vertical collection case 66 in membrane wall 63 UNICOMs of the described left and right sides, horizontal collection case 62 and horizontal collection case 65 down in the membrane wall UNICOM of described back, described water route UNICOM of vertical collection case 61 and shell cylindrical shell 1.The strile-back rear end of chamber 6 of described membrane wall also is provided with explosion proof door 67 and blows ash mouthfuls 68.
Be provided with the 3rd backhaul smoke pipe 12 in the described plug-in cylindrical shell 11, described the 3rd backhaul smoke pipe 12 is by flue 10 and described front smoke box 5 UNICOMs.Described the 3rd backhaul smoke pipe 12 can be fixed in the plug-in cylindrical shell 11 by front tube sheet 14 and back tube sheet 15.Water-injecting cavity between the tube bank of the barrel of plug-in cylindrical shell 11 and the 3rd backhaul smoke pipe 12 is by the water route UNICOM of fairlead 16 with shell cylindrical shell 1.Also be provided with outlet flue 13 on the plug-in cylindrical shell 11.Described plug-in cylindrical shell 11 is set in parallel in the outside of described shell cylindrical shell 1.
Described second backhaul smoke pipe 9 and the 3rd backhaul smoke pipe 12 are made of a plurality of convection banks, and the threaded flue structure is adopted in described convection bank.
Operation principle of the present utility model is as follows:
Horizontal twin furnace courage pulverized-coal fired boiler of the present utility model, coal dust borrow a wind to spray in the twin furnace courage 2 by burner, and simultaneously, tertiary air is spirt twin furnace courage 2 in proportion, have guaranteed that twin furnace courage 2 has sufficient oxygen and fuel reaction burning.High-temperature flue gas after the 2 internal combustion heat exchange of twin furnace courage enters membrane wall chamber 6 convection bank that enters the second backhaul smoke pipe 9 downwards of transferring again 180 ° of strile-bacing and carries out heat convection, heat convection is carried out in the convection bank that enters the 3rd backhaul smoke pipe 12 in the plug-in cylindrical shell 11 by flue 10 flue gases again, enters flue gas purification system from outlet flue 13 at last.
Shell cylindrical shell 1, membrane wall chamber 6 and the plug-in cylindrical shell 11 that strile-back constitutes the water system of sealing.Water injects earlier in the plug-in cylindrical shell 11, is connected to shell cylindrical shell 1 through heat convection through fairlead 16, and the part steam water interface enters from the membrane wall chamber 6 next part casees that strile-back, and is pooled to upper collecting chamber along membrane wall, enters shell cylindrical shell 1 again.Steam is drawn boiler and was advanced carbonated drink separation, has improved the quality of steam greatly.
Membrane wall strile-backs, and to follow process as follows for water routes in the chamber 6: the water in the shell cylindrical shell 1 at first enters down the vertical case 66 that collects, the water of vertical down collection case 66 enters left and right sides membrane wall 33 and following horizontal collection case 65 respectively, horizontal collection case 65 water enter horizontal collection case 62 by back membrane wall 64 down, the water of going up horizontal collection case 62 flows into goes up vertical collection case 61, simultaneously left and right sides membrane wall 63 waterborne is raised to the vertical case 61 that collects and converges, the water of going up vertical collection case 61 at last flows in the drum, has finished whole water circulation.
What should be understood that is: the foregoing description is just to explanation of the present utility model, rather than to restriction of the present utility model, any utility model that does not exceed in the utility model connotation scope is created, and all falls within the protection domain of the present utility model.

Claims (6)

1. horizontal twin furnace courage pulverized-coal fired boiler, comprise shell cylindrical shell (1) and plug-in cylindrical shell (11), be provided with twin furnace courage (2), front tube sheet (3), back tube sheet (4), front smoke box (5), membrane wall strile-back chamber (6), skin plating (7) and the second backhaul smoke pipe (9) in the described shell cylindrical shell (1), the described twin furnace courage (2) and the second backhaul smoke pipe (9) are fixed in the described shell cylindrical shell (1) by described front tube sheet (3) and back tube sheet (4); Described front smoke box (5) and skin plating (7) are separately positioned on described boiler barrel (1) front and back end; The front end of the described second backhaul smoke pipe (9) and described front smoke box (5) UNICOM, the rear end is by described membrane wall strile-back chamber (6) and described twin furnace courage (2) UNICOM; It is characterized in that:
The described membrane wall chamber (6) of strile-bacing comprises vertical collection case (61), go up horizontal collection case (62), left and right sides membrane wall (63), back membrane wall (64), horizontal collection case (65) and following indulging collect case (66) down, the described vertical collection case (61) of is connected with boiler back tube sheet (4) respectively with following vertical collection case (66), the described horizontal collection case (62) of is connected also conducting with last vertical collection case (61), described horizontal collection case (65) down is connected and conducting with following vertical collection case (66), vertical collection case (61) and down vertical collection case (66) in described left and right sides membrane wall (63) UNICOM, horizontal collection case (62) and horizontal collection case (65) down in the membrane wall UNICOM of described back, described water route UNICOM of vertical collection case (61) and shell cylindrical shell (1);
Described two return smoke pipe (9) is arranged on the downside of described twin furnace courage (2); Be provided with the 3rd backhaul smoke pipe (12) in the described plug-in cylindrical shell (11), described the 3rd backhaul smoke pipe (12) is by flue (10) and described front smoke box (5) UNICOM; Also be provided with outlet flue (13) on the described plug-in cylindrical shell (11); Described plug-in cylindrical shell (11) is by the water route UNICOM of fairlead (16) with shell cylindrical shell (1).
2. a kind of horizontal twin furnace courage pulverized-coal fired boiler as claimed in claim 1 is characterized in that described second backhaul smoke pipe (9) and the 3rd backhaul smoke pipe (12) adopt the threaded flue structure.
3. a kind of horizontal twin furnace courage pulverized-coal fired boiler as claimed in claim 1 is characterized in that strile-back chamber (7) bottom of described membrane wall also is provided with ash port (8).
4. a kind of horizontal single flue pulverized-coal fired boiler as claimed in claim 1 is characterized in that the strile-back rear end of chamber (6) of described membrane wall also is provided with explosion proof door (67).
5. a kind of horizontal single flue pulverized-coal fired boiler as claimed in claim 1 is characterized in that the strile-back rear end of chamber (6) of described membrane wall also is provided with and blows ash mouthful (68).
6. as any one described a kind of horizontal twin furnace courage pulverized-coal fired boiler of claim 1-5, it is characterized in that described plug-in cylindrical shell (11) is set in parallel in the outside of described shell cylindrical shell (1).
CN 201220684819 2012-12-12 2012-12-12 Horizontal double-furnace pulverized coal boiler Expired - Lifetime CN203099788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220684819 CN203099788U (en) 2012-12-12 2012-12-12 Horizontal double-furnace pulverized coal boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220684819 CN203099788U (en) 2012-12-12 2012-12-12 Horizontal double-furnace pulverized coal boiler

Publications (1)

Publication Number Publication Date
CN203099788U true CN203099788U (en) 2013-07-31

Family

ID=48851186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220684819 Expired - Lifetime CN203099788U (en) 2012-12-12 2012-12-12 Horizontal double-furnace pulverized coal boiler

Country Status (1)

Country Link
CN (1) CN203099788U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103032865A (en) * 2012-12-12 2013-04-10 杭州燃油锅炉有限公司 Horizontal pulverized coal fired boiler with two furnace pipes
CN104110673A (en) * 2014-07-22 2014-10-22 江苏双良锅炉有限公司 Double-flue reversal chamber of large horizontal fire-tube boiler
CN104110669A (en) * 2014-07-22 2014-10-22 江苏双良锅炉有限公司 Large horizontal fire-tube double-flue single-reversal-chamber boiler

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103032865A (en) * 2012-12-12 2013-04-10 杭州燃油锅炉有限公司 Horizontal pulverized coal fired boiler with two furnace pipes
CN104110673A (en) * 2014-07-22 2014-10-22 江苏双良锅炉有限公司 Double-flue reversal chamber of large horizontal fire-tube boiler
CN104110669A (en) * 2014-07-22 2014-10-22 江苏双良锅炉有限公司 Large horizontal fire-tube double-flue single-reversal-chamber boiler
CN104110669B (en) * 2014-07-22 2016-03-30 江苏双良锅炉有限公司 Large-size horizontal fire tube dual-furnace-chamber list return combustion chamber boiler

Similar Documents

Publication Publication Date Title
CN102644911A (en) Vertical coal dust corner tube boiler
CN101957059A (en) Full reverse convection unsealed water tube boiler
CN203099788U (en) Horizontal double-furnace pulverized coal boiler
CN203203004U (en) Horizontal type coal water slurry fired boiler
CN203099786U (en) Horizontal single-furnace pulverized coal boiler
CN103047638B (en) Horizontal type two-channel pulverized coal fired boiler
CN103032865A (en) Horizontal pulverized coal fired boiler with two furnace pipes
CN202902245U (en) Upright-type coal powder corner-tube boiler
CN103062746B (en) Horizontal type pulverized coal boiler with single furnace pipe
CN202350105U (en) Dual-purpose electronic temperature-controlled constant-temperature boiler using biomass fuel and coal
CN202902244U (en) Horizontal single-furnace-liner fire pipe type pulverized coal boiler
CN203099787U (en) Horizontal double-channel pulverized coal boiler
CN203203006U (en) Upright pulverized coal corner tube type boiler
CN103032864A (en) Vertical coal powder corner tube boiler
CN201066195Y (en) Horizontal type reverse-combusting coal-firing boiler
CN201764676U (en) Carbonized gas mixed-combustion normal pressure boiler
CN103062747A (en) Vertical type coal dust corner tube boiler
CN206018716U (en) A kind of full gasification counter-combustion energy-saving cooking stove
CN104359099A (en) Three-return-stroke powder steam boiler
CN203203007U (en) Upright pulverized coal corner tube type boiler
CN201074840Y (en) Horizontal water-fire pipe dual-fire-grate inverse-burning boiler
CN203203009U (en) Vertical modularized coal water slurry corner tube boiler
CN203615313U (en) LHH-type vertical-type multi-pass steam boiler
CN103134036A (en) Vertical type modular coal water slurry corner tube boiler
CN202125941U (en) Horizontal backfire coal burning boiler with double-layer water pipe grate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Hangzhou City, Zhejiang province 311115 Fengdu Pingyao Town, Yuhang District Industrial Zone Road, Yangcheng Road No. 1-9

Patentee after: HANGZHOU JUNENG ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Address before: Hangzhou City, Zhejiang province 311115 Fengdu Pingyao Town, Yuhang District Industrial Zone Road, Yangcheng Road No. 1-9

Patentee before: HANGZHOU JUNENG BOILER Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130731