CN203064982U - Transporting device for mountain high slope construction materials - Google Patents

Transporting device for mountain high slope construction materials Download PDF

Info

Publication number
CN203064982U
CN203064982U CN 201220739671 CN201220739671U CN203064982U CN 203064982 U CN203064982 U CN 203064982U CN 201220739671 CN201220739671 CN 201220739671 CN 201220739671 U CN201220739671 U CN 201220739671U CN 203064982 U CN203064982 U CN 203064982U
Authority
CN
China
Prior art keywords
slope
high slope
dolly
construction material
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220739671
Other languages
Chinese (zh)
Inventor
刘勇
廖纪明
王竺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN 201220739671 priority Critical patent/CN203064982U/en
Application granted granted Critical
Publication of CN203064982U publication Critical patent/CN203064982U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a transporting device for mountain high slope construction materials. The transporting device for the mountain high slope construction materials comprises a rail extending along the slope face of a high slope, a trolley arranged on the rail and used for transporting the construction materials and a pulling device pulling the trolley to slide along the rail. The pulling device is arranged at the top of the high slope. The trolley is provided with a pulling rope and connected with the pulling device through the pulling rope. The transporting device for the mountain high slope construction materials is simple in structure. When the slope face of the high slope needs construction, the construction materials are firstly placed in the trolley, then the pulling device is started so that the trolley is pulled to a construction position, finally the construction materials in the trolley are unloaded to the construction position, and transportation of the construction materials is completed. Compared with the prior, the transporting device for the mountain high slope construction materials is used for transporting the construction materials, operation is convenient and rapid and transporting efficiency is high.

Description

The conveying arrangement of massif side slope construction material
Technical field
The utility model relates to engineering machinery field, especially, relates to a kind of conveying arrangement of massif side slope construction material.
Background technology
In the work progress of highway or town road, because change of topography, the highway layout absolute altitude is general different with the ground absolute altitude, so embankment often occurs, the cutting phenomenon, changed the natural state of equilibrium on former stratum, and because embankment, cutting is exposed in the natural environment, be subjected to the influence of various natural causes for a long time, easily cause the ground body deformability, mobile, thus the stable of side slope destroyed, for guaranteeing the stable of roadbed and preventing and treating various subgrade defects, except carrying out subgrade drainage work, also need in conjunction with the local hydrology, situation such as geology and material is adopted an effective measure, to all kinds of soil, the stone side slope is carried out necessary protection.At present, generally adopt crane or concrete pump truck to carry out the construction of high slope concrete support.During to the high slope concrete construction, for example: to the construction of concrete frame lattice beam or cement concrete anchor cable etc., if adopt the crane construction, generally higher because of the vertical dimension of high slope, and the domatic inclination area of high slope is generally bigger, and construction puts in place so be difficult to all; If adopt the concrete pump truck construction, then required construction cost is higher.
The utility model content
The utility model aims to provide a kind of conveying arrangement of simple in structure, easy to operate, the quick and massif side slope construction material that conveying efficiency is high, be difficult to all with what solve that existing conveying arrangement exists that construction puts required construction cost technical problems of high in place.
For achieving the above object, the utility model provides a kind of conveying arrangement of massif side slope construction material, comprises the track along the domatic extension of high slope, the dolly that is arranged at delivery construction material on the track and the draw gear that trailer wagon slides along track; Draw gear is arranged at the top, slope of high slope, has hauling rope on the dolly, and dolly links to each other with draw gear by hauling rope.
Further, track comprises many sleepers along the domatic equidistant layout of high slope, is layed in first steel pipe and second steel pipe and the fastener that slide for dolly on the sleeper; First steel pipe is fixed with an end of many sleepers by fastener simultaneously, and second steel pipe is fixed with the other end of many sleepers by fastener simultaneously.
Further, also comprise the chute assembly that construction material is directed to the construction location on the high slope in the dolly, the chute assembly is arranged on high slope domatic, and the tail end of one end and dolly joins, and its other end extends to the construction location place.
Further, the chute assembly is made by pvc pipe.
Further, also comprise fixed pulley, fixed pulley is installed on the top, slope of high slope, and hauling rope links to each other with draw gear by behind the fixed pulley.
Further, also comprise puddle mixer, puddle mixer is arranged at the toe of high slope.
Further, draw gear is winch.
The utlity model has following beneficial effect:
The conveying arrangement of massif side slope construction material of the present utility model, simple in structure; During to the domatic construction of high slope, adopt draw gear to draw the dolly that is loaded with construction material to the construction location place, not only easy to operate, quick compared to existing technology, and the conveying efficiency height.
Except purpose described above, feature and advantage, the utility model also has other purpose, feature and advantage.With reference to figure, the utility model is described in further detail below.
Description of drawings
The accompanying drawing that constitutes the application's a part is used to provide further understanding of the present utility model, and illustrative examples of the present utility model and explanation thereof are used for explaining the utility model, do not constitute improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the structural representation according to the conveying arrangement of massif side slope construction material of the present utility model;
Fig. 2 is that part A among Fig. 1 is to structural representation; And
Fig. 3 is the local structure for amplifying scheme drawing at I place among Fig. 2.
Marginal data
1, track; 11, sleeper; 12, first steel pipe; 13, second steel pipe; 14, fastener; 2, dolly; 3, draw gear; 4, chute assembly; 5, fixed pulley; 6, puddle mixer.
The specific embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is elaborated, but the multitude of different ways that the utility model can be defined by the claims and cover is implemented.
As shown in Figure 1, the conveying arrangement of a kind of massif side slope construction material of the present utility model comprises the track 1 along the domatic extension of high slope, the dolly 2 that is arranged at delivery construction material on the track 1 and the draw gear 3 that trailer wagon 2 slides along track 1; Draw gear 3 is arranged at the top, slope of high slope, has hauling rope on the dolly 2, and dolly 2 links to each other with draw gear 3 by hauling rope.According to the conveying arrangement of a kind of massif side slope construction material of the present utility model, simple in structure; When need be to domatic construction of high slope, at first construction material is contained in the dolly 2, and then startup draw gear 3 draws dolly 2 to the construction location place, again the construction materials in the dolly 2 are discharged in the construction location place at last, namely finish the transportation of construction material, compared to existing technology, adopt conveying arrangement transportation construction material of the present utility model, not only easy to operate, quick, and the conveying efficiency height.
As shown in Figures 2 and 3, particularly, track 1 comprises many sleepers 11 along the domatic equidistant layout of high slope, is layed in first steel pipe 12 and second steel pipe 13 and the fastener 14 that slide for dolly 2 on the sleeper 11, first steel pipe 12 is fixed with an end of many sleepers 11 by fastener 14 simultaneously, and second steel pipe 13 is fixed with the other end of many sleepers 11 by fastener 14 simultaneously.
Further, because high slope is domatic generally bigger, the domatic of same vertical dimension may be longer, so when construction material is the less material of cement, cement concrete, sandstone equal-volume, for splendid attires in the dolly 2 are delivered to each construction location place fast and accurately as above-mentioned construction material, conveying arrangement of the present utility model also comprises the chute assembly 4 that these construction materials is directed to the construction location on the high slope in the dolly 2, preferably, chute assembly 4 is made by pvc pipe, alleviate the weight of chute assembly 4, carry during convenient construction.During practice of construction, at first use draw gear 3 trailer wagons 2 to slide to required height along track 1, and then chute assembly 4 is carried on high slope domatic at this place, one end of chute assembly 4 and the tail end of dolly 2 are joined, the other end of chute assembly 4 extends to the construction location place, the last valve plate of opening dolly 2 afterbodys again, by the effect of chute assembly 4, can be delivered to cement, cement concrete, the less construction material of sandstone equal-volume the position of actual needs construction fast and accurately.
Further, adopt draw gear 3, preferably, draw gear 3 is generally construction machinery and equipment winch commonly used, traction delivery cement, cement concrete, when the sloping top direction of the dolly 2 of construction materials such as sandstone along track 1 to high slope slides, because cement, cement concrete, construction materials such as sandstone are generally heavier, and the gradient of high slope is generally bigger, so need bigger tractive force to slide along track 1 by trailer wagon 2, for reducing the draw gear 3 required tractive forces that are applied on the dolly 2, so conveying arrangement of the present utility model also comprises fixed pulley 5, fixed pulley 5 is installed on the top, slope of high slope, and the hauling rope on the dolly 2 links to each other with draw gear 3 by fixed pulley 5 backs.
The conveying arrangement of massif side slope construction material of the present utility model also comprises puddle mixer 6, puddle mixer 6 is arranged at the toe place of high slope, when the construction material of carrying is cement concrete or mortar, can directly pour in the dolly 2 by cement concrete or mortar that puddle mixer 6 stirs, thereby the saving haulage time is enhanced productivity.
As can be seen from the above description, the utility model the above embodiments have realized following technique effect:
The conveying arrangement of massif side slope construction material of the present utility model, simple in structure; During to the domatic construction of high slope, adopt draw gear to draw the dolly that is loaded with construction material to the construction location place, not only easy to operate, quick compared to existing technology, and the conveying efficiency height.Conveying arrangement of the present utility model also comprises the chute assembly that these construction materials is directed to the construction location on the high slope in the dolly, by the effect of chute assembly, can be delivered to cement, cement concrete, the less construction material of sandstone equal-volume the position of actual needs construction fast and accurately.
The above is preferred embodiment of the present utility model only, is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.

Claims (7)

1. the conveying arrangement of a massif side slope construction material is characterized in that,
Comprise track (1) along the domatic extension of described high slope, be arranged at described track (1) and go up the dolly (2) of the described construction material of delivery and draw the draw gear (3) that described dolly (2) slides along described track (1);
Described draw gear (3) is arranged at the top, slope of described high slope, and described dolly has hauling rope on (2), and described dolly (2) links to each other with described draw gear (3) by described hauling rope.
2. the conveying arrangement of massif side slope construction material according to claim 1 is characterized in that,
Described track (1) comprises many sleepers (11) along the domatic equidistant layout of described high slope, be layed in described sleeper (11) goes up first steel pipe (12) and second steel pipe (13) and the fastener (14) that slides for described dolly (2);
Described first steel pipe (12) is fixed with an end of many described sleepers (11) by described fastener (14) simultaneously, and described second steel pipe (13) is fixed with the other end of many described sleepers (11) by described fastener (14) simultaneously.
3. the conveying arrangement of massif side slope construction material according to claim 1 and 2, it is characterized in that, also comprise the chute assembly (4) that described construction material is directed to the construction location on the described high slope in the described dolly (2), described chute assembly (4) is arranged on described high slope domatic, the tail end of one end and described dolly (2) joins, and its other end extends to described construction location place.
4. the conveying arrangement of massif side slope construction material according to claim 3 is characterized in that, described chute assembly (4) is made by pvc pipe.
5. the conveying arrangement of massif side slope construction material according to claim 4, it is characterized in that, also comprise fixed pulley (5), described fixed pulley (5) is installed on the top, slope of described high slope, and described hauling rope links to each other with described draw gear (3) by described fixed pulley (5) back.
6. the conveying arrangement of massif side slope construction material according to claim 5 is characterized in that, also comprises puddle mixer (6), and described puddle mixer (6) is arranged at the toe of described high slope.
7. the conveying arrangement of massif side slope construction material according to claim 1 is characterized in that, described draw gear (3) is winch.
CN 201220739671 2012-12-28 2012-12-28 Transporting device for mountain high slope construction materials Expired - Fee Related CN203064982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220739671 CN203064982U (en) 2012-12-28 2012-12-28 Transporting device for mountain high slope construction materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220739671 CN203064982U (en) 2012-12-28 2012-12-28 Transporting device for mountain high slope construction materials

Publications (1)

Publication Number Publication Date
CN203064982U true CN203064982U (en) 2013-07-17

Family

ID=48763797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220739671 Expired - Fee Related CN203064982U (en) 2012-12-28 2012-12-28 Transporting device for mountain high slope construction materials

Country Status (1)

Country Link
CN (1) CN203064982U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437174A (en) * 2016-07-15 2017-02-22 中国建筑第二工程局有限公司 Rail conveying device used for inclined working plane and construction method of rail conveying device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437174A (en) * 2016-07-15 2017-02-22 中国建筑第二工程局有限公司 Rail conveying device used for inclined working plane and construction method of rail conveying device
CN106437174B (en) * 2016-07-15 2019-04-12 中国建筑第二工程局有限公司 It is a kind of for tilting the track conveying device and its construction of work surface

Similar Documents

Publication Publication Date Title
CN203284165U (en) Side slope material transporting system
CN203269274U (en) Slope section rail type conveying device
CN101914895B (en) Flat wagon for moving beam and using method thereof
CN106542283A (en) A kind of construction material track conveying device and using method for being adapted to talus side slope
CN107237649A (en) The long steep inclined shaft transportation system of light section and construction method
CN202542382U (en) Mountain high-slope construction material conveying device
CN205417623U (en) Machine is transported to long step material
CN203064982U (en) Transporting device for mountain high slope construction materials
CN206987883U (en) The long steep inclined shaft transportation system of light section
CN209398790U (en) A kind of rock anchor device traversing for cable crane main cable saddle
CN203114336U (en) Device for transporting slag discharging vehicle in inclined shaft section and steep slope section
CN203321581U (en) Material conveying device for inclined shaft
CN205636741U (en) Slope construction's building materials loading attachment
CN103362546B (en) A kind of inclined shaft conveying device and haul method thereof
CN103643678A (en) Deep-foundation-pit container-type earth excavating and transporting method
CN109372575B (en) Device and method for long-distance consignment in main drive tunnel of TBM shield
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN108899807A (en) Subway long steep grade entrance electromechanics construction method of installation
CN204506903U (en) Rail transport quick despatch car device
CN106149782B (en) A kind of mobile and combined suspension cable shovel of large span, which digs to grab, hangs traction transport system
CN201495571U (en) Special soil lifting device for topdown construction method underground excavation engineering
CN210712846U (en) Slope protection material transportation system
CN103601141A (en) Device capable of transporting materials vertically
CN206857981U (en) A kind of gantry slag bucket device that automatic clinker-removing is completed by self gravitation effect
CN204727245U (en) Side dump tipper

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20181228