CN203007825U - Bridge structure at juncture position of bridge abutment and subgrade - Google Patents

Bridge structure at juncture position of bridge abutment and subgrade Download PDF

Info

Publication number
CN203007825U
CN203007825U CN 201320029200 CN201320029200U CN203007825U CN 203007825 U CN203007825 U CN 203007825U CN 201320029200 CN201320029200 CN 201320029200 CN 201320029200 U CN201320029200 U CN 201320029200U CN 203007825 U CN203007825 U CN 203007825U
Authority
CN
China
Prior art keywords
abutment
roadbed
soil
horizontal steel
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320029200
Other languages
Chinese (zh)
Inventor
查支祥
徐志龙
张可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG PROSPERITY CONSTRUCTION CO., LTD.
Zhejiang Xinyuan Construction Co., Ltd.
Original Assignee
ZHEJIANG XINYUAN CONSTRUCTION CO Ltd
Ningbo Institute of Technology of ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XINYUAN CONSTRUCTION CO Ltd, Ningbo Institute of Technology of ZJU filed Critical ZHEJIANG XINYUAN CONSTRUCTION CO Ltd
Priority to CN 201320029200 priority Critical patent/CN203007825U/en
Application granted granted Critical
Publication of CN203007825U publication Critical patent/CN203007825U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a bridge structure at a juncture position of a bridge abutment and a subgrade, the structure includes a soil subgrade (5), a concrete pavement (6) and the bridge abutment (4), and the soil subgrade (5) is connected with the back face of the bridge abutment (4); ear walls are arranged on the back face of an abutment body (2). The soil subgrade (5), horizontal steel bars (9) and the concrete between two ear-walls form an abutment back (10). A thin-wall pipe pile (11) and a soil nail (12) are arranged inside the soil subgrade (5), wherein the soil subgrade (5) extends from the abutment back (10) along the length of concrete pavement (6) direction, the length of the thin-wall pipe pile (11) is decreased gradually, and the length and density of the soil nail (12) are decreased. The structure can avoid bumping at bridge-head.

Description

The structure of the abutment of bridge and roadbed junction
Technical field
The utility model relates to technical field of bridge engineering, is specifically a kind of abutment of bridge and the structure of roadbed junction.
Background technology
The abutment of bridge refers to be positioned at the bridge two ends and the supporting superstructure that is connected with roadbed and bear the structure of the pressure that bankets at the abutment back side one side of river course (namely away from).Its function, also has the pressure that bankets of keeping out the abutment back side, stablize Bridgehead by Blastig, bridge floor is connected with the road surface and the effect of connection reposefully to the basis except the load that transmits bridge superstructure.
The structure of the abutment of the bridge of prior art and roadbed junction is as follows: abutment comprises that platform cap, abutment body and concrete foundation are cushion cap, abutment body is cast on cushion cap, the platform cap is cast in the end face of abutment body, bridge plate is shelved on the abutment body end face of abutment, the back side of abutment body namely is cast with the parallel ear wall of twice away from the one side in river course along the length direction on road surface, the back side of abutment body namely abutment body is connected with subgrade soil away from the one side in river course, the subgrade soil upper has the rigid pavement, and the end face of the platform cap of the end face on road surface, abutment is substantially concordant with the bridge floor three.
The job practices of the structure of the abutment of the bridge of prior art and roadbed junction is as follows: first digging out the heatable adobe sleeping platform of accommodating abutment by the position in river course, then pour into a mould successively cushion cap, abutment body, platform cap and the ear wall of abutment, and the end of bridge plate is shelved on the abutment body end face of abutment, again with the heatable adobe sleeping platform between abutment and soil body roadbed with earthen backfill and compacting, make soil body roadbed and the abutment back side draw close namely to make soil body roadbed to be connected with the abutment back side, at last in soil body roadbed upper rigid pavement.
there is following defective in the structure of the abutment of the bridge of prior art and roadbed junction: because abutment is the rigidity abutment, rigidity is large, and roadbed especially the subgrade stiffness in weak soil ground is little, like this, there is the sudden change of a rigidity between rigidity abutment and roadbed, bridge floor and road surface all can produce certain sedimentation and deformation under the active force of vehicle, and the sudden change of rigidity can make the sedimentation and deformation amplitude difference on bridge floor and road surface larger, cause producing very large difference in height between the two, generally, be exactly that the few roadbed subsidence of bridge floor sedimentation is many, difference in height makes and forms step between the two, cause vehicle through this position, bumping at bridge-head to occur, directly the impact driving is comfortable and safe.
Summary of the invention
A technical problem to be solved in the utility model is, a kind of abutment of the bridge that the bumping at bridge-head situation occurs of avoiding driving a vehicle and the structure of roadbed junction are provided.
a technical solution of the present utility model is, a kind of abutment of bridge and the structure of roadbed junction are provided, it comprises soil body roadbed, rigid pavement and by cushion cap, the abutment that abutment body and platform cap consist of, abutment body is cast on cushion cap, the platform cap is cast in the end face of abutment body, the bridge plate of bridge is shelved on the end face of abutment body, soil body roadbed is connected with the back side of abutment, the rigid pavement is cast on soil body roadbed, the parallel ear wall of twice is built along the length direction of rigid pavement in the back side of abutment body, abutment body is embedded with the many horizontal steel bars that protrude the back side of abutment body and stretch into soil body roadbed, per pass ear wall also is embedded with the many horizontal steel bars that protrude the medial surface of ear wall and stretch into soil body roadbed, every horizontal steel bar is wrapped with concrete, soil body roadbed between twice ear wall, all the horizontal steel bar concrete outer with being wrapped in horizontal steel bar consists of the platform back of the body, be provided with the thin-wall pipe pile that many row's length are successively decreased in the soil body roadbed that extends from the platform back of the body along the rigid pavement length direction, be provided with the soil nailing that many length and density are all successively decreased in the soil body roadbed that extends from the platform back of the body along the rigid pavement length direction.
The structure of the abutment of the utility model bridge and roadbed junction and job practices compared with prior art have the following advantages and beneficial effect:
owing to being the platform back of the body of the globality that jointly consists of of concrete and soil body roadbed by horizontal steel bar, horizontal steel bar outer wrapping near the platform back of the body of abutment, its rigidity increases, and namely a rigidity specific rigidity bridge floor rigidity of the platform back of the body is smaller, and the soil body roadbed that the length direction from the platform back of the body along the road surface extends is provided with the thin-wall pipe pile that successively decreases highly successively, and the thin-wall pipe pile that highly successively decreases has played the effect of supporting the elastic support of upper pressure, and its rigidity is also to carry on the back the road surface from platform to successively decrease gently successively, moreover be provided with successively many soil nailings in the soil body roadbed that the length direction from the platform back of the body along the road surface extends, the density of soil nailing and highly also successively decreasing gently successively on the road surface dorsad from platform, the frictional force of soil nailing and the soil body can strengthen the rigidity of soil body roadbed, be that the existence of soil nailing also makes the rigidity of carrying on the back the road surface from platform successively decrease successively, therefore the platform back of the body in globality, under the acting in conjunction of thin-wall pipe pile and soil nailing, the junction that the rigidity of one is successively decreased gently appears between rigidity bridge floor and prevailing roadway, make the rigidity bridge floor, the joint portion, rigidity between the prevailing roadway three is successively decreased gently, thereby cause bridge floor, the joint portion, the mild increase of road surface three's sedimentation and deformation amplitude is bridge floor, the joint portion, the road surface three seamlessly transit, and can not produce step due to the drastic change of sedimentation and deformation amplitude, this has just effectively been avoided occurring in the driving process situation of bumping at bridge-head, ensured the comfortable and safe of driving.
As improvement, also be cast with one deck soil nailing panel layer between soil body roadbed and rigid pavement, also be provided with one deck steel mesh reinforcement in the soil nailing panel layer, top and the steel mesh reinforcement of every soil nailing are fixed, and every thin-wall pipe pile is fixed through connecting reinforcement and steel mesh reinforcement, like this, steel mesh reinforcement can be so that all soil nailing and all integral body of thin-wall pipe pile formation, finally strengthen the rigidity of soil body roadbed, further reduce the poor rigidity of soil body roadbed and rigidity bridge floor, make from the bridge floor to the road surface more smooth-going.
As improving again, the array pitch of many row's thin-wall pipe piles equates, the spacing of same row's thin-wall pipe pile also equates, can make like this stressed evenly reasonable of soil body roadbed, the final rigidity that strengthens soil body roadbed, further reduce the poor rigidity of soil body roadbed and rigidity bridge floor, make from the bridge floor to the road surface more smooth-going.
As also improving, many horizontal steel bars that are embedded in abutment body are distributed in the multilayer of differing heights, and the many horizontal steel bars of every layer equidistantly distribute; Be embedded in the multilayer that ear many horizontal steel bars within the walls also are distributed in differing heights, also equidistantly distribute with much higher horizontal steel bar of layer, like this, many horizontal steel bars of different layers have formed stereoeffect, stressed more reasonable, can effectively strengthen platform back of the body rigidity, reduce the poor rigidity of the platform back of the body and rigidity bridge floor, make bridge floor more smooth-going to the platform back of the body.
As further improvement, being wrapped in the outer concrete of horizontal steel bar is fast rigid concrete, like this can the reduction of erection time.
Description of drawings
Fig. 1 is the sectional structure schematic diagram (for making Fig. 1 clear, saving the ear wall in Fig. 1) of the structure of the abutment of the utility model bridge and roadbed junction.
Fig. 2 is the plan structure schematic diagram of the structure of the abutment of the utility model bridge and roadbed junction.
Shown in figure 1, cushion cap, 2, abutment body, 3, the platform cap, 4, abutment, 5, soil body roadbed, 6, rigid pavement, 7, bridge plate, 8, the ear wall, 9, horizontal steel bar, 10, the platform back of the body, 11, thin-wall pipe pile, 12, soil nailing, 13, steel mesh reinforcement, 14, the soil nailing panel layer, 15, connecting reinforcement.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
As shown in Figure 1 and Figure 2, the structure of the abutment of the utility model bridge and roadbed junction, it comprises soil body roadbed 5, rigid pavement 6 and the abutment 4 that is made of cushion cap 1, abutment body 2 and platform cap 3.Abutment body 2 is cast on cushion cap 1, and platform cap 3 is cast in the end face of abutment body 2, and the end of the bridge plate 7 of bridge is shelved on the end face of abutment body 2.Soil body roadbed 5 is connected with the back side of abutment 4, and in particular, soil body roadbed 5 is drawn close at the back side of abutment 4, and the soil pressure of soil body roadbed 5 is born at the back side of abutment 4.Rigid pavement 6 is cast on soil body roadbed 5.The back side of abutment body 2 along the rigid pavement 6 length direction build the parallel ear wall 8 of twice, ear wall 8 is together with abutment body 2 is cast in.The end face of rigid pavement 6, platform cap 3 and bridge floor three's junction is roughly concordant, seamlessly transits.Abutment body 2 is embedded with the many horizontal steel bars 9 that protrude the back side of abutment body 2 and stretch into soil body roadbed 5, and the many horizontal steel bars 9 that namely are embedded in abutment body 2 are distributed in the multilayer of differing heights, and the many horizontal steel bars 9 of every layer equidistantly distribute; Be embedded with the horizontal steel bar 9 of 4 layers as abutment body 2, every layer is 9 equally spaced horizontal steel bars 9.Described horizontal steel bar 9 refers to approximate horizontal, but in practice of construction, certain inclination rather than complete absolute level may be arranged.Per pass ear wall 8 also is embedded with the many horizontal steel bars 9 that protrude the medial surface of ear wall 8 and stretch into soil body roadbed 5, namely be embedded in the multilayer that ear wall 8 interior many horizontal steel bars 9 also are distributed in differing heights, also equidistantly distribute with much higher horizontal steel bar 9 of layer, as being embedded with the horizontal steel bar 9 of 4 layers in ear wall 9, every layer is 4 equally spaced horizontal steel bars.Every horizontal steel bar 9 is wrapped with fast rigid concrete, as the concrete of sulphate aluminium cement.The soil body roadbed 5 that twice ear wall is 8, whole horizontal steel bars 9 and be wrapped in the platform back of the body 10 of the globality of the outer fast rigid concrete Special composition solid of horizontal steel bar 9.The roughly vertical thin-wall pipe pile 11 that is provided with in the soil body roadbed 5 that 6 length directions extend from the platform back of the body 10 along the rigid pavement that many row's length successively decrease; Described roughly vertically referring in practice of construction, may have certain inclination rather than fully absolute vertically.the array pitch of many row's thin-wall pipe piles 11 equates, the spacing of same row's thin-wall pipe pile 11 also equates, array pitch as many rows thin-wall pipe pile 11 is 5m, and the spacing of every row's thin-wall pipe pile 11 is also 5m, in other words, distance between adjacent two row's thin-wall pipe piles 11 is 5m, and the distance of the every two adjacent thin-wall pipe piles 11 of every row is also 5m, same row's thin-wall pipe pile 11 equal in length, the length of different rows' thin-wall pipe pile 11 shortens gradually, a length of arranging thin-wall pipe pile 11 as the most close platform back of the body 10 is 12m, second row length is 6m, the 3rd row's length is 3m, the 4th arranges namely, and the destage back of the body 10 length farthest is 2m.The roughly vertical soil nailing 12 that is provided with in the soil body roadbed 5 that 6 length directions extend from the platform back of the body 10 along the rigid pavement that many length and density all successively decreases, it is that the length of soil nailing 12 is along with the distance away from the platform back of the body 10 increases and constantly successively decreases that length is successively decreased, soil nailing 12 length as the access platform back of the body 10 are 5m, soil nailing 12 is along with the distance with the platform back of the body 10 increases and shortens gradually, and the length of the destage back of the body 10 soil nailing 12 farthest is 2m.The radical of soil nailing in the density of soil nailing 12 refers to every square metre, in the regional soil body roadbed 5 that the destage back of the body 10 approaches, soil nailing 12 radicals of every square metre are many, soil nailing 12 is intensive, then distance increase soil nailing 12 density along with the destage back of the body 10 reduce, soil nailing 12 distributes thinning thin, and in the soil body roadbed 5 in the zone that the distance of the destage back of the body 10 is maximum, the radical of the soil nailing 12 of every square metre is minimum.Also be cast with one deck soil nailing panel layer 14 between soil body roadbed 5 and rigid pavement 6, also be provided with one deck steel mesh reinforcement 13 in soil nailing panel layer 14.The top of every soil nailing 12 and steel mesh reinforcement 13 is fixing, and specifically, soil nailing 12 comprises anchor tube, and people sink to anchor tube in soil, and then fluid concrete has just formed soil nailing 12 in the anchor tube, and weld with steel mesh reinforcement 13 on the top of the anchor tube of soil nailing 12.Every thin-wall pipe pile 11 is fixing with steel mesh reinforcement 13 through connecting reinforcement 15, specifically, connecting reinforcement 15 is L shaped, is cast with concrete in thin-wall pipe pile 11, the perpendicular muscle of L shaped connecting reinforcement 15 is anchored in the concrete of thin-wall pipe pile 11, the horizontal bar of L shaped connecting reinforcement 15 and steel mesh reinforcement 12 welding.
As shown in Figure 1 and Figure 2, implement the job practices of the structure of the abutment of the utility model bridge and roadbed junction, its step comprises as follows.
A, digging out the heatable adobe sleeping platform of accommodating abutment 4 by the position in river course.
B, bottom pour mold is annotated cushion cap 1 in the hole.
C, place the cage of reinforcement of the good abutment body 2 of colligation on cushion cap 1, and fix many horizontal steel bars 9 on cage of reinforcement, fix again the template of abutment body 2, the template at the back side of abutment body 2 is provided with and every horizontal steel bar 9 through hole one to one, every horizontal steel bar 9 stretches out the template at abutment body 2 back sides from through hole, fluid concrete, make it to form many horizontal steel bars 9 of back side protrusion of abutment body 2 and abutment body 2, dismantle the again template of abutment body 2, to extract out along horizontal steel bar 9 when dismantling the template at the back side of abutment body 2, avoid bending horizontal steel bar 9 as far as possible.
D, according to prior art at the cage of reinforcement of the good platform cap 3 of end face colligation of abutment body 2, lay template and pouring platform cap 3.
E, an end of bridge plate 7 is shelved on the end face of this abutment body 2, the other end of bridge plate 7 is shelved on the end face of the abutment body 2 of another abutment 4.
The reinforcing cage of f, colligation two ear walls 8, and on ear wall 8 reinforcing cages fixed level to reinforcing bar 9, the fixing template of ear wall 8, the template of the inboard of ear wall 8 is provided with and every horizontal steel bar 9 through hole one to one, every horizontal steel bar 9 protrudes the template of ear wall 8 inboards from through hole, cast ear wall 8 concrete, then ear wall 8 templates of dismantling, to extract out along horizontal steel bar 9 when dismantling the template of medial surface of ear wall 8, avoid bending horizontal steel bar 9 as far as possible.
g, with the heatable adobe sleeping platform between soil body backfill abutment 4 and soil body roadbed 5, finally make soil body roadbed 5 and the back side of the abutment body 2 of abutment 4 and the back side of cushion cap 1 close up, in the process of banketing, pouring into a mould fast rigid concrete wraps up every horizontal steel bar 9, and with the soil body, each horizontal steel bar 9 and fast rigid concrete are buried, banket to the end face absolute altitude of soil body roadbed 5, compacted fill, the soil body roadbed 5 that twice ear wall is 8 and be imbedded in whole horizontal steel bars 9 in soil body roadbed 5 and all-in-one-piece the back of the body 10 that fast rigid concrete consists of the larger space multistory of rigidity.
H, squeezing into many row's thin-wall pipe piles 11 in soil body roadbed 5, same row's many thin-wall pipe piles 11 distances equate, the spacing of same row's thin-wall pipe pile 11 also equates, arrange the length of thin-wall pipe pile 11 6 length directions successively decrease along the rigid pavement from the platform back of the body 10 more.
I, squeeze into many soil nailings 12 in soil body roadbed 5,6 length directions successively decrease successively along the rigid pavement from the platform back of the body 10 for the length of soil nailing 12 and density; The mode of beating soil nailing 12 belongs to prior art, as the hollow anchor tube of soil nailing is squeezed in soil, then from anchor tube top fluid concrete, forms soil nailing 12.The radical of soil nailing 12 in the density of soil nailing 12 refers to every square metre.
J, shelve one deck steel mesh reinforcement 13, and top and the steel mesh reinforcement 13 of every soil nailing 12 is fixing, and every thin-wall pipe pile 11 is fixing with steel mesh reinforcement 13 through L shaped connecting reinforcement 15, the perpendicular muscle that is about to L shaped connecting reinforcement 15 is anchored in the concrete of thin-wall pipe pile 11, the horizontal bar of L shaped connecting reinforcement 15 and steel mesh reinforcement 12 welding; Fluid concrete, form soil nailing panel layer 14 again.
K, lay the bed course levelling on soil nailing panel layer 14, then in bed course upper rigid pavement 6.

Claims (5)

1. the structure of the abutment of a bridge and roadbed junction, it comprises soil body roadbed (5), rigid pavement (6) and by cushion cap (1), the abutment (4) that abutment body (2) and platform cap (3) consist of, abutment body (2) is cast on cushion cap (1), platform cap (3) is cast in the end face of abutment body (2), the bridge plate of bridge (7) is shelved on the end face of abutment body (2), soil body roadbed (5) is connected with the back side of abutment (4), rigid pavement (6) is cast on soil body roadbed (5), the back side of abutment body (2) along the rigid pavement length direction of (6) build the parallel ear wall (8) of twice, it is characterized in that: abutment body (2) is embedded with the many horizontal steel bars (9) that protrude the back side of abutment body (2) and stretch into soil body roadbed (5), per pass ear wall (8) also is embedded with the many horizontal steel bars (9) that protrude the medial surface of ear wall (8) and stretch into soil body roadbed (5), every horizontal steel bar (9) is wrapped with concrete, soil body roadbed (5) between twice ear wall (8), whole horizontal steel bars (9) and the concrete that is wrapped in outside horizontal steel bar (9) consist of the platform back of the body (10), be provided with the thin-wall pipe pile (11) that many row's length are successively decreased in the soil body roadbed (5) that extends from the platform back of the body (10) along rigid pavement (6) length direction, be provided with the soil nailing (12) that many length and density are all successively decreased in the soil body roadbed (5) that extends from the platform back of the body (10) along rigid pavement (6) length direction.
2. the structure of the abutment of bridge according to claim 1 and roadbed junction, it is characterized in that: also be cast with one deck soil nailing panel layer (14) between soil body roadbed (5) and rigid pavement (6), also be provided with one deck steel mesh reinforcement (13) in soil nailing panel layer (14), the top of every soil nailing (12) and steel mesh reinforcement (13) are fixing, and every thin-wall pipe pile (11) is fixing through connecting reinforcement (15) and steel mesh reinforcement (13).
3. the structure of the abutment of bridge according to claim 1 and roadbed junction is characterized in that: the array pitch of arranging thin-wall pipe pile (11) equates more, and the spacing of same row's thin-wall pipe pile (11) also equates.
4. the structure of the abutment of bridge according to claim 1 and roadbed junction, it is characterized in that: the many horizontal steel bars (9) that are embedded in abutment body (2) are distributed in the multilayer of differing heights, and the many horizontal steel bars (9) of every layer equidistantly distribute; Be embedded in the multilayer that the interior many horizontal steel bars (9) of ear wall (8) also are distributed in differing heights, also equidistantly distribute with a much higher horizontal steel bar of layer (9).
5. the structure of the abutment of bridge according to claim 1 and roadbed junction, it is characterized in that: being wrapped in the outer concrete of horizontal steel bar (9) is fast rigid concrete.
CN 201320029200 2013-01-21 2013-01-21 Bridge structure at juncture position of bridge abutment and subgrade Expired - Fee Related CN203007825U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320029200 CN203007825U (en) 2013-01-21 2013-01-21 Bridge structure at juncture position of bridge abutment and subgrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320029200 CN203007825U (en) 2013-01-21 2013-01-21 Bridge structure at juncture position of bridge abutment and subgrade

Publications (1)

Publication Number Publication Date
CN203007825U true CN203007825U (en) 2013-06-19

Family

ID=48599434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320029200 Expired - Fee Related CN203007825U (en) 2013-01-21 2013-01-21 Bridge structure at juncture position of bridge abutment and subgrade

Country Status (1)

Country Link
CN (1) CN203007825U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114521A (en) * 2013-01-21 2013-05-22 浙江大学宁波理工学院 Structure and construction method of junction position of bridge abutment and roadbed
CN105113386A (en) * 2015-08-17 2015-12-02 苏州同尚工程设计咨询有限公司 Stage back suitable for preventing bridgehead bump on high filling subgrade
CN115217026A (en) * 2022-07-28 2022-10-21 石家庄铁道大学 Integral flexible abutment and abutment-roadbed structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114521A (en) * 2013-01-21 2013-05-22 浙江大学宁波理工学院 Structure and construction method of junction position of bridge abutment and roadbed
CN103114521B (en) * 2013-01-21 2015-02-11 浙江大学宁波理工学院 Structure and construction method of junction position of bridge abutment and roadbed
CN105113386A (en) * 2015-08-17 2015-12-02 苏州同尚工程设计咨询有限公司 Stage back suitable for preventing bridgehead bump on high filling subgrade
CN115217026A (en) * 2022-07-28 2022-10-21 石家庄铁道大学 Integral flexible abutment and abutment-roadbed structure
CN115217026B (en) * 2022-07-28 2023-03-14 石家庄铁道大学 Integral flexible abutment and abutment-roadbed structure

Similar Documents

Publication Publication Date Title
CN103114521B (en) Structure and construction method of junction position of bridge abutment and roadbed
CN208981122U (en) A kind of bridge platform back Foam lightweight soil roadbed backfill structure
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN106087629B (en) Without the prefabricated baffle foam concrete light road bank structure of conical slope and construction method
WO2019237678A1 (en) Structure of rigid frame bridge having abutments and construction method therefor
CN107974942B (en) A kind of abrupt slope side rigid frame-continuous girder end bay construction method
CN103952986A (en) Load-shedding type rigid culvert structure
CN102864788A (en) Method for underpinning reinforced bridge pile foundation by bear-type static pressure cluster pile
CN105239594A (en) Prestressed pipe pile upright
CN203007825U (en) Bridge structure at juncture position of bridge abutment and subgrade
CN103572775A (en) Semi-assembly type retaining wall of soil filling slope and construction method for semi-assembly type retaining wall
CN112482202A (en) Pull rod type multipurpose steel trestle bridge abutment and construction method thereof
CN205116202U (en) Stake of prestressing force side and integrated stand of steel lattice column
CN206752502U (en) Abrupt slope simply supported beam chair form peg board wall construction
CN206070724U (en) The structure at design large span deep buried metro station is combined using Y shape pillar with uplift pile
CN104499425A (en) Structure and construction process for reducing power impact response at back of seamless bridge abutment
CN209556197U (en) A kind of thin-walled square chest hollow floor
CN204875495U (en) No abutment body seat formula abutment
CN202000234U (en) Tray type U-shaped reinforced subgrade structure
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN206090197U (en) Prefabricated baffle foam concrete light embankment structure of no conical slope
CN203765790U (en) Pedestal for prestress small box girder of highway in soft-foundation geological condition
CN105804101A (en) Load-reducing retaining system capable of reducing stress of retaining structure, construction method and applications
CN213204139U (en) Cantilever combined soil retaining structure for sinking square
CN205529734U (en) A U -shaped retaining structure for filling road bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHEJIANG FANRONG CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: NINGBO TECH COLLEGE, ZHEJIANG UNIV.

Effective date: 20140917

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 315000 NINGBO, ZHEJIANG PROVINCE TO: 317100 TAIZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140917

Address after: 317100 room 20, General Chamber building, No. 2002 Indus Road, three County town, Zhejiang

Patentee after: ZHEJIANG PROSPERITY CONSTRUCTION CO., LTD.

Patentee after: Zhejiang Xinyuan Construction Co., Ltd.

Address before: 315000 Ningbo, Zhejiang Higher Education Park money Hunan Road No. 1

Patentee before: Ningbo Institute of Technology, Zhejiang University

Patentee before: Zhejiang Xinyuan Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130619

Termination date: 20160121

EXPY Termination of patent right or utility model