CN202978179U - Snow-blowing deicing device for power devices - Google Patents

Snow-blowing deicing device for power devices Download PDF

Info

Publication number
CN202978179U
CN202978179U CN 201220684088 CN201220684088U CN202978179U CN 202978179 U CN202978179 U CN 202978179U CN 201220684088 CN201220684088 CN 201220684088 CN 201220684088 U CN201220684088 U CN 201220684088U CN 202978179 U CN202978179 U CN 202978179U
Authority
CN
China
Prior art keywords
snow
chute
walker
ice
walking frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220684088
Other languages
Chinese (zh)
Inventor
张民
杨晓滨
冯迎春
王震
段建军
于柠源
张伟
马玮杰
陈培峰
庄燕飞
孙兆国
孟令国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenance Branch of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201220684088 priority Critical patent/CN202978179U/en
Application granted granted Critical
Publication of CN202978179U publication Critical patent/CN202978179U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

电力装置吹雪融冰装置,包括行走架,行走架的侧壁设置横向的开口,行走架上设置控制器、加热箱、主动轮和第一压紧轮,控制箱内设置电机,行走架开设竖直的第一滑槽,第一压紧轮的轮轴外周设置滑动轴承组件,轴承的外套上部连接弹簧的一端,弹簧的另一端与第一滑槽的顶部固定连接,弹簧始终给轴承一个向下的力,行走架底部安装加热箱,加热箱的一端设置风机,加热箱另一端设置出风管,加热箱内安装电热丝。本实用新型安装在电缆等输电线路上,沿输电线路行走,通过加热的空气吹去线路上的冰雪,使冰雪融化,采用柔和的方式将冰雪去除,工作效率增加,吹雪融冰效果好,清理速度快,并且工作过程安全稳定,避免人工直接作业,保障冬季电网正常运行。

Figure 201220684088

The power device snow-blowing and ice-melting device includes a walking frame, the side wall of the walking frame is provided with a horizontal opening, a controller, a heating box, a driving wheel and a first pressing wheel are arranged on the walking frame, a motor is arranged in the control box, and a vertical opening is set on the walking frame. The first straight chute, the outer periphery of the axle of the first pinch wheel is provided with a sliding bearing assembly, the upper part of the outer casing of the bearing is connected to one end of the spring, and the other end of the spring is fixedly connected to the top of the first chute, and the spring always gives the bearing a downward direction. A heating box is installed at the bottom of the walking frame, a fan is installed at one end of the heating box, an air duct is installed at the other end of the heating box, and an electric heating wire is installed in the heating box. The utility model is installed on transmission lines such as cables, walks along the transmission line, blows off the ice and snow on the line by heated air, melts the ice and snow, removes the ice and snow in a gentle way, increases the work efficiency, has a good effect of blowing snow and melting ice, and cleans The speed is fast, and the working process is safe and stable, avoiding manual direct operation and ensuring the normal operation of the power grid in winter.

Figure 201220684088

Description

电力装置吹雪融冰装置Power device Snow blowing and ice melting device

技术领域 technical field

 本实用新型涉及一种电力系统装置,确切地说是一种电力装置吹雪融冰装置。 The utility model relates to an electric power system device, specifically a snow-blowing and ice-melting device for an electric power device.

背景技术 Background technique

冰雪、冻雨灾害是冬季中对电力设备的破坏较大的自然灾害,一旦受到损坏会使部分电网陷入瘫痪状态,恢复重建工作相当繁杂、繁重,将巨大的经济损失。特别是输电线路结冰,冰层的重量压在输电线路上,容易将线路压坏。线路上一旦结冰,只能人工使用绝缘金属杆将积雪、冰柱一点点地清除。线路结冰一般是多层,工作量大,效率低,效果差,清除速度很慢;敲击容易使线路不稳定,造成意外发生,威胁工作人员安全。 Ice, snow and freezing rain disasters are natural disasters that damage power equipment in winter. Once damaged, some power grids will be paralyzed, and the restoration and reconstruction work is quite complicated and heavy, which will cause huge economic losses. Especially the power transmission line is frozen, and the weight of the ice layer is pressed on the power transmission line, which is easy to crush the line. Once the line freezes, the snow and icicles can only be removed bit by bit by using insulated metal poles manually. Line icing is generally multi-layered, with heavy workload, low efficiency, poor effect, and slow removal speed; knocking can easily make the line unstable, cause accidents, and threaten the safety of staff.

实用新型内容 Utility model content

为克服上述现有技术中的不足,本实用新型是提供一种电力装置吹雪融冰装置。 In order to overcome the deficiencies in the above-mentioned prior art, the utility model provides a snow-blowing and ice-melting device of an electric power device.

本实用新型为实现上述目的,通过以下技术方案实现:电力装置吹雪融冰装置,包括行走架,行走架的侧壁设置横向的开口,行走架上设置控制器、加热箱、主动轮和第一压紧轮,控制箱内设置电机,电机的输出轴与主动轮的轴通过传动带连接,主动轮位于第一压紧轮的下方,行走架开设竖直的第一滑槽,第一压紧轮的轮轴外周设置滑动轴承组件,滑动轴承组件安装在行走架的第一滑槽内,滑动轴承组件由轴承、弹簧、滑块连接构成,轴承的外套上设置滑块,滑块与第一滑槽相配合,轴承的外套上部连接弹簧的一端,弹簧的另一端与第一滑槽的顶部固定连接,弹簧始终给轴承一个向下的力,行走架底部安装加热箱,加热箱的一端设置风机,加热箱另一端设置出风管,加热箱内安装电热丝。 In order to achieve the above object, the utility model is realized through the following technical proposals: the snow-blowing and ice-melting device of the power device includes a walking frame, the side wall of the walking frame is provided with a transverse opening, and a controller, a heating box, a driving wheel and a first driving wheel are arranged on the walking frame. Compression wheel, a motor is arranged in the control box, the output shaft of the motor is connected with the shaft of the driving wheel through a transmission belt, the driving wheel is located below the first compression wheel, the walking frame is provided with a vertical first chute, and the first compression wheel The outer periphery of the wheel shaft is provided with a sliding bearing assembly, which is installed in the first chute of the walking frame. The sliding bearing assembly is composed of a bearing, a spring, and a slider connected. Matching, the upper part of the bearing jacket is connected to one end of the spring, and the other end of the spring is fixedly connected to the top of the first chute. The spring always gives the bearing a downward force. A heating box is installed at the bottom of the walking frame, and a fan is installed at one end of the heating box. An air outlet pipe is arranged at the other end of the heating box, and an electric heating wire is installed in the heating box.

为了进一步实现本实用新型的目的,还可以采用以下技术方案:所述的行走架上安装从动轮和第二压紧轮,从动轮的轴和主动轮的轴通过皮带连接,从动轮位于第二压紧轮的下方,行走架开设竖直的第二滑槽,第二压紧轮通过滑动轴承组件安装在第二滑槽内。所述的行走架上设置红外温度计。 In order to further realize the purpose of the utility model, the following technical solutions can also be adopted: the driven wheel and the second pressing wheel are installed on the walking frame, the shaft of the driven wheel and the shaft of the driving wheel are connected by a belt, and the driven wheel is located at the second Below the pinch wheel, the walking frame offers a vertical second chute, and the second pinch wheel is installed in the second chute by the sliding bearing assembly. An infrared thermometer is arranged on the walking frame.

本实用新型安装在电缆等输电线路上,沿输电线路行走,通过加热的空气吹去线路上的冰雪,使冰雪融化,采用柔和的方式将冰雪去除,工作效率增加,吹雪融冰效果好,清理速度快,并且工作过程安全稳定,避免人工直接作业,降低财产损失,保障冬季电网正常运行。本实用新型还具有结构简洁紧凑、制造成本低廉和使用简便的优点。 The utility model is installed on transmission lines such as cables, walks along the transmission line, blows off the ice and snow on the line by heated air, melts the ice and snow, removes the ice and snow in a gentle way, increases the work efficiency, has a good effect of blowing snow and melting ice, and cleans The speed is fast, and the working process is safe and stable, avoiding manual direct operation, reducing property losses, and ensuring the normal operation of the power grid in winter. The utility model also has the advantages of simple and compact structure, low manufacturing cost and easy use.

附图说明 Description of drawings

图1是实用新型的立体结构示意图;图2是图1主视结构示意图;图3是图2的后视结构示意图;图4是图2的右视结构示意图。 Fig. 1 is a three-dimensional structure schematic diagram of the utility model; Fig. 2 is a front view structure schematic diagram of Fig. 1; Fig. 3 is a rear view structure schematic diagram of Fig. 2; Fig. 4 is a right view structure schematic diagram of Fig. 2 .

附图标记:1电缆 2从动轮 3第二压紧轮 4行走架 5第一滑槽 6第一压紧轮 7出风管 8加热箱 9控制器 10红外温度计 11主动轮 12弹簧 13电热丝 14风机 15开口 16轴承 17滑块 18第二滑槽。  Reference signs: 1 cable 2 driven wheel 3 second pressing wheel 4 walking frame 5 first chute 6 first pressing wheel 7 air outlet pipe 8 heating box 9 controller 10 infrared thermometer 11 driving wheel 12 spring 13 heating wire 14 Fan 15 Opening 16 Bearing 17 Slider 18 Second chute. the

具体实施方式 Detailed ways

电力装置吹雪融冰装置,如图所示,包括行走架4,行走架4的侧壁设置横向的开口15,通过开口15将本实用新型安装在电缆1上,行走架4上设置控制器9、加热箱8、主动轮11和第一压紧轮6,控制箱9内设置电机,电机的输出轴与主动轮11的轴通过传动带连接,主动轮11位于第一压紧轮6的下方,行走架4开设竖直的第一滑槽5,第一压紧轮6的轮轴外周设置滑动轴承组件,滑动轴承组件安装在行走架4的第一滑槽5内,滑动轴承组件由轴承16、弹簧12、滑块17连接构成,轴承16的外套上设置滑块17,滑块17与第一滑槽5相配合,轴承16的外套上部连接弹簧12的一端,弹簧12的另一端与第一滑槽5的顶部固定连接,弹簧12始终给轴承16一个向下的力,第一压紧轮6和主动轮将电缆1压住,行走架4底部安装加热箱8,加热箱8的一端设置风机14,加热箱8另一端设置出风管7,加热箱8内安装电热丝13。如图方向所示电机带动主动轮11顺时针转动,使本实用新型沿电缆1向左运动,风机14将外界的风吸入至加热箱8,经过电热丝13加入,由出风管7排出,热风喷到电缆1上,将电缆1上冰雪吹化,以达到清理积雪和冰的目的。本实用新型采用采用柔和的方式将冰雪去除,工作效率增加,吹雪融冰效果好,清理速度快,并且工作过程安全稳定,避免人工直接作业,降低财产损失,保障冬季电网正常运行。 The snow-blowing and ice-melting device of the power device, as shown in the figure, includes a walking frame 4, the side wall of the walking frame 4 is provided with a transverse opening 15, and the utility model is installed on the cable 1 through the opening 15, and a controller 9 is arranged on the walking frame 4 , heating box 8, driving wheel 11 and the first pinching wheel 6, motor is set in the control box 9, the output shaft of the motor is connected with the axle of driving wheel 11 by transmission belt, and driving wheel 11 is positioned at the below of the first pinching wheel 6, Walking frame 4 offers vertical first chute 5, and the wheel axle periphery of the first pinch wheel 6 is provided with sliding bearing assembly, and sliding bearing assembly is installed in the first chute 5 of walking frame 4, and sliding bearing assembly is made of bearing 16, Spring 12, slide block 17 are connected to form, slide block 17 is set on the outer cover of bearing 16, slide block 17 cooperates with the first chute 5, one end of the outer cover top of bearing 16 connects spring 12, the other end of spring 12 and the first The top of the chute 5 is fixedly connected, the spring 12 always gives a downward force to the bearing 16, the first pressing wheel 6 and the driving wheel press the cable 1, and the heating box 8 is installed at the bottom of the walking frame 4, and one end of the heating box 8 is set Fan 14, the other end of heating box 8 is provided with air outlet pipe 7, and heating wire 13 is installed in heating box 8. As shown in the figure, the motor drives the driving wheel 11 to rotate clockwise, so that the utility model moves to the left along the cable 1, and the fan 14 sucks the outside wind into the heating box 8, adds it through the heating wire 13, and discharges it from the air outlet pipe 7. The hot air is sprayed on the cable 1, and the ice and snow on the cable 1 are blown to achieve the purpose of cleaning up snow and ice. The utility model adopts a soft way to remove ice and snow, which increases work efficiency, has a good effect of blowing snow and melting ice, and has a fast cleaning speed. The working process is safe and stable, avoiding manual direct operation, reducing property losses, and ensuring the normal operation of the power grid in winter.

为了保证本实用新型行走过程的稳定,所述的行走架4上安装从动轮2和第二压紧轮3,从动轮2的轴和主动轮11的轴通过皮带连接,从动轮2位于第二压紧轮3的下方,行走架4开设竖直的第二滑槽18,第二压紧轮3通过滑动轴承组件安装在第二滑槽18内。从动轮2和第二压紧轮3能够进一步将电缆1压紧,提高运行过程稳定性。 In order to ensure the stability of the walking process of the utility model, the driven wheel 2 and the second pressing wheel 3 are installed on the walking frame 4, the shaft of the driven wheel 2 and the shaft of the driving wheel 11 are connected by a belt, and the driven wheel 2 is located at the second Below the pressing wheel 3, the walking frame 4 offers a vertical second chute 18, and the second pressing wheel 3 is installed in the second chute 18 by a sliding bearing assembly. The driven wheel 2 and the second pressing wheel 3 can further press the cable 1 to improve the stability of the running process.

为了控制风量,节约能源,所述的行走架4上设置红外温度计10。通过红外温度计10测量温度,从而控制加热的风量和温度。 In order to control the air volume and save energy, an infrared thermometer 10 is arranged on the walking frame 4 . The temperature is measured by an infrared thermometer 10, thereby controlling the heating air volume and temperature.

本实用新型的技术方案并不限制于本实用新型所述的实施例的范围内。本实用新型未详尽描述的技术内容均为公知技术。 The technical solution of the utility model is not limited within the scope of the embodiments described in the utility model. The technical contents not described in detail in the utility model are all known technologies.

Claims (3)

1. electric device snow-blowing and deicing device, it is characterized in that: comprise walker (4), the sidewall of walker (4) arranges horizontal opening (15), controller (9) is set on walker (4), heating cabinet (8), driving wheel (11) and the first contact roller (6), control cabinet arranges motor in (9), the output shaft of motor is connected by driving-belt with the axle of driving wheel (11), driving wheel (11) is positioned at the below of the first contact roller (6), walker (4) is offered vertical the first chute (5), the wheel shaft periphery of the first contact roller (6) arranges slide bearing assembly, slide bearing assembly is arranged in first chute (5) of walker (4), slide bearing assembly is by bearing (16), spring (12), slide block (17) connects and composes, outer the putting of bearing (16) arranges slide block (17), slide block (17) matches with the first chute (5), one end of the overcoat top linking springs (12) of bearing (16), the other end of spring (12) is fixedly connected with the top of the first chute (5), spring (12) is given (16) downward power of bearing all the time, heating cabinet (8) is installed in walker (4) bottom, one end of heating cabinet (8) arranges blower fan (14), heating cabinet (8) other end sets out airduct (7), heating wire (13) is installed in heating cabinet (8).
2. electric device snow-blowing and deicing device according to claim 1, it is characterized in that: upper driven pulley (2) and the second contact roller (3) installed of described walker (4), the axle of driven pulley (2) is connected 11 with driving wheel) axle connect by belt, driven pulley (2) is positioned at the below of the second contact roller (3), walker (4) is offered vertical the second chute (18), and the second contact roller (3) is arranged in the second chute (18) by slide bearing assembly.
3. electric device snow-blowing and deicing device according to claim 1, is characterized in that: infrared thermometer (10) is set on described walker (4).
CN 201220684088 2012-12-13 2012-12-13 Snow-blowing deicing device for power devices Expired - Fee Related CN202978179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220684088 CN202978179U (en) 2012-12-13 2012-12-13 Snow-blowing deicing device for power devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220684088 CN202978179U (en) 2012-12-13 2012-12-13 Snow-blowing deicing device for power devices

Publications (1)

Publication Number Publication Date
CN202978179U true CN202978179U (en) 2013-06-05

Family

ID=48519206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220684088 Expired - Fee Related CN202978179U (en) 2012-12-13 2012-12-13 Snow-blowing deicing device for power devices

Country Status (1)

Country Link
CN (1) CN202978179U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102983538A (en) * 2012-12-13 2013-03-20 山东电力集团公司检修公司 Snow blowing and ice thawing device for electrical device
CN104464977A (en) * 2014-11-20 2015-03-25 国网河南栾川县供电公司 Paint spraying device for bare wire
CN106207865A (en) * 2016-10-02 2016-12-07 成都蒲江珂贤科技有限公司 Electrician's special high-pressure line maintenance instrument
CN106972405A (en) * 2017-04-14 2017-07-21 贵州电网有限责任公司 A kind of monofilament coiling device and its application method for being used to repair transmission line wire
CN108023310A (en) * 2018-01-29 2018-05-11 山东博发智能科技有限公司 A kind of quick apparatus for peeling off of compression type cable
CN108173226A (en) * 2016-12-07 2018-06-15 长沙鲁维湘机电科技有限公司 A kind of power transmission line deicer
CN108493884A (en) * 2018-04-06 2018-09-04 方晓妹 A kind of high-voltage line snow removing water removal defroster
CN109950848A (en) * 2019-02-16 2019-06-28 郑州工业应用技术学院 Overhead line deicing robot for power system
CN110474276A (en) * 2019-07-12 2019-11-19 徐州博导信息科技有限公司 A kind of suspension type high-altitude steel cable device for expelling ice and snow
CN111327010A (en) * 2020-03-20 2020-06-23 国网山东省电力公司龙口市供电公司 Electric power operation and maintenance equipment de-icer
CN112600118A (en) * 2020-12-06 2021-04-02 武汉露能科技有限公司 Transmission line work robot

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102983538B (en) * 2012-12-13 2015-11-18 山东电力集团公司检修公司 Electric device snow-blowing and deicing device
CN102983538A (en) * 2012-12-13 2013-03-20 山东电力集团公司检修公司 Snow blowing and ice thawing device for electrical device
CN104464977A (en) * 2014-11-20 2015-03-25 国网河南栾川县供电公司 Paint spraying device for bare wire
CN104464977B (en) * 2014-11-20 2017-07-14 国网河南栾川县供电公司 A kind of spray-painting plant for bare wire wire
CN106207865B (en) * 2016-10-02 2018-05-22 陈卡丹 Electrician's special high-pressure line maintenance instrument
CN106207865A (en) * 2016-10-02 2016-12-07 成都蒲江珂贤科技有限公司 Electrician's special high-pressure line maintenance instrument
CN108173226A (en) * 2016-12-07 2018-06-15 长沙鲁维湘机电科技有限公司 A kind of power transmission line deicer
CN106972405A (en) * 2017-04-14 2017-07-21 贵州电网有限责任公司 A kind of monofilament coiling device and its application method for being used to repair transmission line wire
CN106972405B (en) * 2017-04-14 2019-02-15 贵州电网有限责任公司 It is a kind of for repairing the monofilament coiling device and its application method of transmission line wire
CN108023310A (en) * 2018-01-29 2018-05-11 山东博发智能科技有限公司 A kind of quick apparatus for peeling off of compression type cable
CN108493884A (en) * 2018-04-06 2018-09-04 方晓妹 A kind of high-voltage line snow removing water removal defroster
CN109950848A (en) * 2019-02-16 2019-06-28 郑州工业应用技术学院 Overhead line deicing robot for power system
CN110474276A (en) * 2019-07-12 2019-11-19 徐州博导信息科技有限公司 A kind of suspension type high-altitude steel cable device for expelling ice and snow
CN111327010A (en) * 2020-03-20 2020-06-23 国网山东省电力公司龙口市供电公司 Electric power operation and maintenance equipment de-icer
CN112600118A (en) * 2020-12-06 2021-04-02 武汉露能科技有限公司 Transmission line work robot
CN112600118B (en) * 2020-12-06 2022-05-10 武汉露能科技有限公司 Transmission line work robot

Similar Documents

Publication Publication Date Title
CN202978179U (en) Snow-blowing deicing device for power devices
CN102983538B (en) Electric device snow-blowing and deicing device
CN204012597U (en) A kind of electrified deicing device
CN208623288U (en) A kind of high-voltage line de-icing apparatus
CN208015330U (en) High-altitude cable deicing device
CN204732829U (en) A kind of deicer for power transmission conducting wire
CN203660476U (en) Transmission line deicing device
CN208955618U (en) A kind of deicer for transmission line of electricity
CN113555806A (en) A switchgear for intelligent temperature and humidity regulation based on the Internet of Things
CN104410028B (en) A kind of swing conducting wire deicing snow device
CN203367930U (en) Ice-melting and deicing device for power grid
CN216819346U (en) Power cable with supplementary snow removing structure
CN110854782A (en) Deicing device of power transmission line
CN205828949U (en) A kind of electric power cabinet high-efficiency cooling device
CN207664575U (en) A kind of anti-freezing device for transmission line of electricity
CN212063423U (en) Power transmission line anti-icing and deicing robot
CN207782279U (en) A kind of electric line foreign matter remove device
CN207801421U (en) A kind of electric system removing icing device
CN206865655U (en) A kind of smart city Special monitoring device
CN203142727U (en) Multifunctional sulfur hexafluoride inflatable trolley
CN205829114U (en) A power line deicing device
CN204252064U (en) A kind of deicing or snow melting device
CN110492422B (en) High altitude cable defroster
CN209329648U (en) Defrosting and deicing device of power taking equipment in alpine region
CN202840436U (en) High-voltage cable snow-removing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20171213

CF01 Termination of patent right due to non-payment of annual fee