CN202969379U - 锚杆张拉千斤顶吊装支架 - Google Patents
锚杆张拉千斤顶吊装支架 Download PDFInfo
- Publication number
- CN202969379U CN202969379U CN 201220687680 CN201220687680U CN202969379U CN 202969379 U CN202969379 U CN 202969379U CN 201220687680 CN201220687680 CN 201220687680 CN 201220687680 U CN201220687680 U CN 201220687680U CN 202969379 U CN202969379 U CN 202969379U
- Authority
- CN
- China
- Prior art keywords
- cross bar
- jack
- lifting
- anchor pole
- rock bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型提供一种锚杆张拉千斤顶吊装支架,可以解决现有深基坑锚杆张拉时千斤顶吊装困难的问题。锚杆张拉千斤顶吊装支架,置于深基坑灌注桩冠梁上,包括底座、立杆和横杆,所述立杆固设在所述底座上,所述横杆具有连接端和自由端,所述横杆通过其连接端固连于所述立杆的上部,所述横杆上安装有可沿所述横杆移动的滑动件,所述滑动件底端设有用于吊装千斤顶的吊系。采用本实用新型进行深基坑锚杆张拉自重较大千斤顶的吊装,结构简单,操作方便,可轻松地吊装千斤顶,操作成本低。
Description
技术领域
本实用新型涉及建筑领域,具体涉及一种锚杆张拉千斤顶吊装支架。
背景技术
锚杆张拉是在锚杆中提前加拉力,使锚杆承受拉应力,主动对基坑侧壁或边坡施加压应力,平衡岩土侧压力,减小基坑位移,锚杆张拉所用到的工具一般为中空千斤顶及配套油泵。
在建设工程基坑锚杆支护施工过程中,由于工程需要,锚杆张拉需要多次进行,锚杆初次张拉基坑开挖后,再进行锚杆二次及多次张拉,由于基坑深度增大,锚杆二次及多次张拉就要高空作业。锚杆张拉张拉力30~50吨,所需千斤顶自重30kg以上,张拉力50~80吨千斤顶自重65kg以上,张拉力80~120吨千斤顶自重100kg以上,深基坑锚杆张拉张拉力大多在30~120吨之间,所需千斤顶自重30~100kg。千斤顶自重30kg左右时人工利用爬梯勉强操作,但危险系数很大,自重65kg以上仅靠人工无法操作,以往一般采用吊车吊装千斤顶,一则费用较高,二则有时因基坑内外条件所致,吊车没有安放条件,将花更大的代价来完成张拉。
因此,亟待设计一种锚杆张拉千斤顶吊装支架,满足深基坑锚杆张拉大自重千斤顶吊装的需要。
发明内容
本实用新型提供一种锚杆张拉千斤顶吊装支架,可以解决现有深基坑锚杆张拉时千斤顶吊装困难的问题。
为达到解决上述技术问题的目的,本实用新型采用以下技术方案予以实现:一种锚杆张拉千斤顶吊装支架,置于深基坑灌注桩冠梁上,包括底座、立杆和横杆,所述立杆固设在所述底座上,所述横杆具有连接端和自由端,所述横杆通过其连接端固连于所述立杆的上部,所述横杆上安装有可沿所述横杆移动的滑动件,所述滑动件底端设有用于吊装千斤顶的吊系。
在本实用新型的技术方案中,还包括如下附加技术特征:
所述底座底部安装有滚动件。
所述横杆上沿其长度方向间隔设有多个销孔。
所述锚杆张拉千斤顶吊装支架还包括用于支撑所述横杆的支撑斜杆,所述支撑斜杆一端支撑连接于所述横杆的自由端,另一端置于深基坑灌注桩腰梁上。
所述吊系为手拉葫芦。
与现有技术相比,采用本实用新型进行深基坑锚杆张拉大自重千斤顶的吊装,结构简单,操作方便,可轻松地吊装千斤顶,操作成本低。
附图说明
图1为本实用新型实施例锚杆张拉千斤顶吊装支架的结构示意图。
具体实施方式
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。
参照图1所示,本实施例锚杆张拉千斤顶吊装支架,包括底座1、立杆2和横杆3,立杆2通过固定螺栓4牢固地固定于底座1上,横杆3具有连接端3-1和自由端3-2,横杆3通过其连接端3-1固连于立杆2的上部,横杆3上安装有可沿横杆3横向移动的滑动件5,滑动件5底端设有用于吊装千斤顶6的吊系7。
具体的,底座1采用型钢或型钢混凝土制作,重量较大,可设400~600kg,为整个支架起到稳固底盘的作用。在使用时将底座1安放于深基坑灌注桩冠梁8上,冠梁8的边缘处安装护栏进行保护,依次组装立杆2、横杆3、滑动件5和吊系7,调整横杆3前后长度并固定,安放吊系7,起吊千斤顶6;人工前推吊系7,将千斤顶6平移至张拉位置的正上方,拉动吊系7,下放千斤顶6,然后安装张拉程序进行锚杆张拉。本实施例中吊系7可以是手拉葫芦或吊索,本实施例中吊系7优选手拉葫芦;滑动件5是吊系7与横杆3连接的过渡构件,可以选用滑块或吊钩,本实施例中滑动件5优选吊钩。
由于底座1重量较大,为便于人工灵活移动,提高作业效率,在底座1底部安装有滚动件10,滚动件10可以是滚轮或滚动轴承等。
横杆3为吊装支架的主要受力构件,采用厚壁无缝钢管制作,立杆2起到支撑与连接横杆3的作用,立杆2为槽钢,其两侧面的上部相对设置连接孔;横杆3上沿其长度方向间隔设有多个销孔,横杆3的连接端3-1穿过立杆2两侧面上的两连接孔后由第一固定销9插装在横杆3上的一销孔上固定,从而将横杆3固连于立杆2的上部。当然,横杆3也可采用其他固定方式固定在立杆2上,本实施例对此不作具体限制。通过在横杆3上设置多个销孔,可根据现场作业条件前后移动横杆3后插装第一固定销9固定,同时在靠近横杆3自由端3-2位置处的销孔上可设置第二固定销13用于止挡滑动件5。
由于千斤顶6重量较大,为保证横杆3的稳固性,本实施例锚杆张拉千斤顶吊装支架还包括用于支撑横杆3的支撑斜杆11,支撑斜杆11一端支撑连接于横杆3的自由端3-2,另一端置于深基坑灌注桩腰梁12上。本实施例中支撑斜杆11采用U型螺栓和固定支撑销连接于横杆3的自由端3-2。
以上所述,仅是本实用新型的较佳实施例而已,并非是对本实用新型作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例。但是凡是未脱离本实用新型技术方案内容,依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本实用新型技术方案的保护范围。
Claims (5)
1.一种锚杆张拉千斤顶吊装支架,置于深基坑灌注桩冠梁上,其特征在于:包括底座、立杆和横杆,所述立杆固设在所述底座上,所述横杆具有连接端和自由端,所述横杆通过其连接端固连于所述立杆的上部,所述横杆上安装有可沿所述横杆移动的滑动件,所述滑动件底端设有用于吊装千斤顶的吊系。
2.根据权利要求1所述的锚杆张拉千斤顶吊装支架,其特征在于:所述底座底部安装有滚动件。
3.根据权利要求1或2所述的锚杆张拉千斤顶吊装支架,其特征在于:所述横杆上沿其长度方向间隔设有多个销孔。
4.根据权利要求3所述的锚杆张拉千斤顶吊装支架,其特征在于:所述锚杆张拉千斤顶吊装支架还包括用于支撑所述横杆的支撑斜杆,所述支撑斜杆一端支撑连接于所述横杆的自由端,另一端置于深基坑灌注桩腰梁上。
5.根据权利要求3所述的锚杆张拉千斤顶吊装支架,其特征在于:所述吊系为手拉葫芦。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220687680 CN202969379U (zh) | 2012-12-13 | 2012-12-13 | 锚杆张拉千斤顶吊装支架 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220687680 CN202969379U (zh) | 2012-12-13 | 2012-12-13 | 锚杆张拉千斤顶吊装支架 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202969379U true CN202969379U (zh) | 2013-06-05 |
Family
ID=48510473
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220687680 Expired - Fee Related CN202969379U (zh) | 2012-12-13 | 2012-12-13 | 锚杆张拉千斤顶吊装支架 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202969379U (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104632246A (zh) * | 2014-09-01 | 2015-05-20 | 北车建设工程有限责任公司 | 一种大跨度地下结构 |
| CN111470434A (zh) * | 2020-04-30 | 2020-07-31 | 中建五局第三建设有限公司 | 一种岩壁锚索预应力张拉千斤顶安装装置 |
| CN112942842A (zh) * | 2021-02-04 | 2021-06-11 | 广东省第五建筑工程有限公司 | 一种角梁预应力钢筋张拉方法 |
-
2012
- 2012-12-13 CN CN 201220687680 patent/CN202969379U/zh not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104632246A (zh) * | 2014-09-01 | 2015-05-20 | 北车建设工程有限责任公司 | 一种大跨度地下结构 |
| CN111470434A (zh) * | 2020-04-30 | 2020-07-31 | 中建五局第三建设有限公司 | 一种岩壁锚索预应力张拉千斤顶安装装置 |
| CN112942842A (zh) * | 2021-02-04 | 2021-06-11 | 广东省第五建筑工程有限公司 | 一种角梁预应力钢筋张拉方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204803896U (zh) | 一种深基坑钢支撑预应力施加的调整装置 | |
| CN104631333B (zh) | 拱桥小横梁、小纵梁及桥面板现浇施工移动吊架及方法 | |
| CN202090370U (zh) | 小直径锚杆桩抗拔试验装置 | |
| US20130081337A1 (en) | Tower erection system and method | |
| KR101894388B1 (ko) | 파일 프레임 및 그 설치방법 | |
| CN202041399U (zh) | 预制梁应力静荷载试验装置 | |
| CN103541735A (zh) | 隧道掘进机步进顶推支撑装置及施工方法 | |
| CN103993745B (zh) | 一种转换梁整体吊装装置及其吊装方法 | |
| CN109441361B (zh) | 一种桩架及其立桅方法 | |
| CN108396754B (zh) | 一种悬吊浮拼钢围堰的施工方法 | |
| CN203451050U (zh) | 桩基钢筋笼吊筋 | |
| NO20121187A1 (no) | Fremgangsmåte og anordning til en glideforskaling som ikke har sammenbindende åk. | |
| CN202866262U (zh) | 土建施工用承重挂架 | |
| CN203037472U (zh) | 石油钻机静载荷测试装置 | |
| CN203755173U (zh) | 用于桥梁高墩液压爬升的模板装置 | |
| CN209163736U (zh) | 一种桩架 | |
| CN212479255U (zh) | 一种用于悬索桥隧道锚锚室拱顶二衬施工设备 | |
| CN202785257U (zh) | 人工挖孔桩钢筋笼吊装、定位用的控制装置 | |
| KR20170121523A (ko) | 역 낙하산 형태의 중앙 집중식 와이어로프를 이용한 말뚝시험 방법 및 그 장치 | |
| CN204551267U (zh) | 拱桥小横梁、小纵梁及桥面板现浇施工移动吊架 | |
| CN204080642U (zh) | 一种用于安装中小桥梁预制梁板装置 | |
| CN204402496U (zh) | 一种竖井钢绞线千斤顶吊滑模提升装置 | |
| CN204062152U (zh) | 高压泵管固定装置 | |
| CN202989786U (zh) | 旧桥体外预应力加固结构 | |
| CN2916133Y (zh) | 带有加固装置的工字钢梁 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130605 Termination date: 20151213 |
|
| EXPY | Termination of patent right or utility model |