CN202956654U - Remote monitoring equipment in sewage treatment operation - Google Patents

Remote monitoring equipment in sewage treatment operation Download PDF

Info

Publication number
CN202956654U
CN202956654U CN2012206885518U CN201220688551U CN202956654U CN 202956654 U CN202956654 U CN 202956654U CN 2012206885518 U CN2012206885518 U CN 2012206885518U CN 201220688551 U CN201220688551 U CN 201220688551U CN 202956654 U CN202956654 U CN 202956654U
Authority
CN
China
Prior art keywords
data
wireless
communication
equipment
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012206885518U
Other languages
Chinese (zh)
Inventor
靳晔
贾英新
王勇
庞增拴
张雷
刘占阳
孙海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI ELECTROMECHANICAL INTEGRATION TESTING BASE
Original Assignee
HEBEI ELECTROMECHANICAL INTEGRATION TESTING BASE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI ELECTROMECHANICAL INTEGRATION TESTING BASE filed Critical HEBEI ELECTROMECHANICAL INTEGRATION TESTING BASE
Priority to CN2012206885518U priority Critical patent/CN202956654U/en
Application granted granted Critical
Publication of CN202956654U publication Critical patent/CN202956654U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The utility model relates to remote monitoring equipment in sewage treatment operation. The remote monitoring equipment comprises a digital display circuit, a data storage, a communication device, a wireless field data acquisition circuit and a wired field data acquisition circuit, wherein data signals are transmitted through an individual line or an asymmetrical digital subscriber loop (ADSL) among the parts; the wireless field data acquisition circuit transmits data to the data storage through a date transfer unit (DTU) mode or through wireless general packet radio service (GPRS); the wireless field data acquisition circuit and the wired field data acquisition circuit respectively transmit the acquired data signals to the communication device; the communication device transmits the signals to the data storage; and the data storage transmits the signals to the data display circuit. By the equipment, the sewage treatment system can be remotely and automatically controlled on line in real time, and the equipment is particularly suitable for remote monitoring of sewage treatment operation enterprises.

Description

Remote supervisory and control(ling) equipment in a kind of wastewater treatment operation
Technical field
The utility model belongs to environmental technology field, relates to the remote supervisory and control(ling) equipment in a kind of wastewater treatment operation.This equipment is based on data transmission method that VPN telecommunication and OPC combine and realizes that the long-range real-time online of sewage disposal system controls automatically, is particularly suitable for the remote monitoring of wastewater treatment operation enterprise.
Background technology
Along with the development of economy and society, the discharge of municipal effluent, industrial waste water is also increasing, for alleviating the pollution of sewage to environment, in all parts of the country large to provinces and cities, the little investment construction sewage treatment plant that all carries out on a large scale to small towns.Domestic each sewage treatment plant scene has the monitoring software of a set of robotization controlling the equipment operation of water factory basically, because each sewage treatment plant is widely distributed on region, therefore some simple forms that the leadership in the sewage operation enterprise can only rely on subordinate water factory regularly to upload for the understanding of the operation situation of each Sewage Plant of subordinate, so simple management mode is difficult to grasp timely and effectively the true operation situation of subordinate water factory of enterprise.
Because automatic control system has all been done at first stage of construction by existing water factory, the supervisory system of a set of maturation is arranged in operation in each water factory.But, owing to building main body, differing, the platform of supervisory system is of all kinds, and various configuration platform have.Reach the target of unified monitoring, in the Sewage Plant supervisory layers, adopt two kinds of methods.(1) walk around the supervisory system of Sewage Plant, directly read the PLC controller data, underlying device---PLC controller---information center three-layer network control structure, make information center and Sewage Plant control center parallel, all from PLC controller reading out data.Due to information center and Sewage Plant control center read the reasons such as sequential, there is certain error certainly in data between the two, but general trend is consistent.This kind need increase corresponding hardware device RTU on the basis of original PLC hardware.(2) adopt open OPC service, the OPC service is installed on information center's server, the OPC service end is installed in the control system of water factory, serve and information center's communication by OPC.And these two kinds of modes respectively have shortcoming, can not real-time collecting subordinate sewage water factory real time data, the subordinate of actual response group Sewage Plant operation situation, long-range operation management inconvenience.
The utility model content
The utility model, for solving the problem in present technology, provides the remote supervisory and control(ling) equipment in a kind of wastewater treatment operation, and it can realize that the long-range real-time online of sewage disposal system controls automatically, is particularly suitable for the remote monitoring of wastewater treatment operation enterprise.
The utility model is achieved by the following technical solutions:
Remote supervisory and control(ling) equipment in a kind of wastewater treatment operation, it comprises data display circuit, data-carrier store, communication device, wireless on-site data gathering circuit and wired on-site data gathering circuit, adopt special line or ADSL communicated data signal between each several part, described wireless on-site data gathering circuit and wired on-site data gathering circuit are transferred to communication device by the data-signal of collection respectively, described communication device is transferred to data-carrier store by signal, and data-carrier store is transferred to data display circuit by signal.
Described wireless on-site data gathering circuit is by the DTU mode or transfer data to data-carrier store by wireless GPRS.
Wired on-site data gathering circuit transmits data by special line or ADSL, sets up OPC service end function, by VPC virtual server function, transfers data to data-carrier store.Data-carrier store is set up the OPC client functionality, the data of data display circuit acquired data storage device, and configuration displaying scene data are to display.
The utility model equipment combining wireless GPRS transmission and Ethernet transmission technology, in main office, realize that in each sub-factory, substation, the data transmission cross-platform, cross-system of different control system exchanges and monitoring, complete the data real time monitoring, record and gather, facilitate operation enterprise to be managed concentratedly.
The beneficial effect that the utility model compared with prior art has is:
The utility model equipment can realize that the long-range real-time online of sewage disposal system controls automatically, is particularly suitable for the remote monitoring of wastewater treatment operation enterprise.
The accompanying drawing explanation
Fig. 1 is the utility model principle schematic
Embodiment
With reference to the accompanying drawings the utility model embodiment is elaborated.
As Fig. 1, remote supervisory and control(ling) equipment in a kind of wastewater treatment operation of the utility model, it comprises data display circuit, data-carrier store, communication device, wireless on-site data gathering circuit and wired on-site data gathering circuit, adopt special line or ADSL communicated data signal between each several part, described wireless on-site data gathering circuit and wired on-site data gathering circuit are transferred to communication device by the data-signal of collection respectively, described communication device is transferred to data-carrier store by signal, and data-carrier store is transferred to data display circuit by signal.
Described wireless on-site data gathering circuit is by the DTU mode or transfer data to data-carrier store by wireless GPRS.
Wired on-site data gathering circuit transmits data by special line or ADSL, sets up OPC service end function, by VPC virtual server function, transfers data to data-carrier store.Data-carrier store is set up the OPC client functionality, the data of data display circuit acquired data storage device, and configuration displaying scene data are to display.
The utility model equipment combining wireless GPRS transmission and Ethernet transmission technology, in main office, realize that in each sub-factory, substation, the data transmission cross-platform, cross-system of different control system exchanges and monitoring, complete the data real time monitoring, record and gather, facilitate operation enterprise to be managed concentratedly.

Claims (2)

1. the remote supervisory and control(ling) equipment in wastewater treatment operation, it is characterized in that, it comprises data display circuit, data-carrier store, communication device, wireless on-site data gathering circuit and wired on-site data gathering circuit, adopt special line or ADSL communicated data signal between each several part, described wireless on-site data gathering circuit and wired on-site data gathering circuit are transferred to communication device by the data-signal of collection respectively, described communication device is transferred to data-carrier store by signal, and data-carrier store is transferred to data display circuit by signal.
2. the remote supervisory and control(ling) equipment in wastewater treatment operation as claimed in claim 1, is characterized in that, described wireless on-site data gathering circuit is by the DTU mode or transfer data to data-carrier store by wireless GPRS.
CN2012206885518U 2012-12-13 2012-12-13 Remote monitoring equipment in sewage treatment operation Expired - Fee Related CN202956654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012206885518U CN202956654U (en) 2012-12-13 2012-12-13 Remote monitoring equipment in sewage treatment operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012206885518U CN202956654U (en) 2012-12-13 2012-12-13 Remote monitoring equipment in sewage treatment operation

Publications (1)

Publication Number Publication Date
CN202956654U true CN202956654U (en) 2013-05-29

Family

ID=48462215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012206885518U Expired - Fee Related CN202956654U (en) 2012-12-13 2012-12-13 Remote monitoring equipment in sewage treatment operation

Country Status (1)

Country Link
CN (1) CN202956654U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103399544A (en) * 2013-07-24 2013-11-20 张运泉 Automatic control method for urban sewage treatment and control system thereof
CN107942904A (en) * 2017-11-24 2018-04-20 上海依科绿色工程有限公司 Industry Waste water station data acquisition device, monitoring and managing method, server and management system
CN109240250A (en) * 2018-11-15 2019-01-18 北京碧圣联合水务有限公司 A kind of water process supervisory systems and method
CN109947039A (en) * 2017-12-21 2019-06-28 广东闻扬环境科技有限公司 The method of long-range monitoring water treatment facilities

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103399544A (en) * 2013-07-24 2013-11-20 张运泉 Automatic control method for urban sewage treatment and control system thereof
CN103399544B (en) * 2013-07-24 2015-09-02 张运泉 A kind of municipal sewage treatment automation control method and control system thereof
CN107942904A (en) * 2017-11-24 2018-04-20 上海依科绿色工程有限公司 Industry Waste water station data acquisition device, monitoring and managing method, server and management system
CN109947039A (en) * 2017-12-21 2019-06-28 广东闻扬环境科技有限公司 The method of long-range monitoring water treatment facilities
CN109240250A (en) * 2018-11-15 2019-01-18 北京碧圣联合水务有限公司 A kind of water process supervisory systems and method

Similar Documents

Publication Publication Date Title
CN203745870U (en) Water resource intelligent integrated monitoring system
CN202956654U (en) Remote monitoring equipment in sewage treatment operation
CN104534557B (en) A kind of make-and-break time area method heat metering system
CN203101965U (en) Remote sewage treatment online monitoring and controlling system
CN201497897U (en) Comprehensive system based on CDMA remote wireless monitoring
CN105471109A (en) Intelligent power consumption management system facing household wind and solar energy mutual-complementing power station and management method thereof
CN105182917A (en) Mid-small-sized hydropower station intelligent control system and method therefor
CN204883352U (en) Tobacco peculiar smell treatment facility running state remote monitering system
CN103454999B (en) The long distance control system of tobacco sheet production line and method for supervising
WO2017214917A1 (en) Intelligent water quality monitoring system
CN105003958A (en) Internet-of-Things-based urban region centralized heat supply monitoring system and heat supply system
CN201859537U (en) Multifunctional bandwidth power carrier concentrator
CN106097155B (en) A kind of car plumbing intelligent monitoring and management system based on mobile Internet
CN103632524A (en) Multi-platform energy consumption monitoring system with various access ways
CN201905101U (en) Remote orchard intelligent irrigation system based on ZigBee and GPRS (general packet radio service)
CN205320696U (en) Intelligence system of growing flower based on wifi cloud
CN202120433U (en) Meter reading system
CN202014263U (en) Centralized monitoring system for power and environmental equipment of communication base station
CN103176466A (en) Water-saving agricultural ecological information acquisition system
CN210777116U (en) Low-power consumption data acquisition wireless module
CN203311619U (en) Intelligent monitoring and managing system of water resource
CN204462791U (en) A kind of municipal heating systems wireless remote control system
CN101393455A (en) Waterworks monitoring, managing and scheduling apparatus
CN202995998U (en) Automatic meter-reading system
CN202495141U (en) Multipurpose meter reading concentrator

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130529

Termination date: 20131213

C17 Cessation of patent right