CN202929193U - 一种电能表整体误差校验系统 - Google Patents

一种电能表整体误差校验系统 Download PDF

Info

Publication number
CN202929193U
CN202929193U CN 201220498772 CN201220498772U CN202929193U CN 202929193 U CN202929193 U CN 202929193U CN 201220498772 CN201220498772 CN 201220498772 CN 201220498772 U CN201220498772 U CN 201220498772U CN 202929193 U CN202929193 U CN 202929193U
Authority
CN
China
Prior art keywords
voltage
low
unit
voltage unit
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220498772
Other languages
English (en)
Inventor
彭新亮
赵拴柱
赵阳波
邹守莉
朱西成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI FUJI ELECTRIC POWER TECHNOLOGY Co Ltd
Original Assignee
SHAANXI FUJI ELECTRIC POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI FUJI ELECTRIC POWER TECHNOLOGY Co Ltd filed Critical SHAANXI FUJI ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN 201220498772 priority Critical patent/CN202929193U/zh
Application granted granted Critical
Publication of CN202929193U publication Critical patent/CN202929193U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

本实用新型公开了一种电能表整体误差校验系统,包括低压单元和高压单元,其中在低压单元中设置三相低压功率源,该低压单元还设有与被测低压电能表相连接的接口,在高压单元中设置三相高压大电流功率源,该三相高压功率源上设有与被检高压计量装置相连接的接口,高压单元的输出端与多路误差处理单元相连接,在该系统中还包括基准电能测量系统,其与低压单元和高压单元之间电连接,在该系统中还包括监控系统,其与低压单元、基准电能测量系统以及多路误差处理单元进行通信连接。这种电能表整体误差校验系统不仅能够对一体化的高压电能表进行误差检测,也能够对传统的计量装置进行整体误差的直接校验。

Description

一种电能表整体误差校验系统
技术领域:
本实用新型涉及一种电能计量校验设备,具体地涉及一种电能表整体误差校验系统。
背景技术:
高压电能表的准确度如何是其性能的关键因素。如何对它的误差进行校验是正确使用高压电能计量装置时经常遇到的问题。现有的高压电能计量装置主要由电压互感器、电流互感器和低压电能表三部分组成,其计量误差与电压互感器、电流互感器的准确度、接线方式及低压电能表的准确度有关,目前在校验时需要分别检测电互感器、电流互感器以及低压电能表的误差,同时还有PT二次压降带来的误差,再使用整体误差的方法评价电能计量装置的准确度。中国国家标准中有相关规定:当电压互感器和电流互感器为0.2级(士0.2%)、电能表为0.5级(士0.5%)时,整体误差被估算为士0.7%。
然而根据国际电工委员会规定的基本原则:“所有仪表和计量装置的误差都必须进行实际的测量,未经测量,仅是以其他测量中计算出来的引用电压、电流和功率因数组合的误差,不能作为评价装置基本误差的依据”。所以上述的国家标准中的“整体误差”不能用于评价高压电能计量装置的准确度。
高压电能表实现了高压电能的直接计量,具有整体误差,传统的高压电能计量装置的校验方法与设备不能用于高压电能表的误差检定。因此需要研究一种整体误差校验系统实现对各种电能表,尤其是高压电能表的误差检测。
实用新型内容:
本实用新型为了解决上述的技术问题,提供一种电能表整体误差校验系统,包括低压单元和高压单元,其中在低压单元中设置三相低压功率源,该低压功率源包括六路数字式信号发生器,其与3个用于稳压稳流稳相的功率放大器相连接,该低压单元设有与被测低压电能表相连接的接口,在高压单元中设置三相高压大电流功率源,该三相高压功率源上设有与被检高压计量装置相连接的接口,高压单元的输出端与多路误差处理单元相连接,在该系统中还包括基准电能测量系统,其与低压单元和高压单元之间电连接,在该系统中还包括监控系统,其与低压单元、基准电能测量系统以及多路误差处理单元进行通信连接。
上述的电能表整体误差校验系统不仅能够对一体化的高压电能表进行误差检测,也能够对电力计量柜、计量箱等传统的计量装置进行整体误差的直接校验,还能够对弱输出组合互感器加低压电能表的计量装置以及电子式组合互感器加电能表的计量装置进行整体误差的校验。
附图说明:
图1是本实用新型的电能表的整体误差校验系统的示意图。
具体实施方式:
如图1所示,作为本实用新型的具体实施方式,电能表的整体误差校验系统包括低压单元1和高压单元5,其中在低压单元1中设置三相低压功率源2,该低压功率源2包括六路数字式信号发生器3,其与3个用于稳压稳流稳相的功率放大器4相连接,该低压单元1设有与被测低压电能表相连接的接口,在高压单元5中设置三相高压大电流功率源6,该三相高压功率源6上设有与被检高压计量装置相连接的接口,高压单元5的输出端与多路误差处理单元8相连接,在该系统中还包括基准电能测量系统7,其与低压单元1和高压单元5之间电连接,在该系统中还包括监控系统9,其与低压单元1、基准电能测量系统7以及多路误差处理单元8进行通信连接。
监控系统9根据试验要求设置需要的电压、电流和功率因数并发送给外部试验电源的CPU,由三相低压功率源2根据幅值、相位检测的结果对电源进行调整,生成满足试验要求的低压电源。低压电源再通过三相高压大电流功率源6产生满足高压电能表校验的高压大电流。由基准电能计量系统7与高压电能表同时测量高压大电流,并将功率脉冲输送到监控系统进行比对,得到有功电能或无功电能的计量误差,进行显示、保存。同时由多路误差处理单元8反馈调节输出电压与电流,保证电源输出的稳定性。

Claims (1)

1.一种电能表整体误差校验系统,包括低压单元和高压单元,其中在低压单元中设置三相低压功率源,该低压功率源包括六路数字式信号发生器,其与3个用于稳压稳流稳相的功率放大器相连接,该低压单元设有与被测低压电能表相连接的接口,其特征在于:在高压单元中设置三相高压大电流功率源,该三相高压功率源上设有与被检高压计量装置相连接的接口,高压单元的输出端与多路误差处理单元相连接,在该系统中还包括基准电能测量系统,其与低压单元和高压单元之间电连接,在该系统中还包括监控系统,其与低压单元、基准电能测量系统以及多路误差处理单元进行通信连接。
CN 201220498772 2012-09-27 2012-09-27 一种电能表整体误差校验系统 Expired - Fee Related CN202929193U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220498772 CN202929193U (zh) 2012-09-27 2012-09-27 一种电能表整体误差校验系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220498772 CN202929193U (zh) 2012-09-27 2012-09-27 一种电能表整体误差校验系统

Publications (1)

Publication Number Publication Date
CN202929193U true CN202929193U (zh) 2013-05-08

Family

ID=48219140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220498772 Expired - Fee Related CN202929193U (zh) 2012-09-27 2012-09-27 一种电能表整体误差校验系统

Country Status (1)

Country Link
CN (1) CN202929193U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901945A (zh) * 2012-09-27 2013-01-30 陕西富集电力科技股份有限公司 一种电能表整体误差校验系统
CN103558580A (zh) * 2013-11-14 2014-02-05 国家电网公司 一种电能表的浪涌抗扰度检测系统及方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102901945A (zh) * 2012-09-27 2013-01-30 陕西富集电力科技股份有限公司 一种电能表整体误差校验系统
CN103558580A (zh) * 2013-11-14 2014-02-05 国家电网公司 一种电能表的浪涌抗扰度检测系统及方法

Similar Documents

Publication Publication Date Title
CN201444193U (zh) 用于数字化电能计量装置的综合误差检验装置
Cataliotti et al. A novel approach to current transformer characterization in the presence of harmonic distortion
CN103207379B (zh) 电流互感器直流偏磁误差特性测量方法及装置
CN102156274A (zh) 配电网三相电能计量系统现场整体检测系统
CN201867490U (zh) 多表位标准电能表检定装置
CN201425621Y (zh) 一种高压电能计量装置的误差校验系统
CN101806876A (zh) 电子式互感器校验系统
CN101251585A (zh) 高压电能计量装置整体误差校验方法及装置
CN201514473U (zh) 高压电能计量装置误差定位装置
CN106405470A (zh) 电子式电流互感器谐波准确度整体检测方法和检测装置
CN101770006A (zh) 新型电子式互感器校验方法
CN204945357U (zh) 一种电子式互感器稳态误差测量装置
CN103063895B (zh) 钳形抗干扰电流互感器及变压器铁芯接地电流测试系统
CN202075405U (zh) 配电网三相电能计量系统现场整体检测系统
Schöttke et al. Transfer characteristic of a MV/LV transformer in the frequency range between 2 kHz and 150 kHz
CN103558571A (zh) 电子式互感器及合并单元校验系统
CN202929193U (zh) 一种电能表整体误差校验系统
CN104931914A (zh) 一种模拟现场的高压电能表检定系统
CN104076226B (zh) 基于电压差值和电流差值测量变压器能效的装置及方法
CN203287514U (zh) 电流互感器直流偏磁误差特性测量装置
CN204177954U (zh) 一种35kV高压电能计量装置整体误差检定系统
CN102901945A (zh) 一种电能表整体误差校验系统
CN203551762U (zh) 电子式互感器及合并单元校验系统
CN201859212U (zh) 电子式互感器的新型校验装置
Zhang et al. Design and test of a new high-current electronic current transformer with a Rogowski coil

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20150927

EXPY Termination of patent right or utility model