CN202882959U - Rock bolting front canopy device of mine driving face - Google Patents

Rock bolting front canopy device of mine driving face Download PDF

Info

Publication number
CN202882959U
CN202882959U CN 201220456620 CN201220456620U CN202882959U CN 202882959 U CN202882959 U CN 202882959U CN 201220456620 CN201220456620 CN 201220456620 CN 201220456620 U CN201220456620 U CN 201220456620U CN 202882959 U CN202882959 U CN 202882959U
Authority
CN
China
Prior art keywords
front canopy
forestope
nut
lifting nut
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220456620
Other languages
Chinese (zh)
Inventor
孙长龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220456620 priority Critical patent/CN202882959U/en
Application granted granted Critical
Publication of CN202882959U publication Critical patent/CN202882959U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a rock bolting front canopy device of a mine driving face. The rock bolting front canopy device is suitable for being used as a temporary support when a rock bolting drivages. The rock bolting front canopy device comprises a front canopy and suspension devices, wherein the front canopy is machined by channel steel, and a limiting device is placed on the front canopy to fix an anchor beam or a steel belt. Each suspension device are composed of a suspension nut, a suspension screw rod, an upper supporting plate, a lower supporting plate, an upper lifting nut and a lower lifting nut. The suspension devices connected on a top anchor rod through the suspension nut to enable the rock bolting front canopy and the suspension devices to be hung below a top plate, and enable the front canopy to be placed between the upper supporting plate and the lower supporting plate. Suspension devices with two as a group support one front canopy together. One end of the front canopy is fixed on an installed top plate anchor rod, and the other end of the front canopy extends to an empty top area. The upper lifting nut and the lower lifting nut lift to enable the front canopy and a top plate surrounding rock to be contacted tightly to play a role of the front canopy bolting. The rock bolting front canopy device of the mine driving face is simple in structure, light, flexible, convenient to use, time-saving, labor-saving and good in supporting effect. The rock bolting front canopy device of the mine driving face is moved forward in an alternation mode, safety of operation personnel can be guaranteed, and working with no protection is avoided.

Description

Coal mine evacuation working face bolt support front cantilever apparatus
Technical field
The utility model relates to a kind of coal mine evacuation working face bolt support front cantilever apparatus, belongs to the Bolt Supporting in Roadways field.Do temporary lining when mainly being applicable to the roadway supported by bolt driving.
Background technology
In the shaft and drift supporting, bolt support is modal a kind of support form, and its temporary lining is puzzlement constructor's a difficult problem always, and what have does not reach the temporary lining effect, and implementing of having is cumbersome, time-consuming, effort.Existing temporary lining is: make forestope with track or i iron, be suspended on the roll bolt with the metal suspension ring, and with in time reach of construction, lay wooden large plate on it, length and lanewidth are suitable.This forestope is done the suspender suspension with the metal suspension ring and is fixed on the intact roll bolt of supporting, after forestope moves forward with construction, meeting head on can't be at the lower anchor pole of beating of temporary lining with the anchor pole of forestope in-line arrangement, must wait all the other anchor poles set complete after, recalling forestope could set again, not only lose time, increased labor strength, and have potential safety hazard.Working procedure is: tap, look for clean crag and the cash of living → move forestope (temporary lining) → permanent support (to beat square, skyhook) → withdraw forestope (temporary lining) → permanent support (beat, fill blue anchor pole, linked network, put the beams in place, finish the roll bolt supporting).For a long time temporary lining is always merely nominal, has both affected construction speed, is unfavorable for again safe construction.
Summary of the invention
The problem that temporary lining exists when tunneling for solving roadway supported by bolt, the utility model provides a kind of coal mine evacuation working face bolt support front cantilever apparatus.
The utility model is realized with following technical scheme: a kind of coal mine evacuation working face bolt support front cantilever apparatus, it comprises forestope and forestope is suspended on suspender on the roll bolt that described suspender comprises jack nut, suspended screw, top board, bottom plate, upper lifting nut and lower lifting nut; Suspended screw passes the bottom-up bottom plate that is arranged in order, lower lifting nut, top board, upper lifting nut is connected with jack nut and is connected with lower lifting nut, upper lifting nut thread, and its upper end is fixedly connected with jack nut and is fastened on the roll bolt by jack nut; Described forestope cross section is flute profile, has a bar hole along the forestope length direction on the bottom land of forestope, and the bar hole width cooperates with suspended screw; Forestope is placed between top board and the bottom plate and goes here and there on suspended screw, and an end is fixed on the mounted roofbolt, other end interception empty top zone.
Two of described suspenders are one group, and two suspenders are arranged apart along bar hole, jointly hang a forestope.
The ascending, descending nut rises or decline makes forestope contact the tight front-probe support effect of playing with roof rock by regulating; The constructor temporary lining is lower beat anchor pole after pretension finish permanent support.Then the null term operation is avoided in circulation reach, guarantees operating personnel's personal safety, and supporting effect is good.
The beneficial effects of the utility model are: simple in structure, and light and flexible, easy to use, alternating forward, time saving and energy saving, can guarantee operating personnel's personal safety, avoid the null term operation, supporting effect is good.
Description of drawings
Fig. 1 is the bolt support plan view;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the partial sectional view of Fig. 1;
Fig. 4 is the structural representation of suspender after forestope is combined;
Fig. 5 is the forestope structural representation;
Fig. 6 is the utility model scheme of installation.
Among the figure: 1, forestope, 1.1, bar hole, 2, suspender, 2.1, jack nut, 2.2, suspended screw, 2.3, top board, 2.4, bottom plate, 2.5, upper lifting nut, 2.6, lower lifting nut, 3, roll bolt, 3.1, the roll bolt nut, 3.2, the roll bolt head, 4, section of side anchor pole, 5, ladder beam, 6, anchor beam, 7, anchor rod pallet board, 8, stop.
The specific embodiment
Such as Fig. 1, Fig. 2 and shown in Figure 3, the coal mine evacuation working face bolt support comprises front cantilever apparatus, roll bolt 3, section of side anchor pole 4, ladder beam 5, anchor beam 6 and anchor rod pallet board 7.
As shown in Figure 4, coal mine evacuation working face bolt support front cantilever apparatus it comprise forestope 1 and forestope 1 be suspended on suspender 2 on the roll bolt 3.Suspender 2 comprises jack nut 2.1, suspended screw 2.2 top boards 2.3, bottom plate 2.4, upper lifting nut 2.5 and lower lifting nut 2.6; Suspended screw 2.2 passes the bottom-up bottom plate that is arranged in order 2.4, lower lifting nut 2.6, top board 2.3, upper lifting nut 2.5 and jack nut 2.1 and is threaded with lower lifting nut 2.6, upper lifting nut 2.5, and its upper end is fixedly connected with jack nut 2.1 and is fastened on the roll bolt 3 by jack nut 2.1.As shown in Figure 5, forestope 1 cross section is flute profile, has a bar hole 1.1 along the forestope length direction on the bottom land of forestope, and the bar hole width cooperates with suspended screw 2.2; The present embodiment forestope is processed by channel-section steel.Forestope 1 is placed between top board 2.3 and the bottom plate 2.4 and goes here and there on suspended screw 2.2, and an end is fixed on the mounted roofbolt 1, other end interception empty top zone.It is enough strong that forestope and suspender, component strength are wanted, take iron and steel matter cast member as first-selected.
As shown in Figure 6,2 two of suspenders are one group, and two suspenders 2 are arranged apart along bar hole 1.1, jointly hang a forestope.Spacing distance is provided with for the fixing stop 8 of anchor beam 6 or steel band on described forestope 1.Present embodiment stop 8 is out 2 circular holes on bar hole 1.1, crosses the top with metal or plastic wire on anchor beam or the steel band.Lifting nut rises and makes forestope contact the tight front-probe support effect of playing with roof rock.The constructor temporary lining is lower beat anchor pole after pretension finish permanent support.Then the null term operation is avoided in circulation reach, guarantees operating personnel's personal safety, and supporting effect is good.Suspended screw 2.2 is connected on the roll bolt 3 by jack nut 2.1, pin timbering forestope suspension device is suspended in below the top board, forestope is placed on the joist seat on the lifting nut, one end interception empty top zone, the fixing anchor beam of limited location device is crossed the top with metal (plastics) net on anchor beam or the steel band on the forestope.Lifting nut rises and makes forestope contact the tight front-probe support effect of playing with roof rock.The constructor temporary lining is lower beat anchor pole after pretension finish permanent support.Then the null term operation is avoided in circulation reach, guarantees operating personnel's personal safety, and supporting effect is good.
Coal mine evacuation working face bolt support front cantilever apparatus can change existing supporting construction operation: tap, look for clean crag and the cash of living → move forestope (temporary lining) → permanent support (beat square, skyhook, linked network, put the beams in place, finish the roll bolt supporting).Light and flexible, easy to use, alternating forward, time saving and energy saving, can guarantee operating personnel's personal safety, avoid the null term operation, supporting effect is good.Thereby be easy to promote, have good society and economic benefit.

Claims (4)

1. coal mine evacuation working face bolt support front cantilever apparatus, it comprises forestope (1) and forestope (1) is suspended on suspender (2) on the roll bolt (3) that it is characterized in that: described suspender (2) comprises jack nut (2.1), suspended screw (2.2), top board (2.3), bottom plate (2.4), upper lifting nut (2.5) and lower lifting nut (2.6); Suspended screw (2.2) passes the bottom-up bottom plate that is arranged in order (2.4), lower lifting nut (2.6), top board (2.3), upper lifting nut (2.5) and jack nut (2.1) and is threaded with lower lifting nut (2.6), upper lifting nut (2.5), and its upper end is fixedly connected with jack nut (2.1) and is fastened on the roll bolt (3) by jack nut (2.1); Described forestope (1) cross section is flute profile, has a bar hole (1.1) along the forestope length direction on the bottom land of forestope, and the bar hole width cooperates with suspended screw (2.2); Forestope (1) is placed between top board (2.3) and the bottom plate (2.4) and goes here and there on suspended screw (2.2), and an end is fixed on the mounted roofbolt (1), other end interception empty top zone.
2. coal mine evacuation working face bolt support front cantilever apparatus according to claim 1, it is characterized in that: (2) two of described suspenders are one group, and two suspenders (2) are arranged apart along bar hole (1.1), jointly hang a forestope.
3. coal mine evacuation working face bolt support front cantilever apparatus according to claim 1 is characterized in that: spacing distance is provided with for the fixing stop (8) of anchor beam (6) or steel band on described forestope.
4. it is characterized in that: process with channel-section steel at described forestope according to claim 1 or 3 described coal mine evacuation working face bolt support front cantilever apparatus.
CN 201220456620 2012-09-09 2012-09-09 Rock bolting front canopy device of mine driving face Expired - Fee Related CN202882959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220456620 CN202882959U (en) 2012-09-09 2012-09-09 Rock bolting front canopy device of mine driving face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220456620 CN202882959U (en) 2012-09-09 2012-09-09 Rock bolting front canopy device of mine driving face

Publications (1)

Publication Number Publication Date
CN202882959U true CN202882959U (en) 2013-04-17

Family

ID=48074399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220456620 Expired - Fee Related CN202882959U (en) 2012-09-09 2012-09-09 Rock bolting front canopy device of mine driving face

Country Status (1)

Country Link
CN (1) CN202882959U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483146A (en) * 2020-12-17 2021-03-12 唐山开滦建设(集团)有限责任公司 Self-moving forestope supporting device of anchor net roadway and operation method thereof
CN116537843A (en) * 2023-06-14 2023-08-04 鄂尔多斯市昊华红庆梁矿业有限公司 Tunnel temporary support process method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483146A (en) * 2020-12-17 2021-03-12 唐山开滦建设(集团)有限责任公司 Self-moving forestope supporting device of anchor net roadway and operation method thereof
CN116537843A (en) * 2023-06-14 2023-08-04 鄂尔多斯市昊华红庆梁矿业有限公司 Tunnel temporary support process method

Similar Documents

Publication Publication Date Title
CN202881852U (en) Suspension bridge cable installation system
CN203530851U (en) Basket device for combined basket working vehicle
CN203583910U (en) Fixing bracket system for safety rope for high-altitude operations with steel structure
CN206971689U (en) Support operating platform that is detachable and recycling
CN205908031U (en) A rail mounted lifting device for high -rise building curtain wall construction
CN208502205U (en) The high mobile operation platform of big layer
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN208454342U (en) A kind of safety of tower crane platform and standard knot install conjoined device
CN202882959U (en) Rock bolting front canopy device of mine driving face
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN202718380U (en) Hydraulic climbing frame for construction of high-rise building
CN216840531U (en) Hanging flower basket stabilising arrangement
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN106149542A (en) Combined cable bridge
CN203383516U (en) Construction device for installing connecting beam on frame type steel structure
CN201722937U (en) Sliding platform for installation of net rack
CN202689588U (en) Safety rope cantilever support
CN206289544U (en) A kind of simple electric nacelle device
CN210982429U (en) Suspension device for underground sensor
CN206418398U (en) A kind of stacker installation and debugging travelling bridge
CN212895962U (en) Detachable operation platform for tensioning operation of cantilever irrigation beam
CN103866691B (en) A kind of Large scale cable crane track cable group anchor device
CN203212227U (en) Suspending and fixing device of underground electric hoist
CN202926348U (en) U-shaped shed fixing device
CN209322327U (en) A kind of anti-deflection device of monorail crane rail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20140909

EXPY Termination of patent right or utility model