CN202846897U - Boss on glass steel slope and in connection with horizontal fixing point - Google Patents

Boss on glass steel slope and in connection with horizontal fixing point Download PDF

Info

Publication number
CN202846897U
CN202846897U CN 201220532079 CN201220532079U CN202846897U CN 202846897 U CN202846897 U CN 202846897U CN 201220532079 CN201220532079 CN 201220532079 CN 201220532079 U CN201220532079 U CN 201220532079U CN 202846897 U CN202846897 U CN 202846897U
Authority
CN
China
Prior art keywords
boss
glass steel
parts made
composite glass
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220532079
Other languages
Chinese (zh)
Inventor
徐东航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shuangyi Technology Co ltd
Original Assignee
Shandong Shuangyi Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shuangyi Group Co Ltd filed Critical Shandong Shuangyi Group Co Ltd
Priority to CN 201220532079 priority Critical patent/CN202846897U/en
Application granted granted Critical
Publication of CN202846897U publication Critical patent/CN202846897U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a boss on a glass steel slope and in connection with a horizontal fixing point and belongs to the technical field of glass steel production. The boss is manufactured on the glass steel slope by using an RTM (Resin Transfer Molding) process; a polyurethane foaming layer is pre-embedded in the boss; a steel plate is pre-embedded on the upper part of the a polyurethane foaming layer; the boss and a glass steel member are integrally formed; after the glass steel member is solidified, the punching and the tapping are carried out on the pre-embedded steel plate; and finally a steel member and the glass steel member are connected together through a connecting bolt. The boss has the beneficial effects of being easy for operation, attractive in appearance, low in error, and capable of guaranteeing the product consistency and the connection strength, reducing the labor intensity, and improving the work efficiency.

Description

The fiberglass slope connects horizontal fixing point boss
Technical field
The utility model belongs to the fiberglass production technical field, is specifically related to a kind of jockey of Parts Made of Composite Glass.
Background technology
Make the field at fiberglass, many steel parts will be connected with Parts Made of Composite Glass, and the employing steel part that has directly is embedded in the fiberglass the inside, and the employing structure glue that has is sticked together steel part and Parts Made of Composite Glass.The shortcoming of these several modes is that paper fiberglass and Parts Made of Composite Glass are not whole, connects not fasteningly, and outer surface is not attractive in appearance, affected greatly by the artificial origin, and homogeneity of product is poor, the bad control of precision, and the error height, labour intensity is large, inefficiency.
Summary of the invention
The purpose of this utility model provides the horizontal fixing point boss of a kind of fiberglass slope connection, and to be connected difficulty large to solve existing steel part and Parts Made of Composite Glass, error height, the problem such as labour intensity is large, and efficient is low.
The utility model mainly is comprised of Parts Made of Composite Glass, built-in fitting, connecting bolt, steel part, Parts Made of Composite Glass, solving the technical scheme that its technical problem adopts is to adopt RTM technique to make boss at the fiberglass slope, because boss is subjected to the impact of ramp slope, boss may be larger, so pre-buried polyurethane foaming layer in the boss, polyurethane foaming layer top pre-embedded steel slab, boss and Parts Made of Composite Glass global formation, after Parts Made of Composite Glass solidifies, in the pre-embedded steel slab tapping of punching, with connecting bolt steel part and Parts Made of Composite Glass are linked together at last.
It is easy to operate adopting good effect of the present utility model, and surface aesthetic has guaranteed uniformity and the bonding strength of product to have reduced labour intensity, and error is low, has improved operating efficiency.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified:
Fig. 1 is the utility model structural representation;
1 steel part, 2 connecting bolts, 3 pre-embedded steel slabs, 4 polyurethane foaming layers, 5 Parts Made of Composite Glass among the figure.
The specific embodiment
As shown in the figure: the utility model adopts RTM technique to make a boss at Parts Made of Composite Glass 5 slopes, because boss is subjected to the impact of ramp slope, boss may be larger, send out layer 4 so want pre-buried polyurethane, polyurethane foaming layer top pre-embedded steel slab 3, boss and Parts Made of Composite Glass 5 global formations are after Parts Made of Composite Glass solidifies, in pre-embedded steel slab 3 tapping of punching, with connecting bolt 2 steel part 1 and Parts Made of Composite Glass 5 are linked together at last.

Claims (1)

1. a fiberglass slope connects horizontal fixing point boss, mainly formed by Parts Made of Composite Glass, built-in fitting, connecting bolt, steel part, it is characterized in that adopting RTM technique to make boss at the fiberglass slope, pre-buried polyurethane foaming layer in the boss, polyurethane foaming layer top pre-embedded steel slab, boss and Parts Made of Composite Glass global formation are after Parts Made of Composite Glass solidifies, in the pre-embedded steel slab tapping of punching, with connecting bolt steel part and Parts Made of Composite Glass are linked together at last.
CN 201220532079 2012-10-18 2012-10-18 Boss on glass steel slope and in connection with horizontal fixing point Expired - Lifetime CN202846897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220532079 CN202846897U (en) 2012-10-18 2012-10-18 Boss on glass steel slope and in connection with horizontal fixing point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220532079 CN202846897U (en) 2012-10-18 2012-10-18 Boss on glass steel slope and in connection with horizontal fixing point

Publications (1)

Publication Number Publication Date
CN202846897U true CN202846897U (en) 2013-04-03

Family

ID=47978131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220532079 Expired - Lifetime CN202846897U (en) 2012-10-18 2012-10-18 Boss on glass steel slope and in connection with horizontal fixing point

Country Status (1)

Country Link
CN (1) CN202846897U (en)

Similar Documents

Publication Publication Date Title
CN202846897U (en) Boss on glass steel slope and in connection with horizontal fixing point
CN102873881B (en) Method for connecting glass reinforced plastic slope and horizontal fixed point boss
CN201176551Y (en) Precast slab for roads
CN202107996U (en) Bridge extending device
CN204402019U (en) Silo top heavy grade conical shell template system
CN202073322U (en) Novel vibrating table
CN202831228U (en) Connecting structure of inner steel plate wall and concrete column
CN204252404U (en) Shear force wall reinforcing steel bar topping controls mould
CN203331197U (en) Composite floor slab prefabricated die
CN201991095U (en) Heat-preserving energy-saving plate
CN201950769U (en) Die with split foot sole die for large wrapping-pipe toilet
CN202213288U (en) Multi-cylinder synchronizer of laminating conveyor
CN201614688U (en) Composite precast slab used for laminated slab
CN202610675U (en) Composite stone slab
CN2846609Y (en) Building formwork coated with phenolic dipped paper water-proof layer
CN206189786U (en) Turn over and break shaping precast concrete face brick veneer wallboard
CN201109956Y (en) Radiant heating floor
CN205224395U (en) Prefabricated sandwich heat preservation coincide wallboard
CN203049401U (en) Adhesive and water-permeable stone
CN202882181U (en) Concrete laminated slab overlapping joint with steel bar and connecting with spiral bar within span
CN202556010U (en) Die for processing catenary post embedded part
CN204098286U (en) A kind of washroom dash leads wall
CN202416850U (en) Simple box construction formwork
CN202596122U (en) Floor structure of parking area
CN202967638U (en) Automatic plate turnover machine system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANDONG SHUANGYI TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: SHANGDONG SHUANGYI GROUP CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Xinhua Industrial Park in Shandong Province, two road 253000 Dezhou City No. 1

Patentee after: SHANDONG SHUANGYI TECHNOLOGY Co.,Ltd.

Address before: Xinhua Industrial Park in Shandong Province, two road 253000 Dezhou City No. 1

Patentee before: SHANDONG SHUANGYI GROUP Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130403