CN202827252U - Road and bridge construction special vehicle - Google Patents

Road and bridge construction special vehicle Download PDF

Info

Publication number
CN202827252U
CN202827252U CN 201220537404 CN201220537404U CN202827252U CN 202827252 U CN202827252 U CN 202827252U CN 201220537404 CN201220537404 CN 201220537404 CN 201220537404 U CN201220537404 U CN 201220537404U CN 202827252 U CN202827252 U CN 202827252U
Authority
CN
China
Prior art keywords
road
bridge construction
vehicle
bridge
special vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220537404
Other languages
Chinese (zh)
Inventor
何立斌
李晶
李军卫
Original Assignee
何立斌
李晶
李军卫
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 何立斌, 李晶, 李军卫 filed Critical 何立斌
Priority to CN 201220537404 priority Critical patent/CN202827252U/en
Application granted granted Critical
Publication of CN202827252U publication Critical patent/CN202827252U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a road and bridge construction special vehicle and relates to road and bridge construction auxiliary vehicles. The road and bridge construction special vehicle comprises a vehicle head (1), a vehicle body (2), vehicle wheels (3), locating square grooves (4) and locating lifting rods (5). The vehicle body (2) is arranged at the back end of the vehicle head (1), a plurality of vehicle wheels (3) are evenly arranged below the vehicle body (2), a plurality of locating square grooves (4) are evenly formed in the vehicle body (2), and the lower end of each locating lifting rod is connected with each locating square groove (4) in a clamping mode. The road and bridge construction special vehicle is novel and unique in design and convenient to operate. Due to the fact that a tool which assists large-scale bridge transportation parts to turn up, the road and bridge construction special vehicle saves unloading time of the large-scale bridge transportation parts, an unloading process is reliable and safe, and the road and bridge construction special vehicle reduces trouble for road and bridge construction workers.

Description

Road bridge construction special vehicle
Technical field
The utility model relates to that bridge construction is auxiliary uses car, is specifically related to a kind of road bridge construction special vehicle.
Background technology
Develop rapidly along with national economy, China's bridge construction project also increases rapidly, scale also constantly enlarges, in the bridge work progress, the transportation of large bridge equipment is an important difficult problem, in the large bridge transportation, the large bridge transportation directly is tiled on the transport trolley transports, after arriving the destination, need large-scale crane to unload, need in the uninstall process angle of large bridge transportation perk, then rope is socketed on the large bridge transportation, adopt crane to lift rope and unload, the certain special instrument of angle needs of large bridge transportation perk is assisted and is carried out, not only waste time and energy, also dangerous, this has increased a lot of troubles for road bridge construction workman.
Summary of the invention
The purpose of this utility model provides the bridge construction special vehicle, it is novel in design unique, easy to operate, in car, be provided with specially the instrument of auxiliary large bridge transportation perk, saved the unloading time of large bridge transportation, and uninstall process is reliable and secure, alleviates a lot of troubles for road bridge construction workman.
In order to solve the existing problem of background technology, the utility model is by the following technical solutions: it comprises headstock 1, car body 2, wheel 3, location square groove 4 and positioned-lifting post 5, the rear end of headstock 1 is provided with car body 2, the below of car body 2 evenly is provided with several wheels 3, car body 2 inside evenly are provided with several location square grooves 4, and the lower end of positioned-lifting post 5 is connected in the square groove 4 of location.
One side of described location square groove 4 is provided with anti-moving pilot pin 7.
When the utility model uses, bridge workpiece 6 is placed on the positioned-lifting post 5, after being transported to the destination, by the rise of positioned-lifting post 5, bridge workpiece 6 is held up, adopt crane to unload, when bridge workpiece 6 belongs to the small bridge workpiece, the small bridge workpiece directly can be used 5 to rise its picking-up is transported, and an end of small bridge transportation is against anti-moving pilot pin 7 one sides, prevents from sliding at the middle-size and small-size bridge workpiece of transportation.
The utlity model has following beneficial effect: it is novel in design unique, easy to operate, in car, be provided with specially the instrument of assisting the perk of large bridge transportation, saved the unloading time of large bridge transportation, and uninstall process is reliable and secure, alleviates a lot of troubles for road bridge construction workman.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of car body in the utility model.
The specific embodiment
With reference to Fig. 1-2, this specific embodiment is taked following technical scheme: it comprises headstock 1, car body 2, wheel 3, location square groove 4 and positioned-lifting post 5, the rear end of headstock 1 is provided with car body 2, the below of car body 2 evenly is provided with several wheels 3, car body 2 inside evenly are provided with several location square grooves 4, and the lower end of positioned-lifting post 5 is connected in the square groove 4 of location.
One side of described location square groove 4 is provided with anti-moving pilot pin 7.
When this specific embodiment is used, bridge workpiece 6 is placed on the positioned-lifting post 5, after being transported to the destination, by the rise of positioned-lifting post 5, bridge workpiece 6 is held up, adopt crane to unload, when bridge workpiece 6 belongs to the small bridge workpiece, the small bridge workpiece directly can be used 5 to rise its picking-up is transported, and an end of small bridge transportation is against anti-moving pilot pin 7 one sides, prevents from sliding at the middle-size and small-size bridge workpiece of transportation.
This specific embodiment has following beneficial effect: it is novel in design unique, easy to operate, in car, be provided with specially the instrument of assisting the perk of large bridge transportation, saved the unloading time of large bridge transportation, and uninstall process is reliable and secure, alleviates a lot of troubles for road bridge construction workman.

Claims (2)

1. road bridge construction special vehicle, it is characterized in that it comprises headstock (1), car body (2), wheel (3), location square groove (4) and positioned-lifting post (5), the rear end of headstock (1) is provided with car body (2), the below of car body (2) evenly is provided with several wheels (3), car body (2) inside evenly is provided with several location square grooves (4), and the lower end of positioned-lifting post (5) is connected in the location square groove (4).
2. described road bridge construction special vehicle according to claim 1 is characterized in that a side of described location square groove (4) is provided with anti-moving pilot pin (7).
CN 201220537404 2012-10-20 2012-10-20 Road and bridge construction special vehicle Expired - Fee Related CN202827252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220537404 CN202827252U (en) 2012-10-20 2012-10-20 Road and bridge construction special vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220537404 CN202827252U (en) 2012-10-20 2012-10-20 Road and bridge construction special vehicle

Publications (1)

Publication Number Publication Date
CN202827252U true CN202827252U (en) 2013-03-27

Family

ID=47939024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220537404 Expired - Fee Related CN202827252U (en) 2012-10-20 2012-10-20 Road and bridge construction special vehicle

Country Status (1)

Country Link
CN (1) CN202827252U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106274599A (en) * 2016-08-27 2017-01-04 国网山东省电力公司蓬莱市供电公司 A kind of electric power hanging apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106274599A (en) * 2016-08-27 2017-01-04 国网山东省电力公司蓬莱市供电公司 A kind of electric power hanging apparatus
CN106274599B (en) * 2016-08-27 2018-09-28 国网山东省电力公司蓬莱市供电公司 A kind of electric power hanging apparatus

Similar Documents

Publication Publication Date Title
CN204675764U (en) A kind of hand operated transport of convenient management
CN202415010U (en) Transportation lifting appliance for installing truck frame of heavy truck
CN202827252U (en) Road and bridge construction special vehicle
CN202046809U (en) Double-trolley hook bridge crane
CN104044610A (en) Single prop van for mine
CN202201007U (en) Hook barrel transporting vehicle
CN204266603U (en) The interim apparatus for placing of high-strength bolt
CN203079538U (en) Graphite block clamping device
CN203593016U (en) Novel concrete pier carrying device
CN202641786U (en) Part conveying trolley
CN202669886U (en) Carrying trolley for lateral plate of forklift
CN203003276U (en) Booster used for loading and unloading arc bevel gear milling machine axial workpiece
CN202671138U (en) Manual hydraulic platform car
CN202201006U (en) Novel trolley
CN203995903U (en) A kind of cement electric pole conveying device
CN201446988U (en) Derrick moving trailer adopting tractor for dragging
CN204659766U (en) Universal large the transport trolley in a kind of down-hole
CN204057679U (en) The anti-skidding lifting appliance of a kind of crane beam
CN203946112U (en) A kind of mine individual prop transport trolley
CN204823869U (en) Double girder overhead crane
CN202518282U (en) Simple and easy loader transporter
CN203728505U (en) Hoisting-bulldozing dual-purpose construction trolley
CN202320052U (en) Portable ladder holder for recovery vehicle
CN203558787U (en) Transfer truck for long steel pieces
CN204823724U (en) Bridge crane crane span structure structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20141020

EXPY Termination of patent right or utility model