CN202784874U - Building block decoding layering conveyor used for foam slurry core filling building block production line - Google Patents

Building block decoding layering conveyor used for foam slurry core filling building block production line Download PDF

Info

Publication number
CN202784874U
CN202784874U CN 201220191759 CN201220191759U CN202784874U CN 202784874 U CN202784874 U CN 202784874U CN 201220191759 CN201220191759 CN 201220191759 CN 201220191759 U CN201220191759 U CN 201220191759U CN 202784874 U CN202784874 U CN 202784874U
Authority
CN
China
Prior art keywords
block
building block
fixed
tray
chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220191759
Other languages
Chinese (zh)
Inventor
谢怀宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lvjian Technology Group New Building Material Hi Tech Co Ltd
Original Assignee
GUIZHOU BODIAN BUILDING MATERIAL CHEMICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU BODIAN BUILDING MATERIAL CHEMICAL TECHNOLOGY Co Ltd filed Critical GUIZHOU BODIAN BUILDING MATERIAL CHEMICAL TECHNOLOGY Co Ltd
Priority to CN 201220191759 priority Critical patent/CN202784874U/en
Application granted granted Critical
Publication of CN202784874U publication Critical patent/CN202784874U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a building block decoding layering conveyor used for a foam slurry core filling building block production line, and belongs to the field of building block production equipment. The building block decoding layering conveyor used for the foam slurry core filling building block production line is mainly used for conveying 2-6 layers of stacking building blocks to a foam slurry core filling machine in a layer-by-layer mode through machinery, and manual carrying is replaced. The building block decoding layering conveyor used for the foam slurry core filling building block production line is characterized in that a gear motor (1) is in connection with a reversing machine (3) through a driving chain (2), the reversing machine (3) is respectively in connection with two first transmission shafts (5) through reversing machine chains (4), and accordingly a layer board bracket (7) on four lifting chains (6) is driven to be in a lifting movement. A gear motor (8) is in connection with a second transmission shaft (9) through a chain. A gear (13) is fixed at each of two ends of the second transmission shaft (9). The second transmission shaft (9) is fixed on a machine frame (14) through bearings and drives the machine frame (14) to move back and forth along a gear rail (15) through positive and negative movements of the gear motor (8), and the 2-6 layers of the layer boards loaded with building blocks are conveyed to the building block conveyor one by one.

Description

Be used for the foam slip and fill out the building block decoding layering conveyer of core block production line
Technical field
The present invention relates to building materials production facilities technical field, specifically relate to a kind of building block decoding layering conveyer of filling out the core block production line for the foam slip.
Background technology
Fill out in the semi-automatic production method of core composite heat insulation block at a kind of foam slip, proportioning machine with raw material prepare be transported to puddle mixer and stir after, be transported to the block machine place by the concrete band conveyor, after block machine vibration moulding, be transported to the other end by block conveyor, by manually it being built up the 2-6 layer, then by artificial use fork truck or special cart it is transported to first maintenance place, and be arranged in order by the sequencing of time, carry out 4-8 hour natural curing, after building-block possesses certain cement concrete solidification intensity, successively it is transported to the foam slip by artificial use fork truck or special cart by the sequencing of curing time and fills out block conveyor place under the core machine, by manually successively being put on the block conveyor, being transported to the foam slip by block conveyor fills out core machine place and carries out slip casting, after building-block is finished slip casting, namely become the foam slip and fill out the core building block, then be transported to the other end by block conveyor, by manually the foam slip being filled out after the core building block builds up the 2-6 layer, by artificial use fork truck or special cart it is transported to for the second time maintenance place, and in chronological sequence order is arranged in order, difference according to expanded material, carry out respectively 1-8 hour natural curing, after solidifying in the cavity of foam slip in building block, by artificial use fork truck or special cart, sequencing by curing time transports it into the stockyard successively, and code is in heaps, further carries out natural curing.
In this production process, if successively move on the block conveyor by manually the code of 2-6 layer being piled up piece, then being transported to the foam slip by block conveyor fills out core machine place and carries out slip casting, then improved workman's labour intensity, production efficiency is not high, for this situation, the contriver has developed a kind of building block decoding layering conveyer of filling out the core block production line for the foam slip, this equipment successively is transported to the building block of 2-6 layer piling on the block conveyor, being transported to the foam slip by block conveyor fills out core machine place and carries out slip casting, to replace a dead lift, greatly reduce labour intensity, improved production efficiency.
Summary of the invention
The technical scheme that its technical matters that solves the utility model adopts is:
A kind of building block decoding layering conveyer of filling out the core block production line for the foam slip, it is characterized in that this equipment comprises decelerator 1, chain drive-belt 2, reversing machine 3, reversing machine chain 4, the first transmission shaft 5, elevating chain 6, plate support bracket 7, rotate tray 7a, bearing 7b, be fixed on the block 7c that rotates on the tray, be fixed on block 7d on the adapter shaft, connect square steel 7e, decelerator 8, second driving shaft 9,2-6 layer piling building block 10, bolt 11, adapter shaft 12, gear 13, frame 14, the gear track 15 of chain; Decelerator 1 connects reversing machine 3 by chain drive-belt 2, and reversing machine 3 connects respectively two the first transmission shafts 5 by reversing machine chain 4, drives thus four plate support brackets 7 on the elevating chain 6 and does dipping and heaving; Plate support bracket 7 is by rotating tray 7a, bearing 7b, be fixed on the block 7c that rotates on the tray, the block 7d that is fixed on the adapter shaft forms with the square steel 7e that is connected chain, bolt 11 is fixed on adapter shaft 12 on the square steel 7e, square steel 7e is connected with elevating chain 6, the two ends of adapter shaft 12 are equipped with bearing 7b, rotating tray 7a is installed on the bearing 7b, can rotate, block 7c is fixed on and rotates on the tray 7a, block 7d is fixed on the adapter shaft 12, so that rotation tray 7a and elevating chain 6 meet at right angles, but rotating tray 7a anticlockwise direction rotates, thereby rotate tray 7a and can cross supporting plate and move downward, and when rotating tray 7a by turning to clockwise when meeting at right angles with elevating chain 6, be fixed on and rotate the block 7d that the block 7c on the tray is fixed on the adapter shaft and block, rotating tray 7a just can not be by being rotated further clockwise, thereby can hold up supporting plate and move vertically upward; Decelerator 8 links to each other with second driving shaft 9 by chain, gear 13 is fixed on the two ends of second driving shaft 9, second driving shaft 9 is fixed on the frame 14 by bearing, by the positive and negative rotation of decelerator (8), drives frame (14) along gear track (15) back and forth movement.
Technique effect of the present utility model is the piling building block that has realized successively carrying with machinery the 2-6 layer, and the piling building block of 2-6 layer is successively decoded, and replaces a dead lift, greatly reduces labour intensity, has improved production efficiency.
Description of drawings
Fig. 1 is the birds-eye view of building block decoding layering conveyer
Fig. 2 is the front view of building block decoding layering conveyer
Fig. 3 is the lateral plan of plate support bracket in the building block decoding layering conveyer
Fig. 4 is the front view of plate support bracket in the building block decoding layering conveyer
Fig. 5 is the lateral plan of building block decoding layering conveyer
Number in the figure is respectively: 1, decelerator; 2, chain drive-belt; 3, reversing machine; 4, reversing machine chain; 5, the first transmission shaft; 6, elevating chain; 7, plate support bracket; 7a, rotate tray, 7b, bearing, are fixed on the block that rotates on the tray at 7c, 7d, are fixed on the block on the adapter shaft, 7e, connect the square steel of chain, and 8, decelerator; 9, second driving shaft; 10,2-6 layer piling building block; 11, bolt; 12, adapter shaft; 13, gear; 14, frame; 15, gear track.
The specific embodiment
Shown in Fig. 1~5, be used for the foam slip and fill out the building block decoding layering conveyer of core block production line and comprise: decelerator 1, chain drive-belt 2, reversing machine 3, reversing machine chain 4, the first transmission shaft 5, elevating chain 6, plate support bracket 7, rotate tray 7a, bearing 7b, be fixed on the block 7c that rotates on the tray, be fixed on block 7d on the adapter shaft, connect square steel 7e, decelerator 8, second driving shaft 9,2-6 layer piling building block 10, bolt 11, adapter shaft 12, gear 13, frame 14, the gear track 15 of chain.Under the PLC programming control, decelerator 1 drives reversing machine 3 by chain drive-belt 2 and rotates, and reversing machine 3 drives respectively two the first transmission shafts 5 by reversing machine chain 4 and rotates, and drives thus four plate support brackets 7 on the elevating chain 6 and does dipping and heaving.Such as Fig. 3, shown in Figure 4, plate support bracket 7 is by rotating tray 7a, bearing 7b, be fixed on the block 7c that rotates on the tray, be fixed on the block 7d on the adapter shaft, the square steel 7e that connects chain forms, bolt 11 is fixed on adapter shaft 12 on the square steel 7e, square steel 7e is connected with elevating chain 6, the two ends of adapter shaft 12 are equipped with bearing 7b, rotating tray 7a is installed on the bearing 7b, can rotate, block 7c is fixed on and rotates on the tray 7a, block 7d is fixed on the adapter shaft 12, so that rotation tray 7a and elevating chain 6 meet at right angles, but rotating tray 7a anticlockwise direction rotates, thereby rotate tray 7a and can cross supporting plate and move downward, and when by turning to clockwise when meeting at right angles with elevating chain 6, be fixed on and rotate the block 7d that the block 7c on the tray 7a is fixed on the adapter shaft and block, rotating tray 7a just can not be by being rotated further clockwise, thereby can hold up supporting plate and move vertically upward.
In the piling building block of 2-6 layer is sent to building block decoding layering conveyer behind the fixed position, plate support bracket 7 vertically descends to the supporting plate that top layer is loaded with building block, and cross the supporting plate 50mm that top layer is loaded with building block, then hold up the supporting plate that is loaded with building block and move to vertically upward desired location, then decelerator 8 starts, rotate by chain-driving second driving shaft 9, the gear 13 that drives thus second driving shaft 9 two ends rotates at gear track 15, and drive frame 14 travels forward, the supporting plate level that is loaded with building block is transported to desired location directly over the block conveyor 15, then vertically descend, the supporting plate that is loaded with building block is put on the block conveyor 15, then plate support bracket 7 continues decline 50mm, after the supporting plate that block conveyor will be loaded with building block transports out of the level attitude of plate support bracket 7, plate support bracket 7 again vertical uplift arrives desired location, decelerator 8 backward rotation, make plate support bracket 7 again horizontal motion directly over the multilayer supporting plate that is loaded with building block, then vertically drop to 50mm place below the top layer supporting plate, repeat above-mentioned course of action, supporting plate one plate that the 2-6 layer is loaded with building block connects a plate and delivers on the block conveyor 15.

Claims (1)

1. one kind is used for the building block decoding layering conveyer that the foam slip is filled out the core block production line, it is characterized in that this equipment comprises decelerator (1), chain drive-belt (2), reversing machine (3), reversing machine chain (4), the first transmission shaft (5), elevating chain (6), plate support bracket (7), rotate tray (7a), bearing (7b), be fixed on the block (7c) that rotates on the tray, be fixed on the block (7d) on the adapter shaft, the square steel (7e) that connects chain, decelerator (8), second driving shaft (9), 2-6 layer piling building block (10), bolt (11), adapter shaft (12), gear (13), frame (14), gear track (15); Decelerator (1) connects reversing machine (3) by chain drive-belt (2), reversing machine (3) connects respectively two the first transmission shafts (5) by reversing machine chain (4), and the plate support bracket (7) that drives thus on four elevating chains (6) is done dipping and heaving; Plate support bracket (7) is by rotating tray (7a), bearing (7b), be fixed on the block (7c) that rotates on the tray, the block (7d) that is fixed on the adapter shaft forms with the square steel that is connected chain (7e), bolt (11) is fixed on adapter shaft (12) on the square steel (7e), square steel (7e) is connected with elevating chain (6), the two ends of adapter shaft (12) are equipped with bearing (7b), rotating tray (7a) is installed on the bearing (7b), can rotate, block (7c) is fixed on and rotates on the tray (7a), block (7d) is fixed on the adapter shaft (12), meet at right angles with elevating chain (6) so that rotate tray (7a), rotate tray (7a) but the anticlockwise direction rotation, thereby rotate tray (7a) and can cross supporting plate and move downward, and when rotating tray (7a) by turning to clockwise with elevating chain (6) when meeting at right angles, be fixed on and rotate the block (7d) that the block (7c) on the tray is fixed on the adapter shaft and block, rotating tray (7a) just can not be by being rotated further clockwise, thereby can hold up supporting plate and move vertically upward; Decelerator (8) links to each other with second driving shaft (9) by chain, gear (13) is fixed on the two ends of second driving shaft (9), second driving shaft (9) is fixed on the frame (14) by bearing, the positive and negative rotation of decelerator (8) drives frame (14) along gear track (15) back and forth movement.
CN 201220191759 2012-04-24 2012-04-24 Building block decoding layering conveyor used for foam slurry core filling building block production line Expired - Fee Related CN202784874U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220191759 CN202784874U (en) 2012-04-24 2012-04-24 Building block decoding layering conveyor used for foam slurry core filling building block production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220191759 CN202784874U (en) 2012-04-24 2012-04-24 Building block decoding layering conveyor used for foam slurry core filling building block production line

Publications (1)

Publication Number Publication Date
CN202784874U true CN202784874U (en) 2013-03-13

Family

ID=47812185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220191759 Expired - Fee Related CN202784874U (en) 2012-04-24 2012-04-24 Building block decoding layering conveyor used for foam slurry core filling building block production line

Country Status (1)

Country Link
CN (1) CN202784874U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102658979A (en) * 2012-04-24 2012-09-12 贵州博典建材化工科技有限公司 Method for decoding and hierarchically conveying building blocks in the process of producing foam slurry core-filled building blocks
CN103693360A (en) * 2013-12-11 2014-04-02 王强 Brick conveying device
CN105668221A (en) * 2016-03-07 2016-06-15 淄博友利机电设备有限公司 EPS (expanded polystyrene) continuous cutting line stack separation system
CN111112003A (en) * 2019-12-31 2020-05-08 韩丽玮 Plate processing device and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102658979A (en) * 2012-04-24 2012-09-12 贵州博典建材化工科技有限公司 Method for decoding and hierarchically conveying building blocks in the process of producing foam slurry core-filled building blocks
CN103693360A (en) * 2013-12-11 2014-04-02 王强 Brick conveying device
CN103693360B (en) * 2013-12-11 2016-07-06 王强 A kind of fortune brick device
CN105668221A (en) * 2016-03-07 2016-06-15 淄博友利机电设备有限公司 EPS (expanded polystyrene) continuous cutting line stack separation system
CN111112003A (en) * 2019-12-31 2020-05-08 韩丽玮 Plate processing device and method

Similar Documents

Publication Publication Date Title
CN102672796B (en) Semi-automatic production method of foam slurry core-filling building blocks
CN202784874U (en) Building block decoding layering conveyor used for foam slurry core filling building block production line
CN103128847B (en) Double-block type sleeper production line and production process thereof
CN102658979A (en) Method for decoding and hierarchically conveying building blocks in the process of producing foam slurry core-filled building blocks
CN102632548B (en) Production method of foam slurry core-filled building block capable of being quickly condensed under steam-curing-free condition
CN102672815B (en) Production method of foam slurry core-filling building blocks free of steaming
CN102632547B (en) Semi-automatic production method of novel composite heat insulation building block
CN104647577A (en) Automatic production lien for assembling type housing prefabricated panels
CN105236149B (en) A kind of tilt bed aerated bricks stacking machine and its control method
CN204640490U (en) The economical production line of composite thermal self-insulation building block
CN102632546A (en) Stage-by-stage maintenance method in automatic production process of foam slurry core filling building blocks
CN202910981U (en) Semi-automatic production line for foam slurry core-filling building blocks
CN102672813A (en) Staging maintaining method of rapid hardening foam slurry core filling block in automatic production process
CN206720665U (en) A kind of construction walling cement highly efficient transmission equipment
CN207273527U (en) A kind of production line for cutting shaping haydite concrete prefabricated panel
CN104723452A (en) Method for producing composite self-heat-preservation building blocks
CN204640491U (en) Foam slurry fills out the economical production line of core building block
CN204487794U (en) Foam slurry fills out the automatic production line of core building block
CN204869205U (en) Novel full automatic production line of compound self preservation temperature building block
CN112850070A (en) High-purity aluminum ingot transfer device
CN202784574U (en) Plate lifting-pushing all-in-one machine used for foam slurry core filling building block automatic production line
CN202924388U (en) Ceramic tile temporary storage device
CN202910980U (en) Simple production line of foam slurry core-filling building blocks
CN203266899U (en) Brick outputting system of brick making machine automatic production line
CN104742245A (en) Full-automatic production method for composite self-insulation building blocks

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170601

Address after: 410211 Hunan province Changsha Tongguanshan District of Wangcheng city streets Lake Group

Patentee after: GREEN TECHNOLOGY CONSTRUCTION GROUP NEW BUILDING MATERIAL HIGH-TECH CO., LTD.

Address before: Qingyan Town of Huaxi District 550027 Guizhou city of Guiyang province Si Qian Cun

Patentee before: Guizhou Bodian Building Material Chemical Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20170424