Be used for the foam slip and fill out the building block decoding layering conveyer of core block production line
Technical field
The present invention relates to building materials production facilities technical field, specifically relate to a kind of building block decoding layering conveyer of filling out the core block production line for the foam slip.
Background technology
Fill out in the semi-automatic production method of core composite heat insulation block at a kind of foam slip, proportioning machine with raw material prepare be transported to puddle mixer and stir after, be transported to the block machine place by the concrete band conveyor, after block machine vibration moulding, be transported to the other end by block conveyor, by manually it being built up the 2-6 layer, then by artificial use fork truck or special cart it is transported to first maintenance place, and be arranged in order by the sequencing of time, carry out 4-8 hour natural curing, after building-block possesses certain cement concrete solidification intensity, successively it is transported to the foam slip by artificial use fork truck or special cart by the sequencing of curing time and fills out block conveyor place under the core machine, by manually successively being put on the block conveyor, being transported to the foam slip by block conveyor fills out core machine place and carries out slip casting, after building-block is finished slip casting, namely become the foam slip and fill out the core building block, then be transported to the other end by block conveyor, by manually the foam slip being filled out after the core building block builds up the 2-6 layer, by artificial use fork truck or special cart it is transported to for the second time maintenance place, and in chronological sequence order is arranged in order, difference according to expanded material, carry out respectively 1-8 hour natural curing, after solidifying in the cavity of foam slip in building block, by artificial use fork truck or special cart, sequencing by curing time transports it into the stockyard successively, and code is in heaps, further carries out natural curing.
In this production process, if successively move on the block conveyor by manually the code of 2-6 layer being piled up piece, then being transported to the foam slip by block conveyor fills out core machine place and carries out slip casting, then improved workman's labour intensity, production efficiency is not high, for this situation, the contriver has developed a kind of building block decoding layering conveyer of filling out the core block production line for the foam slip, this equipment successively is transported to the building block of 2-6 layer piling on the block conveyor, being transported to the foam slip by block conveyor fills out core machine place and carries out slip casting, to replace a dead lift, greatly reduce labour intensity, improved production efficiency.
Summary of the invention
The technical scheme that its technical matters that solves the utility model adopts is:
A kind of building block decoding layering conveyer of filling out the core block production line for the foam slip, it is characterized in that this equipment comprises decelerator 1, chain drive-belt 2, reversing machine 3, reversing machine chain 4, the first transmission shaft 5, elevating chain 6, plate support bracket 7, rotate tray 7a, bearing 7b, be fixed on the block 7c that rotates on the tray, be fixed on block 7d on the adapter shaft, connect square steel 7e, decelerator 8, second driving shaft 9,2-6 layer piling building block 10, bolt 11, adapter shaft 12, gear 13, frame 14, the gear track 15 of chain; Decelerator 1 connects reversing machine 3 by chain drive-belt 2, and reversing machine 3 connects respectively two the first transmission shafts 5 by reversing machine chain 4, drives thus four plate support brackets 7 on the elevating chain 6 and does dipping and heaving; Plate support bracket 7 is by rotating tray 7a, bearing 7b, be fixed on the block 7c that rotates on the tray, the block 7d that is fixed on the adapter shaft forms with the square steel 7e that is connected chain, bolt 11 is fixed on adapter shaft 12 on the square steel 7e, square steel 7e is connected with elevating chain 6, the two ends of adapter shaft 12 are equipped with bearing 7b, rotating tray 7a is installed on the bearing 7b, can rotate, block 7c is fixed on and rotates on the tray 7a, block 7d is fixed on the adapter shaft 12, so that rotation tray 7a and elevating chain 6 meet at right angles, but rotating tray 7a anticlockwise direction rotates, thereby rotate tray 7a and can cross supporting plate and move downward, and when rotating tray 7a by turning to clockwise when meeting at right angles with elevating chain 6, be fixed on and rotate the block 7d that the block 7c on the tray is fixed on the adapter shaft and block, rotating tray 7a just can not be by being rotated further clockwise, thereby can hold up supporting plate and move vertically upward; Decelerator 8 links to each other with second driving shaft 9 by chain, gear 13 is fixed on the two ends of second driving shaft 9, second driving shaft 9 is fixed on the frame 14 by bearing, by the positive and negative rotation of decelerator (8), drives frame (14) along gear track (15) back and forth movement.
Technique effect of the present utility model is the piling building block that has realized successively carrying with machinery the 2-6 layer, and the piling building block of 2-6 layer is successively decoded, and replaces a dead lift, greatly reduces labour intensity, has improved production efficiency.
Description of drawings
Fig. 1 is the birds-eye view of building block decoding layering conveyer
Fig. 2 is the front view of building block decoding layering conveyer
Fig. 3 is the lateral plan of plate support bracket in the building block decoding layering conveyer
Fig. 4 is the front view of plate support bracket in the building block decoding layering conveyer
Fig. 5 is the lateral plan of building block decoding layering conveyer
Number in the figure is respectively: 1, decelerator; 2, chain drive-belt; 3, reversing machine; 4, reversing machine chain; 5, the first transmission shaft; 6, elevating chain; 7, plate support bracket; 7a, rotate tray, 7b, bearing, are fixed on the block that rotates on the tray at 7c, 7d, are fixed on the block on the adapter shaft, 7e, connect the square steel of chain, and 8, decelerator; 9, second driving shaft; 10,2-6 layer piling building block; 11, bolt; 12, adapter shaft; 13, gear; 14, frame; 15, gear track.
The specific embodiment
Shown in Fig. 1~5, be used for the foam slip and fill out the building block decoding layering conveyer of core block production line and comprise: decelerator 1, chain drive-belt 2, reversing machine 3, reversing machine chain 4, the first transmission shaft 5, elevating chain 6, plate support bracket 7, rotate tray 7a, bearing 7b, be fixed on the block 7c that rotates on the tray, be fixed on block 7d on the adapter shaft, connect square steel 7e, decelerator 8, second driving shaft 9,2-6 layer piling building block 10, bolt 11, adapter shaft 12, gear 13, frame 14, the gear track 15 of chain.Under the PLC programming control, decelerator 1 drives reversing machine 3 by chain drive-belt 2 and rotates, and reversing machine 3 drives respectively two the first transmission shafts 5 by reversing machine chain 4 and rotates, and drives thus four plate support brackets 7 on the elevating chain 6 and does dipping and heaving.Such as Fig. 3, shown in Figure 4, plate support bracket 7 is by rotating tray 7a, bearing 7b, be fixed on the block 7c that rotates on the tray, be fixed on the block 7d on the adapter shaft, the square steel 7e that connects chain forms, bolt 11 is fixed on adapter shaft 12 on the square steel 7e, square steel 7e is connected with elevating chain 6, the two ends of adapter shaft 12 are equipped with bearing 7b, rotating tray 7a is installed on the bearing 7b, can rotate, block 7c is fixed on and rotates on the tray 7a, block 7d is fixed on the adapter shaft 12, so that rotation tray 7a and elevating chain 6 meet at right angles, but rotating tray 7a anticlockwise direction rotates, thereby rotate tray 7a and can cross supporting plate and move downward, and when by turning to clockwise when meeting at right angles with elevating chain 6, be fixed on and rotate the block 7d that the block 7c on the tray 7a is fixed on the adapter shaft and block, rotating tray 7a just can not be by being rotated further clockwise, thereby can hold up supporting plate and move vertically upward.
In the piling building block of 2-6 layer is sent to building block decoding layering conveyer behind the fixed position, plate support bracket 7 vertically descends to the supporting plate that top layer is loaded with building block, and cross the supporting plate 50mm that top layer is loaded with building block, then hold up the supporting plate that is loaded with building block and move to vertically upward desired location, then decelerator 8 starts, rotate by chain-driving second driving shaft 9, the gear 13 that drives thus second driving shaft 9 two ends rotates at gear track 15, and drive frame 14 travels forward, the supporting plate level that is loaded with building block is transported to desired location directly over the block conveyor 15, then vertically descend, the supporting plate that is loaded with building block is put on the block conveyor 15, then plate support bracket 7 continues decline 50mm, after the supporting plate that block conveyor will be loaded with building block transports out of the level attitude of plate support bracket 7, plate support bracket 7 again vertical uplift arrives desired location, decelerator 8 backward rotation, make plate support bracket 7 again horizontal motion directly over the multilayer supporting plate that is loaded with building block, then vertically drop to 50mm place below the top layer supporting plate, repeat above-mentioned course of action, supporting plate one plate that the 2-6 layer is loaded with building block connects a plate and delivers on the block conveyor 15.