CN202745893U - Beam hanging device installation structure for temporary support of excavation working surface - Google Patents

Beam hanging device installation structure for temporary support of excavation working surface Download PDF

Info

Publication number
CN202745893U
CN202745893U CN 201220309032 CN201220309032U CN202745893U CN 202745893 U CN202745893 U CN 202745893U CN 201220309032 CN201220309032 CN 201220309032 CN 201220309032 U CN201220309032 U CN 201220309032U CN 202745893 U CN202745893 U CN 202745893U
Authority
CN
China
Prior art keywords
anchor rod
hanging device
support plate
beam hanging
beam device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220309032
Other languages
Chinese (zh)
Inventor
刘灿民
聂翊
谭海滨
武加妮
佟瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENGQUAN MINING-INDUSTRY Co Ltd SHANDONG
Original Assignee
SHENGQUAN MINING-INDUSTRY Co Ltd SHANDONG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENGQUAN MINING-INDUSTRY Co Ltd SHANDONG filed Critical SHENGQUAN MINING-INDUSTRY Co Ltd SHANDONG
Priority to CN 201220309032 priority Critical patent/CN202745893U/en
Application granted granted Critical
Publication of CN202745893U publication Critical patent/CN202745893U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a beam hanging device installation structure for the temporary support of an excavation working surface. The beam hanging device installation structure is characterized in that the exposed tail end of an anchor rod is reserved by a certain length, and the length is larger than the total thickness of two anchor rod nuts and a beam handing device support plate; and the aperture of the beam handing device support plate is enlarged to be 2 millimeters larger than the diameter of the anchor rod. When installation is carried out, firstly the anchor rod is fixed on a tunnel roof by using the anchor rod nuts, the beam hanging device support plate is arranged below the first anchor rod nut, and then a beam hanging device is fixed by using the second anchor rod nut. According to the utility model, when the direction of the beam hanging device is adjusted, because the anchor rod nuts arranged below the beam hanging device support plate are in independent structures, the beam hanging device support plate can rotate by only loosening the anchor rod nuts arranged below the beam hanging device support plate and keeping the original anchor rod nut immovable, and therefore the hanging stability of a forepoling beam is ensured.

Description

Hanging beam device mounting structure during temporary support for drivage face
Technical field:
The utility model relates to the colliery digging laneway temporary support device, relates in particular to forestope.
Background technology:
During the coal mine roadway driving, some employings tunnel forestope carries out top board temporary lining, and forestope need be installed on the hanging beam device.During installation the hanging beam device towards consistent with the direction of forestope, install smoothly to make things convenient for forestope.Because the hanging beam device relies on former anchor nut to be fixed on the anchor pole, need anchor nut is aimed at anchor pole for adjusting direction during use, with nut and hanging beam device first half integral-rotation, nut is produced loosening, this hangs stable influential to forestope, may cause potential safety hazard.
Summary of the invention:
The purpose of this utility model is for overcoming the deficiency of existing hanging beam device, existing hanging beam device mounting structure is improved, a kind of new hanging beam device mounting structure is provided, reaching the not integrally rotated purpose of nut and hanging beam device.
Hanging beam device mounting structure during a kind of temporary support for drivage face, it is that outer Rose's head with anchor pole reserves certain-length, this length is greater than the gross thickness of two anchor nuts and hanging beam device supporting plate, and it is greater than bolt diameter 2mm that the aperture on the hanging beam device supporting plate is expanded.
During installation, first anchor pole is fixed on the back with anchor nut, hanging beam device supporting plate is installed in below the first anchor nut, with the second anchor nut the hanging beam device is fixed again.
The utility model advantage is: when adjusting hanging beam device direction, because the anchor nut that is installed under the supporting plate is absolute construction, only need the anchor nut under the loosening hanging beam device supporting plate, it is motionless that former anchor nut keeps, hanging beam device supporting plate is namely rotatable, has guaranteed the stability that forestope is hung.
Description of drawings
Fig. 1 is the front view of the utility model embodiment.
Among the figure: 1-supporting plate, 2-anchor pole, 3-the first anchor nut, 4-the second anchor nut.
The specific embodiment
As shown in Figure 1, hanging beam device mounting structure during a kind of temporary support for drivage face, the structure of hanging beam device such as Fig. 1, it has a supporting plate 1, it is large and anchor pole 2 diameter 2mm that aperture on the supporting plate 1 is expanded, outer Rose's head with anchor pole 2 during installation reserves certain-length, this length is greater than the gross thickness of two anchor nuts 3 and supporting plate 1, during installation, first anchor pole 2 usefulness the first anchor nut 3 is fixed on the back, hanging beam device supporting plate 1 is installed in below the former anchor nut 3 again, is screwed on outer Rose's head of anchor pole 2 with the second anchor nut 4 again, the hanging beam device is fixed.

Claims (1)

1. the hanging beam device mounting structure a during temporary support for drivage face is characterized in that, it is that outer Rose's head with anchor pole reserves certain-length, and this length is greater than the gross thickness of two anchor nuts and hanging beam device supporting plate; It is greater than bolt diameter 2mm that aperture on the hanging beam device supporting plate is expanded.
CN 201220309032 2012-06-29 2012-06-29 Beam hanging device installation structure for temporary support of excavation working surface Expired - Fee Related CN202745893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220309032 CN202745893U (en) 2012-06-29 2012-06-29 Beam hanging device installation structure for temporary support of excavation working surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220309032 CN202745893U (en) 2012-06-29 2012-06-29 Beam hanging device installation structure for temporary support of excavation working surface

Publications (1)

Publication Number Publication Date
CN202745893U true CN202745893U (en) 2013-02-20

Family

ID=47705309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220309032 Expired - Fee Related CN202745893U (en) 2012-06-29 2012-06-29 Beam hanging device installation structure for temporary support of excavation working surface

Country Status (1)

Country Link
CN (1) CN202745893U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374648A (en) * 2019-07-11 2019-10-25 新汶矿业集团有限责任公司华丰煤矿 A kind of tunnel forestope temporary support device and method for protecting support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374648A (en) * 2019-07-11 2019-10-25 新汶矿业集团有限责任公司华丰煤矿 A kind of tunnel forestope temporary support device and method for protecting support

Similar Documents

Publication Publication Date Title
CN202745893U (en) Beam hanging device installation structure for temporary support of excavation working surface
CN205577563U (en) Control pole setting
CN203050749U (en) Energy-absorbing transformable anchor rod tray
CN204212791U (en) Driving face Novel front canopy hoisting ring device
CN205242289U (en) Road engineering uses prevent wind guider
CN202544875U (en) Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
CN204240996U (en) Driving face in coal mine rotating laser support
CN203891910U (en) Laser orientation instrument installation frame
CN211081920U (en) Mining stock installation device
CN202827792U (en) Automotive chassis protection plate
CN203531937U (en) Surrounding rock supporting yielding anchor rod device
CN202520237U (en) Universally-adjustable roofbolter and universally-adjustable jumbolter
CN204645628U (en) Street lamp post stone bolt locating template
CN202926347U (en) Anchor net supporting roadway advance support device
CN206110737U (en) Steel construction bicycle shed
CN203412148U (en) Wedge-shaped glass auxiliary frame pressing plate
CN203498715U (en) Underground fully-mechanized coal mining monorail crane
CN104577715A (en) Hydraulic adjustable lightning rod device
CN201003408Y (en) Rotarily mounted type anchoring-bolt
CN202851026U (en) Laneway side supporting anchor rod
CN203559926U (en) Scraper conveyor head pressing column fixing device
CN204355996U (en) Colliery Stage winch New Supporting Equipment of Primary
CN204343203U (en) A kind of stable type portable vehicle triangular warning device being provided with banded fog lamp
CN204436423U (en) A kind of roofbolt construction arrangement for civil engineering
CN215979479U (en) Novel filling pipeline fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20150629

EXPY Termination of patent right or utility model