CN202731747U - Combined type tower-drill integrated core drill - Google Patents

Combined type tower-drill integrated core drill Download PDF

Info

Publication number
CN202731747U
CN202731747U CN 201220399400 CN201220399400U CN202731747U CN 202731747 U CN202731747 U CN 202731747U CN 201220399400 CN201220399400 CN 201220399400 CN 201220399400 U CN201220399400 U CN 201220399400U CN 202731747 U CN202731747 U CN 202731747U
Authority
CN
China
Prior art keywords
tower
boring tower
boring
oil cylinder
hypomere
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220399400
Other languages
Chinese (zh)
Inventor
马增福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
H.H. DRILL-TECH DRILLING MACHINERY CO., LTD.
Original Assignee
LIANYUNGANG HUANGHAI MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIANYUNGANG HUANGHAI MACHINERY CO Ltd filed Critical LIANYUNGANG HUANGHAI MACHINERY CO Ltd
Priority to CN 201220399400 priority Critical patent/CN202731747U/en
Application granted granted Critical
Publication of CN202731747U publication Critical patent/CN202731747U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A combined type tower-drill integrated core drill comprises a tower body, a core drill installed on a pedestal and a caterpillar body mounted below the pedestal. A front support of a boring tower is arranged at front portion of the pedestal, and a back support of a boring tower is arranged at rear portion of the pedestal. The tower body comprises an upper segment of the boring tower, a lower segment of the boring tower and an erecting hydro-cylinder, wherein a folding articulated shaft is arranged in front of a joint of the upper segment of the boring tower and the lower segment of the boring tower, location holes which are matched with each other are arranged at back of the joint of the upper segment of the boring tower and the lower segment of the boring tower, an automatic plug pin mechanism which is matched with the location holes is arranged on the upper segment of the boring tower and the lower segment of the boring tower, and a double-cylinder mutual assistance mechanism is arranged between the upper segment of the boring tower and the lower segment of the boring tower. According to the utility model, the core drill, the tower body and the caterpillar body are combined together so that structure of a drill is compact and beneficial for transportation of the whole drill. Due to the fact that the automatic plug pin mechanism is adopted by the tower body, the tower body can be assembled without the need for manpower so that labor cost is reduced. Moreover, degree of automation can be increased and work efficiency can be improved due to adoption of the double-cylinder mutual assistance mechanism by a drill body.

Description

A kind of combined tower machine one rock-core borer
Technical field
The utility model relates to a kind of core drilling technical equipment, particularly a kind of combined tower machine one rock-core borer.
Background technology
Since 2006, State Council promulgated since " Resolution on Strengthen Geological Work ".China's mining industry is recovered rapidly, the geological core drilling rapid growth, and mineral exploration drops into, corresponding continuing to increase.Geologic prospect equipment, spindle-type core drill still are the army of absolutely main force of exploration market.XY-4, XY-42, XY-44, XY-5 type rig are covered with shallow, middle level exploration basically.Spindle-type core drill, most units in charge of construction dispose four turrets or A type tower.Fill, tear open tower and handle tower, all need certain human and material resources and resettlement equipment, the supplementary costs of relatively constructing is higher.Reduce work progress, because the expense of dismounting, resettlement is designed convenient durable exploring equipment, be the long-term cry of unit in charge of construction always.This also is the responsibility that we design output drilling equipment unit.
In the last few years, successively developed XY-4T, XY-42T, XY-44T, XY-5T type tower machine one rig.The tower machine one rig of the type, after the assembling, tower and rig are connected as a single entity at the construction field (site), and the outward appearance of its tower is four rib masts type package assemblies, compares with A type tower with four turrets, and general structure is succinct, and single-piece is lightweight, and removing, it is more convenient to install.Although, with respect to four turrets and A type tower, the easily advantage of resettlement is arranged.But during position, mobile hole, shortcoming is outstanding, must disassemble boring tower with main frame and separate.Boring tower resolves into four above parts, reaches the purpose of moving the position, hole by crane gear and resettlement equipment.Arrived new construction site, again group cover main frame and installation boring tower.Such one tear open, one move, a dress, just need to drop into certain human and material resources and equipment.The cost of tearing tower, resettlement, assembling open is still higher.In addition, the tower of XY-4T, 42T, 44T, 5T type structure, the tower seat is connected with main frame, since the limitation of main machine structure, the tower of the larger load of uncomfortable easily configuration.Such as the tower of joining of X6 type and above rig, domestic general counterweight type four turrets and A type tower.Tower, machine to this traditional type are independent, mounting or dismounting tower, resettlement tower, labour's that all need be a large amount of equipment.When the operation of mountain region, rig does not possess gradeability, needs a large amount of manpowers, the material resources transportation, and the unit of external client or overseas construction because external labour's cost is high, not too good, requires to improve automaticity, reduces cost of labor.
Summary of the invention
The technical problems to be solved in the utility model is for the deficiencies in the prior art, proposes a kind of hole convenience of moving, and need not disassemble, and can reduce the combined tower machine one rock-core borer of cost of labor.
The technical problems to be solved in the utility model is to realize by the following technical programs, a kind of combined tower machine one rock-core borer, comprise tower body, be installed in the rock-core borer and the crawler belt body that is installed in the base bottom on base top, described base front portion is provided with the boring tower fore-stock that upwards arranges, the base rear portion is provided with the boring tower after-poppet that upwards arranges, described tower body comprises the epimere boring tower, hypomere boring tower and a tower oil cylinder, playing the tower oil cylinder is installed between hypomere boring tower and the base, be characterized in: described boring tower after-poppet top is hinged with slide, before slide is provided with boring tower, the slide rail of rear slippage, be provided with the slide rail plate that cooperates with slide rail at the hypomere boring tower back side, be provided with the slippage oil cylinder between slide and the hypomere boring tower; Front at epimere boring tower and hypomere boring tower joint is provided with the back flap hinge spindle, is provided with the locating hole that cooperatively interacts at the back side of epimere boring tower and hypomere boring tower joint, is provided with the automatic plug pin mechanism that cooperates with locating hole at epimere boring tower or hypomere boring tower; Between upper and lower boring tower, be provided with the twin-tub mechanism that helps each other, the described twin-tub mechanism that helps each other comprises that two are promoted mainly oil cylinder and at least one secondary push oil cylinder, promote mainly oil cylinder and be arranged on the boring tower both sides, an end of promoting mainly oil cylinder is hinged on the back side of hypomere boring tower, the other end is hinged on the front of epimere boring tower, secondary push oil cylinder is arranged on the tower body inside of joint, and secondary push oil cylinder one end and epimere boring tower are hinged, and the other end and hypomere boring tower are hinged.
The technical problems to be solved in the utility model can also come further to realize that described automatic plug pin mechanism comprises the alignment pin that cooperates with locating hole by the following technical programs, and alignment pin links to each other with insert-pull pin oil cylinder on being fixed on tower body.
The technical problems to be solved in the utility model can also be come to realize that further described secondary push oil cylinder is two by the following technical programs.
Compared with prior art, the utility model fits together rock-core borer, tower body and crawler belt body, so that drill configuration is compact, single-piece is lightweight, is convenient to resettlement, also is beneficial to the complete machine transportation; Tower body adopts the automatic plug pin mechanism, need not manpower assembling tower body, has reduced cost of labor; Drill body adopts the twin-tub mechanism that helps each other, and can make the boring tower epimere automatically finish 180 ° upset, has increased the degree of automation; The rig walking mechanism adopts crawler belt, so that rig smooth running voluntarily, climbing capacity is strong, has improved operating efficiency.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is tower body schematic diagram of the present utility model.
Fig. 3 is the twin-tub of the present utility model mechanism structure schematic diagram of helping each other.
The specific embodiment
A kind of combined tower machine one rock-core borer, comprise tower body, be installed in rock-core borer 13 and the crawler belt body 14 that is installed in base 1 below on the base 1, described base 1 front portion is provided with the boring tower fore-stock 15 that upwards arranges, base 1 rear portion is provided with the boring tower after-poppet 2 that upwards arranges, described tower body comprises epimere boring tower 5, hypomere boring tower 3 and a tower oil cylinder 4, playing tower oil cylinder 4 is installed between hypomere boring tower 3 and the base 1, described boring tower after-poppet 2 tops are hinged with slide, before slide is provided with boring tower, the slide rail of rear slippage, bore the 3 tower back sides at hypomere and be provided with the slide rail plate that cooperates with slide rail, be provided with slippage oil cylinder 8 between slide and the hypomere boring tower 3; Front at epimere boring tower 5 and hypomere boring tower 3 joints is provided with the back flap hinge spindle, the back side at epimere boring tower 5 and hypomere boring tower 3 joints is provided with the locating hole that cooperatively interacts, and is provided with the automatic plug pin mechanism that cooperates with locating hole at epimere boring tower 5 or hypomere boring tower 3; Between upper and lower boring tower, be provided with the twin-tub mechanism that helps each other, the described twin-tub mechanism that helps each other comprises that two are promoted mainly oil cylinder 7 and at least one secondary push oil cylinder 6, promote mainly oil cylinder 7 and be arranged on the boring tower both sides, an end of promoting mainly oil cylinder 7 is hinged on the back side of hypomere boring tower 3, the other end is hinged on the front of epimere boring tower 5, secondary push oil cylinder 6 is arranged on the tower body inside of joint, and secondary push oil cylinder 6 one ends and epimere boring tower 5 are hinged, and the other end and hypomere boring tower 3 are hinged.
Described automatic plug pin mechanism comprises the alignment pin 9 that cooperates with locating hole, and alignment pin 9 links to each other with insert-pull pin oil cylinder 10 on being fixed on tower body.Back side dual-side at epimere boring tower 5 and hypomere boring tower 3 joints all is provided with the location otic placode, the location otic placode is provided with the locating hole that cooperatively interacts, insert-pull pin oil cylinder 10 on the automatic plug pin mechanism extend into alignment pin 9 in the locating hole when boring tower launches fully, and upper and lower section boring tower is fixed together; After construction is finished, need alignment pin 9 is regained, to pack up so that boring tower is collapsible, the insert-pull pin oil cylinder 10 on the described automatic plug pin mechanism can be arranged on the epimere boring tower 5, also can be arranged on the hypomere boring tower 3.
Described secondary push oil cylinder 6 is two.Described epimere boring tower 5 is provided with top rail 11 in tower body inside, hypomere boring tower 3 is provided with lower transverse beam 12 in tower body inside, and secondary push oil cylinder 6 one ends are hinged on the top rail 11, and the other end is hinged on the lower transverse beam 12, from boring tower front or the back side, secondary push oil cylinder 6 with promote mainly oil cylinder 7 and be arranged in parallel.Tower body when folded state, the total length after the distance at the major and minor push oil cylinder free bearing center of the major and minor push oil cylinder free bearing center on the hypomere boring tower 3 and epimere boring tower 5 is retracted more than or equal to major and minor push oil cylinder; Tower body is when deployed condition, and the oil cylinder free bearing center of promoting mainly on the hypomere boring tower 3 and the distance of promoting mainly oil cylinder free bearing center of epimere tower 5 are less than or equal to the total length of promoting mainly after oil cylinder 7 stretches out.When promoting mainly oil cylinder 7 work, secondary push oil cylinder 6 is servo-actuated; Otherwise, in like manner.The twin-tub mechanism that helps each other is interoperation with two oil cylinders, and epimere boring tower 5 has been accomplished that the turning unfoldings of 180 degree or upset are folding.Under twin-tub is helped each other the effect of mechanism, so that the complete turning unfolding of epimere boring tower 5; After construction is finished, under twin-tub is helped each other the effect of mechanism, that boring tower is folding.With traditional way, assembling, vertical drill tower or the boring tower of tearing open, fall all need many people and hanging device just can finish, and this twin-tub mechanism that helps each other only operates with a people and just can finish.
The oil circuit junction of described rock-core borer is equipped with hydraulic quick coupler.The power of this machine is diesel engine, and a power is provided with two branches, i.e. hydraulic drive branch and mechanical drive branch.Hydraulic drive branches into boring tower and rises, falls, the expansion of tower and folding, and four landing leg stretchings, secondary elevator transmission, pressurization is crept into, and decompression is crept into, and hydraulic pressure adds to be held.Machine driving is that the machinery rotation device creeps into, and master winch promotes.

Claims (3)

1. combined tower machine one rock-core borer, comprise tower body, be installed in the rock-core borer and the crawler belt body that is installed in the base bottom on base top, described base front portion is provided with the boring tower fore-stock that upwards arranges, the base rear portion is provided with the boring tower after-poppet that upwards arranges, described tower body comprises the epimere boring tower, hypomere boring tower and a tower oil cylinder, playing the tower oil cylinder is installed between hypomere boring tower and the base, it is characterized in that: described boring tower after-poppet top is hinged with slide, before slide is provided with boring tower, the slide rail of rear slippage, be provided with the slide rail plate that cooperates with slide rail at the hypomere boring tower back side, be provided with the slippage oil cylinder between slide and the hypomere boring tower; Front at epimere boring tower and hypomere boring tower joint is provided with the back flap hinge spindle, is provided with the locating hole that cooperatively interacts at the back side of epimere boring tower and hypomere boring tower joint, is provided with the automatic plug pin mechanism that cooperates with locating hole at epimere boring tower or hypomere boring tower; Between upper and lower boring tower, be provided with the twin-tub mechanism that helps each other, the described twin-tub mechanism that helps each other comprises that two are promoted mainly oil cylinder and at least one secondary push oil cylinder, promote mainly oil cylinder and be arranged on the boring tower both sides, an end of promoting mainly oil cylinder is hinged on the back side of hypomere boring tower, the other end is hinged on the front of epimere boring tower, secondary push oil cylinder is arranged on the tower body inside of joint, and secondary push oil cylinder one end and epimere boring tower are hinged, and the other end and hypomere boring tower are hinged.
2. combined tower machine one rock-core borer according to claim 1, it is characterized in that: described automatic plug pin mechanism comprises the alignment pin that cooperates with locating hole, alignment pin links to each other with insert-pull pin oil cylinder on being fixed on tower body.
3. combined tower machine one rock-core borer according to claim 1, it is characterized in that: described secondary push oil cylinder is two.
CN 201220399400 2012-08-14 2012-08-14 Combined type tower-drill integrated core drill Expired - Fee Related CN202731747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220399400 CN202731747U (en) 2012-08-14 2012-08-14 Combined type tower-drill integrated core drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220399400 CN202731747U (en) 2012-08-14 2012-08-14 Combined type tower-drill integrated core drill

Publications (1)

Publication Number Publication Date
CN202731747U true CN202731747U (en) 2013-02-13

Family

ID=47657459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220399400 Expired - Fee Related CN202731747U (en) 2012-08-14 2012-08-14 Combined type tower-drill integrated core drill

Country Status (1)

Country Link
CN (1) CN202731747U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909201A (en) * 2016-07-04 2016-08-31 山东聚龙液压机械有限公司 Novel caterpillar core drilling machine and static cone sounding all-in-one machine
CN108505939A (en) * 2018-05-29 2018-09-07 徐州艾维思达钻探机械有限公司 A kind of folding retractable mechanism of geological prospecting drilling machine list boring tower

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105909201A (en) * 2016-07-04 2016-08-31 山东聚龙液压机械有限公司 Novel caterpillar core drilling machine and static cone sounding all-in-one machine
CN105909201B (en) * 2016-07-04 2018-08-14 山东聚龙装备制造有限公司 A kind of novel crawler rock-core borer and static sounding all-in-one machine
CN108505939A (en) * 2018-05-29 2018-09-07 徐州艾维思达钻探机械有限公司 A kind of folding retractable mechanism of geological prospecting drilling machine list boring tower

Similar Documents

Publication Publication Date Title
CN100357530C (en) Multifunctional turn digging dynamoelectric drilling machine
CN201943072U (en) Hydraulic static pile pressing machine with folding type stand column
CN104389518B (en) Telescopic topmast rod-type all-hydraulic core drilling rig
CN102094579A (en) Full-hydraulic tire rock drilling anchoring drill carriage
CN104196443A (en) Narrow-fuselage six-arm fully hydraulic anchor rod anchor cable drill carriage
CN102777124B (en) Integrated core drilling machine for single-cylinder double-acting tower crane
CN204024470U (en) The all-hydraulic anchor shaft anchor cable drill carriage of a kind of narrow fuselage six arm
CN202731747U (en) Combined type tower-drill integrated core drill
CN209261485U (en) A kind of truck-mounted drilling rig
CN108910088A (en) Land walking integrated robot
CN201180488Y (en) Rotary digging drill rig
CN102155168A (en) Large triangular structure derricking mechanism for rotary drilling rig with auxiliary jacking mechanism
CN202745692U (en) Integrated core drilling machine for single cylinder with double functions tower crane
CN205154040U (en) Drilling derrick upper segment folding mechanism upright walks
CN201560710U (en) Integral all-hydraulic drill for mining capable of satisfying several drilling styles
CN204024469U (en) The all-hydraulic anchor shaft anchor cable drill carriage of six arms that a kind of supporting continuous miner uses
CN102061882B (en) Multifunctional self-propelled tower-machine integrated core drill machine
CN201865574U (en) Integral core drilling machine of multifunctional self-walking type tower crane
CN204212692U (en) A kind of telescopic topmast rod-type all-hydraulic core drilling rig
CN102777128B (en) Folding boring tower
CN208934594U (en) Multifunctional mobile raise boring machine
CN202300197U (en) Backpack-type integrated-base portable drilling machine
CN202401980U (en) Mast and long spiral drilling machine with same
CN103552947B (en) A kind of Foldable hydraulic support upending frame
CN202970495U (en) Long spiral drilling rig and folding mast thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160214

Address after: 222000 Jiangsu, Haizhou District, Haizhou Development Zone, the new East Road, No. 1

Patentee after: H.H. DRILL-TECH DRILLING MACHINERY CO., LTD.

Address before: 222000 Jiangsu, Haizhou District, Haizhou Development Zone, the new East Road, No. 1

Patentee before: Lianyungang Huanghai Machinery Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

Termination date: 20160814