CN202731289U - Early dismounting device for aluminum alloy top plate - Google Patents

Early dismounting device for aluminum alloy top plate Download PDF

Info

Publication number
CN202731289U
CN202731289U CN 201220317748 CN201220317748U CN202731289U CN 202731289 U CN202731289 U CN 202731289U CN 201220317748 CN201220317748 CN 201220317748 CN 201220317748 U CN201220317748 U CN 201220317748U CN 202731289 U CN202731289 U CN 202731289U
Authority
CN
China
Prior art keywords
state control
aluminum alloy
support post
early
cruciform vent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220317748
Other languages
Chinese (zh)
Inventor
陈晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Baili Engineering Technology Development Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Baili Engineering Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Baili Engineering Technology Development Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN 201220317748 priority Critical patent/CN202731289U/en
Application granted granted Critical
Publication of CN202731289U publication Critical patent/CN202731289U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an early dismounting device for an aluminum alloy top plate. The device is formed by a supporting stand column, a limiting piece, a transverse beam supporting piece, a state control piece, a state control rod, a top plate and a connecting bottom plate, wherein the supporting stand column is welded with the state control rod which is provided with the limiting rod and is inserted into the supporting stand column; a single-axis symmetrical cross-shaped hole is arranged at the center of the state control piece and an inclined slope from a plate body edge to the edge of the single-axis symmetrical cross-shaped hole is cut on the bottom face of the state control piece; a double-axis symmetrical cross-shaped hole is arranged at the center of the transverse beam supporting piece; the transverse beam supporting piece and the state control rod are located on a section between the limiting piece of a supporting stand rod and the state control rod; and the bottom face of the state control piece is supported on the state control rod to form a work pair capable of releasing loosened and wedge-caulking states. The early dismounting device disclosed by the utility model can conveniently dismount the top plate of a template and can partially support, so that the effective turnover of the template and the supporting piece can be realized; and the construction efficiency is improved and the early dismounting device can be used for early dismounting the template of the top plate.

Description

The aluminum alloy roof plate early-dismantling device
Technical field
The utility model relates to the concrete blinding early-dismantling device in a kind of building operations, particularly a kind of aluminum alloy roof plate early-dismantling device.
Background technology
In order to reduce the consumption of the energy and resource, slow down environmental disruption, the Chinese government has promulgated " green building assessment standard " immediately following world trends at the beginning of 2006, and then issued " Green Construction Guidelines ", actively carries out the green building construction.Building operations time in whole building life is very short, but its impact on environment is very large, also is to concentrate very much for the consumption of resource and the energy.So, the Green building, must carry out green construction.Green construction refers in the engineering construction; under the prerequisite of basic demands such as ensuring the quality of products, safe; by scientific management and technological progress, economize on resources to greatest extent and the construction activities that reduces the environment negative effect, realize energy-conservation, save land, four joint and environmental protection of water saving, material-saving.In building operations, template, scaffold are widely used as a kind of circulation material that can be recycled and facility.Therefore, the basic demand that the construction formwork system under green construction requires must satisfy is: 1. consumed energy is less as far as possible; 2. do not produce for environment or to the greatest extent few produce harm; 3. during actual product uses, can realize what more times repeatability of counting was utilized as far as possible; 4. when expectation was discarded, as far as possible reasonably harmless treatment, resource recycling utilized; 5. at this stage, must there be the reliable recovery system that can guarantee that above-mentioned requirements realizes in manufacturer, or the assurance product can be realized completely innoxious degraded in nature.
In " Green Construction Guidelines ", template, scaffold have highlighted as circulation material and facility: circulation material and the facility that 1. should select durable, maintenance and convenient disassembly; 2. preferentially select making, installation, the integrated professional contingent of dismounting to carry out the form work engineering construction; 3. template should to save natural resource as principle, be promoted the use of typing punching block, steel framework bamboo mould, bamboo offset plate; 4. the scheme of reply form work engineering is optimized before the construction.Multilayer, highrise building use the template system that can reuse, and shuttering supporting should adopt tool bracing; 5. optimize the external scaffolding scheme of highrise building, the scheme such as adopt that Integral lifting, segmentation are encorbelmented; 6. promote the technology that adopts external wall insulation to substitute concrete construction formwork; 7. take the material-saving measure of effective technology and management, improve the number of turnover of template, scaffold etc.; 8. to greatly develop research and the application of Construction Technology of Fair Faced Concrete and new type formwork and Construction Formwork ﹠ Scaffold Technology.
If can have when some strength also do not reach the form removal condition fully at concrete by taking rational braced structures, stripping and part support member, realize in advance turnover, the utilization rate of template will be improved greatly, reducing construction cost can better be carried out the instruction that country proposes for form work engineering in " Green Construction Guidelines ".
In the actual implementation process, how simple and convenient realization is to the dismounting of part support member, and keeps the concrete roof that does not reach the form removal condition is fully effectively supported, and becomes the difficult point of early tearing open in the work progress.
The utility model content
The purpose of this utility model provides a kind of aluminum alloy roof plate early-dismantling device, solve when concrete strength does not reach the form removal condition fully, keep supporting frame motionless the dismounting of template whereabouts by special micro-adjusting mechanism is set, guarantee the technical problem that reaches the lasting supporting role of form removal condition concrete roof fully to being; And it is easy to operate to solve micro-adjusting mechanism, simply constructed problem.
For achieving the above object, the utility model adopts following technical scheme:
A kind of aluminum alloy roof plate early-dismantling device, by support post, locating part, beam support, the state control member, the state control lever, top board and connecting bottom board form, welding is provided with locating part on the described support post, and offer through hole, described locating part and through hole interval arrange, and more close support post top, the position of locating part, be inserted with the state control lever in the described through hole, described state control lever and support post are welded to connect, the center of described state control member has the mono-symmetry cruciform vent, and its bottom surface cutting has the slope to mono-symmetry cruciform vent edge from the plate body edge, the center of described beam support has the symmetrical cruciform vent of twin shaft, center superposition when the symmetrical cruciform vent of described twin shaft and mono-symmetry cruciform vent are overlapping, described beam support and state control member be section between the locating part of support post and state control lever, and the bottom supporting of state control member is on the state control lever, both formation can realize loosening the operative minor with the wedging state, described roof supporting and connecting bottom board are welded on respectively end face and the bottom surface of support post, have the connecting hole that is connected with bottom support on the described connecting bottom board.
Described state control member is formed at its projection on one side by rectangle plate body and casting, and the width on the slope of its bottom surface cutting and the minor face of mono-symmetry cruciform vent are wide, and its end is to the edge, long limit of mono-symmetry cruciform vent.
Described beam support is comprised of Supporting plate and the stopper that is arranged on middle part, Supporting plate two long limits, and described stopper and Supporting plate are cast as one and are 45 degree angles between the two, and described Supporting plate is the rectangle steel plate.
The long limit of the symmetrical cruciform vent of described twin shaft and mono-symmetry cruciform vent all is not less than the length of state control lever, and both minor faces and support post are wide.
Described locating part is U-shaped steel card, back-shaped stirrup, or is welded on the steel bar of support post side in parallel.
The gradient on described slope is 6~15 degree.
Described state control lever is the cold-drawn round steel.
Described support post is square steel pipe.
Described top board and connecting bottom board are equal-sized square plate.
Compared with prior art the utlity model has following characteristics and beneficial effect:
The center of beam support described in the utility model has the symmetrical cruciform vent of twin shaft, center superposition when the symmetrical cruciform vent of described twin shaft and mono-symmetry cruciform vent are overlapping, and the long limit that makes the symmetrical cruciform vent of twin shaft and mono-symmetry cruciform vent all is not less than the length of state control lever, whole whereabouts smoothly during easily installation and removal in the time of can being implemented in formwork erection.
Have the mono-symmetry cruciform vent at the center of described state control member, and its bottom surface cutting has the slope to mono-symmetry cruciform vent edge from the plate body edge, make the bottom surface state orientation control lever of state control member during installation, the state control member is supported on the state control lever, make with state control member and state control lever and form the operative minor that can realize loosening with the wedging state, in the installation and removal process, only need to rap state control member upper protruding block with hammer, make the state control member realize being parallel to the horizontal movement of connecting bottom board, rapidly and efficiently.
Early-dismantling device described in the utility model is simple in structure, and is lightweight, and peace is torn open conveniently, can be used with other support members simultaneously, and the scope of application is wide.
Bracing or strutting arrangement described in the utility model, realized cleverly the dismounting to supporting traverse and aluminum alloy mould plate, and support post still support top do not reach the concrete roof of intensity fully, can be when guaranteeing construction quality, accelerating template and the accessory turnover of top board construction uses, lower construction cost, improve efficiency of construction.
The utility model can be widely used in tearing open the morning of concrete roof template.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is the utility model front view.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the left view of Fig. 1.
Fig. 4 is the upward view of Fig. 1.
Fig. 5 is upper limit spare detail drawing.
Fig. 6 is the top view of Fig. 5.
Fig. 7 is the left view of Fig. 5.
Fig. 8 is the beam support detail drawing.
Fig. 9 is the top view of Fig. 8.
Figure 10 is the left view of Fig. 8.
Figure 11 is state control member detail drawing.
Figure 12 is the top view of Figure 11.
Figure 13 is the left view of Figure 11.
Figure 14 is the axonometric drawing of Figure 11.
Figure 15 is the connecting bottom board detail drawing.
Figure 16 is the top board detail drawing.
Figure 17 is the steel pipe detail drawing.
Figure 18 is the top view of Figure 17.
Reference numeral: 1-top board, 2-support post, 3-upper limit spare, 4-beam support, 4.1-Supporting plate, 4.2-stopper, 5-state control member, 5.1-rectangle plate body, 5.2-projection, 6-state control lever, 7-connecting bottom board, 8-connecting hole, 9-mono-symmetry cruciform vent, 10-through hole, the symmetrical cruciform vent of 11-twin shaft.
The specific embodiment
Embodiment is extremely shown in Figure 180 referring to Fig. 1, a kind of aluminum alloy roof plate early-dismantling device, being used for the concrete roof template is the early-dismantling of aluminium alloy plate, by support post 2, locating part 3, beam support 4, state control member 5, state control lever 6, top board 1 and connecting bottom board 7 form, welding is provided with locating part 3 on the described support post 2, and offer through hole 10, described locating part 3 and through hole 10 intervals arrange, and more close support post 2 tops, the position of locating part 3, be inserted with state control lever 6 in the described through hole 10, described state control lever 6 is welded to connect with support post 2, the center of described state control member 5 has mono-symmetry cruciform vent 9, and its bottom surface cutting has the slope to mono-symmetry cruciform vent 9 edges from the plate body edge, the center of described beam support 4 has the symmetrical cruciform vent 11 of twin shaft, center superposition when the symmetrical cruciform vent 11 of described twin shaft and mono-symmetry cruciform vent 9 are overlapping, described beam support 4 and state control member 5 successively perforating branches support column 2 to section between locating part 3 and the state control lever 6, and make the bottom surface state orientation control lever 6 of state control member 5, state control member 5 is supported on the state control lever 6, can realize loosening operative minor with the wedging state with its formation, described roof supporting 1 and connecting bottom board 7 are welded on respectively end face and the bottom surface of support post 2, have the connecting hole 8 that is connected with bottom support on the described connecting bottom board 7.
Described state control member 5 is formed at its projection 5.1 on one side by rectangle plate body 5.1 and casting, and the width on the slope of its bottom surface cutting and the minor face of mono-symmetry cruciform vent 9 are wide, and its end is to the edge, long limit of mono-symmetry cruciform vent 9.
Described beam support 4 is comprised of Supporting plate 4.1 and the stopper 4.2 that is arranged on middle part, 4.1 liang long limits of Supporting plate, and described stopper 4.2 is cast as one with Supporting plate 4.1 and is 45 degree angles between the two, and described Supporting plate 4.1 is the rectangle steel plate.
The long limit of the symmetrical cruciform vent 11 of described twin shaft and mono-symmetry cruciform vent 9 all is not less than the length of state control lever 6, and both minor faces and support post 2 are wide.
Described locating part 3 is U-shaped steel card, back-shaped stirrup, or is welded on the steel bar of support post 2 sides in parallel.
The gradient on described slope is 6~15 degree.
Described state control lever 6 is the cold-drawn round steel.
Described support post 2 is square steel pipe.
Described top board 1 and connecting bottom board 7 are equal-sized square plate.
The model of the square steel pipe of described support post is 40*40*4mm, length 332.5mm.Connecting bottom board and top board are 120*120*6mm.
Described through hole center to the distance of support post 2 soffits is 89.5mm.
The vertical distance at described locating part 3 centers to the center of top board 1 is 201mm.
The diameter of described state control lever 6 is 18mm, and length is 63mm, and its center to center distance support post bottom surface is 89.5mm.The diameter of described through hole is 19mm.
Described connecting hole 8 is distributed in outside the contact surface of support post 2 and connecting bottom board 7, is evenly distributed, and its distribute spacing is 100mm, and number is at least four.Described rectangle plate body 5.1 is of a size of 160*100*20mm; Described Supporting plate 4.1 is of a size of 150*170*10mm; Described stopper 4.2 is of a size of 152*25*6mm.
The preparation method of described aluminum alloy roof plate early-dismantling device, making step is as follows:
Step 1, rush in the middle and lower part of support post 2 diameter than state control lever 6 slightly larger in diameter through hole 10;
Step 2 is inserted state control lever 6 in the through hole 10 on the support posts 2, and is welded to connect with support post 2;
Step 3 is welded on top board 1 on the upper surface of support post 2;
Step 4, the state control lever 6 that locating part 3 is fastened in support post 2 is welded to connect with upper curtate and with support post 2, reserves a segment distance between described locating part 3 and the state control lever 6;
Step 5, beam support 4, state control member 5 are inserted in support post 2 successively from the bottom, state control member 5 is supported on the state control lever 6, it is corresponding and make both long side directions consistent with state control lever 6 directions to overlap mono-symmetry cruciform vent 9 on the fashionable symmetrical cruciform vent 11 of twin shaft and the state control member 5 that makes on the beam support 4;
Step 6 is welded on connecting bottom board 7 on the lower surface of support post 2.Install, zinc-plated by requirement is set to all members.
Using method: the utility model and height-adjustable bottom steel support and are used.
The template top board installs process, at first, device described in the utility model is being placed on bottom steel support end face, and the top board that the lower connecting plate in the utility model device and bottom steel are supported is bolted, then adjust the height that bottom steel supports, then mounted bottom steel is supported coupling together with connector, form a rectangular support frame, be placed on the beam support of device described in the utility model early tearing crossbeam open.Then two templates are placed on and early tear open on the crossbeam, the template rebound is placed on the roof supporting of device described in the utility model, then continue to install next early singulated unit according to above-mentioned steps, complete to whole layer mounting of roof plate.
The template top board is early torn process open:
Treat that concrete reaches some strength, knock state control member in the device described in the utility model with hammer, make the state control member that the motion parallel with connecting bottom board occur, state control lever 6 passes successively from minor face and the symmetrical cruciform vent of the twin shaft on the beam support 4 11 long limits of the mono-symmetry cruciform vent 9 on the state control member 5, realization is loosened, state control member and beam support are along the downward slippage of support post, early tear also thereupon slippage downwards of crossbeam open, the template top board also is displaced downwardly to the connecting bottom board position thereupon; Template top board and crossbeam are pulled down, be mounted to next construction layer and realize a dismounting circulation.

Claims (9)

1. aluminum alloy roof plate early-dismantling device, it is characterized in that: by support post (2), locating part (3), beam support (4), state control member (5), state control lever (6), top board (1) and connecting bottom board (7) form, the upper welding of described support post (2) is provided with locating part (3), and offer through hole (10), described locating part (3) and through hole (10) interval arrange, and the more close support post in position (2) top of locating part (3), be inserted with state control lever (6) in the described through hole (10), described state control lever (6) is welded to connect with support post (2), the center of described state control member (5) has mono-symmetry cruciform vent (9), and its bottom surface cutting has from the plate body edge to the slope at mono-symmetry cruciform vent (9) edge, the center of described beam support (4) has the symmetrical cruciform vent (11) of twin shaft, center superposition when the symmetrical cruciform vent (11) of described twin shaft and mono-symmetry cruciform vent (9) are overlapping, described beam support (4) and state control member (5) are positioned at section between the locating part (3) of support post (2) and the state control lever (6), and the bottom supporting of state control member (5) is on state control lever (6), both formation can realize loosening the operative minor with the wedging state, described roof supporting (1) and connecting bottom board (7) are welded on respectively end face and the bottom surface of support post (2), have the connecting hole (8) that is connected with bottom support on the described connecting bottom board (7).
2. aluminum alloy roof plate early-dismantling device according to claim 1, it is characterized in that: described state control member (5) is formed at its projection (5.1) on one side by rectangle plate body (5.1) and casting, the width on the slope of its bottom surface cutting and the minor face of mono-symmetry cruciform vent (9) are wide, and its end is to the edge, long limit of mono-symmetry cruciform vent (9).
3. aluminum alloy roof plate early-dismantling device according to claim 1, it is characterized in that: described beam support (4) is comprised of Supporting plate (4.1) and the stopper (4.2) that is arranged on middle part, the long limits of Supporting plate (4.1) two, described stopper (4.2) is cast as one with Supporting plate (4.1) and is 45 degree angles between the two, and described Supporting plate (4.1) is the rectangle steel plate.
4. aluminum alloy roof plate early-dismantling device according to claim 1, it is characterized in that: the long limit of the symmetrical cruciform vent (11) of described twin shaft and mono-symmetry cruciform vent (9) all is not less than the length of state control lever (6), and both minor faces and support post (2) are wide.
5. aluminum alloy roof plate early-dismantling device according to claim 1 is characterized in that: described locating part (3) is U-shaped steel card, back-shaped stirrup, or is welded on the steel bar of support post (2) side in parallel.
6. aluminum alloy roof plate early-dismantling device according to claim 1 is characterized in that: the gradient on described slope is 6~15 degree.
7. aluminum alloy roof plate early-dismantling device according to claim 1, it is characterized in that: described state control lever (6) is the cold-drawn round steel.
8. aluminum alloy roof plate early-dismantling device according to claim 1, it is characterized in that: described support post (2) is square steel pipe.
9. aluminum alloy roof plate early-dismantling device according to claim 1, it is characterized in that: described top board (1) and connecting bottom board (7) are equal-sized square plate.
CN 201220317748 2012-07-03 2012-07-03 Early dismounting device for aluminum alloy top plate Expired - Fee Related CN202731289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220317748 CN202731289U (en) 2012-07-03 2012-07-03 Early dismounting device for aluminum alloy top plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220317748 CN202731289U (en) 2012-07-03 2012-07-03 Early dismounting device for aluminum alloy top plate

Publications (1)

Publication Number Publication Date
CN202731289U true CN202731289U (en) 2013-02-13

Family

ID=47657001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220317748 Expired - Fee Related CN202731289U (en) 2012-07-03 2012-07-03 Early dismounting device for aluminum alloy top plate

Country Status (1)

Country Link
CN (1) CN202731289U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720359A (en) * 2012-07-03 2012-10-10 中国建筑股份有限公司 Device for early removing aluminum alloy top plate and manufacturing method thereof
CN106103864A (en) * 2014-03-04 2016-11-09 福姆700私人有限公司 The adapter of formwork support structure
CN112166231A (en) * 2018-02-06 2021-01-01 品牌共享服务有限责任公司 Template system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720359A (en) * 2012-07-03 2012-10-10 中国建筑股份有限公司 Device for early removing aluminum alloy top plate and manufacturing method thereof
CN102720359B (en) * 2012-07-03 2014-10-01 中国建筑股份有限公司 Device for early removing aluminum alloy top plate and manufacturing method thereof
CN106103864A (en) * 2014-03-04 2016-11-09 福姆700私人有限公司 The adapter of formwork support structure
CN106103864B (en) * 2014-03-04 2019-03-01 福姆700私人有限公司 The adapter of formwork support structure
CN112166231A (en) * 2018-02-06 2021-01-01 品牌共享服务有限责任公司 Template system

Similar Documents

Publication Publication Date Title
CN202731289U (en) Early dismounting device for aluminum alloy top plate
CN203499229U (en) Operating platform for construction of elevator shaft
CN206545386U (en) Sheet metal forming formwork drops in a kind of toilet
CN202509785U (en) Reusable auxiliary turnover device for large beam slab component
CN204781946U (en) Novel post die clamper
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN203626261U (en) Construction structure of concrete spreader in aluminum alloy formwork system
CN102720359B (en) Device for early removing aluminum alloy top plate and manufacturing method thereof
CN202831617U (en) Large-scale integrated steel template
CN105562968A (en) Method for overturning large steel beam member
CN207277834U (en) Catch pit bottom plate tool-typed formwork
CN102140839B (en) Staircase shaping support formwork
CN202248934U (en) Vertical pre-stressed reinforcing steel tension frame
CN213952915U (en) A operating platform that encorbelments of formula that can have enough to meet need for in well
CN203878984U (en) Novel toilet shortened plate forming system
CN202559734U (en) Cantilever slab template-supporting inclined support device of aluminum alloy template system
CN103470029B (en) Section bar early tears crossbeam and using method open
CN111502274A (en) Pulling-on piece formula aluminum alloy template pulling-on piece clearing device
CN202007384U (en) Connecting device for bottom die and side die of suspended steel box in water
CN207063512U (en) A kind of one side formwork structure
CN104032965A (en) Overturning method of H-shaped beam-slab component
CN201786020U (en) Middle beam for building
CN205444884U (en) Wallboard for civil engineering
CN208456134U (en) A kind of building form dismounting damage-retardation device
CN209025429U (en) For floor slab back casting band without supporting steel plate device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

Termination date: 20200703

CF01 Termination of patent right due to non-payment of annual fee