CN202690042U - Pressure balance bunker device of hydraulic pushing instrument - Google Patents

Pressure balance bunker device of hydraulic pushing instrument Download PDF

Info

Publication number
CN202690042U
CN202690042U CN 201220345636 CN201220345636U CN202690042U CN 202690042 U CN202690042 U CN 202690042U CN 201220345636 CN201220345636 CN 201220345636 CN 201220345636 U CN201220345636 U CN 201220345636U CN 202690042 U CN202690042 U CN 202690042U
Authority
CN
China
Prior art keywords
bunker
instrument
balance
joint
balance bunker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220345636
Other languages
Chinese (zh)
Inventor
梁志诚
蒋俊湘
徐国庆
胡茂楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Oilfield Service Corp
Original Assignee
Jiangsu Petroleum Exploration Bureau Of China Petrochemical Corp
China Petroleum and Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Petroleum Exploration Bureau Of China Petrochemical Corp, China Petroleum and Chemical Corp filed Critical Jiangsu Petroleum Exploration Bureau Of China Petrochemical Corp
Priority to CN 201220345636 priority Critical patent/CN202690042U/en
Application granted granted Critical
Publication of CN202690042U publication Critical patent/CN202690042U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a pressure balance bunker device of a hydraulic pushing instrument. The balance bunker device comprises an instrument oil pipe joint, a leather bag balance bunker and a power bunker joint, wherein an oil pipe interface connected with an instrument oil pipe is formed in the instrument oil pipe joint; the lower end of the power bunker joint is connected with a power bunker; a through hole is formed in the power bunker joint along the axial direction; the pipe orifice of the upper end of the leather bag balance bunker is sleeved at the lower end of the instrument oil pipe joint and connected with the instrument oil pipe joint through a hoop in a sealed mode; the oil pipe interface is communicated with an inner cavity of the leather bag balance bunker; the pipe orifice of the lower end of the leather bag balance bunker is sleeved at the upper end of the power bunker joint and connected with the power bunker joint through a hoop in a sealed mode; the inner cavity of the leather bag balance bunker is filled with hydraulic oil; a protection cover is sleeved outside the leather bag balance bunker; and a mud inlet through which the inside and outside of the cover are communicated is formed on the protection cover. A leather bag is contracted when external mud pressure is applied to the leather bag, the hydraulic oil in the leather bag is extruded, and the change of downhole pressure is transmitted to the instrument. The balance bunker device has a simple integral structure and acts reliably.

Description

Hydraulic thrust is by instrument pressure balance bin device
Technical field
The utility model relates to a kind of well logging servicing unit, and particularly a kind of hydraulic thrust is by instrument pressure balance bin device.
Background technology
The pressure balance storehouse is the key components that hydraulic thrust leans on instrument, is related to the safety of instrument integral body and the reliability of work.Hydraulic thrust is by being provided with oil pump in the power bin of instrument, and what the power that provides by oil pump was finished instrument opens the receipts leg, and pressure balance stores hydraulic oil in the storehouse, both to the oil pump feed of power bin, and the again variation of the outside mud pressure of perception and offer instrument.
At present, piston type is all adopted in the pressure balance storehouse, and the oil mass of in time replenishing in the instrument internal high and low pressure storehouse with the plunger-type balance mode changes, and realizes the internal and external pressure balance of instrument.The pressure pushing piston motion of mud changes the oil pressure in the balance bunker, but the SDZ-3000 hydraulic thrust leans on the employed piston-type pressure balance bunker of instrument device, and upper cover of piston rod has been equipped with the spring of reset response.Existing SDZ-3000 hydraulic thrust by instrument in production application, the time have instrument to advance the mud accident generation, cause very large economic loss.It is because being that piston-type pressure balance bunker device exists fault of construction, and dynamic storehouse oil pipeline is damaged by pressure by the pressure balance storehouse on top when causing, and build-up of pressure balance sysmte oil starvation causes that instrument internal advances the accident of mud; Sometimes because the spring in the pressure balance storehouse is blocked, make the piston balance sysmte inoperative, cause that instrument internal advances the accident of mud.
The utility model content
The purpose of this utility model is, overcomes problems of the prior art, provides a kind of hydraulic thrust simple in structure, reliable operation to lean on instrument pressure balance bin device.
For solving above technical problem, a kind of hydraulic thrust provided by the utility model is by instrument pressure balance bin device, comprise the instrument oil connection, bladder balance bunker and power bin joint, be provided with the tubing interface that is connected with the instrument oil pipe in the described instrument oil connection, the lower end of described power bin joint is connected with power bin and the power bin joint is provided with through hole vertically, the upper pipes muzzle of described bladder balance bunker is contained in the lower end of described instrument oil connection and is tightly connected by clip and instrument oil connection, and the inner chamber of described tubing interface and described bladder balance bunker connects; The lower end mouthpiece cover of described bladder balance bunker is contained in described power bin upper end of joint and is connected with the power bin joint sealing by clip, and the inner chamber of described bladder balance bunker has been filled with hydraulic oil.
With respect to prior art, the utility model has been obtained following beneficial effect: bladder balance bunker is an elastic construction, when being subject to the pressure of outside mud, leather bag can shrink, smaller volume, the hydraulic oil in the leather bag is squeezed simultaneously, transmits the variation of down-hole pressure to instrument; Overall structure is simple, and oil reserve is large, reliable in action, and maintenance and repair is convenient.
As preferred version of the present utility model, the two ends mouth of pipe outer wall of described bladder balance bunker is respectively equipped with the rubber reinforcement sleeve pipe, and described rubber reinforcement sleeve pipe is connected as a single entity with the two ends mouth of pipe respectively, and described clip is stuck in outside the described rubber reinforcement sleeve pipe.The rubber reinforcement sleeve pipe can improve the intensity of the mouth of pipe, can bear the larger pressure of clip, guarantees that sealing reliably and not can damage.
As further preferred version of the present utility model, the middle part outer wall of described bladder balance bunker length direction is provided with the rubber reinforcement sleeve pipe, and described rubber reinforcement sleeve pipe and described bladder balance bunker are connected as a single entity.Outer wall arranges the rubber reinforcement sleeve pipe at the middle part of bladder balance bunker length direction, can improve the intensity of bladder balance bunker.
As further preferred version of the present utility model, described bladder balance bunker is set with protected enclosure outward, and described protected enclosure is provided with and connects the inside and outside mud entrance of case.Bladder balance bunker in the down-hole easily and the borehole wall, rock and metal object rub, rub and can cause when serious bladder balance bunker to damage leakage of oil, protective cover is set after, neither affect the pressure of perception down-hole slurry, play again protective action, prolong application life and the reliability of balance bunker.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail, accompanying drawing only provides reference and explanation usefulness, and is non-in order to limit the utility model.
Fig. 1 is that the utility model hydraulic thrust is by the structural representation of instrument pressure balance bin device.
Among the figure: 1. instrument oil connection; 1a. tubing interface; 2. bladder balance bunker; 2a. rubber reinforcement sleeve pipe; 3. clip; 4. power bin joint; 4a. oil filler point; 5. protected enclosure; 5a. mud entrance.
The specific embodiment
As shown in Figure 1, hydraulic thrust of the present utility model comprises instrument oil connection 1, bladder balance bunker 2 and power bin joint 4 by instrument pressure balance bin device, be provided with the tubing interface 1a that is connected with the instrument oil pipe in the instrument oil connection 1, the lower end of power bin joint 4 is connected with power bin and the power bin joint is provided with through hole vertically, the upper pipes muzzle of bladder balance bunker 2 is contained in the lower end of instrument oil connection 1 and is tightly connected by clip 3 and instrument oil connection, and the inner chamber of tubing interface 1a and bladder balance bunker 2 connects; Bladder balance bunker 2 lower end mouthpiece covers are contained in power bin joint 4 upper ends and are connected with the power bin joint sealing by clip 3, and the inner chamber of bladder balance bunker 2 has been filled with hydraulic oil.
The middle part of bladder balance bunker 2 length directions and two ends mouth of pipe outer wall are respectively equipped with rubber reinforcement sleeve pipe 2a, and rubber reinforcement sleeve pipe 2a and bladder balance bunker are connected as a single entity.Bladder balance bunker is set with protected enclosure 5 outward, and protected enclosure 5 is provided with and connects the inside and outside mud entrance 5a of case.
The power bin joint is provided with oil filler point 4a and steam vent, after the balance bunker assembling is complete, to balance bunker inner chamber injection liquid force feed, passes through simultaneously the outside exhaust of steam vent by oil filler point 4a.Instrument is in use the down-hole, and when being subject to the pressure of outside mud, leather bag can shrink, smaller volume, and the hydraulic oil in the leather bag is squeezed simultaneously, transmits the variation of down-hole pressure to instrument.
The above only is the better possible embodiments of the utility model, and is non-so limit to scope of patent protection of the present utility model.In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop in the protection domain of the utility model requirement.

Claims (4)

1. a hydraulic thrust is by instrument pressure balance bin device, comprise instrument oil connection and power bin joint, be provided with the tubing interface that is connected with the instrument oil pipe in the described instrument oil connection, the lower end of described power bin joint is connected with power bin and the power bin joint is provided with through hole vertically, it is characterized in that: also comprise bladder balance bunker, the upper pipes muzzle of described bladder balance bunker is contained in the lower end of described instrument oil connection and is tightly connected by clip and instrument oil connection, and the inner chamber of described tubing interface and described bladder balance bunker connects; The lower end mouthpiece cover of described bladder balance bunker is contained in described power bin upper end of joint and is connected with the power bin joint sealing by clip, and the inner chamber of described bladder balance bunker has been filled with hydraulic oil.
2. hydraulic thrust according to claim 1 is by instrument pressure balance bin device, it is characterized in that: the two ends mouth of pipe outer wall of described bladder balance bunker is respectively equipped with the rubber reinforcement sleeve pipe, described rubber reinforcement sleeve pipe is connected as a single entity with the two ends mouth of pipe respectively, and described clip is stuck in outside the described rubber reinforcement sleeve pipe.
3. hydraulic thrust according to claim 2 is by instrument pressure balance bin device, and it is characterized in that: the middle part outer wall of described bladder balance bunker length direction is provided with the rubber reinforcement sleeve pipe, and described rubber reinforcement sleeve pipe and described bladder balance bunker are connected as a single entity.
According to claim 1 and 2 or 3 described hydraulic thrusts by instrument pressure balance bin device, it is characterized in that: described bladder balance bunker is set with protected enclosure outward, described protected enclosure is provided with and connects the inside and outside mud entrance of case.
CN 201220345636 2012-07-17 2012-07-17 Pressure balance bunker device of hydraulic pushing instrument Expired - Fee Related CN202690042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220345636 CN202690042U (en) 2012-07-17 2012-07-17 Pressure balance bunker device of hydraulic pushing instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220345636 CN202690042U (en) 2012-07-17 2012-07-17 Pressure balance bunker device of hydraulic pushing instrument

Publications (1)

Publication Number Publication Date
CN202690042U true CN202690042U (en) 2013-01-23

Family

ID=47545672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220345636 Expired - Fee Related CN202690042U (en) 2012-07-17 2012-07-17 Pressure balance bunker device of hydraulic pushing instrument

Country Status (1)

Country Link
CN (1) CN202690042U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470251A (en) * 2013-09-13 2013-12-25 中国海洋石油总公司 Pressure compensation structure of nuclear magnetic resonance logger
CN109238877A (en) * 2018-09-20 2019-01-18 中南大学 The complete deep cross plate shearing instrument in sea
CN110821422A (en) * 2019-11-07 2020-02-21 连云港杰瑞自动化有限公司 Single-joint flexible short joint

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470251A (en) * 2013-09-13 2013-12-25 中国海洋石油总公司 Pressure compensation structure of nuclear magnetic resonance logger
CN103470251B (en) * 2013-09-13 2016-04-06 中国海洋石油总公司 A kind of pressure compensation structure of NMR (Nuclear Magnetic Resonance) logging instrument
CN109238877A (en) * 2018-09-20 2019-01-18 中南大学 The complete deep cross plate shearing instrument in sea
CN110821422A (en) * 2019-11-07 2020-02-21 连云港杰瑞自动化有限公司 Single-joint flexible short joint

Similar Documents

Publication Publication Date Title
CN103114809B (en) Vibration absorption type downhole hydraulic pulse generation device and well drilling method thereof
CN202946122U (en) Shock absorption system of petroleum drilling and logging device
CN202690042U (en) Pressure balance bunker device of hydraulic pushing instrument
CN201963216U (en) High-temperature resistant hydraulic two-way shock absorber
CN213392028U (en) A drilling speed-increasing device that can be used for deep well drill string damping and modulating alternating load
CN202903426U (en) Test equipment for rubber drum of packer
CN202914036U (en) Gas-tight underground safety valve of side hole control valve
CN105275452A (en) Vibration damping apparatus with measurement-while-drilling instrument protection function
CN202300216U (en) Connecting device for deblocking down-hole string
CN202627986U (en) Movement conversion damping device
CN203176017U (en) Downhole hydraulic accumulator
CN202325337U (en) Hydraulic center device
CN202108477U (en) Plunger Drainage Gas Production Wellhead Buffer
CN202418109U (en) Stroke sensor for hydraulic oil cylinders
CN201620872U (en) Downhole tracer injection device
CN201074589Y (en) Multipurpose standing valve for oil well pump
CN201650189U (en) Double-stage sealing device
CN2900762Y (en) Gas pressurizing shock absorber
CN201546657U (en) Polished rod break-off blowout preventer
CN204754851U (en) Wear -resisting packing box of tuningout
CN204419043U (en) Flexible from damping drill bit
CN201078217Y (en) Stream commutator
CN202731764U (en) Wax removal eccentric-wear-preventing type hollow sucker rod
CN206267797U (en) A kind of Novel down-hole instrument with vibration isolation defencive function
CN201902178U (en) Pumping rod shock absorber

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151013

Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Patentee after: Sinopec Corp.

Patentee after: SINOPEC OILFIELD SERVICE CORPORATION

Address before: 225009 Weiyang Road, Jiangsu, China, No. 188, No.

Patentee before: Sinopec Corp.

Patentee before: Jiangsu Oil Exploration Corporation of Sinopec

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130123

Termination date: 20150717

EXPY Termination of patent right or utility model