CN202688852U - Multifunctional gallery bridge - Google Patents

Multifunctional gallery bridge Download PDF

Info

Publication number
CN202688852U
CN202688852U CN 201220220055 CN201220220055U CN202688852U CN 202688852 U CN202688852 U CN 202688852U CN 201220220055 CN201220220055 CN 201220220055 CN 201220220055 U CN201220220055 U CN 201220220055U CN 202688852 U CN202688852 U CN 202688852U
Authority
CN
China
Prior art keywords
bridge
building
gallery
room
corridor
Prior art date
Application number
CN 201220220055
Other languages
Chinese (zh)
Inventor
方运平
Original Assignee
方运平
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 方运平 filed Critical 方运平
Priority to CN 201220220055 priority Critical patent/CN202688852U/en
Application granted granted Critical
Publication of CN202688852U publication Critical patent/CN202688852U/en

Links

Abstract

Provided is a multifunctional gallery bridge. The multifunctional gallery bridge can be built on city inner and outer riverways and river bank barriers to meet demands of pedestrians and traffic, and has a multi-story building structure having business service, habitation and relaxation and the like functions. Structurally, the gallery bridge is designed to be an upper structure and a lower structure by regarding the ground as a boundary. On the lower structure of the bridge, end-bearing piles are adopted on bridge foundations, and foundation loading is designed according to a traffic bridge standard, namely the demand of 200-300 tons per square meters. Positive zero and negative zero of the bridge are arranged on a large-span beam, and a span ratio is 30 meters in length and 1.3 meters in height. Reinforced concrete structure arch span connection is adopted according to the bridge, and a floodwater drainage ability of a bridge deck is improved. A multi-floor gallery building is built on the upper portion of the bridge, a beam type or lifting type building or duplex structure is adopted to construct the gallery building, and attached floors of the gallery building and long-heavy eave structures of whole-slope and half-slope roofs are arranged. The attached floors are provided with habitation and business functions. A ground floor of the gallery building is designed to be a reinforced concrete large bay frame without a fixed fence structure in case of passing of extraordinary floods. Surrounding sides of the gallery building are passageways and provided with transparent breast boards.

Description

Multi-functional shelter bridge
Technical field
The utility model relates to a kind of bridge construction, especially can be built on the inside and outside river course, ditch obstacle in city for solve the current of pedestrian and vehicle and take into account commercial operation, leisure, the multi-functional shelter bridge of the multi-layer construction structure that is integrated of living.
Background technology
Shelter bridge, a building of carrying thousand one-hundred-year histories because it has pedestrian and vehicle by function and art of landscape style and features, still is built on the inside and outside river course and ditch obstacle in city widely.These structures are identical with purposes, and the bridge construction of different style is except the carrying pedestrian has increased construction landscape with the city of the vehicle pass-through, also building for shelter bridge.But with regard to current existing shelter bridge, although the face shaping of these buildings and artistic style are had nothing in common with each other, all in order to solve urban traffic or to increase the part human landscape and building, function only limits to traffic and view to its function.The bridge construction of this function singleness is at the society rapid economic development, land resources highlights under the rare background gradually, and existing shelter bridge is improper with regard to some, and is inharmonious with the trend of economic development, the suspicion of waste bridge space resources is arranged, and development and the innovation of shelter bridge are restricted.
Summary of the invention
The deficiency that exists in order to overcome the aspects such as existing shelter bridge function singleness and bridge construction space resources utilization rate are low, the utility model provides a kind of multi-functional shelter bridge, this multi-functional shelter bridge not only can be for pedestrian and vehicle pass-through, but also taken into account commercial operation, leisure, the multi-purpose shelter bridges such as inhabitation.
The technical scheme that its technical problem that solves the utility model adopts is: structurally, the penetrating breast board that encloses side by abutment, the span of arch and room, bridge floor corridor and shelter bridge consists of, wherein, shelter bridge is designed to upper and lower structure take ground as the boundary, on the substructure of bridge, abutment adopts end bearing pile, and given tensile load is by access bridge type design, i.e. 200~300T/m2 requirement.The positive negative zero of bridge is located on the long-span beams, strides the footpath than being long 30m, and high 1.3m adopts the reinforced concrete structure span of arch to connect, and improves the Bridge Sections flood discharge capacity.Room, multilayer corridor is built on the top of bridge, and the building of readding at two ends, room, multilayer corridor adopts the appearance design of outrigger formula, and readding the building internal construction is spring layer, sets up the attached layer in room, corridor, and attached layer sets up human settlements and commercial operation function separately, and readding building roof is the long eaves layers of eaves structure on half way up the mountain and full slope.The bottom-layer design in room, corridor becomes not the fixedly steel concrete large bay framework of Fence structure, improves the shelter bridge flood control capacity, and the prevention extraodinary flood passes through.The room, corridor to enclose side be passage and be provided with penetrating breast board.When needs when this multi-functional shelter bridge sets up human settlements and commercial operation position separately, read the building and room, corridor bottom large bay is fitted up partition by the outrigger formula of room, corridor different aspects setting.
The beneficial effects of the utility model are, can be when keeping shelter bridge traffic and landscape function effect, but also taken into account human settlements and commercial function, effectively utilized the bridge space resources.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the utility model schematic appearance
Fig. 2 is the attached layer of the utility model position schematic diagram
Fig. 3 is the utility model structural representation
Fig. 4 is the partial schematic diagram of Fig. 1
Fig. 5 is the partial schematic diagram of Fig. 1
Among the figure 1, abutment, 2, the span of arch, 3, the room, corridor, 4, read building, 5, Quan Po, 6, half way up the mountain, 7, long eaves layers of eaves structure, 8, attached layer, 9, human settlements or commercial location, 10, the large bay framework, 11, penetrating breast board.
The specific embodiment
In Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, structurally, with shelter bridge be designed to as the boundary take ground, up-down structure, on the substructure of bridge, abutment (1) adopts end bearing pile, given tensile load to press access bridge type design, i.e. 200~300T/m 2Requirement.Positive and negative zero of bridge is located on the long-span beams, strides the footpath than being long 30m; High 1.3 meters, adopt reinforced concrete structure, the span of arch (2) connects, and improves the Bridge Sections flood discharge capacity.Room, multilayer corridor (3) is built on the top of bridge, and the building (4) of readding at two ends, room, multilayer corridor adopts the appearance design of outrigger formula, and readding the building internal construction is spring layer, sets up the attached layer in room, corridor (8), and attached layer sets up human settlements and commercial location (9) operation function separately.Read building roof and be the long eaves layers of eaves structure (7) of full slope (5) and half way up the mountain (6), the bottom-layer design in room, corridor becomes not the fixedly steel concrete large bay framework (10) of Fence structure, improve the shelter bridge flood control capacity, prevent passing through of extraodinary flood.The room, corridor to enclose side be passage and be provided with penetrating breast board (11).

Claims (1)

1. the penetrating breast board that encloses side by abutment, the span of arch and room, bridge floor corridor and shelter bridge on a multi-functional shelter bridge, the structure consists of, it is characterized in that: shelter bridge is designed to upper and lower structure take ground as the boundary, on the substructure of bridge, abutment adopts end bearing pile, given tensile load to press access bridge type design, i.e. 200~300T/m 2Requirement, the positive negative zero of bridge is located on the long-span beams, stride the footpath than being long 30m, high 1.3m, adopt the reinforced concrete structure span of arch to connect, improve the Bridge Sections flood discharge capacity, room, multilayer corridor is built on the top of bridge, the building of readding at two ends, room, multilayer corridor adopts the appearance design of outrigger formula, and readding the building internal construction is spring layer, sets up the attached layer in room, corridor, attached layer sets up human settlements and commercial operation function separately, readding building roof is the long eaves layers of eaves structure on half way up the mountain and full slope, and the bottom-layer design in room, corridor becomes not the fixedly steel concrete large bay framework of Fence structure, improves the shelter bridge flood control capacity, the prevention extraodinary flood passes through, the room, corridor to enclose side be passage and be provided with penetrating breast board.
CN 201220220055 2012-05-06 2012-05-06 Multifunctional gallery bridge CN202688852U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220220055 CN202688852U (en) 2012-05-06 2012-05-06 Multifunctional gallery bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220220055 CN202688852U (en) 2012-05-06 2012-05-06 Multifunctional gallery bridge

Publications (1)

Publication Number Publication Date
CN202688852U true CN202688852U (en) 2013-01-23

Family

ID=47544493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220220055 CN202688852U (en) 2012-05-06 2012-05-06 Multifunctional gallery bridge

Country Status (1)

Country Link
CN (1) CN202688852U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696352A (en) * 2013-12-03 2014-04-02 陕西中霖建设工程集团有限公司 Pedestrian and vehicle separation double-path ecofallow commercial gallery bridge
CN103711072A (en) * 2014-01-15 2014-04-09 方运平 Novel gallery bridge
CN105386636A (en) * 2015-12-12 2016-03-09 田海荣 Gallery bridge with memorial archways
CN106120531A (en) * 2016-08-22 2016-11-16 田海荣 New steel structure shelter bridge base structure and construction method thereof
CN106120541A (en) * 2016-08-22 2016-11-16 田海荣 Novel gallery bridge concrete foundation structure and construction method thereof
CN106368230A (en) * 2016-11-16 2017-02-01 贵州正业工程技术投资有限公司 Arch bridge type cross-over pile foundation bearing platform structure and manufacturing method thereof
CN109537435A (en) * 2018-11-20 2019-03-29 庆元县古韵廊桥研究所 A kind of the antidetonation flood protection device and its construction method of ancient fortune shelter bridge

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696352A (en) * 2013-12-03 2014-04-02 陕西中霖建设工程集团有限公司 Pedestrian and vehicle separation double-path ecofallow commercial gallery bridge
CN103696352B (en) * 2013-12-03 2016-04-27 陕西中霖建设工程集团有限公司 A kind of people's car separation dual-channel ecofallows commercial gallery bridge
CN103711072A (en) * 2014-01-15 2014-04-09 方运平 Novel gallery bridge
CN105386636A (en) * 2015-12-12 2016-03-09 田海荣 Gallery bridge with memorial archways
CN106120531A (en) * 2016-08-22 2016-11-16 田海荣 New steel structure shelter bridge base structure and construction method thereof
CN106120541A (en) * 2016-08-22 2016-11-16 田海荣 Novel gallery bridge concrete foundation structure and construction method thereof
CN106368230A (en) * 2016-11-16 2017-02-01 贵州正业工程技术投资有限公司 Arch bridge type cross-over pile foundation bearing platform structure and manufacturing method thereof
CN109537435A (en) * 2018-11-20 2019-03-29 庆元县古韵廊桥研究所 A kind of the antidetonation flood protection device and its construction method of ancient fortune shelter bridge
CN109537435B (en) * 2018-11-20 2020-08-25 金华市广和古建筑技术研发有限公司 Earthquake-resistant flood control device of ancient transportation gallery bridge and construction method thereof

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN205662947U (en) Coincide assembled underground pipe gallery system
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN106088650B (en) A kind of method and building suitable for building with brick-concrete structure underground increasing layer
CN1219955C (en) Construction method of large span building roof or floor of building and its double lattice beam structure
Bothara et al. General observations of building behaviour during the 8th October 2005 Pakistan earthquake
CN206503230U (en) A kind of fabricated steel building
CN103195085B (en) Downward story-adding basement and construction method thereof
CN104404869A (en) Pile column type concrete hollow pile pier structure
CN201593203U (en) Hiddenly-distributed seepage-proof water guiding system of baseboard of basement
CN101408039A (en) Bamboo-wood mixed structure of house architecture
CN1657712A (en) Drainage and anti-float method for underground building and its used device
US20130199113A1 (en) Floatable Constructions
US20170002532A1 (en) Method for river/lake level regulation and water conservancy system
CN207878747U (en) A kind of laminated floor slab prefabricated board
CN105625566A (en) Fabricated concrete orthogonal-diagonal lattice space grid box type tube-in-tube structure and making method thereof
CN106703201A (en) Fabricated integrated building and production method thereof
CN105089149B (en) The edge-on plane system in aluminium alloy house
CN103510723B (en) A kind of prefabricated integral frame structure dwelling house system
CN1258632C (en) Villa type building
CN103061443A (en) Novel enclosed steel-concrete superimposed plate composite beam
CN207405427U (en) A kind of combined type permeable pavement structure
CN104895229B (en) Prefabricated assembled steel node concrete plate-column structure and its hanging method
CN105040812A (en) Aluminum alloy house
CN101831865A (en) Beam spanning multilayer deck

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130123