CN202658620U - 风机基础环的安装调平装置 - Google Patents
风机基础环的安装调平装置 Download PDFInfo
- Publication number
- CN202658620U CN202658620U CN201220361132.3U CN201220361132U CN202658620U CN 202658620 U CN202658620 U CN 202658620U CN 201220361132 U CN201220361132 U CN 201220361132U CN 202658620 U CN202658620 U CN 202658620U
- Authority
- CN
- China
- Prior art keywords
- fine
- support
- installation
- ring
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
一种风机基础环的安装调平装置,该安装调平装置包括与基础环底座连接的螺栓托架以及用于支撑基础环的支架;螺栓托架包括固接在一起的压紧托板和连接托板,压紧托板上设置有用于基础环底座连接的连接孔,连接托板的中心与微调螺杆的顶部固接,该微调螺杆上套装有微调螺母;支架顶部固接有支架顶板,支架底部固接有预埋底板,支架顶板上设置的预留孔与微调螺杆相匹配。该装置是将支架和基础环分开安装,不仅降低吊车的负载和危险系数,能够在分别安装过程中随时对各部分进行调整,保证安装的精准度,提高工作效率;本实用新型通过旋转微调螺母调整螺距来实现对基础环平整度的微调,工程造价低,安装速度快,保证基础环的安装质量。
Description
技术领域
本实用新型涉及风力发电机领域的风机基础环的施工方法,具体地说是风机基础环的安装调平方法。
背景技术
目前,国内比较先进的风机基础环的安装方法是将支架和基础环固定后同时安装,安装完成后采用微调液压千斤顶对基础环进行调平。这种施工方法采用地脚螺栓支撑架固定的方法,在安装过程中,先将基础环与地脚螺栓支撑固定连接好,再用吊车将整体吊装,基础环安装后需要进行一次平整度调整,在进行混凝土浇筑过程前还要进行二次调节,虽然微调千斤顶能够对细微的高度差进行调整,但是没有明确的数值,需要通过多次调整比对才能实现平整。现有的风机基础环的安装和调平方法,不仅安装过程吊车负载大,危险系数高,工作效率低,而且采用千斤顶进行微调的资金投入大,需多次比对调整才能完成,工序复杂,延长施工时间,影响施工进度。
实用新型内容
本实用新型是针对现有技术中存在的诸多缺陷,提供一种支架与基础环分开安装,且平整度调整实现数值化一次调整完成的风机基础环安装调平方法。
实现上述目的采用的技术方案是:一种风机基础环的安装调平装置,该安装调平装置包括与基础环底座连接的螺栓托架以及用于支撑基础环的支架;所述螺栓托架包括固接在一起的压紧托板和连接托板,压紧托板上设置有用于基础环底座连接的连接孔,连接托板的中心与微调螺杆的顶部固接,该微调螺杆上套装有微调螺母;所述支架顶部固接有支架顶板,支架底部固接有预埋底板,支架顶板上设置的预留孔与微调螺杆相匹配。
与现有的施工方法相比,本实用新型公开的这种安装调平装置是将支架和基础环分开安装,不仅降低了吊车的负载,降低了危险系数,而且能够在分别安装过程中随时对各部分进行调整,保证安装的精准度,提高工作效率;本实用新型还采用了螺栓螺扣精准调平的方式对基础环进行调平,确定高度偏差之后,通过旋转微调螺母调整螺距来实现对基础环平整度的微调,精准度高,调整次数少,工程造价低,安装速度快,保证了基础环的安装质量。
附图说明
图1为本实用新型中基础环的整体结构示意图。
图2为图1中的A-A向结构示意图。
图3为图2的右视图。
图4为图2中的I部局部放大图。
图5为图3中的2-2向示意图。
图6为图3中的3-3向示意图。
图7为图3中的4-4向示意图。
图中:基础环1,基础环底座2,螺栓托架3,连接螺栓4,微调螺杆5,微调螺母6,支架7,预埋底板8,压紧托板9,连接托板10,支架顶板11,连接孔12,预留孔13。
具体实施方式
下面结合附图对本实用新型做进一步说明。
参见附图1-7,本实用新型所公开的这种风机基础环的安装调平方法,其施工过程中需要用到安装调平装置对基础环进行安装、调平。该安装调平装置包括与基础环底座2连接的螺栓托架3以及用于支撑基础环1的支架7。螺栓托架3包括固接在一起的压紧托板9和连接托板10,压紧托板9上设置有用于基础环底座2连接的连接孔12,该连接孔12与连接螺栓4相匹配。连接托板10的中心与微调螺杆5的顶部固接,本实施例中,连接孔12的数目是四个,能够实现基础环底座2和压紧托板之间的紧密连接。微调螺杆5上套装有微调螺母6。支架7顶部固接有支架顶板11,支架7底部固接有预埋底板8,支架顶板11上设置的预留孔13与微调螺杆5相匹配。预埋底板8焊接在支架的底部,作为预埋件。本实施例中的支架7采用工字钢。基础环1和基础环底座2之间为一体结构。
本新型所公开安装调平装置,螺栓托架和支架为一组支撑件,在基础环的安装过程中,在基础环底部沿其圆周均匀安装3组这样的支撑件,各组支撑件的安装位置沿基础环圆周以120°分布。
风机基础环安装调平方法,按照以下步骤进行。
a、安装基础环支架预埋件:将支架、预埋底板和支架顶板采用人工倒运的方式设置在基坑内,将支架立起后,支架的中心轴线与支架顶部的支架顶板和支架底部的预埋底板的中心点重合,支架顶板上预留孔的方向为基础环的内侧方向,调整预埋底板内侧边缘距基础环中心点的距离,调整完毕后对支架顶板、支架和预埋底板之间进行点焊固接。调整预埋底板内侧边距基础环中心点的距离,是为了保证各个预埋底板的内侧边到基础环中心的距离相同,即支架和螺栓托架的安装位置保持在同一圆周上,保证基础环的稳定和安装精度。
b、基础环与螺栓托架连接:用吊车将基础环吊离地面,待平稳后锁定吊车,螺栓托架中的压紧托板与基础环底座下表面贴合,连接螺栓穿过压紧托板上的连接孔,将压紧托板和基础环底座连接,此时连接螺栓的螺母预留3-5个扣,这里的扣即螺杆的螺距,一个扣为一个螺距,预留3-5个扣是为了对其进行小范围偏差的调整。
c、基础环与支架连接:基础环被吊至支架上方后开始落钩,基础环底座距离支架顶板400-550mm时稳住吊车,工作人员进入基坑内配合吊车落钩,旋转基础环,使螺栓托架中连接托板上固接的微调螺杆对准并穿过支架顶板上的预留孔,微调螺杆穿过预留孔后工作人员松手,待基础环全部压在支架上且稳定后,工作人员先紧固压紧托板和基础环底座之间的连接螺栓的螺母,然后对支架、支架顶板及预埋底板进行满焊,保证它的稳定性,基础环安装完毕。
d、基础环平整度调整:用水平仪对基础环的平整度进行监测,通过调整微调螺杆上的微调螺母,通过旋转微调螺母调整螺距,完成对基础环平整度的微小调整。
Claims (1)
1. 一种风机基础环的安装调平装置,其特征在于,该安装调平装置包括与基础环底座连接的螺栓托架以及用于支撑基础环的支架;所述螺栓托架包括固接在一起的压紧托板和连接托板,压紧托板上设置有用于基础环底座连接的连接孔,连接托板的中心与微调螺杆的顶部固接,该微调螺杆上套装有微调螺母;所述支架顶部固接有支架顶板,支架底部固接有预埋底板,支架顶板上设置的预留孔与微调螺杆相匹配。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201220361132.3U CN202658620U (zh) | 2012-07-25 | 2012-07-25 | 风机基础环的安装调平装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201220361132.3U CN202658620U (zh) | 2012-07-25 | 2012-07-25 | 风机基础环的安装调平装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202658620U true CN202658620U (zh) | 2013-01-09 |
Family
ID=47453536
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201220361132.3U Expired - Lifetime CN202658620U (zh) | 2012-07-25 | 2012-07-25 | 风机基础环的安装调平装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202658620U (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102747746A (zh) * | 2012-07-25 | 2012-10-24 | 中国二十二冶集团有限公司 | 风机基础环的安装调平装置及方法 |
| CN103243746A (zh) * | 2013-05-20 | 2013-08-14 | 四川谦泰仁投资管理有限公司 | 风力发电机基础环精准校平系统及其施工方法 |
| CN104532871A (zh) * | 2014-12-04 | 2015-04-22 | 瑞风能源(武汉)工程技术有限公司 | 一种风机基础及用于风机基础的预应力组件 |
| CN105525626A (zh) * | 2016-01-07 | 2016-04-27 | 浙江省送变电工程公司 | 可调节式机械连接预埋件及其使用方法 |
| CN110016931A (zh) * | 2019-05-15 | 2019-07-16 | 龙源(北京)风电工程设计咨询有限公司 | 一种新型预应力锚栓风机基础及方法 |
| CN110694703A (zh) * | 2019-11-13 | 2020-01-17 | 新羿制造科技(北京)有限公司 | 微液滴检测芯片固定装置 |
-
2012
- 2012-07-25 CN CN201220361132.3U patent/CN202658620U/zh not_active Expired - Lifetime
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102747746A (zh) * | 2012-07-25 | 2012-10-24 | 中国二十二冶集团有限公司 | 风机基础环的安装调平装置及方法 |
| CN103243746A (zh) * | 2013-05-20 | 2013-08-14 | 四川谦泰仁投资管理有限公司 | 风力发电机基础环精准校平系统及其施工方法 |
| CN104532871A (zh) * | 2014-12-04 | 2015-04-22 | 瑞风能源(武汉)工程技术有限公司 | 一种风机基础及用于风机基础的预应力组件 |
| CN105525626A (zh) * | 2016-01-07 | 2016-04-27 | 浙江省送变电工程公司 | 可调节式机械连接预埋件及其使用方法 |
| CN110016931A (zh) * | 2019-05-15 | 2019-07-16 | 龙源(北京)风电工程设计咨询有限公司 | 一种新型预应力锚栓风机基础及方法 |
| CN110694703A (zh) * | 2019-11-13 | 2020-01-17 | 新羿制造科技(北京)有限公司 | 微液滴检测芯片固定装置 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202658620U (zh) | 风机基础环的安装调平装置 | |
| CN203640309U (zh) | 一种大跨度钢结构屋盖主桁架总拼装胎架上用的可调式管托 | |
| CN102747746B (zh) | 风机基础环的安装调平装置及方法 | |
| CN105649325A (zh) | 装配式混凝土剪力墙结构可调节式三角架支撑体系及方法 | |
| CN204282219U (zh) | 一种大型桥梁支座灌浆模架 | |
| CN104499619B (zh) | 一种pc外挂墙底部调节组件 | |
| CN103243746A (zh) | 风力发电机基础环精准校平系统及其施工方法 | |
| CN207392771U (zh) | 一种导向式钢柱定位器 | |
| CN103628692B (zh) | 一种楼面梁安装支架及使用其安装楼面梁的方法 | |
| CN203531027U (zh) | 采用专用千斤顶作为支撑定位的风机基础环精准校平系统 | |
| CN209413294U (zh) | 一种节省施工空间的梁模板支架 | |
| CN207766199U (zh) | 一种便于调节的光伏支架 | |
| CN206071066U (zh) | 混凝土浇筑表面平整度精确控制工具 | |
| CN222044684U (zh) | 吊顶支撑装置 | |
| CN204645706U (zh) | 超大悬挑钢桁架安装临时支撑装置 | |
| CN206986745U (zh) | 一种现浇简支梁支架卸落装置 | |
| CN114687567A (zh) | 一种超高重型预埋件吊挂施工工装及方法 | |
| CN206616694U (zh) | 预制叠合梁与预制柱连接处快速定位调整工装 | |
| CN104960076A (zh) | 预制装配式楼梯模具 | |
| CN106592623B (zh) | 底坑结构安装方法 | |
| CN204984738U (zh) | 一种风电机组塔架基础环倾斜时的垫平装置 | |
| CN201358267Y (zh) | 转炉的安装台架 | |
| CN210439281U (zh) | 一种钢管桩支架的抱箍式卸落结构 | |
| CN209942948U (zh) | 一种燃气轮机用可调高度及跨距的支承底架 | |
| CN208363598U (zh) | 一种快速移动安装支撑系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20130109 |
|
| CX01 | Expiry of patent term |