CN202657827U - H-type steel sling - Google Patents
H-type steel sling Download PDFInfo
- Publication number
- CN202657827U CN202657827U CN 201220215372 CN201220215372U CN202657827U CN 202657827 U CN202657827 U CN 202657827U CN 201220215372 CN201220215372 CN 201220215372 CN 201220215372 U CN201220215372 U CN 201220215372U CN 202657827 U CN202657827 U CN 202657827U
- Authority
- CN
- China
- Prior art keywords
- type steel
- shaped steel
- hanging beam
- row
- hanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 41
- 239000010959 steel Substances 0.000 title claims abstract description 41
- 238000005266 casting Methods 0.000 claims abstract description 4
- 239000000725 suspension Substances 0.000 claims description 17
- 238000000465 moulding Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses an H-type steel sling which comprises a hanging beam; the upper end surface of the hanging beam is provided with a lifting lug; both ends of the hanging beam are respectively provided with flying rings; the flying rings are connected with a row of drop hangers through ropes, wherein each drop hanger comprises two fork teeth which are integrated by casting, and a row of H-type steel which is in parallel by inserting; and the two fork teeth of each drop hanger respectively extend into a cavity between two pieces of adjacent H-type steel in the row of H-type steel and are hooked on each piece of H-type steel. According to the H-type steel sling, the structure is reasonable and reliable, and the operation is convenient; and compared with conventional loading and unloading by binding with a steel wire rope, the working efficiency is greatly improved, the labor intensity of a worker is reduced, the working conditions are improved, the loading and unloading cost is reduced, and meanwhile the safety in operation is improved.
Description
Technical field
The utility model relates to the suspender field, specifically a kind of H shaped steel hanger.
Background technology
H shaped steel is that a kind of sectional area distributes the more more rational economic section high efficiency section bar of optimization, the ratio of strength to weight, because of its section and identical the gaining the name of English alphabet " H ".Owing to all arrange with the right angle in each position of H shaped steel, so H shaped steel all has on all directions, and resistance to bending is strong, construction is simple, save the advantages such as cost and lightweight construction, is widely used.
Conventional H shaped steel handling method is to stop up with row's shaped steel that steel rope will be placed in together side by side, then the suspension hook of hoisting crane is hung on the steel rope and lift by crane, this handling method efficient is lower, and each need to carry out one-step bundling and the operation of lightening restrictions at least when loading and unloading, increased workman's labour intensity, also have the H shaped steel that binds together by rope coil when lifting, safety factor is lower.
The utility model content
The purpose of this utility model provides a kind of H shaped steel hanger, improves H shaped steel handling efficiency, and improves safety factor.
The technical solution of the utility model is as follows:
A kind of H shaped steel hanger, include hanging beam, the upper surface of described hanging beam has hanger, it is characterized in that: the two ends of described hanging beam are separately installed with suspension ring, described suspension ring are connected with row's suspension hook by rope, and wherein each suspension hook includes two prongs by casting integrated moulding; Include the row H shaped steel be in juxtaposition by interting, two prongs of each suspension hook extend to respectively in the row H shaped steel in the cavity between adjacent two H shaped steel and are hooked on each H shaped steel.
Described H shaped steel hanger is characterized in that: described hanging beam is by being connected to steel wire hang between hanger and the crane hook on crane hook.
The beneficial effects of the utility model:
The utility model is rational in infrastructure, reliable, and is easy to operate, with routine with steel rope tie up loading and unloading compare, greatly improved work efficiency, alleviated workman's labour intensity, improved service conditions, reduced shipping and delivery cost, improved simultaneously the safety of operation.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the structural representation of the utility model suspension hook.
The specific embodiment
Referring to Fig. 1,2, a kind of H shaped steel hanger includes hanging beam 1, the upper surface of hanging beam 1 has hanger 2, the two ends of hanging beam 1 are separately installed with suspension ring 3, and suspension ring 3 are connected with row's suspension hook 5 by rope 4, and wherein each suspension hook includes two prongs 6 by casting integrated moulding; Include the row H shaped steel 7 be in juxtaposition by interting, two prongs of each suspension hook extend to respectively in the row H shaped steel 7 in the cavity between adjacent two H shaped steel and are hooked on each H shaped steel.
Hanging beam 1 is suspended on the crane hook by the steel rope 8 that is connected between hanger 2 and the crane hook.
Claims (2)
1. H shaped steel hanger, include hanging beam, the upper surface of described hanging beam has hanger, it is characterized in that: the two ends of described hanging beam are separately installed with suspension ring, described suspension ring are connected with row's suspension hook by rope, and wherein each suspension hook includes two prongs by casting integrated moulding; Include the row H shaped steel be in juxtaposition by interting, two prongs of each suspension hook extend to respectively in the row H shaped steel in the cavity between adjacent two H shaped steel and are hooked on each H shaped steel.
2. H shaped steel hanger according to claim 1 is characterized in that: described hanging beam is by being connected to steel wire hang between hanger and the crane hook on crane hook.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220215372 CN202657827U (en) | 2012-05-15 | 2012-05-15 | H-type steel sling |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220215372 CN202657827U (en) | 2012-05-15 | 2012-05-15 | H-type steel sling |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202657827U true CN202657827U (en) | 2013-01-09 |
Family
ID=47452748
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220215372 Expired - Fee Related CN202657827U (en) | 2012-05-15 | 2012-05-15 | H-type steel sling |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202657827U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109573813A (en) * | 2018-12-20 | 2019-04-05 | 安徽马钢工程技术集团有限公司 | A kind of handling H profile steel girder steel fixture and its handling method |
-
2012
- 2012-05-15 CN CN 201220215372 patent/CN202657827U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109573813A (en) * | 2018-12-20 | 2019-04-05 | 安徽马钢工程技术集团有限公司 | A kind of handling H profile steel girder steel fixture and its handling method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202321966U (en) | Special lifting appliance for multi-lifting-point high wire coil rod | |
| CN101659369A (en) | Triangle-type hanger | |
| CN201801293U (en) | Automatically tightening lifting tool | |
| CN202848940U (en) | Chamber roof truss overall declining removal device of large gas chamber | |
| CN202390075U (en) | Simple lifting device special for PHC (prestress high-strength concrete) tubular pile | |
| CN201056462Y (en) | Multi-hanging point disk combined sling | |
| CN201056463Y (en) | Plugging and hanging type combined sling of soldering pipe | |
| CN202808173U (en) | Lifting device special for lateral columns | |
| CN202657827U (en) | H-type steel sling | |
| CN204624959U (en) | Building berth main frame installation hoisting structure | |
| CN205132903U (en) | Steel wire slings | |
| CN204569141U (en) | Steel plate overhead hoist | |
| CN202321964U (en) | Special lift for double-coil goods | |
| CN203513086U (en) | Special lifting appliance for long-bundle-shaped material | |
| CN201236104Y (en) | Special slings for loading and unloading heavy steel tube | |
| CN207142642U (en) | A kind of multilayer steel plates suspender | |
| CN202594613U (en) | Hoisting clamp | |
| CN202529725U (en) | Novel crane | |
| CN201809035U (en) | Drop hanger device for mobile object | |
| CN203754232U (en) | Simple steel rail lifting tool | |
| CN201619944U (en) | Sling instrument | |
| CN203295025U (en) | Clamping tool for hoisting single H beam | |
| CN203229308U (en) | Ultra-long tubular hanger | |
| CN101734549A (en) | Lifting sling | |
| CN203612819U (en) | H-shaped steel hanger |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130109 Termination date: 20150515 |
|
| EXPY | Termination of patent right or utility model |