CN202610721U - 一种钢塔节段起吊、安装的设备 - Google Patents

一种钢塔节段起吊、安装的设备 Download PDF

Info

Publication number
CN202610721U
CN202610721U CN 201220282724 CN201220282724U CN202610721U CN 202610721 U CN202610721 U CN 202610721U CN 201220282724 CN201220282724 CN 201220282724 CN 201220282724 U CN201220282724 U CN 201220282724U CN 202610721 U CN202610721 U CN 202610721U
Authority
CN
China
Prior art keywords
hoisting
truss
lifting
main
running gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220282724
Other languages
English (en)
Inventor
李松
葛国库
薛光雄
张冬
刘正军
刘民胜
柳鑫星
沈良成
孙艳明
施津安
魏国娜
廖立勋
彭武
张雪松
张艳荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Highway Engineering Co Ltd
CCCC SHB Fourth Engineering Co Ltd
Original Assignee
CCCC Second Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Highway Engineering Co Ltd filed Critical CCCC Second Highway Engineering Co Ltd
Priority to CN 201220282724 priority Critical patent/CN202610721U/zh
Application granted granted Critical
Publication of CN202610721U publication Critical patent/CN202610721U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型提供了一种钢塔节段起吊、安装的设备,包括立柱系统、主桁系统、次桁系统和提升系统,立柱系统、主桁系统、次桁系统和提升系统共同组成桁吊式结构;利用计算机同步控制系统实现自升门式液压提升系统随拼装高度增加分阶段同步顶升,降低了施工风险,同时系统主要构件均可周转使用,节约成本效果显著。且该系统较之塔吊、浮吊等常规吊装设备受场地、自然条件等因素影响较小,适用性强,值得在今后钢塔的拼装施工中进一步推广。

Description

一种钢塔节段起吊、安装的设备
技术领域
本实用新型涉及一种桥梁钢塔施工装置,特别适用于钢塔节段的起吊、安装。
背景技术
钢塔相对于钢筋混凝土索塔具有工厂化加工、体积小、自重轻、施工进度快等特点,有着较为广阔的应用前景,钢塔施工多采用桥位散拼的方式,完成钢塔节段的起吊、安装设备的选用直接关系到工程成本、进度以及施工安全性等。在大型塔吊、浮吊等常规设备受到各种因素制约不宜采用时,自升门式液压提升系统为钢塔的施工提供了一种新的选择。
实用新型内容
本实用新型的目的是提供一种钢塔节段起吊、安装的设备,达到弥补大型塔吊、浮吊等常规设备受到各种因素制约不宜采用时缺陷。
为达上述目的,本实用新型提供了一种钢塔节段起吊、安装的设备,包括立柱系统、主桁系统、次桁系统和提升系统,其特殊之处在于,所述立柱系统、主桁系统、次桁系统和提升系统共同组成桁吊式结构;所述立柱系统包括至少4个立柱基础和设置在该立柱基础之上的立柱,每个立柱采用塔吊标准节/加强节构成立柱本体,横桥向相邻的立柱本体之间通过设置在其上部的桁架平联及成对角牵拉的内拉索联接,立柱本体外套设有上置式顶升系统;所述主桁系统包括至少两个主桁架,且每一个主桁架横桥向布置,通过塔吊过渡节及十字梁与横桥向相邻的两个立柱顶部连接;次桁系统由设置在主桁架上并在该主桁架上行走的次桁架及设置在该次桁架上、沿该次桁架行走的次桁行走系统组成;提升系统由提升设备、提升行走系统和吊具组成,提升行走系统设置在次桁行走系统上方,提升设备设置在该提升行走系统上方,吊具通过钢绞线(钢丝绳)与该提升设备联接。
上述顶升系统包括套设在立柱外的顶升框架和设置该顶升框架顶部的油缸。
本实用新型的优点是:利用计算机同步控制系统实现自升门式液压提升系统随拼装高度增加分阶段同步顶升,降低了施工风险,同时系统主要构件均可周转使用,节约成本效果显著。且该系统较之塔吊、浮吊等常规吊装设备受场地、自然条件等因素影响较小,适用性强,值得在今后钢塔的拼装施工中进一步推广。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是自升门式液压提升系统立面图;
图2是自升门式液压提升系统侧面图;
图3是自升门式液压提升系统平面图。
图中:1、立柱基础;2、桁架平联;3、顶升框架;4、主桁架;5、次桁架;6、次桁行走系统;7、提升设备;8、提升行走系统;9、吊具;10、内拉索;11、立柱;12、十字梁;13、过渡节;14、立柱本体;15、钢塔柱。
具体实施方式
本实用新型提供的钢塔节段起吊、安装的设备,如图1、2、3所示,包括立柱系统、主桁系统、次桁系统和提升系统,其中,立柱系统、主桁系统、次桁系统和提升系统共同组成桁吊式结构;立柱系统包括至少4个立柱基础1和设置在该立柱基础1之上的立柱11,每个立柱11采用塔吊标准节/加强节构成立柱本体14,横桥向相邻的立柱本体14之间通过设置在其上部的桁架平联2及成对角牵拉的内拉索10联接,立柱本体14外套设有上置式顶升系统,该顶升系统包括套设在立柱本体14外的顶升框架3和设置该顶升框架3顶部的油缸。
主桁系统包括至少两个主桁架4(架桥机主梁),且每一个主桁架4横桥向布置,通过塔吊过渡节13及十字梁12与横桥向相邻的两个立柱本体14顶部连接;次桁系统由设置在主桁架4(架桥机主梁)上并在该主桁架4上行走的次桁架5(架桥机主梁)及设置在该次桁架上、沿该次桁架行走的次桁行走系统6组成;提升系统由提升设备7、提升行走系统8和吊具9组成,提升行走系统8设置在次桁架5(架桥机主梁)上方,提升设备7设置在该提升行走系统8上,吊具9通过钢绞线(钢丝绳)与该提升设备7联接。
在实际施工时,首先根据自升门式液压提升系统设计,施工立柱基础1,按首次拼装高度需要安装标准节/加强节11及顶升框架3,通过塔吊过渡节13及十字梁12将主桁架4与立柱系统连接,安装次桁行走系统6及次桁架5后,完成提升系统的安装,提升系统包括提升设备7、提升行走系统8和吊具9。
次桁架5通过次桁行走系统6在主桁架4上移动,同时提升行走系统8可在次桁架5上行走,实现钢索塔节段的平面移位及提升,在将钢塔节段提升到位后,利用吊具9调节钢塔节段角度后焊接。
随着钢塔拼装高度的增加,利用计算机同步控制系统、控制安装在顶升框架3顶部的油缸实现同步顶升,同步安装桁架平联及内拉索10,增强自升门式液压系统的整体稳定性。
综上所述,本实用新型提供的钢塔节段起吊、安装的设备的优点是:利用计算机同步控制系统实现自升门式液压提升系统随拼装高度增加分阶段同步顶升,降低了施工风险,同时系统主要构件均可周转使用,节约成本效果显著。且该系统较之塔吊、浮吊等常规吊装设备受场地、自然条件等因素影响较小,适用性强,值得在今后钢塔的拼装施工中进一步推广。

Claims (2)

1.一种钢塔节段起吊、安装的设备,包括立柱系统、主桁系统、次桁系统和提升系统,其特征在于:所述立柱系统、主桁系统、次桁系统和提升系统共同组成桁吊式结构;
所述立柱系统包括至少4个立柱基础和设置在该立柱基础之上的立柱,每个立柱采用塔吊标准节/加强节构成立柱本体,横桥向相邻的立柱本体之间通过设置在其上部的桁架平联及成对角牵拉的内拉索联接,立柱本体外套设有上置式顶升系统;
所述主桁系统包括至少两个主桁架,且每一个主桁架横桥向布置,通过塔吊过渡节及十字梁与横桥向相邻的两个立柱顶部连接;
次桁系统由设置在主桁架上并在该主桁架上行走的次桁架及设置在该次桁架上、沿该次桁架行走的次桁行走系统组成; 
提升系统由提升设备、提升行走系统和吊具组成,提升行走系统设置在次桁行走系统上方,提升设备设置在该提升行走系统上,吊具通过钢绞线与该提升设备联接。
2.如权利要求1所述的钢塔节段起吊、安装的设备,其特征在于:所述顶升系统包括套设在立柱外的顶升框架和设置该顶升框架顶部的油缸。
CN 201220282724 2012-06-15 2012-06-15 一种钢塔节段起吊、安装的设备 Expired - Lifetime CN202610721U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220282724 CN202610721U (zh) 2012-06-15 2012-06-15 一种钢塔节段起吊、安装的设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220282724 CN202610721U (zh) 2012-06-15 2012-06-15 一种钢塔节段起吊、安装的设备

Publications (1)

Publication Number Publication Date
CN202610721U true CN202610721U (zh) 2012-12-19

Family

ID=47344433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220282724 Expired - Lifetime CN202610721U (zh) 2012-06-15 2012-06-15 一种钢塔节段起吊、安装的设备

Country Status (1)

Country Link
CN (1) CN202610721U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628411A (zh) * 2013-11-21 2014-03-12 中交第二航务工程局有限公司 山区高空附塔悬臂式提梁桁吊系统
CN104695333A (zh) * 2014-11-27 2015-06-10 中铁四局集团第五工程有限公司 一种跨江独缆悬索桥曲面弧形主塔施工方法
CN104846748A (zh) * 2015-05-25 2015-08-19 中铁上海工程局集团第五工程有限公司 一种保证空间扭曲曲线钢主塔安装线型的装置及方法
CN106012863A (zh) * 2016-07-22 2016-10-12 中铁上海工程局集团有限公司 一种吊装门架及其在异型反对称钢主塔施工中的使用方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628411A (zh) * 2013-11-21 2014-03-12 中交第二航务工程局有限公司 山区高空附塔悬臂式提梁桁吊系统
CN103628411B (zh) * 2013-11-21 2015-11-18 中交第二航务工程局有限公司 山区高空附塔悬臂式提梁桁吊系统
CN104695333A (zh) * 2014-11-27 2015-06-10 中铁四局集团第五工程有限公司 一种跨江独缆悬索桥曲面弧形主塔施工方法
CN104846748A (zh) * 2015-05-25 2015-08-19 中铁上海工程局集团第五工程有限公司 一种保证空间扭曲曲线钢主塔安装线型的装置及方法
CN104846748B (zh) * 2015-05-25 2016-08-17 中铁上海工程局集团第五工程有限公司 一种保证空间扭曲曲线钢主塔安装线型的装置及方法
CN106012863A (zh) * 2016-07-22 2016-10-12 中铁上海工程局集团有限公司 一种吊装门架及其在异型反对称钢主塔施工中的使用方法
CN106012863B (zh) * 2016-07-22 2018-06-19 中铁上海工程局集团有限公司 一种吊装门架及其在异型反对称钢主塔施工中的使用方法

Similar Documents

Publication Publication Date Title
CN202936736U (zh) 一种斜拉桥组合梁施工桥面吊机
CN101537976B (zh) 双塔桅巨型自升降起重设备及其跟携吊装方法
CN201943007U (zh) 活动支架不变幅架梁吊机
CN101761031B (zh) 大节段桥面梁连续垂直提升装置
CN202610721U (zh) 一种钢塔节段起吊、安装的设备
CN203296361U (zh) 大跨度钢结构跨外组对吊装平台
CN101487233B (zh) 大跨径钢箱梁斜拉桥临时墩墩顶梁段的安装方法
CN102910532B (zh) 大型箱型井架空中对接起吊方法
CN203222917U (zh) 网架结构新型仿古坡屋面
CN108049666B (zh) 一种超大平面多层钢桁架电子厂房钢结构的梯次安装方法
CN102582786A (zh) 深海浮式平台的建造工艺
CN201627314U (zh) 大跨度张弦梁钢屋架高空移动装置
CN104495653A (zh) 一种多功能大吨位架梁起重机及架梁方法
CN204982628U (zh) 一种平拉索桥
CN204625045U (zh) 一种钢结构吊装用门型支架式吊装装置
CN201598570U (zh) 斜拉桥缆索吊装设备
CN208684247U (zh) 一种预制节段用吊装装置
CN202245861U (zh) 可整体提升超高、大跨度、重型钢通廊的装置
CN203938401U (zh) 塔式起重机独立高度增加装置
CN202249004U (zh) 改进型钢结构厂房结构
CN202864756U (zh) 一种动臂塔式起重机起重臂安全走台
CN201943006U (zh) 辅助不变幅架梁吊机架设钢箱梁用主塔区活动支架
CN202744960U (zh) 一种大跨度钢桁梁悬索桥合龙装置
CN201647844U (zh) 一种无桥台提梁站
CN205170224U (zh) 履带式移动塔吊

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160927

Address after: 710065, No. eight, No. 262 East Road, Yanta District, Shaanxi, Xi'an

Patentee after: Zhongjiao Second Highway Engineering Bureau Co., Ltd.

Patentee after: CCCC Second Highway Fourth Engineering Co., Ltd.

Address before: 710065, No. eight, No. 262 East Road, Yanta District, Shaanxi, Xi'an

Patentee before: Zhongjiao Second Highway Engineering Bureau Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20121219

CX01 Expiry of patent term