CN202586156U - Tool for replacing overvoltage protector in distribution line in live-line manner - Google Patents
Tool for replacing overvoltage protector in distribution line in live-line manner Download PDFInfo
- Publication number
- CN202586156U CN202586156U CN 201220102388 CN201220102388U CN202586156U CN 202586156 U CN202586156 U CN 202586156U CN 201220102388 CN201220102388 CN 201220102388 CN 201220102388 U CN201220102388 U CN 201220102388U CN 202586156 U CN202586156 U CN 202586156U
- Authority
- CN
- China
- Prior art keywords
- overvoltage protection
- distribution line
- lead
- line
- chuck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种电气施工领域的工具,尤其是涉及一种用于配电线路带电更换过电压保护装置的工具。The utility model relates to a tool in the field of electrical construction, in particular to a tool for live replacement of an overvoltage protection device for a power distribution line.
背景技术 Background technique
如今随着架空配电线路逐渐实现绝缘化,它解决了裸导线所解决不了的走廊和安全问题,但其雷击断线问题却十分突出。过电压保护装置是一种避免配电网架空绝缘导线雷击跳闸和雷击断线的十分有效的装置,然而该装置不可避免地在使用中会发生故障而损坏,目前对于在带电状态下如何更换损坏的过压保护装置,以及更换过程中如何使导线与工作空间内其他物质接触,没有更佳的方案。Nowadays, as the overhead distribution lines are gradually insulated, it solves the corridor and safety problems that bare wires cannot solve, but the problem of lightning disconnection is very prominent. The overvoltage protection device is a very effective device to avoid lightning tripping and lightning disconnection of the overhead insulated conductors of the distribution network. However, the device will inevitably fail and be damaged during use. At present, how to replace the damaged There is no better solution for the overvoltage protection device and how to keep the wires in contact with other substances in the workspace during the replacement process.
实用新型内容 Utility model content
本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种能保证带电作业、减少了停电时间,增加了供电量的用于配电线路带电更换过电压保护装置的工具。The purpose of this utility model is to provide a tool for live replacement of overvoltage protection devices on distribution lines that can ensure live work, reduce power outage time, and increase power supply in order to overcome the above-mentioned defects in the prior art.
本实用新型的目的可以通过以下技术方案来实现:The purpose of this utility model can be achieved through the following technical solutions:
一种用于配电线路带电更换过电压保护装置的工具,所述的配电线路包括导线、横担、绝缘子和过电压保护装置,所述的过电压保护装置与绝缘子并联设在导线与横担之间,其特征在于,所述的工具包括绝缘支架和绝缘操作棒,所述的绝缘支架包括支架本体及紧固构件,所述的支架本体下端通过紧固构件固定在线路横担上,上端顶住导线;所述的绝缘操作棒包括夹头、紧固螺栓、上盖及下盖,所述的夹头一端穿过上盖后固定,所述的下盖通过紧固螺栓与上盖连接,所述的支架本体顶起导线后,所述的夹头夹住过电压保护装置。A tool for replacing an overvoltage protection device on a power distribution line. The distribution line includes a wire, a cross arm, an insulator, and an overvoltage protection device. The overvoltage protection device and the insulator are connected in parallel between the wire and the cross arm. Between the bearings, it is characterized in that the tool includes an insulating bracket and an insulating operating rod, the insulating bracket includes a bracket body and a fastening member, and the lower end of the bracket body is fixed on the line cross arm through the fastening member, The upper end withstands the wire; the insulating operation rod includes a chuck, a fastening bolt, an upper cover and a lower cover, one end of the chuck passes through the upper cover and is fixed, and the lower cover is connected to the upper cover by the fastening bolt To connect, after the support body lifts up the wire, the clip clamps the overvoltage protection device.
所述的紧固构件包括横向紧固组件及纵向紧固组件,所述的横向紧固组件和纵向紧固组件分别从横向和纵向将支架本体固定在线路横担上。The fastening component includes a horizontal fastening component and a vertical fastening component, and the horizontal fastening component and the vertical fastening component respectively fix the bracket body on the line cross-arm from the horizontal and vertical directions.
所述的支架本体的纵截面为直角梯形。The longitudinal section of the bracket body is a right-angled trapezoid.
绝缘操作棒还包括螺丝刀头,该螺丝刀头设在上盖和下盖的连接处。The insulating operation rod also includes a screwdriver head, which is arranged at the junction of the upper cover and the lower cover.
与现有技术相比,本实用新型提高了设备运行可靠性,降低了客户停电次数,缩短了客户停电时间,同时增加供电企业的售电量,有着十分重要的意义。Compared with the prior art, the utility model improves the operating reliability of the equipment, reduces the number of customer power outages, shortens the time of customer power outages, and at the same time increases the electricity sales of power supply enterprises, which is of great significance.
附图说明 Description of drawings
图1为本实用新型绝缘支架的结构示意图;Fig. 1 is the structural representation of the utility model insulation support;
图2为本实用新型绝缘操作棒的结构示意图。Fig. 2 is a structural schematic diagram of the insulating operating rod of the present invention.
具体实施方式 Detailed ways
下面结合附图和具体实施例对本实用新型进行详细说明。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
实施例Example
本实施例主要用于地电位作业,通过提升导线来达到带电更换10kV配电线路中过电压保护装置目的。如图1所示,一种用于配电线路带电更换过电压保护装置的工具,过电压保护装置25与绝缘子并联设在导线与横担14之间,所述的工具包括绝缘支架和绝缘操作棒,所述的绝缘支架包括支架本体11及紧固构件,所述的支架本体11下端通过紧固构件固定在线路横担14上,上端顶住导线;所述的绝缘操作棒包括夹头21、紧固螺栓、上盖22及下盖23,所述的夹头21一端穿过上盖22后固定,所述的下盖23通过紧固螺栓与上盖22连接,所述的支架本体11顶起导线后,所述的夹头21夹住过电压保护装置25。This embodiment is mainly used for ground potential work, and the purpose of replacing the overvoltage protection device in the 10kV power distribution line is achieved by lifting the wire. As shown in Figure 1, a tool for live replacement of overvoltage protection devices for distribution lines,
紧固构件包括横向紧固组件12及纵向紧固组件13,横向紧固组件12和纵向紧固组件13分别从横向和纵向将支架本体11固定在线路横担14上。绝缘操作棒还包括螺丝刀头24,该螺丝刀头24设在上盖和下盖的连接处。The fastening member includes a
具体的作业步骤包括:The specific work steps include:
1)第一绝缘操作棒分别将A相和B相导线两侧、A相和B相的绝缘子用绝缘罩罩住;1) The first insulating operation rod covers both sides of the A-phase and B-phase conductors, and the insulators of the A-phase and B-phase with insulating covers;
2)支架本体11安装在横担14的适当位置;2) The
3)第一绝缘操作棒拆除需更换的A相过电压保护装置25两侧的导线和绝缘子上的绝缘罩;3) The first insulation operation rod removes the wires on both sides of the A-phase
4)第一绝缘操作棒将导线勾在支架本体11上,并使之有轻微上拉趋势;4) The first insulating operating rod hooks the wire on the
5)第二绝缘操作棒夹牢需更换的过电压保护装置25,第一绝缘操作棒拧开绝缘子的螺丝;5) The second insulating operating rod clamps the
6)导线连同绝缘子整体上拉并脱离横担14表面,更换过电压保护装置25;6) Pull the wire together with the insulator as a whole and separate from the surface of the
7)导线连同绝缘子缓慢放下,第一绝缘操作棒轻微调整导线,与新更换的过电压保护装置25一起置于横担14的圆孔中,第二绝缘操作棒拧紧绝缘子的螺丝;7) Slowly put down the wire together with the insulator, slightly adjust the wire with the first insulating operating rod, place it in the round hole of the
8)第一绝缘操作棒将A相导线两侧和绝缘子用绝缘罩重新罩住,支架本体11拆除;8) The first insulation operation rod covers both sides of the A-phase wire and the insulator with an insulation cover again, and the
9)第二绝缘操作棒拆除A相和B相所有导线和绝缘子处的绝缘罩,整个更换工作结束。9) The second insulating operation rod removes the insulating covers at all wires and insulators of phase A and phase B, and the whole replacement work is completed.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220102388 CN202586156U (en) | 2012-03-16 | 2012-03-16 | Tool for replacing overvoltage protector in distribution line in live-line manner |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220102388 CN202586156U (en) | 2012-03-16 | 2012-03-16 | Tool for replacing overvoltage protector in distribution line in live-line manner |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202586156U true CN202586156U (en) | 2012-12-05 |
Family
ID=47255527
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220102388 Expired - Lifetime CN202586156U (en) | 2012-03-16 | 2012-03-16 | Tool for replacing overvoltage protector in distribution line in live-line manner |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202586156U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102593755A (en) * | 2012-03-16 | 2012-07-18 | 上海市电力公司 | Tool for live replacement of over-voltage protection device of distribution line |
-
2012
- 2012-03-16 CN CN 201220102388 patent/CN202586156U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102593755A (en) * | 2012-03-16 | 2012-07-18 | 上海市电力公司 | Tool for live replacement of over-voltage protection device of distribution line |
| CN102593755B (en) * | 2012-03-16 | 2014-09-10 | 上海市电力公司 | Tool for live replacement of over-voltage protection device of distribution line |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205195145U (en) | Support is changed to insulator | |
| CN202034151U (en) | Post type lightning arrester device | |
| CN102545094A (en) | Method for changing tension simulators from live 10kV power supply line | |
| CN102646945B (en) | Method for 500kV live replacement of composite insulators | |
| CN201355752Y (en) | Insulated conductor live peeling bracket for distribution line | |
| CN203352104U (en) | Multifunctional insulating cross arm | |
| CN202586156U (en) | Tool for replacing overvoltage protector in distribution line in live-line manner | |
| CN203260976U (en) | Cable termination tower | |
| CN103746316B (en) | A device and method for live replacement of straight-line corner tower insulator strings | |
| CN203242776U (en) | 10kV insulation-piercing electricity-testing grounding ring | |
| CN102916372B (en) | 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument | |
| CN105449612A (en) | A conductive wire insulation support plate apparatus | |
| CN203690799U (en) | Device for replacing suspension angle tower insulator string in live state | |
| CN202586154U (en) | Insulating operation rod for replacing overvoltage protector in distribution line in live-line manner | |
| CN102593755B (en) | Tool for live replacement of over-voltage protection device of distribution line | |
| CN202601336U (en) | Novel lightning-proof overvoltage protector of line insulator | |
| CN102904080B (en) | The straight and-clamping fastening earth connection of a kind of power transformation sieve bar | |
| CN202550391U (en) | High-voltage power maintenance implement | |
| CN202586155U (en) | Insulating support for replacing overvoltage protector in distribution line in live-line manner | |
| CN205544113U (en) | Cross arm for transmission tower | |
| CN204068041U (en) | For the insulation isolation fixture of 10kV overhead distribution equipment | |
| CN103280758A (en) | Cable terminal tower | |
| CN201312079Y (en) | Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method | |
| CN206820360U (en) | One kind can second lift wire insulation cross-arm | |
| CN206023125U (en) | A kind of tubular bus connector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121210 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20121210 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Patentee after: Shanghai Electric Power Corporation Patentee after: State Grid Corporation of China Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Patentee before: Shanghai Electric Power Corporation |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20121205 Effective date of abandoning: 20140910 |
|
| RGAV | Abandon patent right to avoid regrant |