CN202586156U - Tool for replacing overvoltage protector in distribution line in live-line manner - Google Patents

Tool for replacing overvoltage protector in distribution line in live-line manner Download PDF

Info

Publication number
CN202586156U
CN202586156U CN 201220102388 CN201220102388U CN202586156U CN 202586156 U CN202586156 U CN 202586156U CN 201220102388 CN201220102388 CN 201220102388 CN 201220102388 U CN201220102388 U CN 201220102388U CN 202586156 U CN202586156 U CN 202586156U
Authority
CN
China
Prior art keywords
overvoltage protection
distribution line
lead
line
chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220102388
Other languages
Chinese (zh)
Inventor
钱杏兴
张正钧
吴刚
季竹君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Power Corp
State Grid Corp of China SGCC
Original Assignee
Shanghai Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Power Corp filed Critical Shanghai Electric Power Corp
Priority to CN 201220102388 priority Critical patent/CN202586156U/en
Application granted granted Critical
Publication of CN202586156U publication Critical patent/CN202586156U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

The utility model relates to a tool for replacing an overvoltage protector in a distribution line in a live-line manner. The distribution line comprises a lead, a cross arm, an insulator, and an overvoltage protector, wherein the overvoltage protector and the insulator are parallelly connected and arranged between the lead and the cross arm. The tool comprises an insulating support and an insulating operation rod, wherein the insulating support comprises a support body and a fastening member; the lower end of the support body is fixed upon the line cross arm via the fastening member, with the upper end thereof supporting the lead; the insulating operation rod comprises a chuck, a fastening bolt, an upper cover, and a lower cover; one end of the chuck is fixed after passing through the upper cover; the lower cover is connected with the upper cover via the fastening bolt; and the chuck clamps the overvoltage protector after the support body jacks up the lead. Compared with the prior art, the tool of the utility model ensures live-line operation, reduces the power-off time, and increases the power supply amount.

Description

用于配电线路带电更换过电压保护装置的工具Tools for live replacement of overvoltage protective devices on distribution lines

技术领域 technical field

本实用新型涉及一种电气施工领域的工具,尤其是涉及一种用于配电线路带电更换过电压保护装置的工具。The utility model relates to a tool in the field of electrical construction, in particular to a tool for live replacement of an overvoltage protection device for a power distribution line.

背景技术 Background technique

如今随着架空配电线路逐渐实现绝缘化,它解决了裸导线所解决不了的走廊和安全问题,但其雷击断线问题却十分突出。过电压保护装置是一种避免配电网架空绝缘导线雷击跳闸和雷击断线的十分有效的装置,然而该装置不可避免地在使用中会发生故障而损坏,目前对于在带电状态下如何更换损坏的过压保护装置,以及更换过程中如何使导线与工作空间内其他物质接触,没有更佳的方案。Nowadays, as the overhead distribution lines are gradually insulated, it solves the corridor and safety problems that bare wires cannot solve, but the problem of lightning disconnection is very prominent. The overvoltage protection device is a very effective device to avoid lightning tripping and lightning disconnection of the overhead insulated conductors of the distribution network. However, the device will inevitably fail and be damaged during use. At present, how to replace the damaged There is no better solution for the overvoltage protection device and how to keep the wires in contact with other substances in the workspace during the replacement process.

实用新型内容 Utility model content

本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种能保证带电作业、减少了停电时间,增加了供电量的用于配电线路带电更换过电压保护装置的工具。The purpose of this utility model is to provide a tool for live replacement of overvoltage protection devices on distribution lines that can ensure live work, reduce power outage time, and increase power supply in order to overcome the above-mentioned defects in the prior art.

本实用新型的目的可以通过以下技术方案来实现:The purpose of this utility model can be achieved through the following technical solutions:

一种用于配电线路带电更换过电压保护装置的工具,所述的配电线路包括导线、横担、绝缘子和过电压保护装置,所述的过电压保护装置与绝缘子并联设在导线与横担之间,其特征在于,所述的工具包括绝缘支架和绝缘操作棒,所述的绝缘支架包括支架本体及紧固构件,所述的支架本体下端通过紧固构件固定在线路横担上,上端顶住导线;所述的绝缘操作棒包括夹头、紧固螺栓、上盖及下盖,所述的夹头一端穿过上盖后固定,所述的下盖通过紧固螺栓与上盖连接,所述的支架本体顶起导线后,所述的夹头夹住过电压保护装置。A tool for replacing an overvoltage protection device on a power distribution line. The distribution line includes a wire, a cross arm, an insulator, and an overvoltage protection device. The overvoltage protection device and the insulator are connected in parallel between the wire and the cross arm. Between the bearings, it is characterized in that the tool includes an insulating bracket and an insulating operating rod, the insulating bracket includes a bracket body and a fastening member, and the lower end of the bracket body is fixed on the line cross arm through the fastening member, The upper end withstands the wire; the insulating operation rod includes a chuck, a fastening bolt, an upper cover and a lower cover, one end of the chuck passes through the upper cover and is fixed, and the lower cover is connected to the upper cover by the fastening bolt To connect, after the support body lifts up the wire, the clip clamps the overvoltage protection device.

所述的紧固构件包括横向紧固组件及纵向紧固组件,所述的横向紧固组件和纵向紧固组件分别从横向和纵向将支架本体固定在线路横担上。The fastening component includes a horizontal fastening component and a vertical fastening component, and the horizontal fastening component and the vertical fastening component respectively fix the bracket body on the line cross-arm from the horizontal and vertical directions.

所述的支架本体的纵截面为直角梯形。The longitudinal section of the bracket body is a right-angled trapezoid.

绝缘操作棒还包括螺丝刀头,该螺丝刀头设在上盖和下盖的连接处。The insulating operation rod also includes a screwdriver head, which is arranged at the junction of the upper cover and the lower cover.

与现有技术相比,本实用新型提高了设备运行可靠性,降低了客户停电次数,缩短了客户停电时间,同时增加供电企业的售电量,有着十分重要的意义。Compared with the prior art, the utility model improves the operating reliability of the equipment, reduces the number of customer power outages, shortens the time of customer power outages, and at the same time increases the electricity sales of power supply enterprises, which is of great significance.

附图说明 Description of drawings

图1为本实用新型绝缘支架的结构示意图;Fig. 1 is the structural representation of the utility model insulation support;

图2为本实用新型绝缘操作棒的结构示意图。Fig. 2 is a structural schematic diagram of the insulating operating rod of the present invention.

具体实施方式 Detailed ways

下面结合附图和具体实施例对本实用新型进行详细说明。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

实施例Example

本实施例主要用于地电位作业,通过提升导线来达到带电更换10kV配电线路中过电压保护装置目的。如图1所示,一种用于配电线路带电更换过电压保护装置的工具,过电压保护装置25与绝缘子并联设在导线与横担14之间,所述的工具包括绝缘支架和绝缘操作棒,所述的绝缘支架包括支架本体11及紧固构件,所述的支架本体11下端通过紧固构件固定在线路横担14上,上端顶住导线;所述的绝缘操作棒包括夹头21、紧固螺栓、上盖22及下盖23,所述的夹头21一端穿过上盖22后固定,所述的下盖23通过紧固螺栓与上盖22连接,所述的支架本体11顶起导线后,所述的夹头21夹住过电压保护装置25。This embodiment is mainly used for ground potential work, and the purpose of replacing the overvoltage protection device in the 10kV power distribution line is achieved by lifting the wire. As shown in Figure 1, a tool for live replacement of overvoltage protection devices for distribution lines, overvoltage protection devices 25 and insulators are installed in parallel between the wire and the cross arm 14, the tool includes an insulating bracket and an insulating operation Rod, the insulating bracket includes a bracket body 11 and a fastening member, the lower end of the bracket body 11 is fixed on the line cross-arm 14 through the fastening member, and the upper end withstands the wire; the insulating operation rod includes a chuck 21 , fastening bolts, upper cover 22 and lower cover 23, one end of the chuck 21 passes through the upper cover 22 and is fixed, the lower cover 23 is connected with the upper cover 22 by fastening bolts, the support body 11 After the wire is lifted, the clamp 21 clamps the overvoltage protection device 25 .

紧固构件包括横向紧固组件12及纵向紧固组件13,横向紧固组件12和纵向紧固组件13分别从横向和纵向将支架本体11固定在线路横担14上。绝缘操作棒还包括螺丝刀头24,该螺丝刀头24设在上盖和下盖的连接处。The fastening member includes a horizontal fastening component 12 and a vertical fastening component 13 , and the horizontal fastening component 12 and the vertical fastening component 13 respectively fix the support body 11 on the line cross-arm 14 from the horizontal and vertical directions. The insulating operation rod also includes a screwdriver head 24, which is arranged at the junction of the upper cover and the lower cover.

具体的作业步骤包括:The specific work steps include:

1)第一绝缘操作棒分别将A相和B相导线两侧、A相和B相的绝缘子用绝缘罩罩住;1) The first insulating operation rod covers both sides of the A-phase and B-phase conductors, and the insulators of the A-phase and B-phase with insulating covers;

2)支架本体11安装在横担14的适当位置;2) The bracket body 11 is installed at an appropriate position of the cross arm 14;

3)第一绝缘操作棒拆除需更换的A相过电压保护装置25两侧的导线和绝缘子上的绝缘罩;3) The first insulation operation rod removes the wires on both sides of the A-phase overvoltage protection device 25 to be replaced and the insulation cover on the insulator;

4)第一绝缘操作棒将导线勾在支架本体11上,并使之有轻微上拉趋势;4) The first insulating operating rod hooks the wire on the bracket body 11, and makes it slightly pull up;

5)第二绝缘操作棒夹牢需更换的过电压保护装置25,第一绝缘操作棒拧开绝缘子的螺丝;5) The second insulating operating rod clamps the overvoltage protection device 25 to be replaced, and the first insulating operating rod unscrews the screw of the insulator;

6)导线连同绝缘子整体上拉并脱离横担14表面,更换过电压保护装置25;6) Pull the wire together with the insulator as a whole and separate from the surface of the cross arm 14, and replace the overvoltage protection device 25;

7)导线连同绝缘子缓慢放下,第一绝缘操作棒轻微调整导线,与新更换的过电压保护装置25一起置于横担14的圆孔中,第二绝缘操作棒拧紧绝缘子的螺丝;7) Slowly put down the wire together with the insulator, slightly adjust the wire with the first insulating operating rod, place it in the round hole of the cross arm 14 together with the newly replaced overvoltage protection device 25, and tighten the screw of the insulator with the second insulating operating rod;

8)第一绝缘操作棒将A相导线两侧和绝缘子用绝缘罩重新罩住,支架本体11拆除;8) The first insulation operation rod covers both sides of the A-phase wire and the insulator with an insulation cover again, and the bracket body 11 is removed;

9)第二绝缘操作棒拆除A相和B相所有导线和绝缘子处的绝缘罩,整个更换工作结束。9) The second insulating operation rod removes the insulating covers at all wires and insulators of phase A and phase B, and the whole replacement work is completed.

Claims (4)

1. instrument that is used for distribution line charged for replacement overvoltage protection; Described distribution line comprises lead, cross-arm, insulator and overvoltage protection, and described overvoltage protection is parallelly connected with insulator to be located between lead and the cross-arm, it is characterized in that; Described instrument comprises insulating support and insulation hook stick; Described insulating support comprises rack body and clamp structure, and described rack body lower end is fixed on the circuit cross-arm through clamp structure, and lead is withstood in the upper end; Described insulation hook stick comprises chuck, fastening bolt, loam cake and lower cover; Described chuck one end is fixed after passing loam cake; Described lower cover is connected with loam cake through fastening bolt, and behind the described rack body jack-up lead, described chuck is clamped overvoltage protection.
2. a kind of instrument that is used for distribution line charged for replacement overvoltage protection according to claim 1; It is characterized in that; Described clamp structure comprises horizontal fastening assembly and vertical fastening assembly, and described horizontal fastening assembly is fixed on rack body on the circuit cross-arm from horizontal and vertical respectively with vertical fastening assembly.
3. a kind of instrument that is used for distribution line charged for replacement overvoltage protection according to claim 1 is characterized in that the longitudinal section of described rack body is a right-angled trapezium.
4. a kind of instrument that is used for distribution line charged for replacement overvoltage protection according to claim 1 is characterized in that, the insulation hook stick also comprises driver bit, and this driver bit is located at the junction of loam cake and lower cover.
CN 201220102388 2012-03-16 2012-03-16 Tool for replacing overvoltage protector in distribution line in live-line manner Expired - Lifetime CN202586156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220102388 CN202586156U (en) 2012-03-16 2012-03-16 Tool for replacing overvoltage protector in distribution line in live-line manner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220102388 CN202586156U (en) 2012-03-16 2012-03-16 Tool for replacing overvoltage protector in distribution line in live-line manner

Publications (1)

Publication Number Publication Date
CN202586156U true CN202586156U (en) 2012-12-05

Family

ID=47255527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220102388 Expired - Lifetime CN202586156U (en) 2012-03-16 2012-03-16 Tool for replacing overvoltage protector in distribution line in live-line manner

Country Status (1)

Country Link
CN (1) CN202586156U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593755A (en) * 2012-03-16 2012-07-18 上海市电力公司 Tool for live replacement of over-voltage protection device of distribution line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102593755A (en) * 2012-03-16 2012-07-18 上海市电力公司 Tool for live replacement of over-voltage protection device of distribution line
CN102593755B (en) * 2012-03-16 2014-09-10 上海市电力公司 Tool for live replacement of over-voltage protection device of distribution line

Similar Documents

Publication Publication Date Title
CN205195145U (en) Support is changed to insulator
CN202034151U (en) Post type lightning arrester device
CN102545094A (en) Method for changing tension simulators from live 10kV power supply line
CN102646945B (en) Method for 500kV live replacement of composite insulators
CN201355752Y (en) Insulated conductor live peeling bracket for distribution line
CN203352104U (en) Multifunctional insulating cross arm
CN202586156U (en) Tool for replacing overvoltage protector in distribution line in live-line manner
CN203260976U (en) Cable termination tower
CN103746316B (en) A device and method for live replacement of straight-line corner tower insulator strings
CN203242776U (en) 10kV insulation-piercing electricity-testing grounding ring
CN102916372B (en) 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument
CN105449612A (en) A conductive wire insulation support plate apparatus
CN203690799U (en) Device for replacing suspension angle tower insulator string in live state
CN202586154U (en) Insulating operation rod for replacing overvoltage protector in distribution line in live-line manner
CN102593755B (en) Tool for live replacement of over-voltage protection device of distribution line
CN202601336U (en) Novel lightning-proof overvoltage protector of line insulator
CN102904080B (en) The straight and-clamping fastening earth connection of a kind of power transformation sieve bar
CN202550391U (en) High-voltage power maintenance implement
CN202586155U (en) Insulating support for replacing overvoltage protector in distribution line in live-line manner
CN205544113U (en) Cross arm for transmission tower
CN204068041U (en) For the insulation isolation fixture of 10kV overhead distribution equipment
CN103280758A (en) Cable terminal tower
CN201312079Y (en) Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method
CN206820360U (en) One kind can second lift wire insulation cross-arm
CN206023125U (en) A kind of tubular bus connector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121210

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121210

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee after: Shanghai Electric Power Corporation

Patentee after: State Grid Corporation of China

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee before: Shanghai Electric Power Corporation

AV01 Patent right actively abandoned

Granted publication date: 20121205

Effective date of abandoning: 20140910

RGAV Abandon patent right to avoid regrant