CN202559816U - 体外预应力预埋锚栓连接式混凝土风电塔架 - Google Patents
体外预应力预埋锚栓连接式混凝土风电塔架 Download PDFInfo
- Publication number
- CN202559816U CN202559816U CN2012201758484U CN201220175848U CN202559816U CN 202559816 U CN202559816 U CN 202559816U CN 2012201758484 U CN2012201758484 U CN 2012201758484U CN 201220175848 U CN201220175848 U CN 201220175848U CN 202559816 U CN202559816 U CN 202559816U
- Authority
- CN
- China
- Prior art keywords
- concrete
- transitional
- section
- concrete section
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Wind Motors (AREA)
Abstract
本实用新型属于风力发电设备,特别涉及一种体外预应力预埋锚栓连接式混凝土风电塔架,包括混凝土段(1)、过渡混凝土段(2)、过渡钢结构段(3)、钢结构段(4)、钢绞线(5)、钢绞线锚具(19),其特征在于混凝土段(1)和过渡混凝土段(2)分别由两片或者多片混凝土段环片(1-1)和过渡混凝土段环片(2-1)组成,混凝土段(1)之间、过渡混凝土段(2)和混凝土段(1)之间均装有安装垫块(8)调正并用充填料(15)固定,体外预应力预埋锚栓连接式混凝土风电塔架由于采用分片、分段、体外式结构,方便了运输和安装,降低了制造费用,各部分连接更便于操作施工,便于工厂化生产,有利于风力发电的推广和应用。
Description
技术领域
本实用新型属于风力发电设备,特别涉及一种体外预应力预埋锚栓连接式混凝土风电塔架。
背景技术
风力发电塔架是风力发电设备的重要组成部分,随着风力发电机组功率不断增大,对风力发电塔架的高度、强度提出了更高的要求,由于受到运输条件的限制,无限扩大塔架的直径对于运输和吊装来说很难完成。同时,成本低廉、安装方便的预应力混凝土风电塔架的应用因其体积庞大笨重受到限制,体内预应力预埋锚栓连接式混凝土风电塔架虽然吊装和运输很方便,成本也低廉,但是各部分连接并不便于操作施工,而且影响分体组装式风电塔架的可靠性。
发明内容
本实用新型的目的在于克服上述技术不足,提供一种吊装、运输方便,成本低廉,便于操作施工的体外预应力预埋锚栓连接式混凝土风电塔架。
本实用新型解决技术问题采用的技术方案是:体外预应力预埋锚栓连接式混凝土风电塔架包括混凝土段、过渡混凝土段、过渡钢结构段、钢结构段、钢绞线、钢绞线锚具,其特点是混凝土段和过渡混凝土段分别由两片或者多片混凝土段环片和过渡混凝土段环片组成,混凝土段环片、过渡混凝土段环片的两端分别预埋设有多层箍筋一、箍筋二,混凝土段环片之间、过渡混凝土段环片之间的纵向接缝拼接是由多层箍筋一、箍筋二错层横向间隔插装,插装后箍筋一之间,箍筋二之间分别形成的横向腰形中四角纵向固定插装四根直钢筋,纵向接缝外侧分别粘有胶条密封,胶条内侧之间、箍筋一和四根直钢筋之间、箍筋二和四根直钢筋之间灌装高强砂浆固定,过渡钢结构段下法兰上均布设有多个钢绞线孔,钢绞线孔之间间隔均布设有多个预埋锚栓孔,过渡混凝土段上端均布设有多个钢绞线埋管,钢绞线埋管之间间隔均布设有多个预埋锚栓,混凝土段内圆周上均布设有多个加强凸台一,过渡混凝土段内圆周上均布设有多个加强凸台二,混凝土段之间连接处、过渡混凝土段和混凝土段连接处上面的混凝土段底部每个加强凸台一、过渡混凝土段底部每个加强凸台二上分别设有一个预埋导向棒穿装管,预埋导向棒穿装管内孔的顶端固定装有塞头,预埋导向棒穿装管螺纹连接前端为圆锥形的导向棒的上端,混凝土段之间连接处、过渡混凝土段和混凝土段之间连接处下方的混凝土段上端每个加强凸台一上设有一个导向槽,导向槽上上端过盈装有环形密封,前端为圆锥形的导向棒的下端穿装在环形密封和导向槽中,混凝土段之间、过渡混凝土段和混凝土段之间均装有安装垫块调正并用充填料固定,预埋锚栓穿装在过渡钢结构段下法兰上的预埋锚栓孔中,上端用螺母一锁紧固定,过渡钢结构段下法兰和过渡混凝土段之间装安装垫块调正并用充填料固定,钢绞线下端与基础连接,上端穿装过渡混凝土段的钢绞线埋管和过渡钢结构段下法兰的钢绞线孔中用钢绞线锚具固定,过渡钢结构段下法兰和过渡混凝土段之间装安装垫块调正并用充填料固定,钢绞线孔上端装环形密封,环形密封套装在钢绞线上,过渡钢结构段和钢结构段之间用螺栓、垫圈、螺母二锁紧连接。
本实用新型的有益效果是:体外预应力预埋锚栓连接式混凝土风电塔架由于采用分片、分段、体外式结构,方便了运输和安装,降低了制造费用,各部分连接更便于操作施工,便于工厂化生产,有利于风力发电的推广和应用。
附图说明
以下结合附图以实施例具体说明。
图1是体外预应力预埋锚栓连接式混凝土风电塔架结构图。
图2是图1中过渡钢结构段与过渡混凝土段连接处A-A剖视图。
图3是图1中过渡混凝土段上端B-B剖视图。
图4是图1中混凝土段D-D(过渡混凝土段下端C-C)剖视图。
图5是图4中V处放大图。
图6是图1中I处放大图。
图7是图1中II处放大图。
图8是图1中III处放大图。
图9是图1中Ⅳ处放大图。
图中,1-混凝土段;1-1-混凝土段环片;1-2-箍筋一;1-3-导向槽;1-4-加强凸台一;2-过渡混凝土段;2-1-过渡混凝土段环片;2-2-箍筋二;2-3-加强凸台二;2-4-钢绞线埋管;3-过渡钢结构段;3-1-过渡钢结构段下法兰;3-2-钢绞线孔;3-3-预埋锚栓孔;4-钢结构段;5-钢绞线;6-直钢筋;7-环形密封;8-安装垫块;9-导向棒;10-预埋导向棒穿装管;11-塞头;12-胶条;13-预埋锚栓;14-螺母一;15-充填料;16-螺栓;17-垫圈;18-螺母二;19-钢绞线锚具;20-高强砂浆。
具体实施方式
实施例,参照附图1~9,体外预应力预埋锚栓连接式混凝土风电塔架由混凝土段1、过渡混凝土段2、过渡钢结构段3、钢结构段4连接组成,混凝土段1和过渡混凝土段2分别由两片或者多片混凝土段环片1-1和过渡混凝土环片2-1组成。混凝土段环片1-1、过渡混凝土段环片2-1的两端分别预埋设有多层箍筋一1-2、箍筋二2-2,混凝土段环片1-1之间、过渡混凝土段环片2-1之间的纵向接缝拼接是由多层箍筋一1-2、箍筋二2-2错层横向间隔插装,插装后箍筋一1-2之间、箍筋二2-2之间分别形成的横向腰形中四角纵向固定插装四根直钢筋6,纵向接缝外侧分别粘有胶条12密封。胶条12内侧之间、箍筋一1-2和四根直钢筋6之间,箍筋二2-2和四根直钢筋6之间灌装高强砂浆20固定。过渡钢结构段下法兰3-1上均布设有多个钢绞线孔3-2,钢绞线孔3-2之间间隔均布设有多个预埋锚栓孔3-3,过渡混凝土段2上端均布设有多个钢绞线埋管2-4,钢绞线埋管2-4之间间隔均布设有多个预埋锚栓13。混凝土段1内圆周上均布设有多个加强凸台一1-4,过渡混凝土段2内圆周上均布设有多个加强凸台二2-3。混凝土段1之间连接处、过渡混凝土段2和混凝土段1之间连接处上面的混凝土段1底部每个加强凸台一1-4、过渡混凝土段2底部每个加强凸台二2-3上分别设有一个预埋导向棒穿装管10,预埋导向棒穿装管10内顶端固定装有塞头11,预埋导向棒穿装管10螺纹连接前端为圆锥形的导向棒9的上端。混凝土段1之间连接处、过渡混凝土段2和混凝土段1之间连接处下方的混凝土段1上端每个加强凸台一1-4上设有一个导向槽1-3,导向槽1-3上端过盈装有环形密封7,前端为圆锥形的导向棒9的下端穿装在环形密封7和导向槽1-3中。混凝土段1之间、过渡混凝土段2和混凝土段1之间均装有安装垫块8调正并用充填料15固定,预埋锚栓13穿装在过渡钢结构段下法兰3-1上的预埋锚栓孔3-3中上端用螺母一14锁紧固定。过渡钢结构段下法兰1-3和过渡混凝土段2之间装安装垫块8调正并用充填料15固定。钢绞线5下端与基础连接,上端穿装过渡混凝土段2的钢绞线埋管2-4和过渡钢结构段下法兰3-1的钢绞线孔3-2中用钢绞线锚具19锚固,过渡钢结构段下法兰3-1和过渡混凝土段2之间装安装垫块8调正并用充填料15固定,钢绞线孔3-2上端装环形密封7,环形密封7套装在钢绞线5上,过渡钢结构段3和钢结构段4之间用螺栓16、垫圈17、螺母二18锁紧连接。
Claims (1)
1.一种体外预应力预埋锚栓连接式混凝土风电塔架,包括混凝土段(1)、过渡混凝土段(2)、过渡钢结构段(3)、钢结构段(4)、钢绞线(5)、钢绞线锚具(19),其特征在于混凝土段(1)和过渡混凝土段(2)分别由两片或者多片混凝土段环片(1-1)和过渡混凝土段环片(2-1)组成,混凝土段环片(1-1)、过渡混凝土段环片(2-1)的两端分别预埋设有多层箍筋一(1-2)、箍筋二(2-2),混凝土段环片(1-1)之间、过渡混凝土段环片(2-1)之间的纵向接缝拼接是由多层箍筋一(1-2)、箍筋二(2-2)错层横向间隔插装,插装后箍筋一(1-2)之间,箍筋二(2-2)之间分别形成的横向腰形中四角纵向固定插装四根直钢筋(6),纵向接缝外侧分别粘有胶条(12)密封,胶条(12)内侧之间、箍筋一(1-2)和四根直钢筋(6)之间、箍筋二(2-2)和四根直钢筋(6)之间灌装高强砂浆(20)固定,过渡钢结构段下法兰(3-1)上均布设有多个钢绞线孔(3-2),钢绞线孔(3-2)之间间隔均布设有多个预埋锚栓孔(3-3),过渡混凝土段(2)上端均布设有多个钢绞线埋管(2-4),钢绞线埋管(2-4)之间间隔均布设有多个预埋锚栓(13),混凝土段(1)内圆周上均布设有多个加强凸台一(1-4),过渡混凝土段(2)内圆周上均布设有多个加强凸台二(2-3),混凝土段(1)之间连接处、过渡混凝土段(2)和混凝土段(1)连接处上面的混凝土段(1)底部每个加强凸台一(1-4)、过渡混凝土段(2)底部每个加强凸台二(2-3)上分别设有一个预埋导向棒穿装管(10),预埋导向棒穿装管(10)内孔的顶端固定装有塞头(11),预埋导向棒穿装管(10)螺纹连接前端为圆锥形的导向棒(9)的上端,混凝土段(1)之间连接处、过渡混凝土段(2)和混凝土段(1)之间连接处下方的混凝土段(1)上端每个加强凸台一(1-4)上设有一个导向槽(1-3),导向槽(1-3)上上端过盈装有环形密封(7),前端为圆锥形的导向棒(9)的下端穿装在环形密封(7)和导向槽(1-3)中,混凝土段(1)之间、过渡混凝土段(2)和混凝土段(1)之间均装有安装垫块(8)调正并用充填料(15)固定,预埋锚栓(13)穿装在过渡钢结构段下法兰(3-1)上的预埋锚栓孔(3-3)中,上端用螺母一(14)锁紧固定,过渡钢结构段下法兰(3-1)和过渡混凝土段(2)之间装安装垫块(8)调正并用充填料(15)固定,钢绞线(5)下端与基础连接,上端穿装过渡混凝土段(2)的钢绞线埋管(2-4)和过渡钢结构段下法兰(3-1)的钢绞线孔(3-2)中用钢绞线锚具(19)固定,过渡钢结构段下法兰(3-1)和过渡混凝土段(2)之间装安装垫块(8)调正并用充填料(15)固定,钢绞线孔(3-2)上端装环形密封(7),环形密封(7)套装在钢绞线(5)上,过渡钢结构段(3)和钢结构段(4)之间用螺栓(16)、垫圈(17)、螺母二(18)锁紧连接。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012201758484U CN202559816U (zh) | 2012-04-24 | 2012-04-24 | 体外预应力预埋锚栓连接式混凝土风电塔架 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012201758484U CN202559816U (zh) | 2012-04-24 | 2012-04-24 | 体外预应力预埋锚栓连接式混凝土风电塔架 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202559816U true CN202559816U (zh) | 2012-11-28 |
Family
ID=47209483
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012201758484U Expired - Fee Related CN202559816U (zh) | 2012-04-24 | 2012-04-24 | 体外预应力预埋锚栓连接式混凝土风电塔架 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202559816U (zh) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106762445A (zh) * | 2017-01-06 | 2017-05-31 | 佛山科学技术学院 | 一种不锈钢钢筋混凝土海上风电机组塔筒结构 |
| CN110700334A (zh) * | 2019-09-25 | 2020-01-17 | 江苏筑岩建设有限公司 | 一种风机基础快速修复方法 |
| CN111356812A (zh) * | 2017-10-26 | 2020-06-30 | 乌本产权有限公司 | 用于外部张紧塔区段的环形支架、混合塔的外部张紧系统、混合塔的塔段、混合塔、风能设施及用于混合塔的外部张紧系统的安装方法 |
| EP4345293A1 (en) * | 2022-09-27 | 2024-04-03 | Nordex Energy Spain, S.A.U. | Adapter of a tower of a wind turbine tower and concrete section of a tower of a wind turbine |
| WO2024068710A1 (en) * | 2022-09-27 | 2024-04-04 | Nordex Energy Spain, S.A.U. | Adapter of a tower of a wind turbine tower and concrete section of a tower of a wind turbine |
-
2012
- 2012-04-24 CN CN2012201758484U patent/CN202559816U/zh not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106762445A (zh) * | 2017-01-06 | 2017-05-31 | 佛山科学技术学院 | 一种不锈钢钢筋混凝土海上风电机组塔筒结构 |
| CN111356812A (zh) * | 2017-10-26 | 2020-06-30 | 乌本产权有限公司 | 用于外部张紧塔区段的环形支架、混合塔的外部张紧系统、混合塔的塔段、混合塔、风能设施及用于混合塔的外部张紧系统的安装方法 |
| CN111356812B (zh) * | 2017-10-26 | 2022-07-08 | 乌本产权有限公司 | 用于外部张紧塔区段的环形支架、混合塔的外部张紧系统、混合塔的塔段、混合塔、风能设施及用于混合塔的外部张紧系统的安装方法 |
| CN110700334A (zh) * | 2019-09-25 | 2020-01-17 | 江苏筑岩建设有限公司 | 一种风机基础快速修复方法 |
| CN110700334B (zh) * | 2019-09-25 | 2021-04-27 | 江苏筑岩建设有限公司 | 一种风机基础快速修复方法 |
| EP4345293A1 (en) * | 2022-09-27 | 2024-04-03 | Nordex Energy Spain, S.A.U. | Adapter of a tower of a wind turbine tower and concrete section of a tower of a wind turbine |
| WO2024068710A1 (en) * | 2022-09-27 | 2024-04-04 | Nordex Energy Spain, S.A.U. | Adapter of a tower of a wind turbine tower and concrete section of a tower of a wind turbine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN208057316U (zh) | 一种风电机组钢混塔筒预应力钢绞线反向连接法兰结构 | |
| CN103821677B (zh) | 装配式预应力活性粉末混凝土风电塔架 | |
| CN204024928U (zh) | 一种可装配自立式风力发电机组预应力混凝土钢组合塔架 | |
| CN202545136U (zh) | 体外预应力植筋连接式混凝土风电塔架 | |
| CN108266330A (zh) | 一种风电机组预应力钢混塔筒 | |
| CN206917805U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
| CN203569582U (zh) | 一种混凝土管桩与承台的连接结构 | |
| CN104251066B (zh) | 一种内壁带加强结构的钢管塔柱及其制作方法 | |
| CN104018724B (zh) | 一种组合风电塔架预应力混凝土塔段与钢塔段连接装置 | |
| CN103994034B (zh) | 一种预应力混凝土-钢组合风力发电塔架连接装置 | |
| CN202559816U (zh) | 体外预应力预埋锚栓连接式混凝土风电塔架 | |
| CN202500731U (zh) | 体内预应力钢-混凝土风电塔架 | |
| CN204850152U (zh) | 预制混凝土剪力墙竖向连接预紧装置 | |
| CN106978818A (zh) | 连接组件、风力发电机组基础及其制造方法 | |
| CN104314776A (zh) | 一种用于海上和陆上风电机组的装配式预应力塔筒 | |
| CN103266621A (zh) | 一种风力发电机钢绞线预应力基础结构及其施工方法 | |
| CN102493451A (zh) | 一种基于纤维增强塑料筋锚杆与超高性能水泥基粘结锚固介质的岩锚体系 | |
| CN103790175A (zh) | 强风化岩层风力发电机组预应力扩底锚杆基础 | |
| CN108104121A (zh) | 用于提高压力型锚索水泥灌浆体抗压强度的结构及方法 | |
| CN205638802U (zh) | 一种分段组合式预制混凝土塔架结构 | |
| CN202065134U (zh) | 一种分片式混凝土风电塔架 | |
| CN204139694U (zh) | 内壁带加强结构的钢管塔柱 | |
| CN202545137U (zh) | 体内预应力植筋连接式混凝土风电塔架 | |
| CN209385287U (zh) | 一种基于波纹钢腹板箱梁的钢管混凝土格构式风电塔架 | |
| CN206190458U (zh) | 全向预应力抗疲劳组合钢结构风塔 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 123000 New District of Lishui street in Fuxin city of Liaoning province 8-253 Patentee after: Fuxin Jin Yin Energy Investment Co. Ltd. Address before: 123000 New District of Lishui street in Fuxin city of Liaoning province 8-253 Patentee before: Fuxin Jinyin New Eenrgy Technology Consulting Co., Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121128 Termination date: 20180424 |