CN202543798U - Railway bridge inspection and maintenance hanging basket - Google Patents

Railway bridge inspection and maintenance hanging basket Download PDF

Info

Publication number
CN202543798U
CN202543798U CN2012201596140U CN201220159614U CN202543798U CN 202543798 U CN202543798 U CN 202543798U CN 2012201596140 U CN2012201596140 U CN 2012201596140U CN 201220159614 U CN201220159614 U CN 201220159614U CN 202543798 U CN202543798 U CN 202543798U
Authority
CN
China
Prior art keywords
track
fixed
hanging basket
hawser
fore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012201596140U
Other languages
Chinese (zh)
Inventor
张功义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI KETONG ENGINEERING MACHINERY MANUFACTURING Co Ltd
Original Assignee
WUXI KETONG ENGINEERING MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI KETONG ENGINEERING MACHINERY MANUFACTURING Co Ltd filed Critical WUXI KETONG ENGINEERING MACHINERY MANUFACTURING Co Ltd
Priority to CN2012201596140U priority Critical patent/CN202543798U/en
Application granted granted Critical
Publication of CN202543798U publication Critical patent/CN202543798U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a railway bridge inspection and maintenance hanging basket comprising suspension mechanisms arranged left and right at intervals and a hanging basket body hung under the suspension mechanisms by cables, wherein each suspension mechanism comprises parallel rear tracks arranged on a mounting plate at fixed intervals, a rear support is vertically arranged above the rear track, a rear roller is rotatably installed on the bottom end of the rear support, the rear track is provided with a weight balancing block, the mounting plate outside the rear track is fixed with a front track, the front track and the rear track are arranged in parallel, a front support is vertically arranged above the front track, a front roller is rotatably installed on the bottom end of the front support, the rear end of a cross beam is fixed on the top end of the rear support, the middle section of the cross beam is fixed on the top end of the front support, the top end of the front track is fixed with an upper brace, the front end of the cross beam is connected with the cable, the two ends of the cross beam are connected with stiffening cables, and the middle section of each stiffening cable is placed on the top end of the upper brace. The inspection and maintenance hanging basket combines multiple motion manners, such as horizontal motion and vertical motion, makes the operation more convenient and faster, and has the advantages of simple structure, convenience in use and the like.

Description

Railway bridge detects the maintenance hanging basket
Technical field
The utility model relates to a kind of nacelle device, and especially a kind of railway bridge detects the maintenance hanging basket.
Background technology
Different types of rridges all must detect maintenance after using certain time limit; Huge especially railway bridge is all the more so for carrying, but the manway relative narrower that the railway bridge both sides are provided with, and can not bear bigger power; The phenomenon of caving in just appears in stressed concentrating easily; But carrying out bridge when detecting maintenance, all must make the maintainer below of bridge of standing, carrying out the nacelle device that bridge detects maintenance so be badly in need of a kind of stand below of bridge of maintainer that can make things convenient for now.
Summary of the invention
The purpose of the utility model is to overcome the deficiency that exists in the prior art, provides a kind of railway bridge simple in structure, easy to use to detect the maintenance hanging basket.
According to the technical scheme that the utility model provides, said railway bridge detects the maintenance hanging basket, comprises separated between left and right hitch that is provided with and the hitch below hanging basket basket body through the hawser suspention; Said hitch is included in the back track that fixed intervals laterally arrange on the installing plate, above the track of back, is provided with the after-poppet that is vertical setting, is rotatablely equipped with rear roller in the bottom of after-poppet; Rear roller cooperates with the back track, is being provided with balancing weight in the back on the track, on the installing plate in the back outside of track, is fixed with preceding track; Preceding track is set in parallel with the back track, above preceding track, is provided with the fore-stock that is vertical setting, is rotatablely equipped with front wheel in the bottom of fore-stock; Front wheel cooperates with preceding track, and the height of fore-stock equals the height of after-poppet, on the fore-stock of homonymy and after-poppet, crossbeam is installed; The rearward end of crossbeam is fixed on the top ends of after-poppet; The stage casing of crossbeam is fixed on the top ends of fore-stock, is fixed with upper supporting column in the top ends of fore-stock, and the leading section of crossbeam is connected with hawser; The bottom of hawser is connected with hanging basket basket body; Be connected with the reinforcement hawser at the two ends of crossbeam, strengthen the top ends of the stage casing frame of hawser, make that strengthening hawser is in tensioned state at upper supporting column.
On the bottom surface of hanging basket basket body, be fixed with the hydraulic lifting trolley track, the hydraulic lifting trolley track is vertical setting with the back track, on the hydraulic lifting trolley track, slidely connects the hydraulic lifting dolly.
On hanging basket basket body, be fixed with guardrail, on guardrail, be fixed with the electric control box that is connected with hydraulic lifting dolly circuit.
The utility model has had horizontal movement concurrently and multiple motion mode such as move both vertically, and makes to operate conveniently, quick, the utlity model has advantages such as simple in structure, easy to use.
Description of drawings
Fig. 1 is the overall structure sketch map of the utility model.
The specific embodiment
Below in conjunction with concrete accompanying drawing and embodiment the utility model is described further.
As shown in the figure: this railway bridge detects the maintenance hanging basket, comprises separated between left and right hitch that is provided with and the hitch below hanging basket basket body 1 through hawser 2 suspentions; Said hitch is included in the back track 15 that fixed intervals laterally arrange on the installing plate 14, and installing plate 14 is tiled on the manway on request, mainly be for increase and manway between contact area; Prevent the phenomenon that stress is concentrated, above the track 15 of back, be provided with the after-poppet 10 that is vertical setting, be rotatablely equipped with rear roller in the bottom of after-poppet 10; Rear roller cooperates with back track 15, and rear roller can be with after-poppet 10, and track 15 moves along the back, on the track 15 of back, is provided with balancing weight 7; Track 8 before on the installing plate 14 in the outside of back track 15, being fixed with, preceding track 8 is set in parallel with back track 15, above preceding track 8, is provided with the fore-stock 3 that is vertical setting; Bottom at fore-stock 3 is rotatablely equipped with front wheel, and front wheel cooperates with preceding track 8, and front wheel can be with after-poppet 10 to move along preceding track 8; The height of fore-stock 3 equals the height of after-poppet 10, on the fore-stock of homonymy 3 and after-poppet 10, crossbeam 6 is installed, and the rearward end of crossbeam 6 is fixed on the top ends of after-poppet 10; The stage casing of crossbeam 6 is fixed on the top ends of fore-stock 3; Top ends at fore-stock 3 is fixed with upper supporting column 5, and the leading section of crossbeam 6 is connected with hawser 2, and the bottom of hawser 2 is connected with hanging basket basket body 1; Be connected with reinforcement hawser 4 at the two ends of crossbeam 6; Strengthen the top ends of the stage casing frame of hawser 4, make that strengthening hawser 4 is in tensioned state, thereby play the effect of web beam 6 at upper supporting column 5.
On the bottom surface of hanging basket basket body 1, be fixed with hydraulic lifting trolley track 11, hydraulic lifting trolley track 11 is vertical setting with back track 15, on hydraulic lifting trolley track 11, slidely connects hydraulic lifting dolly 12.
On hanging basket basket body 1, be fixed with guardrail 18, on guardrail 18, be fixed with the electric control box 13 that is connected with hydraulic lifting dolly 12 circuit.
Form suspension platform by hanging basket basket body 1 and hydraulic lifting dolly 12; Hanging basket basket body 1 is assembled by hurdle sheet, the blue end, installing rack, elevator etc., and its span can reach 15 meters, connects with strengthening stud between its each parts; Hanging basket basket body bottom is provided with hydraulic lifting trolley track 11; Hydraulic lifting dolly 12 time can move around along hydraulic lifting trolley track 11 in work, and can be elevated to the position of own needs according to user's requirement, make work together convenient, efficient.
During use; The length that stretches out of hitch is mainly regulated according to the environment at scene, and the method for adjusting is with crossbeam 6 front and back translations, is fixed with strengthening stud after moving to correct position; After all preparations finish; Hanging basket basket body 1 needs test several times, do not have any potential safety hazard after, detect the maintenance personal and can stand in and detect maintenance activity on the suspension platform; When detecting, detect the maintenance personal and can carry out elevating translational, moving up and down of suspension platform and the moving horizontally of complete equipment of hydraulic lifting dolly 12 according to the needs of oneself.Upper supporting column 5 with strengthen the intensity that hawser 4 can web beam 6, can prevent crossbeam 6 distortion.
The utility model can reach the purpose of torque adjusting through increase and decrease balancing weight 7 and adjusting crossbeam 6.

Claims (3)

1. a railway bridge detects the maintenance hanging basket, it is characterized in that: comprise separated between left and right hitch that is provided with and the hitch below hanging basket basket body (1) through hawser (2) suspention; Said hitch is included in installing plate (14) and goes up the back track (15) that fixed intervals laterally arrange, and is provided with the after-poppet (10) that is vertical setting in back track (15) top, is rotatablely equipped with rear roller in the bottom of after-poppet (10); Rear roller cooperates with back track (15), on back track (15), is being provided with balancing weight (7), on the installing plate (14) in the back outside of track (15), is fixed with preceding track (8); Preceding track (8) is set in parallel with back track (15); Be provided with the fore-stock (3) that is vertical setting in preceding track (8) top, be rotatablely equipped with front wheel in the bottom of fore-stock (3), front wheel cooperates with preceding track (8); The height of fore-stock (3) equals the height of after-poppet (10); On the fore-stock (3) of homonymy and after-poppet (10), crossbeam (6) is installed, the rearward end of crossbeam (6) is fixed on the top ends of after-poppet (10), and the stage casing of crossbeam (6) is fixed on the top ends of fore-stock (3); Top ends at fore-stock (3) is fixed with upper supporting column (5); The leading section of crossbeam (6) is connected with hawser (2), and the bottom of hawser (2) is connected with hanging basket basket body (1), is connected with at the two ends of crossbeam (6) to strengthen hawser (4); Strengthen the top ends of the stage casing frame of hawser (4), make that strengthening hawser (4) is in tensioned state in upper supporting column (5).
2. railway bridge as claimed in claim 1 detects the maintenance hanging basket; It is characterized in that: on the bottom surface of hanging basket basket body (1), be fixed with hydraulic lifting trolley track (11); Hydraulic lifting trolley track (11) is vertical setting with back track (15), on hydraulic lifting trolley track (11), slidely connects hydraulic lifting dolly (12).
3. railway bridge as claimed in claim 2 detects the maintenance hanging basket, it is characterized in that: on hanging basket basket body (1), be fixed with guardrail (18), on guardrail (18), be fixed with the electric control box (13) that is connected with hydraulic lifting dolly (12) circuit.
CN2012201596140U 2012-04-14 2012-04-14 Railway bridge inspection and maintenance hanging basket Withdrawn - After Issue CN202543798U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201596140U CN202543798U (en) 2012-04-14 2012-04-14 Railway bridge inspection and maintenance hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201596140U CN202543798U (en) 2012-04-14 2012-04-14 Railway bridge inspection and maintenance hanging basket

Publications (1)

Publication Number Publication Date
CN202543798U true CN202543798U (en) 2012-11-21

Family

ID=47164452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201596140U Withdrawn - After Issue CN202543798U (en) 2012-04-14 2012-04-14 Railway bridge inspection and maintenance hanging basket

Country Status (1)

Country Link
CN (1) CN202543798U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619166A (en) * 2012-04-14 2012-08-01 无锡科通工程机械制造有限公司 Hanging basket for detection and maintenance of railway bridge
CN103790109A (en) * 2014-02-28 2014-05-14 中南林业科技大学 Automatic light and multifunctional bridge inspection bracket
CN105464009A (en) * 2016-01-13 2016-04-06 邓泽仲 Device for rapidly replacing bridge and construction method thereof
CN105672141B (en) * 2016-01-13 2017-03-22 宋朝林 Construction device for bridge floor replacement and paving and construction method thereof
CN108951415A (en) * 2018-08-21 2018-12-07 华东建工集团有限公司 A kind of basket-hanging bridge maintaining platform
CN109693996A (en) * 2017-10-23 2019-04-30 细美事有限公司 Aisle structure and the method for installing aisle structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619166A (en) * 2012-04-14 2012-08-01 无锡科通工程机械制造有限公司 Hanging basket for detection and maintenance of railway bridge
CN103790109A (en) * 2014-02-28 2014-05-14 中南林业科技大学 Automatic light and multifunctional bridge inspection bracket
CN103790109B (en) * 2014-02-28 2015-11-04 中南林业科技大学 Portable automatic multifunctional bridge inspection frame
CN105464009A (en) * 2016-01-13 2016-04-06 邓泽仲 Device for rapidly replacing bridge and construction method thereof
CN105672141B (en) * 2016-01-13 2017-03-22 宋朝林 Construction device for bridge floor replacement and paving and construction method thereof
CN105464009B (en) * 2016-01-13 2017-03-29 甄亮 The device and its construction method of quick-replaceable bridge
CN109693996A (en) * 2017-10-23 2019-04-30 细美事有限公司 Aisle structure and the method for installing aisle structure
CN109693996B (en) * 2017-10-23 2022-01-21 细美事有限公司 Walkway construction and method of installing a walkway construction
CN108951415A (en) * 2018-08-21 2018-12-07 华东建工集团有限公司 A kind of basket-hanging bridge maintaining platform

Similar Documents

Publication Publication Date Title
CN102619166B (en) Hanging basket for detection and maintenance of railway bridge
CN202543798U (en) Railway bridge inspection and maintenance hanging basket
CN201406284Y (en) Mobile hoisting portal frame
CN202323777U (en) Continuous traveling device for bridge suspension casting hanging basket
CN109694024A (en) A kind of self-propelled lifting hoisting platform device
CN206591893U (en) A kind of multiple bay of hydrologic monitoring instrument
CN203247031U (en) Hoisting device for curtain board transporting
CN206088958U (en) Fork platform automatic levelling device is cut in removal
CN202594654U (en) Moving rotary equipment mounting bracket
CN205170209U (en) A type gate -type hoisting apparatus
CN203867161U (en) Light traveling suspended scaffold
CN204919354U (en) A construction equipment that is arranged in construction of taking one's place of cable -stay bridge cable wire
CN106437126B (en) A kind of console mode hydraulic lifting scaffold guiding bearing and method for dismounting
CN202880793U (en) Movable type single column type aerial work platform
CN202575780U (en) Crane and balance weight device thereof
CN108166392A (en) A kind of floorings hanging device and method
CN203007831U (en) Bridge maintenance vehicle
CN202628582U (en) Testing device for fan
CN202390106U (en) Lifting hook portal crane easy to maintain
CN204000632U (en) A kind of sandbox prepressing device based on reaction frame
CN204354853U (en) The auxiliary construction device that a kind of electrified railway is built
CN103032633A (en) Wheel type cable monorail crane
CN106401233A (en) Hydraulic driving double-layer movement non-avoidance parking rack
CN206266096U (en) Double girder overhead crane trolley travelling cable traction device
CN221343623U (en) A self-driving chassis for a micro crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121121

Effective date of abandoning: 20131127

RGAV Abandon patent right to avoid regrant