CN202531405U - CBM concentric tube pump - Google Patents

CBM concentric tube pump Download PDF

Info

Publication number
CN202531405U
CN202531405U CN2012200390174U CN201220039017U CN202531405U CN 202531405 U CN202531405 U CN 202531405U CN 2012200390174 U CN2012200390174 U CN 2012200390174U CN 201220039017 U CN201220039017 U CN 201220039017U CN 202531405 U CN202531405 U CN 202531405U
Authority
CN
China
Prior art keywords
pump
joint
outer cylinder
cylinder
pump barrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200390174U
Other languages
Chinese (zh)
Inventor
马昌庆
邱兵
王涛
李占省
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2012200390174U priority Critical patent/CN202531405U/en
Application granted granted Critical
Publication of CN202531405U publication Critical patent/CN202531405U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Details Of Reciprocating Pumps (AREA)

Abstract

A coal bed gas concentric tube type pump is applied to the technical field of coal bed gas exploitation. The lower end of the upper joint of the outer cylinder is connected with the outer cylinder through threads; the lower end of the outer cylinder is connected with the lower joint of the outer cylinder. The upper end of the inner wall of the upper joint of the outer cylinder is provided with an annular step; the lower end of the upper joint of the pump cylinder is connected with the pump cylinder. The lower end of the pump cylinder is connected with a lower joint of the pump cylinder; the lower end surface of the upper joint of the pump barrel is arranged on an annular step on the inner wall of the upper joint of the outer barrel; the outer wall of the upper joint of the pump cylinder is provided with an axial groove. The outer wall of the lower joint of the pump cylinder is provided with an axial groove. A double traveling valve assembly is arranged in the pump cylinder. The upper part of the plunger top cover is connected with a connecting rod; the bottom end of the pump cylinder is provided with a fixed valve assembly. The effect is as follows: the coal powder is filled into the drainage channel of the coal bed gas drainage well, and the coal powder is discharged into the drainage channel through the drainage channel.

Description

煤层气同心管式泵CBM concentric tube pump

技术领域 technical field

本实用新型涉及煤层气开采技术领域,尤其涉及煤层气开采过程中一种煤层气同心管式泵。The utility model relates to the technical field of coal bed gas mining, in particular to a coal bed gas concentric tube pump in the process of coal bed gas mining.

背景技术 Background technique

在煤层气开发中,排液井在排水降压采气的过程中起着关键的作用。排液井内常用的排水设备主要有:管式泵、螺杆泵以及电潜泵等。管式泵在这几种排液采气方式中最为常用。在从煤层排水采气的过程中,煤粉也随煤层内的水进入泵筒和油管之内。油管内水的携带力小于较大颗粒的煤粉的重力时,煤粉就会在泵筒和油管内沉积。In the development of coalbed methane, the liquid drainage well plays a key role in the process of drainage and pressure reduction for gas recovery. Drainage equipment commonly used in drainage wells mainly include: tube pumps, screw pumps and electric submersible pumps. Tube pumps are the most commonly used in these liquid drainage and gas recovery methods. During the process of draining gas from the coal seam, coal powder also enters the pump barrel and the oil pipe along with the water in the coal seam. When the carrying force of the water in the oil pipe is less than the gravity of the coal powder with larger particles, the coal powder will deposit in the pump barrel and the oil pipe.

中国专利公开号:CN201884254U,公开了一种低沉没度煤层气排采专用管式泵。所述管式泵包括工作泵筒,以及设于工作泵筒内的工作柱塞、阀座、出油阀及出油阀罩,所述加压搅拌装置用于增加所述出油阀的进口压力,并可搅拌所述管式泵底部的液体。通过增加加压搅拌装置,使得出油阀入口处的压力增加,间接提高了所述管式泵的沉没度,有利于提高出油阀的打开能力,增加所述管式泵的充满系数。Chinese Patent Publication No.: CN201884254U discloses a special tubular pump for low-submergence coalbed methane drainage. The tubular pump includes a working pump barrel, and a working plunger, a valve seat, an oil outlet valve and an oil outlet valve cover arranged in the working pump barrel, and the pressurized stirring device is used to increase the inlet of the oil outlet valve. pressure and can stir the liquid at the bottom of the tube pump. By adding a pressurizing stirring device, the pressure at the inlet of the oil outlet valve is increased, which indirectly improves the submergence of the tube pump, which is beneficial to improve the opening ability of the oil outlet valve and increase the filling coefficient of the tube pump.

而现有技术对于煤粉沉积在泵筒或油管后,无法通过洗井的方式解除煤粉的沉积。因为煤层经长时间的排水采气生产,压降漏斗的已经形成,即使采用洗井的方法,洗井水会全部漏失到煤层中去,而无法冲洗到堵塞泵筒或油管的煤粉。当泵筒或油管中的煤粉沉积到一定量时,整个排水通道就会被堵死,煤层内的水也就无法被排出,迫使排液井的排水采气的生产停滞下来,而不得不进行检泵作业。检泵和重新下入新泵到该井重新进行排水采气生产,整个作业周期较长,严重影响煤层气的生产。并且由于作业施工时对煤层造成的伤害,使该井投产后,恢复到原先的产量需要一个较长的时间。However, in the prior art, after the pulverized coal is deposited in the pump cylinder or the oil pipe, the deposition of the pulverized coal cannot be removed by well flushing. Because the coal seam has been produced by drainage and gas production for a long time, the pressure drop funnel has been formed. Even if the method of well flushing is adopted, all the well flushing water will be lost into the coal seam, and the coal powder that blocks the pump barrel or oil pipe cannot be flushed. When the pulverized coal in the pump barrel or the oil pipe is deposited to a certain amount, the entire drainage channel will be blocked, and the water in the coal seam will not be able to be discharged, forcing the production of the drainage and gas recovery of the drainage well to stagnate, and have to Perform pump inspection. Checking the pump and re-running the new pump to the well for drainage and gas production again, the entire operation period is long, which seriously affects the production of coalbed methane. And due to the damage caused to the coal seam during operation and construction, it will take a long time to recover to the original output after the well is put into production.

对于煤层气排液井,由于煤粉造成泵筒或油管的堵塞,而不得不频繁进行检泵作业,严重影响煤层气的生产运行,造成煤层气开采成本的升高。For coalbed methane drainage wells, due to the clogging of pump barrels or oil pipes caused by pulverized coal, frequent pump inspection operations have to be performed, which seriously affects the production and operation of coalbed methane, resulting in an increase in the cost of coalbed methane mining.

实用新型内容 Utility model content

本实用新型的目的是:提供一种煤层气同心管式泵,能清除泵筒或油管排水通道内堵塞的煤粉;克服煤层气排液井在排液采气生产过程中,因煤粉频繁堵塞泵筒或油管排水通道,而不得不频繁进行检泵作业,影响煤层气产量的提高,造成煤层气开采成本升高的难题。The purpose of this utility model is: to provide a coalbed methane concentric tube pump, which can remove the coal powder blocked in the pump barrel or the drainage channel of the oil pipe; Blocking the pump barrel or the drainage channel of the oil pipe requires frequent pump inspection operations, which affects the increase in coalbed methane production and causes the problem of increased cost of coalbed methane mining.

本实用新型采用的技术方案是:煤层气同心管式泵,包括有外筒总成和内泵总成两部分。其特征是:The technical scheme adopted by the utility model is: the coalbed methane concentric tube pump, which includes two parts: an outer cylinder assembly and an inner pump assembly. Its characteristics are:

外筒总成主要由外筒上接头、外筒和外筒下接头组成。外筒上接头上端有内螺纹,能连接在油管管柱上;外筒上接头下端有内螺纹,外筒上接头下端螺纹连接外筒;外筒的下端有外螺纹,外筒下端与外筒下接头连接。在外筒上接头的内壁上端有环形台阶;The outer cylinder assembly is mainly composed of the upper joint of the outer cylinder, the outer cylinder and the lower joint of the outer cylinder. The upper end of the upper joint of the outer cylinder has internal threads, which can be connected to the tubing string; the lower end of the upper joint of the outer cylinder has internal threads, and the lower end of the upper joint of the outer cylinder is threaded to connect with the outer cylinder; the lower end of the outer cylinder has external threads, and the lower end of the outer cylinder is connected to the outer cylinder. Connect the lower connector. There is an annular step at the upper end of the inner wall of the joint on the outer cylinder;

内泵总成主要由泵筒上接头、连接杆、泵筒、双游动凡尔总成、固定凡尔总成和泵筒下接头组成。泵筒上接头上端有内螺纹,能连接在同心油管的内层油管的下端;泵筒上接头下端有外螺纹,泵筒上接头下端连接泵筒。泵筒的下端有外螺纹,泵筒的下端连接泵筒下接头;泵筒上接头的横截面为圆环形,泵筒上接头的下端面在外筒上接头内壁的环形台阶上;泵筒上接头的外壁上有轴向槽,轴向槽将泵筒上接头的上下两端连通。泵筒下接头的横截面为圆环形,泵筒下接头在外筒内并连接在泵筒的下端,泵筒下接头的外壁上有轴向槽,轴向槽将泵筒下接头的上下两端连通。在泵筒内有双游动凡尔总成,双游动凡尔总成由柱塞、游动凡尔、游动凡尔座、游动凡尔挡球板组成。柱塞为圆筒形,柱塞的外壁与泵筒内壁滑动配合,在柱塞内固定有两个游动凡尔座,每个游动凡尔座上有一个游动凡尔(钢球),在柱塞内并在下端的游动凡尔之上固定有一个游动凡尔挡球板,在柱塞顶盖上部连接有连接杆,柱塞顶盖上有斜孔;在泵筒的底端有固定凡尔总成。固定凡尔总成包含有固定凡尔挡球板、固定凡尔和固定凡尔座。固定凡尔座固定在泵筒的底部,在固定凡尔座上有一个固定凡尔(钢球),在泵筒内并在固定凡尔之上固定有一个固定凡尔挡球板。The inner pump assembly is mainly composed of the upper joint of the pump barrel, the connecting rod, the pump barrel, the double swimming valve assembly, the fixed valve assembly and the lower joint of the pump cylinder. The upper end of the upper joint of the pump barrel has internal threads, which can be connected to the lower end of the inner oil pipe of the concentric oil pipe; the lower end of the upper joint of the pump barrel has external threads, and the lower end of the upper joint of the pump barrel is connected to the pump barrel. The lower end of the pump barrel has external threads, and the lower end of the pump barrel is connected to the lower joint of the pump barrel; the cross section of the upper joint of the pump barrel is circular, and the lower end surface of the upper joint of the pump barrel is on the annular step of the inner wall of the upper joint of the outer cylinder; An axial groove is arranged on the outer wall of the joint, and the axial groove connects the upper and lower ends of the joint on the pump cylinder. The cross-section of the lower joint of the pump barrel is circular. The lower joint of the pump barrel is inside the outer cylinder and connected to the lower end of the pump barrel. There are axial grooves on the outer wall of the lower joint of the pump barrel. end connection. Inside the pump cylinder, there is a double-moving valve assembly, which is composed of a plunger, a floating valve, a floating valve seat, and a floating valve baffle. The plunger is cylindrical, and the outer wall of the plunger is slidingly matched with the inner wall of the pump barrel. There are two floating valve seats fixed in the plunger, and each floating valve seat has a floating valve (steel ball) In the plunger and above the swimming valve at the lower end, there is a floating ball baffle, and a connecting rod is connected to the upper part of the plunger top cover, and there is a slanted hole on the plunger top cover; There is a fixed valve assembly at the bottom. The fixed valve assembly includes a fixed valve baffle, a fixed valve and a fixed valve seat. The fixed valve seat is fixed on the bottom of the pump barrel, a fixed valve (steel ball) is arranged on the fixed valve seat, and a fixed valve baffle plate is fixed on the fixed valve inside the pump barrel.

简述煤层气同心管式泵的工作过程。参阅图1。将外筒总成按如下顺序依次连接,外筒上接头1、外筒4、外筒下接头14;将内泵总成按如下顺序依次连接,泵筒上接头2、泵筒5、固定凡尔总成、及泵筒下接头13后,将内泵总成装入外筒总成中。Briefly describe the working process of the coalbed methane concentric tube pump. See Figure 1. Connect the outer cylinder assembly in sequence as follows, outer cylinder upper joint 1, outer cylinder 4, outer cylinder lower joint 14; connect the inner pump assembly in sequence as follows, pump cylinder upper joint 2, pump cylinder 5, fixed After the Er assembly and the lower joint 13 of the pump barrel, the inner pump assembly is packed into the outer cylinder assembly.

在地面将煤层气同心管式泵与其他的煤层气排液井洗井装置工具依次连接,下入井中。到达预定位置后,抽油杆的下端连接连接杆3,将柱塞6下入同心管式泵的泵筒5中。安装好抽油机能进行排水采气。需要洗井时,将供液泵车连接至采气井口的套管闸门处,启动泵车,向井筒内泵入清水,洗井水沿井筒下行经导流洗井器、密封调节器、同心油管到达本实用新型同心管式泵外筒总成和内泵总成的环形空间,洗井水从外筒总成和内泵总成的环形空间,通过双通道洗井阀,冲洗同心管式泵内泵总成及油管等内腔中堆积的煤粉,并携带煤粉到达地面。Connect the coalbed methane concentric tube pump with other coalbed methane liquid drainage well flushing device tools sequentially on the ground, and lower them into the well. After reaching the predetermined position, the lower end of the sucker rod is connected with the connecting rod 3, and the plunger 6 is lowered into the pump cylinder 5 of the concentric tubular pump. After installing the pumping unit, drainage and gas recovery can be carried out. When it is necessary to wash the well, connect the liquid supply pump truck to the casing gate of the gas production wellhead, start the pump truck, pump clean water into the wellbore, and the wellwashing water goes down the wellbore through the diversion wellwasher, seal regulator, concentric The oil pipe reaches the annular space of the outer cylinder assembly and the inner pump assembly of the concentric tubular pump of the present invention. The pulverized coal accumulated in the inner cavity of the pump assembly and oil pipe in the pump will carry the pulverized coal to the ground.

本实用新型的有益效果:本实用新型煤层气同心管式泵,有一个环形洗井通道,当煤粉堵塞煤层气排液井排水通道后,使洗井水能经过此通道,将堵塞排水通道的煤粉,清洗到地面上来。不用通过检泵的办法,清除堵塞泵筒或油管的煤粉。洗井水不会进入煤层,不会对煤层造成伤害。洗井结束后,可直接恢复生产,煤层气的产量可迅速恢复到煤粉堵塞泵筒或油管前的产量。具有结构合理而紧凑,安装方便,便于操作的优点。Beneficial effects of the utility model: The coalbed methane concentric tubular pump of the utility model has an annular well-flushing channel. When the pulverized coal blocks the drainage channel of the coalbed methane drainage well, the well-flushing water can pass through this channel, which will block the drainage channel. The pulverized coal is washed to the ground. It is not necessary to check the pump to remove the pulverized coal that blocks the pump barrel or oil pipe. Well washing water will not enter the coal seam and will not cause damage to the coal seam. After the well flushing is completed, the production can be resumed directly, and the output of coalbed methane can be quickly restored to the output before the pulverized coal blocked the pump barrel or oil pipe. It has the advantages of reasonable and compact structure, convenient installation and convenient operation.

附图说明 Description of drawings

图1是本实用新型煤层气同心管式泵结构剖面示意图。Figure 1 is a schematic cross-sectional view of the structure of the utility model coalbed methane concentric tube pump.

图2是图1的B-B剖面示意图,表示四个轴向槽的位置。Fig. 2 is a schematic cross-sectional view of B-B in Fig. 1, showing the positions of four axial grooves.

图中,1-外筒上接头,2-泵筒上接头,3-连接杆,4-外筒,5-泵筒,6-柱塞,7-游动凡尔,8-游动凡尔座,9-游动凡尔挡球板,10-固定凡尔挡球板,11-固定凡尔,12-固定凡尔座,13-泵筒下接头,14-外筒下接头。In the figure, 1-upper joint of outer cylinder, 2-upper joint of pump cylinder, 3-connecting rod, 4-outer cylinder, 5-pump cylinder, 6-plunger, 7-moving valve, 8-moving valve Seat, 9-moving Valve baffle, 10-fixed Valve baffle, 11-fixed Valve, 12-fixed Valve seat, 13-pump barrel lower joint, 14-outer cylinder lower joint.

具体实施方式 Detailed ways

实施例1:以一个煤层气同心管式泵为例,对本实用新型作进一步详细说明。Embodiment 1: Taking a coalbed methane concentric tube pump as an example, the utility model is further described in detail.

参阅图1。本实用新型煤层气同心管式泵,包括有外筒总成和内泵总成两部分。See Figure 1. The utility model coalbed methane concentric tube pump includes two parts: an outer cylinder assembly and an inner pump assembly.

外筒总成主要由外筒上接头1、外筒4和外筒下接头14组成。外筒4的内径85mm,长度8.5m。外筒上接头1上端有内螺纹,能连接在油管管柱上;外筒上接头1下端有内螺纹,外筒上接头1下端螺纹连接外筒4;外筒4的下端有外螺纹,外筒4下端与外筒下接头14连接。在外筒上接头1的内壁上端有环形台阶;环形台阶的内径94mm。The urceolus assembly is mainly composed of the upper joint 1 of the urceolus, the urceolus 4 and the lower joint 14 of the urceolus. The inner diameter of the outer cylinder 4 is 85mm, and the length is 8.5m. The upper end of the upper joint 1 of the outer cylinder has an internal thread, which can be connected to the tubing string; the lower end of the upper joint 1 of the outer cylinder has an internal thread, and the lower end of the upper joint 1 of the outer cylinder is threaded to connect with the outer cylinder 4; the lower end of the outer cylinder 4 has an external thread, and the outer The lower end of the cylinder 4 is connected with the lower joint 14 of the outer cylinder. There is an annular step at the upper end of the inner wall of the joint 1 on the outer cylinder; the inner diameter of the annular step is 94mm.

内泵总成主要由泵筒上接头2、连接杆3、泵筒5、双游动凡尔总成、固定凡尔总成和泵筒下接头13组成。泵筒5的内径32mm,长度8m。泵筒上接头2上端有内螺纹,能连接在同心油管的内层油管的下端;泵筒上接头2下端有外螺纹,泵筒上接头2下端连接泵筒5。泵筒5的下端有外螺纹,泵筒5的下端连接泵筒下接头13;泵筒上接头2的横截面为圆环形,泵筒上接头2的外径93mm。泵筒上接头2的下端面在外筒上接头1内壁的环形台阶上。参阅图2。泵筒上接头2的外壁上均匀分布有四个轴向槽,轴向槽的深度为5mm,轴向槽将泵筒上接头2的上下两端连通。参阅图1。泵筒下接头13的横截面为圆环形,泵筒下接头13的外径83mm。泵筒下接头13外壁与外筒4内壁之间滑动配合。泵筒下接头13在外筒4内并连接在泵筒5的下端,泵筒下接头13的外壁上有四个轴向槽,轴向槽将泵筒下接头13的上下两端连通。在泵筒5内有双游动凡尔总成,双游动凡尔总成由柱塞6、游动凡尔7、游动凡尔座8、游动凡尔挡球板9组成。柱塞6为圆筒形,柱塞6的外径为32mm,长度为0.75m。柱塞6的外壁与泵筒5内壁之间滑动配合,在柱塞6内固定有两个游动凡尔座8,每个游动凡尔座8上有一个直径为15mm的中心孔,中心孔上端有圆锥面。每个游动凡尔座8上有一个游动凡尔7(钢球),在柱塞6内并在下端的游动凡尔7之上固定有一个游动凡尔挡球板9,游动凡尔挡球板9上有四个通孔。在柱塞6顶盖上部螺纹连接有连接杆3,柱塞6顶盖上有两个斜孔。在泵筒5的底端有固定凡尔总成。固定凡尔总成包含有固定凡尔挡球板10、固定凡尔11和固定凡尔座12。固定凡尔座12固定在泵筒5的底部,在固定凡尔座12上有一个固定凡尔11(钢球),在泵筒5内并在固定凡尔11之上固定有一个固定凡尔挡球板10。The inner pump assembly is mainly composed of the upper joint 2 of the pump barrel, the connecting rod 3, the pump barrel 5, the double swimming valve assembly, the fixed valve assembly and the lower joint 13 of the pump cylinder. The inner diameter of the pump barrel 5 is 32mm, and the length is 8m. The upper end of the upper joint 2 of the pump barrel has an internal thread, which can be connected to the lower end of the inner oil pipe of the concentric oil pipe; The lower end of the pump barrel 5 has an external thread, and the lower end of the pump barrel 5 is connected to the lower joint 13 of the pump barrel; the cross section of the upper joint 2 of the pump barrel is circular, and the outer diameter of the upper joint 2 of the pump barrel is 93mm. The lower end surface of the upper joint 2 of the pump barrel is on the annular step of the inner wall of the upper joint 1 of the outer cylinder. See Figure 2. Four axial grooves are evenly distributed on the outer wall of the upper joint 2 of the pump barrel, the depth of the axial grooves is 5mm, and the axial grooves connect the upper and lower ends of the upper joint 2 of the pump barrel. See Figure 1. The cross section of the lower joint 13 of the pump barrel is circular, and the outer diameter of the lower joint 13 of the pump barrel is 83mm. Sliding fit between the outer wall of the lower joint 13 of the pump barrel and the inner wall of the outer cylinder 4 . The lower joint 13 of the pump cylinder is in the outer cylinder 4 and is connected to the lower end of the pump cylinder 5. There are four axial grooves on the outer wall of the lower joint 13 of the pump cylinder, and the axial grooves connect the upper and lower ends of the lower joint 13 of the pump cylinder. Double swimming valve assembly is arranged in pump cylinder 5, and double swimming valve assembly is made up of plunger 6, swimming valve 7, swimming valve seat 8, swimming valve baffle plate 9. The plunger 6 is cylindrical, the outer diameter of the plunger 6 is 32mm, and the length is 0.75m. The outer wall of the plunger 6 is slidingly fitted with the inner wall of the pump barrel 5, and two movable valve seats 8 are fixed in the plunger 6, and each movable valve seat 8 has a central hole with a diameter of 15mm, and the center The upper end of the hole has a conical surface. There is a swimming valve 7 (steel ball) on each swimming valve seat 8, and a swimming valve baffle plate 9 is fixed in the plunger 6 and above the swimming valve 7 of the lower end, swimming There are four through holes on the ball baffle plate 9 that moves. A connecting rod 3 is threaded on the top cover of the plunger 6, and there are two oblique holes on the top cover of the plunger 6. The bottom end of the pump cylinder 5 has a fixed valve assembly. The fixed valve assembly includes a fixed valve baffle plate 10, a fixed valve 11 and a fixed valve seat 12. The fixed valve seat 12 is fixed on the bottom of the pump barrel 5, and there is a fixed valve 11 (steel ball) on the fixed valve seat 12, and a fixed valve is fixed in the pump cylinder 5 and on the fixed valve 11. Baffle 10.

Claims (1)

1.一种煤层气同心管式泵,包括有外筒总成和内泵总成两部分;其特征是: 1. A coalbed methane concentric tubular pump, comprising two parts, an outer cylinder assembly and an inner pump assembly; it is characterized in that: 外筒总成主要由外筒上接头(1)、外筒(4)和外筒下接头(14)组成;外筒上接头(1)上端有内螺纹;外筒上接头(1)下端有内螺纹,外筒上接头(1)下端螺纹连接外筒(4);外筒(4)的下端有外螺纹,外筒(4)下端与外筒下接头(14)连接;在外筒上接头(1)的内壁上端有环形台阶; The outer cylinder assembly is mainly composed of an outer cylinder upper joint (1), an outer cylinder (4) and an outer cylinder lower joint (14); the upper end of the outer cylinder upper joint (1) has internal threads; the lower end of the outer cylinder upper joint (1) has Internal thread, the lower end of the upper joint (1) of the outer cylinder is threaded to connect the outer cylinder (4); the lower end of the outer cylinder (4) has an outer thread, and the lower end of the outer cylinder (4) is connected with the lower joint (14) of the outer cylinder; the joint on the outer cylinder (1) There is an annular step at the upper end of the inner wall; 内泵总成主要由泵筒上接头(2)、连接杆(3)、泵筒(5)、双游动凡尔总成、固定凡尔总成和泵筒下接头(13)组成;泵筒上接头(2)上端有内螺纹;泵筒上接头(2)下端有外螺纹,泵筒上接头(2)下端连接泵筒(5);泵筒(5)的下端有外螺纹,泵筒(5)的下端连接泵筒下接头(13);泵筒上接头(2)的横截面为圆环形,泵筒上接头(2)的下端面在外筒上接头(1)内壁的环形台阶上;泵筒上接头(2)的外壁上有轴向槽,轴向槽将泵筒上接头(2)的上下两端连通;泵筒下接头(13)的横截面为圆环形,泵筒下接头(13)在外筒(4)内并连接在泵筒(5)的下端,泵筒下接头(13)的外壁上有轴向槽,轴向槽将泵筒下接头(13)的上下两端连通;在泵筒(5)内有双游动凡尔总成,双游动凡尔总成由柱塞(6)、游动凡尔(7)、游动凡尔座(8)、游动凡尔挡球板(9)组成;柱塞(6)为圆筒形,柱塞(6)的外壁与泵筒(5)内壁滑动配合,在柱塞(6)内固定有两个游动凡尔座(8),每个游动凡尔座(8)上有一个游动凡尔(7),在柱塞(6)内并在下端的游动凡尔(7)之上固定有一个游动凡尔挡球板(9),在柱塞(6)顶盖上部连接有连接杆(3),柱塞(6)顶盖上有斜孔;在泵筒(5)的底端有固定凡尔总成;固定凡尔总成包含有固定凡尔挡球板(10)、固定凡尔(11)和固定凡尔座(12);固定凡尔座(12)固定在泵筒(5)的底部,在固定凡尔座(12)上有一个固定凡尔(11),在泵筒(5)内并在固定凡尔(11)之上固定有一个固定凡尔挡球板(10)。  The inner pump assembly is mainly composed of the pump barrel upper joint (2), the connecting rod (3), the pump barrel (5), the double swimming valve assembly, the fixed valve assembly and the pump cylinder lower joint (13); the pump The upper end of the upper joint (2) of the cylinder has internal threads; the lower end of the upper joint (2) of the pump cylinder has external threads, and the lower end of the upper joint (2) of the pump cylinder is connected with the pump cylinder (5); the lower end of the pump cylinder (5) has external threads, and the pump The lower end of the barrel (5) is connected to the lower joint (13) of the pump barrel; the cross-section of the upper joint (2) of the pump barrel is circular, and the lower end surface of the upper joint (2) of the pump barrel is in the ring shape of the inner wall of the upper joint (1) of the outer cylinder. On the step; there is an axial groove on the outer wall of the upper joint (2) of the pump barrel, and the axial groove connects the upper and lower ends of the upper joint (2) of the pump barrel; the cross section of the lower joint (13) of the pump barrel is circular, The lower joint (13) of the pump barrel is inside the outer cylinder (4) and connected to the lower end of the pump barrel (5). There are axial grooves on the outer wall of the lower joint (13) of the pump barrel, and the axial groove connects the lower joint (13) of the pump barrel. The upper and lower ends of the upper and lower ends are connected; in the pump barrel (5), there is a double-moving valve assembly, which consists of a plunger (6), a swimming valve (7), a swimming valve seat ( 8) Composed of a swimming ball baffle (9); the plunger (6) is cylindrical, and the outer wall of the plunger (6) slides and fits with the inner wall of the pump barrel (5), and is fixed inside the plunger (6) There are two swimming valve seats (8), one swimming valve (7) on each swimming valve seat (8), and the swimming valve (7) in the plunger (6) and at the lower end ) is fixed with a swimming ball baffle (9), and a connecting rod (3) is connected to the upper part of the top cover of the plunger (6), and there is an oblique hole on the top cover of the plunger (6); 5) The bottom end has a fixed valve assembly; the fixed valve assembly includes a fixed valve baffle (10), a fixed valve (11) and a fixed valve seat (12); a fixed valve seat (12 ) is fixed on the bottom of the pump cylinder (5), and there is a fixed valve (11) on the fixed valve seat (12), and a fixed valve (11) is fixed on the fixed valve (11) in the pump cylinder (5). Val Basket (10). the
CN2012200390174U 2012-02-07 2012-02-07 CBM concentric tube pump Expired - Fee Related CN202531405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200390174U CN202531405U (en) 2012-02-07 2012-02-07 CBM concentric tube pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200390174U CN202531405U (en) 2012-02-07 2012-02-07 CBM concentric tube pump

Publications (1)

Publication Number Publication Date
CN202531405U true CN202531405U (en) 2012-11-14

Family

ID=47132594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200390174U Expired - Fee Related CN202531405U (en) 2012-02-07 2012-02-07 CBM concentric tube pump

Country Status (1)

Country Link
CN (1) CN202531405U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533351A (en) * 2014-12-15 2015-04-22 孙硕成 Multifunctional swabbing and bailing lift device suitable for dynamic and intelligent production management
CN106869867A (en) * 2017-04-10 2017-06-20 淄博东华石油技术有限公司 Washing well coal bed gas extraction equipment
CN111335846A (en) * 2020-04-26 2020-06-26 罗林峰 Coal bed gas exploitation well-flushing equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533351A (en) * 2014-12-15 2015-04-22 孙硕成 Multifunctional swabbing and bailing lift device suitable for dynamic and intelligent production management
CN106869867A (en) * 2017-04-10 2017-06-20 淄博东华石油技术有限公司 Washing well coal bed gas extraction equipment
CN106869867B (en) * 2017-04-10 2023-03-03 淄博东华石油技术有限公司 Washable coalbed methane extraction equipment
CN111335846A (en) * 2020-04-26 2020-06-26 罗林峰 Coal bed gas exploitation well-flushing equipment
CN111335846B (en) * 2020-04-26 2022-10-25 贵阳鑫睿材料科技有限公司 Coal bed gas exploitation well-flushing equipment

Similar Documents

Publication Publication Date Title
CN102536142B (en) Method of non-stop pumping and flushing of coal bed methane liquid drainage well
CN202745846U (en) Coiled tubing perforating, fracturing and sand washing integrated string
CN102536144B (en) CBM dual-channel well flushing valve
CN102797422B (en) Coal bed gas well fishing, drainage and gas production integrated pipe string
CN103541887B (en) Sand control and gas control integrated oil recovery device
CN106869867B (en) Washable coalbed methane extraction equipment
CN103334717A (en) Oil field pumping unit well pumping device
CN102561962B (en) Coalbed methane diversion flushing device
CN107387024A (en) Hollow sucker rod wellbore dosing device and wellbore dosing method
CN107676051B (en) Coal bed gas well annular pressurizing coal powder fishing device and method
CN108071365B (en) A coalbed methane gas production, drainage and water injection integrated pipe string
CN206830131U (en) A kind of sand settling constant pressure check valve for water injection well
CN106246518A (en) Coal bed gas well self-cleaning anti-sticking tubing pump
CN103790529A (en) Coalbed methane drainage extraction and backwashing device and method
CN111021995B (en) A mechanical pumping water drainage gas production wellhead pressurization process string
CN204941904U (en) A kind of sand-proof oil-well pump and plunger thereof
CN209354081U (en) Positive flushing sand pump
RU134984U1 (en) DEVICE FOR CLEANING BOTTOM AND WELL BORE OF DEPOSITS AND FLOATING WASTE
CN202338296U (en) Coalbed methane well built-in screen
CN101929329B (en) Gravel filling sand control device of horizontal well screen pipe
CN117605442A (en) A side-flow well cleaning and drainage oil pump and its use method
CN204663484U (en) A kind of submersible electric pump producing well automatic diverter valve
RU168316U1 (en) DRILLING PUMP UNIT FOR OPERATIONAL COLUMNS OF SMALL DIAMETER
CN114458209B (en) Horizontal well screen pipe detection blocking removal system and method
CN104747115A (en) Multifunctional well head device of coalbed methane pumping-drainage well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20210207