CN202502039U - Fixture for pull-out force tests - Google Patents

Fixture for pull-out force tests Download PDF

Info

Publication number
CN202502039U
CN202502039U CN2011204947568U CN201120494756U CN202502039U CN 202502039 U CN202502039 U CN 202502039U CN 2011204947568 U CN2011204947568 U CN 2011204947568U CN 201120494756 U CN201120494756 U CN 201120494756U CN 202502039 U CN202502039 U CN 202502039U
Authority
CN
China
Prior art keywords
fixture
groove
chuck
opening
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204947568U
Other languages
Chinese (zh)
Inventor
李梦贤
单荣伟
孔凡富
崔义新
师娟
任林昌
张立东
张龙仿
周涛
李建江
杨琳
殷属越
刘丽娜
王培建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Seventh Construction Corp
Original Assignee
No7 Building Corp Chinese Petroleum Gas
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No7 Building Corp Chinese Petroleum Gas filed Critical No7 Building Corp Chinese Petroleum Gas
Priority to CN2011204947568U priority Critical patent/CN202502039U/en
Application granted granted Critical
Publication of CN202502039U publication Critical patent/CN202502039U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a test tooling, in particular to a fixture for pull-out force tests. The fixture comprises a fixture body, a groove is arranged in the fixture body along the length direction, an opening is arranged at the top of the fixture body and communicated with the groove in the fixture body, so that the groove is in a reversed T shape, a bar-shaped groove is arranged at the bottom of the groove in the fixture body and parallel to the direction of the opening, and a bottom protrusion is fixedly arranged at the center of the bottom of the fixture body. According to the fixture, the pull-out tests for heat exchange tube convection bundle samples after welding can be performed conveniently, data are real and reliable, and error values can be basically avoided.

Description

The pulling-out force test fixture
Technical field
The utility model relates to a kind of test frock, especially a kind of pulling-out force test fixture.
Background technology
Heat-exchanging tube bundle is being welded in the technological process of tube sheet joint, need carrying out the pulling-out force test to the heat-exchanging tube bundle sample after the welding sometimes, be used for welding technology is evaluated.And the anchor clamps that do not have clear and definite pulling-out force test method in the prior art and specifically be used for the pulling-out force test at present.
The utility model content
The purpose of the utility model is to have proposed a kind of pulling-out force test fixture, can carry out the pulling-out force test to the heat-exchanging tube bundle sample after the welding easily through these anchor clamps, and data is true and reliable, do not have error amount basically.
The utility model is that the technical scheme below adopting realizes: a kind of pulling-out force test fixture comprises chuck body, wherein; Along its length direction groove is set in the said chuck body, the top of chuck body is provided with opening, and opening is connected with the interior groove of chuck body; Make described groove be inverted T-shaped; The bottom of chuck body inner groovy is provided with bar-shaped trough, and bar-shaped trough is parallel to the direction of opening, and the center position of chuck body bottom is fixed with bottom protrusion.
The beneficial effect of the utility model is: draw the pulling-out force test fixture to be fixed on the puller system through this; Can simulate heat exchanger tube convection bank pulling-out force test fixture in real work stressed direction; Easily the heat exchanger tube convection bank sample after the welding is carried out the pulling-out force test; And data are true and reliable, do not have error amount basically.
Description of drawings
Fig. 1 is the front view of the utility model;
Fig. 2 is the vertical view of the utility model;
Fig. 3 is the working state schematic representation of the utility model.
Among the figure: 1 pulling-out force test fixture; 2 chuck body; 3 bar-shaped troughs; 4 bottom protrusion; 5 openings; 6 samples.
Embodiment
Below in conjunction with accompanying drawing the utility model is further specified.
Fig. 1 to Fig. 3 is the described pulling-out force test fixture of the utility model.These anchor clamps 1 comprise chuck body 2, along its length direction groove are set in the chuck body 2, and the top of chuck body 2 is provided with opening 5; Opening 5 is connected with chuck body 2 interior grooves; Make described groove be inverted T-shaped, the groove of this shape is convenient to place heat exchanger tube convection bank sample, and the top of heat exchanger tube convection bank is passed opening 5 and stretched out chuck body 2 in the sample; Tube sheet in the sample is arranged in the groove, thereby in process of the test, heat exchanger tube convection bank sample is fixed in the chuck body 2.The bottom of chuck body 2 inner groovies is provided with bar-shaped trough 3, and bar-shaped trough 3 is parallel with opening 5, and the part that the heat exchanger tube convection bank is positioned at the tube sheet below can be arranged on bar-shaped trough 3.The center position of chuck body bottom is fixed with bottom protrusion 4.
Utilize these anchor clamps to carry out pulling-out force when test, at first bottom protrusion 4 is placed on afterburning clamping the in the lower end clamp device of puller system; In second step, the tube sheet in the sample 6 is placed in the groove of chuck body 2, and the opening 5 at chuck body top is passed at the top of heat exchanger tube convection bank, and the bottom of heat-exchanging tube bundle is arranged in the bar-shaped trough 3; The 3rd step was placed on the heat exchanger tube on the tube sheet in the clamp device of puller system upper end successively, and the clamp device of puller system upper end is afterburning to be clamped, and sample is upwards lifted, and exchanged heat pipe successively and carried out the pulling-out force test.

Claims (1)

1. pulling-out force test fixture; Comprise chuck body (2); It is characterized in that: along its length direction groove is set in the said chuck body (2), the top of chuck body (2) is provided with opening (5), and opening (5) is connected with the interior groove of chuck body (2); Make described groove be inverted T-shaped; The bottom of chuck body (2) inner groovy is provided with bar-shaped trough (3), and bar-shaped trough (3) is parallel to the direction of opening (5), and the center position of chuck body bottom is fixed with bottom protrusion (4).
CN2011204947568U 2011-12-02 2011-12-02 Fixture for pull-out force tests Expired - Fee Related CN202502039U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204947568U CN202502039U (en) 2011-12-02 2011-12-02 Fixture for pull-out force tests

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204947568U CN202502039U (en) 2011-12-02 2011-12-02 Fixture for pull-out force tests

Publications (1)

Publication Number Publication Date
CN202502039U true CN202502039U (en) 2012-10-24

Family

ID=47038650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204947568U Expired - Fee Related CN202502039U (en) 2011-12-02 2011-12-02 Fixture for pull-out force tests

Country Status (1)

Country Link
CN (1) CN202502039U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105626648A (en) * 2016-03-01 2016-06-01 银邦金属复合材料股份有限公司 Connecting device for tensile test of welding connector and tensile method
CN107290217A (en) * 2017-06-30 2017-10-24 吉林大学 Test overlay cladding and the lifting test method and test specimen of base metals bond strength

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105626648A (en) * 2016-03-01 2016-06-01 银邦金属复合材料股份有限公司 Connecting device for tensile test of welding connector and tensile method
CN107290217A (en) * 2017-06-30 2017-10-24 吉林大学 Test overlay cladding and the lifting test method and test specimen of base metals bond strength

Similar Documents

Publication Publication Date Title
CN201161334Y (en) Quick assembling device for flat welding flange
CN201026553Y (en) Worktable for welding stage
CN203792219U (en) Plastic tube fixing tool with three clamping pivots
CN201222026Y (en) Elongation test clamper for universal tester pipe
CN202502039U (en) Fixture for pull-out force tests
CN207642548U (en) Automobile front floor welding fixture
CN202507022U (en) Axle tube assembly welding and locating tool
CN203011765U (en) Special clamping device matched with pipe ring stretching test
CN205057639U (en) Flipping robot
CN206248469U (en) T-shaped sample stretching tool
CN202362211U (en) Novel pulling force testing device for solar collector
CN204301992U (en) A kind of sebific duct air pressure detects clamping combination unit
CN104972249B (en) Positioning fixture for semi-automatic spot welder
CN204461973U (en) Robotization flow cytometer
CN103386622A (en) Multipurpose tool clamp
CN201009176Y (en) Novel bench vice
CN202846357U (en) Center vertical locating device
CN205580853U (en) A workstation for car body welding destructive test
CN202555997U (en) Clamping and locating mechanism for hydraulic support automatic welding shift device
CN204807391U (en) Anchor clamps that rolling combined material thermal modeling test sample mechanical properties detected
CN205352838U (en) Automatic pulling force machine anchor clamps
CN208437867U (en) Shift handle mounting plate assembly welding clamp
CN207171462U (en) Header positions guide device
CN203566133U (en) Welding test piece clamping support
CN212058533U (en) Full-detection device suitable for parts with porous structures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Miao road Laoshan District 266000 Shandong city of Qingdao province No. 36 in building A

Patentee after: China Petroleum & natural gas seventh Construction Co., Ltd.

Address before: Miao road Laoshan District 266000 Shandong city of Qingdao province No. 36 in building A

Patentee before: No.7 Building Corp., Chinese Petroleum Gas

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121024

Termination date: 20191202