CN202440936U CN201220078120XU CN201220078120U CN202440936U CN 202440936 U CN202440936 U CN 202440936U CN 201220078120X U CN201220078120X U CN 201220078120XU CN 201220078120 U CN201220078120 U CN 201220078120U CN 202440936 U CN202440936 U CN 202440936U
Authority
CN
China
Prior art keywords
cover plate
sleeve
edge
steel tube
concrete filled
Prior art date
Application number
CN201220078120XU
Other languages
Chinese (zh)
Inventor
苏幼坡
高林
徐国强
陈海彬
陈建伟
Original Assignee
河北联合大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 河北联合大学 filed Critical 河北联合大学
Priority to CN201220078120XU priority Critical patent/CN202440936U/en
Application granted granted Critical
Publication of CN202440936U publication Critical patent/CN202440936U/en

Links

Abstract

The utility model relates to a concrete filled steel tube structure, in particular to a concrete filled steel tube connector. The concreted filled steel tube connector comprises a cover plate, a chuck and a sleeve, wherein the cover plate is an annular body with a round outer edge; limit blocks which are arranged at equal intervals are arranged on the upper edge of the upper edge of the cover plate, and cover plate convex teeth which are arranged corresponding to the limit blocks are arranged on the lower edge of the cover plate; a looper which has the same size as the outer diameter of a connected steel pipe is formed in the middle of the chuck, and the edge of the looper is provided with stiffened rib plates which are arranged at equal intervals; a looper which has the same size as the outer diameter of the connected steel pipe is formed in a baseplate of the sleeve, and the upper edge of the of the looper is provided with sleeve convex teeth at equal intervals; and the sleeve convex teeth correspond to the limit blocks on the cover plate and the cover plate convex teeth in position, and the up-down space between each limit block on the cover plate and each cover plate convex tooth is equal to the thickness of each sleeve convex tooth. The concrete filled steel tube connector has the advantages of convenience for construction and installation, safety in connecting measures, firmness in whole connection, suitability for complex construction environments and the like, and can be used for square concrete filled steel tube construction and round concrete filled steel tube construction.

Description

The concrete filled steel tube connector

Technical field:

The utility model relates to encased structures, specifically is a kind of concrete filled steel tube connector.

Background technology:

At present, encased structures is widely applied in highrise building.Usually the connection of encased structures adopts flange connection, welding or sleeve pipe to connect.It is with steel tube component end fixed flange that flange connects, again with the method for attachment of two flange through bolton.Though flange connects easy construction, the interface slit is corroded easily, causes to connect to lose efficacy, and too high to the requirement on machining accuracy of interface unit simultaneously, the cost cost drops into excessive.Welding is to utilize the metallic molecule between the connector at high temperature to interpenetrate and integrated method of attachment.Welding can guarantee the tight connection of steel tube component, but higher to welding environment and operator's technical requirements, and is easy to generate weld defect, can't realize standardized work.It is with the coaxial overlap joint of internal and external casing that sleeve pipe connects, and between internal and external casing, pours into expansive cement and sets up the shearing resistance part, relies on the method for attachment that bonds rubbing action and combine.The sleeve pipe link technique is simple and practical, but node processing have relatively high expectations, the sleeve pipe bond length is big, has promoted steel quantity consumption greatly, also ties up a large amount of axial spaces, is difficult to realize high strength tension and resistance to compression requirement simultaneously.

The utility model content:

The utility model is intended to solve the problem that existing encased structures method of attachment exists; And a kind of concrete filled steel tube node bonding strength that can significantly improve is provided; Guarantee the node connectivity robustness; Strengthen node and connect anti-fatigue performance, can realize the concrete filled steel tube connector that the site operation operation is rapid simultaneously.

The technical scheme that the said problem that solves the utility model adopts is:

A kind of concrete filled steel tube connector comprises cover plate, chuck, sleeve, and said cover plate is a ring bodies that outer rim is rounded, and its top edge is provided with the limited block that five equilibrium is arranged, its lower limb is provided with the cover plate double wedge with the corresponding layout of said limited block; Have and the running-on that is connected the outer diameter of steel pipes equidimension in the middle of the said chuck, this running-on edge is provided with the floor of putting more energy into that five equilibrium is arranged; Have on its base plate of said sleeve and the running-on that is connected the outer diameter of steel pipes equidimension; Its top edge is provided with the sleeve double wedge that five equilibrium is arranged; The position of this sleeve double wedge is corresponding with limited block and cover plate double wedge on the cover plate, and the distance between the upper and lower of limited block on the cover plate and cover plate double wedge and this sleeve double wedge uniform thickness.

Further, its top edge of said cover plate is by quartering fixed limit piece, and its lower limb is by quartering securing cover plate double wedge; Said chuck running-on edge is by being connected the cross guiding shear resisting board position of being welded on the steel pipe inwall, the quartering floor of fixedly putting more energy into; Said sleeve top edge quartering fixed muffle double wedge.

Compared with prior art, the beneficial effect of the utility model is: cover plate, chuck, sleeve can be in advance at plant design and processing and fabricatings according to being connected steel pipe sizes and bonding strength requirement, and the job site is assembled into the concrete filled steel tube connector then.Have construction and installation convenient, connect advantages such as measure safety, integral body are connected firmly, suitable complicated construction environment; Can be used for square steel pipe concrete and concrete filled steel tube construction in the building engineering; Especially connected node has good axially loaded performance, flexural property and anti-fatigue performance; All drawbacks of having avoided flange connection, welding and sleeve pipe to be connected have application space and good practical function widely.

Description of drawings:

Fig. 1 is the concrete filled steel tube connector construction sketch map of the embodiment of the invention.

Fig. 2 is the cover plate vertical view in the present embodiment.

Fig. 3 is the chuck vertical view in the present embodiment.

Fig. 4 is the sleeve vertical view in the present embodiment.

Among the figure: 1-cover plate, 2-chuck, 3-sleeve, 4-cross guiding shear resisting board, steel pipe under the 5-; The 6-floor of putting more energy into, 7-cover plate double wedge, 8-sleeve double wedge, 9-limited block, the last steel pipe of 10-; 11-concrete, the 12-material that is in the milk, 13-chuck running-on, 14-overlaps tube end plate, 15-sleeve running-on.

The specific embodiment:

Below in conjunction with embodiment the present invention is detailed.

Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, the concrete filled steel tube connector is combined by cover plate 1, chuck 2,3 three separating members of sleeve.Cover plate 1 is a ring bodies that outer rim is rounded, and its top edge is by fixing four limited blocks 9 of the quartering, and its lower limb outside is corresponding with four limited block 9 positions by fixing 7, four the cover plate double wedges 7 of four curved cover plate double wedges of the quartering; Have chuck running-on 13 in the middle of the chuck 2; The bore of chuck running-on 13 and the connected external diameter equidimension (square opening) that goes up steel pipe 10 and following steel pipe 5; The position of the cross guiding shear resisting board 4 that welds on steel pipe 5 inwalls, four floors 6 of putting more energy into of quartering welding are pressed in chuck running-on 13 edges; Have on the cover tube end plate 14 and the connected sleeve running-on 15 (square opening) of going up the external diameter equidimension of steel pipe 10 and following steel pipe 5; The sleeve 3 top edge quarterings are fixed four sleeve double wedges 8; Limited block 9 on the position of sleeve double wedge 8 and the cover plate 1 is corresponding with cover plate double wedge 7, and the thickness uniform thickness of the distance between the upper and lower of limited block on the cover plate 19 and cover plate double wedge 7 and sleeve double wedge 8.

Adopt the job practices of this concrete filled steel tube connector, its order as follows:

1. according to the steel pipe appearance and size and the bonding strength requirement of concrete filled steel tube, design respectively and processing and fabricating cover plate 1, chuck 2, sleeve 3 and cross guiding shear resisting board 4 in factory;

2. at the construction field (site), cover plate 1 is inserted in the lower end of last steel pipe 10, and the chuck running-on 13 of chuck 2 and the lower edge of last steel pipe 10 are welded; The sleeve running-on 15 of sleeve 3 and the upper limb of following steel pipe 5 are welded, and inwall welds cross guiding shear resisting board 4 in the upper end of following steel pipe 5;

3. last steel pipe 10 liftings that will process; Rely on the cross guiding shear resisting board 4 on put more energy into floor 6 and the following steel pipe 5 that is welded as a whole with last steel pipe 10 to align the location; An interim support fixation is adopted in fall position back, and the cover plate 1 on the steel pipe 10 is gone up in the adjustment of temporary fixed back, and the limited block 9 of cover plate 1 and sleeve double wedge 8 mismatch of cover plate double wedge 7 with sleeve 3 are aligned; Then cover plate 1 is fallen to sleeve 3 upper limbs and rotate 45 degree, make limited block 9 and cover plate double wedge 7 firmly tighten the sleeve double wedge 8 of sleeve 3;

4. in sleeve 3, pour into high-strength (strength grade is greater than C80) microdilatancy grouting material 12 that is mixed with fiber, design strength to be reached removes interim support and promptly accomplishes being connected of steel pipe 10 and following steel pipe 5;

5. fluid concrete 11 in the steel pipe that connects, design strength to be reached had both been accomplished the construction of concrete filled steel tube.

Claims (4)

1. concrete filled steel tube connector; Comprise cover plate, chuck, sleeve, it is characterized in that said cover plate is a ring bodies that outer rim is rounded; Its top edge is provided with the limited block that five equilibrium is arranged, its lower limb is provided with the cover plate double wedge with the corresponding layout of said limited block; Have and the running-on that is connected the outer diameter of steel pipes equidimension in the middle of the said chuck, this running-on edge is provided with the floor of putting more energy into that five equilibrium is arranged; Have on its base plate of said sleeve and the running-on that is connected the outer diameter of steel pipes equidimension; Its top edge is provided with the sleeve double wedge that five equilibrium is arranged; The position of this sleeve double wedge is corresponding with limited block and cover plate double wedge on the cover plate, and the distance between the upper and lower of limited block on the cover plate and cover plate double wedge and this sleeve double wedge uniform thickness.
2. like claims 1 described concrete filled steel tube connector, it is characterized in that its top edge of said cover plate is by quartering fixed limit piece, its lower limb is by quartering securing cover plate double wedge.
3. like claims 1 described concrete filled steel tube connector, it is characterized in that said chuck running-on edge is by being connected the cross guiding shear resisting board position of being welded on the steel pipe inwall, the quartering floor of fixedly putting more energy into.
4. like claims 1 described concrete filled steel tube connector, it is characterized in that said sleeve top edge quartering fixed muffle double wedge.
CN201220078120XU 2012-03-05 2012-03-05 Concrete filled steel tube connector CN202440936U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220078120XU CN202440936U (en) 2012-03-05 2012-03-05 Concrete filled steel tube connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220078120XU CN202440936U (en) 2012-03-05 2012-03-05 Concrete filled steel tube connector

Publications (1)

Publication Number Publication Date
CN202440936U true CN202440936U (en) 2012-09-19

Family

ID=46822390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220078120XU CN202440936U (en) 2012-03-05 2012-03-05 Concrete filled steel tube connector

Country Status (1)

Country Link
CN (1) CN202440936U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561528A (en) * 2012-03-05 2012-07-11 河北联合大学 Concrete-filled steel tube connector and construction method thereof
CN102966185A (en) * 2012-12-06 2013-03-13 河北联合大学 Novel concrete-filled steel tube connection joint and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561528A (en) * 2012-03-05 2012-07-11 河北联合大学 Concrete-filled steel tube connector and construction method thereof
CN102561528B (en) * 2012-03-05 2014-06-25 河北联合大学 Concrete-filled steel tube connector and construction method thereof
CN102966185A (en) * 2012-12-06 2013-03-13 河北联合大学 Novel concrete-filled steel tube connection joint and construction method thereof
CN102966185B (en) * 2012-12-06 2014-07-30 河北联合大学 Novel concrete-filled steel tube connection joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN106460384B (en) Structural module building connector
US20150322676A1 (en) Splice sleeve with elliptical or compound curve cross section
CN103216044B (en) The cement grouting steel bar connecting structure of precast unit
CN106168054B (en) Connecting structure and its construction method with dry shaped connecting piece precast shear wall plate
CN102433945A (en) Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure
KR101827846B1 (en) Joint structure for steel bridge pier and concrete pile foundation
CN102704698B (en) A kind of full prestressing composite integrated reinforced steel concrete structure
CN102691365B (en) Connecting structure for assembly type concrete shear wall edge member
CN205935417U (en) Take half grout sleeve of threaded connection spare
CN104053845A (en) Brace member
CN101624842B (en) Hollow sandwich filled steel tubular column-steel beam node adopting one-way fastening bolt
CN102071776A (en) Precast grouted steel bar connecting sleeve and construction method thereof
CN105201530A (en) Repairing and strengthening method for large cracks on rock tunnel lining
CN107299683A (en) Compound concrete-filled tubular column assembled docks node and connection method
CN203855954U (en) Square pile with tooth-shaped joints
CN204059347U (en) Prestressed concrete reducing pile tube
CN207003634U (en) A kind of balcony slab installs node
CN207003837U (en) A kind of reinforcing bar connector of precast concrete docking
CN103922660A (en) Shrinkage-free ultrahigh-strength grouting material for connection of steel bar sleeves
CN108330823B (en) Assembled steel reinforced concrete composite beam bridge floorings longitudinal joint connecting structure and construction method
RU82465U1 (en) Coupling for connection of reinforced rods- "lenton"
CN205935195U (en) Prefabricated building concrete beam column shaped steel built -up connection node construction
CN106927364B (en) The antifatigue connection method of steel crane beam and rail
CN108978449A (en) A kind of connector uses the spigot-and-socket construction precast assembly bridge pier of grout sleeve
CN205617661U (en) Short sleeve grout steel bar connection connects and connecting sleeve and pressure -bearing ring that have thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20140305