- CN202440814U CN202440814U CN2012200675535U CN201220067553U CN202440814U CN 202440814 U CN202440814 U CN 202440814U CN 2012200675535 U CN2012200675535 U CN 2012200675535U CN 201220067553 U CN201220067553 U CN 201220067553U CN 202440814 U CN202440814 U CN 202440814U
- Authority
- CN
- China
- Prior art keywords
- sand
- towards
- closely knit
- pile
- sand pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004576 sand Substances 0.000 title claims abstract description 250
- 238000005056 compaction Methods 0.000 title abstract description 11
- 238000010276 construction Methods 0.000 claims abstract description 42
- 239000000843 powder Substances 0.000 claims description 38
- 238000012545 processing Methods 0.000 claims description 28
- 238000000465 moulding Methods 0.000 claims description 11
- 239000000945 filler Substances 0.000 claims description 6
- 238000000034 method Methods 0.000 abstract description 26
- 230000000694 effects Effects 0.000 abstract description 13
- 238000013461 design Methods 0.000 abstract description 7
- 230000002787 reinforcement Effects 0.000 abstract 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 11
- 230000003014 reinforcing effect Effects 0.000 description 9
- 238000005086 pumping Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 7
- 230000015572 biosynthetic process Effects 0.000 description 6
- 239000002689 soil Substances 0.000 description 5
- 230000007812 deficiency Effects 0.000 description 4
- 230000006641 stabilisation Effects 0.000 description 4
- 238000011105 stabilization Methods 0.000 description 4
- 239000004927 clay Substances 0.000 description 3
- 239000002131 composite material Substances 0.000 description 3
- 230000001737 promoting effect Effects 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 230000002411 adverse Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000003672 processing method Methods 0.000 description 2
- 238000010408 sweeping Methods 0.000 description 2
- 241000251468 Actinopterygii Species 0.000 description 1
- 235000001674 Agaricus brunnescens Nutrition 0.000 description 1
- 240000008005 Crotalaria incana Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model discloses a fine sand foundation treatment structure based on vibroflotation compaction sand piles, comprising a plurality of vibroflotation compaction sand piles constructed and moulded on a constructed fine sand foundation, wherein the plurality of vibroflotation compaction sand piles are distributed in an equilateral triangle mode, the distance between the two adjacent vibroflotation compaction sand piles is 1.4-1.6 m, and the pile lengths of the vibroflotation compaction sand piles are not greater than 12 m; and a plurality of short sand piles are uniformly distributed at the circumferential side of each vibroflotation compaction sand pile, the pile lengths of the plurality of short sand piles distributed at the circumferential side of each vibroflotation compaction sand pile are 1-3 m, and the distance between each vibroflotation compaction sand pile and each short sand pile distributed at the circumferential side of each vibroflotation compaction sand pile is 0.6-0.9 m. The fine sand foundation treatment structure disclosed by the utility model is reasonable in structural design, simple in construction method, convenient to realization, low in cost and fast in work efficiency; construction quality is easily ensured; and the problems of high investment cost, complex construction process, low work efficiency, bad foundation reinforcement treatment effect, deep foundation reinforcement inadaptability and the like existing in the present fine sand foundation treatment method are solved.
Description
Technical field
The utility model belongs to powder fine sand foundation processing technology field, especially relates to a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile.
Background technology
Along with development of the West Regions further deeply, the especially heavy chemical base of Yulin energy propelling of building, uncultivated in the past sea of sand factory and the high building that slices join closely together like the teeth of a comb or the scales of a fish that emerge like the mushrooms after rain.On the hair Wu Su desert of Inner Mongol, Yulin length and breadth of land, builders from various parts of the country are faced with and on loose powder fine sand, carry out ground Treatment Technology problem.At present, commonly used method for processing foundation mainly comprise water weigh down sand change fill out, by force rammer, cement mixing pile, lime-soil compaction pile, be applicable to and handle the vibrocompaction etc. that clay content is not more than 10% medium sand, coarse sand ground etc.But, because the geology of powder fine sand foundation has following characteristics: the one, the top aeolian sand is very loose, and bearing capacity is lower and inhomogeneous, and engineering property is poor; The 2nd, the sand clay content is less, glutinous gathering property is poor between the sand particle, and air space ratio is big, seepage of water is strong; The 3rd, internal friction is bigger between unsaturated sand grains; The 4th, it is abundant etc. that phreatic water is contained.Thereby; When adopting above-mentioned method for processing foundation commonly used that the powder fine sand foundation is handled, all there are number of drawbacks and deficiencies such as input cost is higher, construction technology is complicated, efficiency of construction is lower, the ground stabilization treatment effect is relatively poor, the deep foundation reinforcing that do not suit to some extent.Correspondingly, the integral reinforcing effect of processing back powder fine sand foundation is relatively poor.Thereby the above-mentioned desert geological characteristics of powder fine sand foundation makes that all kinds of method for processing foundation commonly used at present all can not be suitable fully.
The utility model content
The utility model technical problem to be solved is to above-mentioned deficiency of the prior art; Provide a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile; Its reasonable in design, job practices be simple, realize convenient and cost is low, work efficiency fast, construction quality is easy to guarantee, can solve input cost higher, the number of drawbacks and the deficiencies such as construction technology is complicated, efficiency of construction is lower, the ground stabilization treatment effect is relatively poor, the deep foundation reinforcing that do not suit of existing powder fine sand foundation processing method existence.
For solving the problems of the technologies described above; The technical scheme that the utility model adopts is: a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile; It is characterized in that: be included on the powder fine sand foundation of constructing a plurality of of construction molding shake towards closely knit sand pile; A plurality of said shaking are the equilateral triangle laying towards closely knit sand pile, and adjacent two said shaking are 1.4m~1.6m towards the spacing between the closely knit sand pile, and said shaking failed to grow up in 12m towards the stake of closely knit sand pile; A plurality of said shaking are laid with a plurality of short sand piles towards all sides of closely knit sand pile; Respectively shake towards the stake long 1m of the being~3m of closely knit sand pile week a plurality of said short sand piles of laying of side, and the spacing of respectively shaking between a plurality of said short sand pile of laying towards closely knit sand pile and its all side is 0.6m~0.9m.
Above-mentioned a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile, it is characterized in that: a plurality ofly saidly shake all identically with size towards the structure of closely knit sand pile, and the structure of a plurality of said short sand piles is all identical with size.
Above-mentioned a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile, it is characterized in that: said short sand pile with shake towards the stake footpath of closely knit sand pile that identical and the two stake footpath is 0.9m ± 0.2m.
Above-mentioned a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile, it is characterized in that: a plurality of said shake towards closely knit sand pile and respectively shake towards closely knit sand pile week side lay a plurality of short sand piles and all be vertically to laying.
Above-mentioned a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile, it is characterized in that: a plurality of said shake towards closely knit sand pile and respectively shake towards closely knit sand pile week side lay a plurality of short sand piles and be and adopt the not pile body of filler vibrocompaction construction molding.
Above-mentioned a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile, it is characterized in that: said spacing of shaking between a plurality of said short sand pile of laying towards closely knit sand pile and its all side is 0.7m~0.8m.
Above-mentioned a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile; It is characterized in that: a plurality of said quantity of laying short sand pile towards all sides of closely knit sand pile of shaking are two, and respectively shake towards the L-shaped laying of two said short sand piles of closely knit sand pile side laying all with it.
Above-mentioned a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile, it is characterized in that: two said short sand piles comprise that one is laid in said shaking and is laid in said shaking towards the short sand pile two on positive left side of closely knit sand pile or positive right side towards the short sand pile one of the positive front side of closely knit sand pile and one.
The utility model compared with prior art has the following advantages:
1, reasonable in design, job practices simple, reasonable in design, realize convenient and cost lower.
2, it is darker that ground is handled the degree of depth, guarantee the safety and the quality of construction easily, and work efficiency is higher.
3, the configuration of constructor's facility is less, is fit to the operation of multicomputer large tracts of land, can shorten construction period greatly.
4, not only control easyly, and realize conveniently, pile quality is prone to control.
5, respectively shake and in the integral reinforcing of closely knit sand pile, play important effect shaking towards the set a plurality of short sand pile of closely knit sand pile week side; It not only can be eliminated because of the close effect of shaking not filled and that stake top foundation soil burden pressure causes for a short time and weaken; Thereby influence is shaken towards the planeness at closely knit sand pile stake top and the adverse consequences of compactness, and can strengthen the integral reinforcing effect of shaking towards the close sand pile composite foundation.
6, construction effect is good, not only is fit to reinforce loose medium coarse sand ground, also is fit to very much to handle clay content and is not more than 10% loose powder fine sand, can make ground obtain significant ground extruding effect, improves bearing capacity of foundation soil, eliminates the ground inhomogeneities.
In sum; The utility model reasonable in design, job practices are simply, realization is convenient and cost is low, work efficiency is fast, construction quality is easy to guarantee; Can be applicable to effectively that powder fine sand foundation processing procedure and treatment effect are good; The bearing capacity of composite foundation can be effectively improved, and input cost higher, number of drawbacks and deficiencies such as construction technology is complicated, efficiency of construction is lower, the ground stabilization treatment effect is relatively poor, the deep foundation reinforcing that do not suit that existing powder fine sand foundation processing method exists can be effectively solved.
Through accompanying drawing and embodiment, the technical scheme of the utility model is done further detailed description below.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the job practices FB(flow block) of the utility model.
Description of reference numerals:
1-shakes towards closely knit sand pile; The short sand pile of 2-.The 3-powder fine sand foundation of constructing.
The specific embodiment
Like Fig. 1, shown in Figure 2; The utility model be included on the powder fine sand foundation 3 of constructing a plurality of of construction molding shake towards closely knit sand pile 1; A plurality of said shaking are the equilateral triangle laying towards closely knit sand pile 1; Adjacent two said shaking are 1.4m~1.6m towards the spacing between the closely knit sand pile 1, and said shaking failed to grow up in 12m towards the stake of closely knit sand pile 1; A plurality of said shaking are laid with a plurality of short sand piles 2 towards all sides of closely knit sand pile 1; The stake long 1m of the being~3m of a plurality of said short sand pile 2 laid towards closely knit sand pile 1 all sides that respectively shakes, and the spacing of respectively shaking between a plurality of said short sand pile of laying towards closely knit sand pile 1 and its all side 2 is 0.6m~0.9m.
In the present embodiment, a plurality ofly saidly shake all identically with size towards the structure of closely knit sand pile 1, and the structure of a plurality of said short sand piles 2 is all identical with size.
Said short sand pile 2 with shake towards the stake footpath of closely knit sand pile 1 that identical and the two stake footpath is 0.9m ± 0.2m.In the present embodiment, said short sand pile 2 is 0.9m with the stake footpath that shakes towards closely knit sand pile 1.
During practice of construction, a plurality of said shaking all are vertically to laying towards the closely knit sand pile 1 and a plurality of short sand pile of laying towards closely knit sand pile 1 all sides 2 that respectively shakes.In the present embodiment, a plurality ofly saidly shake towards closely knit sand pile 1 and a plurality of short sand pile 2 laid towards closely knit sand pile 1 all sides of respectively shaking is and adopts the not pile body of filler vibrocompaction construction molding.
In the present embodiment, said spacing of shaking between a plurality of said short sand pile of laying towards closely knit sand pile 1 and its all side 2 is 0.7m~0.8m.
In the present embodiment, a plurality of said quantity of laying short sand pile 2 towards all sides of closely knit sand pile 1 of shaking are two, and respectively shake towards two said short sand pile 2 L-shaped layings of closely knit sand pile 1 side laying all with it.Two said short sand piles 2 comprise that one is laid in said shaking and is laid in said shaking towards the short sand pile two on closely knit sand pile 1 positive left side or positive right side towards the short sand pile one of closely knit sand pile 1 positive front side and one.
In conjunction with Fig. 3, the work progress of the utility model is following:
Unwrapping wire is measured in step 1, stake position: line-putting method is measured in the stake position according to routine, and a plurality of the shaking to the need construction on construction powder fine sand foundation 3 measured unwrapping wire respectively towards the stake position of closely knit sand pile 1.
Actual steel ruler measuring is used in its position to shaking when unwrapping wire is measured in the stake position of closely knit sand pile 1, carries out each axis and fixed point is measured in the stake position according to piling foundation plan, and axis stake site adopts timber to fix.The control point is drawn in each axis stake outward, and the reference point of checking as repetition measurement is also taked safeguard measure.
Step 201, vibrating impacter are in place: according in the step 1 a plurality of said shaking being measured the unwrapping wire result towards the stake position of closely knit sand pile 1, and adopt hanging device with said vibrating impacter aim at current construct shake towards closely knit sand pile 1.
Step 202, pore-creating side shake: the water under high pressure pumping system that starts said vibrating impacter and join with said vibrating impacter, and control said vibrating impacter with V
FallThe vertical gradually from top to bottom injection of the decrease speed of=1m/min~2m/min is constructed in the powder fine sand foundation 3; Until drop to current construct shake towards closely knit sand pile the stake design elevation place, the end; Then accomplish the current pore-creating process of shaking of constructing, obtain moulding stake hole one towards closely knit sand pile 1; And in the pore-creating process, the hydraulic pressure of institute of said water under high pressure pumping system pumping water under high pressure is that 0.8MPa~1.2MPa and its output are 500L/min~700L/min.
In this step, the current construction shaken when carrying out pore-creating towards closely knit sand pile 1 through said vibrating impacter, said vibrating impacter can be synchronously to current construct to shake carry out ground extruding towards closely knit sand pile 1 all sides said shaking of accomplishing of having constructed towards the pile body of closely knit sand pile 1.
Draw according to test, vibrating impacter described in the step 202 can also carry out ground extruding to the shaking of accomplishing of having constructed in its all side 5m~8m scope towards the pile body of closely knit sand pile 1 synchronously in the pore-creating process.
Step 203, close pile shakes: control said vibrating impacter with hoisting velocity V
CarryAt the uniform velocity slowly upwards be promoted to the aperture in the stake of moulding described in the step 202 hole one, then accomplish current the construction and shake, obtain shaking of construction completion towards closely knit sand pile 1 towards the close formation of pile of shaking of closely knit sand pile 1; Shake in the close formation of pile, the hydraulic pressure of institute of said water under high pressure pumping system pumping water under high pressure is that 0.4MPa~0.6MPa and its output are 250L/min~350L/min; Current construct to shake shake towards the pile of closely knit sand pile 1 that close time t=L * (10s/m~15s/m), wherein L shakes long towards the stake of closely knit sand pile 1 by current construction.
Shake in this step before the close pile, should be earlier to the hoisting velocity V of the vibrating impacter described in the close formation of pile that shakes
CarrySet, and V
Carry=L/t, i.e. V
Carry=(1/10~1/15) m/s.
In the practice of construction process; In the step 1 to a plurality of said shaking when measuring unwrapping wire respectively towards the stake position of closely knit sand pile 1; Also need to measure line-putting method according to the stake position of routine, the stake position of a plurality of said short sand pile of laying towards closely knit sand pile 1 all sides respectively shaking 2 is measured unwrapping wire respectively.
Correspondingly, accomplish current the construction in the step 203 and shake behind the close formation of pile of shaking of closely knit sand pile 1, said the shaking that also needs to have accomplished having constructed in the step 203 immediately swept the stake processing towards closely knit sand pile 1; And sweep in the processing procedure; The said a plurality of said short sand pile of laying towards closely knit sand pile 1 all sides 2 that shakes that needs to have accomplished having constructed in the step 203 is constructed respectively; The job practices of a plurality of said short sand piles 2 is all identical, and for any said short sand pile 2, its work progress is following:
Step I, vibrating impacter are in place: the unwrapping wire result is measured in the stake position according to a plurality of said short sand pile of laying towards closely knit sand pile 1 all sides respectively shaking in the step 12, and adopt hanging device with vibrating impacter described in the step 201 aim at the current short sand pile 2 of construct.
Step II, pore-creating side shake: the water under high pressure pumping system that starts said vibrating impacter and join with said vibrating impacter, and control said vibrating impacter with V
FallThe vertical gradually from top to bottom injection of the decrease speed of=1m/min~2m/min is constructed in the powder fine sand foundation 3; Until the stake design elevation place, the end that drops to the current short sand pile 2 of constructing; Then accomplish the pore-creating process of the current short sand pile 2 of constructing, obtain moulding stake hole two; And in the pore-creating process, the hydraulic pressure of institute of said water under high pressure pumping system pumping water under high pressure is that 0.8MPa~1.2MPa and its output are 500L/min~700L/min.
In this step, when through said vibrating impacter the current short sand pile 2 of constructing being carried out pore-creating, said vibrating impacter can be synchronously lacked constructed said the shaking of completion of sand pile 2 all sides and is carried out ground extruding towards the pile body of closely knit sand pile current the construction.
Draw according to test, vibrating impacter described in the Step II can also carry out ground extruding to the shaking of accomplishing of having constructed in its all side 5m~8m scope towards the pile body of closely knit sand pile 1 synchronously in the pore-creating process.
Step II I, close pile shakes: control said vibrating impacter with the hoisting velocity V described in the step 203
CarrySlowly upwards be promoted to the aperture in the stake of moulding described in Step II hole two, then accomplish the close formation of pile that shakes of the current short sand pile 2 of constructing.
Step IV, repeatedly repeating step I is to step IV, and said the shaking of accomplishing of in completing steps 203, having constructed laid the work progress of a plurality of said short sand piles 2 towards closely knit sand pile 1 all sides.
In fact; Existing no filler vibroflotation method construction is shaken in closely knit sand pile 1 process; All adopt while promoting and stay the mode of shaking to realize that pile body is compacted, but in the powder fine sand foundation is handled, remove few part pile body (being generally the bigger pile body bottom of overlying burden) can follow powerful shake cave in voluntarily closely knit; The above-mentioned mode of shaking of staying while promoting almost influences the current closely knit effect towards closely knit sand pile 1 of shaking of constructing; That is to say, existing no filler vibroflotation method in the powder fine sand foundation institute's construction molding shake poorly towards the compactness of closely knit sand pile 1, the ground stabilization effect is bad.Thereby, adopt the other mode of shaking of pore-creating in the utility model construction, specifically be to bestir oneself and use to constructing that accomplishing shakes carries out ground extruding towards the pile body of closely knit sand pile 1 through shake side in the pore-creating process of closely knit sand pile 1 of all sides.That is to say that the shaking towards the pile body of closely knit sand pile 1 of accomplishing of constructing in the step 203 is closely knit inadequately, must be through all sides other side that is produced in the pore-creating process of closely knit sand pile 1 that shakes bestir oneself with further reinforcing.
When the utility model will have the construction of no filler vibroflotation method now and shake towards closely knit sand pile 1, its formation of pile adopted stayed the pile mode of shaking to be adjusted into to control vibrating impacter with hoisting velocity V while promoting
CarryThe pile mode that at the uniform velocity upwards promotes is not only controlled easyly, and realizes conveniently, and pile quality is prone to control.
Rely on the roughing sand close consolidated subsoil that comes that shakes owing to shake towards closely knit sand pile 1, thereby sweep stake only fully and handle, could guarantee the compactness at a top.Thereby said shaking behind closely knit sand pile 1 accomplished in construction in the step 203, need in time to current construct to shake sweep stake towards closely knit sand pile 1 and handle, that is to say, respectively shake accomplish towards closely knit sand pile 1 construction after, all must in time sweep a processing.Actually sweep stake and handle, the working procedure control and the technical requirements of each short sand pile 2 are all identical with each item technical requirements of shaking towards closely knit sand pile 1.
Simultaneously, the utility model also need be swept stake and handle in when construction, sweeps stake and handles shaking and in the integral reinforcing of closely knit sand pile 1, play important effect.What is called is swept stake, shakes in the completion of constructing exactly and on the inter-pile soil between the closely knit sand pile 1, sets up a plurality of short sand piles.Sweeping stake can eliminate because of the close effect of shaking not filled and that top foundation soil burden pressure causes for a short time and weaken; Thereby influence is shaken towards the planeness at 1 top of closely knit sand pile and the adverse consequences of compactness, and sweeps and can strengthen the integral reinforcing effect of shaking towards the close sand pile composite foundation.
Find through test; What the utility model adopted shakes towards closely knit sand pile 1; Except that few part pile body (being generally the bigger pile body bottom of overlying burden) can follow powerful vibrations cave in voluntarily closely knit; The backfill of all the other most of pile bodies all is to handle (being that its all side is laid the construction of lacking sand pile) and the peripheral sand that other overflows with current when shaking pore-creating towards closely knit sand pile 1 and recharge and form by sweeping stake.
In the practice of construction process, to a plurality of said shaking when closely knit sand pile 1 is constructed in the step 1, its sequence of construction should be carried out by the campshed method of routine one by one.
The above; It only is the preferred embodiment of the utility model; Be not that the utility model is done any restriction; Everyly any simple modification that above embodiment did, change and equivalent structure are changed, all still belong in the protection domain of the utility model technical scheme according to the utility model technical spirit.
Claims (8)
1. one kind based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile; It is characterized in that: be included in the powder fine sand foundation of constructing (3) go up a plurality of of construction molding and shake towards closely knit sand pile (1); A plurality of said shaking are the equilateral triangle laying towards closely knit sand pile (1); Adjacent two said shaking are 1.4m~1.6m towards the spacing between the closely knit sand pile (1), and said shaking failed to grow up in 12m towards the stake of closely knit sand pile (1); A plurality of said shaking are laid with a plurality of short sand piles (2) towards all sides of closely knit sand pile (1); The stake long 1m of the being~3m of a plurality of said short sand pile (2) laid towards all sides of closely knit sand pile (1) that respectively shakes, and the spacing of respectively shaking between a plurality of said short sand pile of laying towards closely knit sand pile (1) and its all side (2) is 0.6m~0.9m.
2. described a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile according to claim 1, it is characterized in that: a plurality ofly saidly shake all identically with size towards the structure of closely knit sand pile (1), and the structure of a plurality of said short sand piles (2) is all identical with size.
3. according to claim 1 or 2 described a kind of, it is characterized in that based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile: said short sand pile (2) with shake towards the stake footpath of closely knit sand pile (1) that identical and the two stake footpath is 0.9m ± 0.2m.
4. according to claim 1 or 2 described a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile, it is characterized in that: a plurality of said shaking all are vertically to laying towards the closely knit sand pile (1) and a plurality of short sand pile of laying towards all sides of closely knit sand pile (1) (2) that respectively shakes.
5. according to claim 1 or 2 described a kind of, it is characterized in that: a plurality ofly saidly shake towards closely knit sand pile (1) and a plurality of short sand pile (2) laid towards all sides of closely knit sand pile (1) of respectively shaking is and adopts the not pile body of filler vibrocompaction construction molding based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile.
6. according to claim 1 or 2 described a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile, it is characterized in that: said spacing of shaking between a plurality of said short sand pile of laying towards closely knit sand pile (1) and its all side (2) is 0.7m~0.8m.
7. according to claim 1 or 2 described a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile; It is characterized in that: a plurality of said quantity of laying short sand pile (2) towards all sides of closely knit sand pile (1) of shaking are two, and respectively shake towards the L-shaped laying of two said short sand piles (2) of closely knit sand pile (1) side laying all with it.
8. described a kind of based on shaking towards the powder fine sand foundation Processing Structure of closely knit sand pile according to claim 7, it is characterized in that: two said short sand piles (2) comprise one be laid in said shake towards the short sand pile one of the positive front side of closely knit sand pile (1) with one be laid in said shake towards closely knit sand pile (1) positive on the left of or the short sand pile two on right side just.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012200675535U CN202440814U (en) | 2012-02-27 | 2012-02-27 | Fine sand foundation treatment structure based on vibroflotation compaction sand piles |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012200675535U CN202440814U (en) | 2012-02-27 | 2012-02-27 | Fine sand foundation treatment structure based on vibroflotation compaction sand piles |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202440814U true CN202440814U (en) | 2012-09-19 |
Family
ID=46822268
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012200675535U Expired - Fee Related CN202440814U (en) | 2012-02-27 | 2012-02-27 | Fine sand foundation treatment structure based on vibroflotation compaction sand piles |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202440814U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110130313A (en) * | 2019-05-30 | 2019-08-16 | 合肥建设装饰(集团)有限责任公司 | Method foundation stabilization tamping unit and its working method are rushed in a kind of shake |
-
2012
- 2012-02-27 CN CN2012200675535U patent/CN202440814U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110130313A (en) * | 2019-05-30 | 2019-08-16 | 合肥建设装饰(集团)有限责任公司 | Method foundation stabilization tamping unit and its working method are rushed in a kind of shake |
| CN110130313B (en) * | 2019-05-30 | 2020-12-01 | 合肥建设装饰(集团)有限责任公司 | Seismic impact method foundation stabilization tamping device and working method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102561304B (en) | Method for constructing non-filled vibration-compacted sand piles on silty-fine sand foundation | |
| CN104404838B (en) | The above railway collapsible loess subgrade substrate treating method of speed 200km | |
| CN104631253A (en) | Improvement and filling method of red clay subgrades at zone 94 and zone 96 of highway | |
| CN203174619U (en) | Reverse raft concrete terrace | |
| CN108643172A (en) | Silt geology vibro-replacement stone compacting pile construction method | |
| CN203924075U (en) | The high embankment edge slope structure of anti-package formula Fill Reinforced With Geogrids Green ecological flexible | |
| CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
| CN101319500A (en) | Construction method of static pressure compaction pile | |
| CN105239551A (en) | Vibration rolling quality control method | |
| CN103835292B (en) | High frequency vibrating rushes the construction method of base-extending deposited pile tube | |
| CN210288333U (en) | Deep foundation treatment structure | |
| CN111719579A (en) | A post-water-injection vibration-dense construction method for desert photovoltaic support pile foundation | |
| CN103572777B (en) | A kind of geotechnical grid retaining wall and construction method thereof | |
| CN202440814U (en) | Fine sand foundation treatment structure based on vibroflotation compaction sand piles | |
| CN104480956B (en) | A kind of minor diameter mold-bagged concrete pile composite foundation | |
| CN109797729A (en) | A kind of roadbed brick slag changes packing course compactness and refers to object detection method | |
| CN102409660A (en) | Multi-section expanded head granular material pile composite foundation prestress construction method | |
| CN103276716B (en) | A kind of changeover portion CFG stake and mattress layer composite foundation stabilization construction method | |
| CN102966109A (en) | Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation | |
| CN103195077B (en) | A kind of dam foundation reinforcement frame structure and stabilization of dam foundation method | |
| CN103527217B (en) | Small-curvature-radius shield tunnel duct piece under dense pile foundation environment and manufacturing method thereof | |
| CN219568503U (en) | External oblique straight alternating cooperative reinforcement system for widening roadbed on soft soil foundation | |
| CN103306290B (en) | Permafrost region pole and tower foundation foundation soil returns fast and freezes backfill construction method | |
| CN101245593A (en) | Construction method of compacted sandstone pile with big gourd head by stress vibrating | |
| CN103410143A (en) | Construction method for improving bearing capacity of hollow pile foundation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120919 Termination date: 20160227 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |