CN202434210U - Combined device for mounting and dismounting high-temperature gas cooled reactor discharging equipment - Google Patents
Combined device for mounting and dismounting high-temperature gas cooled reactor discharging equipment Download PDFInfo
- Publication number
- CN202434210U CN202434210U CN2011205151211U CN201120515121U CN202434210U CN 202434210 U CN202434210 U CN 202434210U CN 2011205151211 U CN2011205151211 U CN 2011205151211U CN 201120515121 U CN201120515121 U CN 201120515121U CN 202434210 U CN202434210 U CN 202434210U
- Authority
- CN
- China
- Prior art keywords
- assembly
- positioning
- interface
- component
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Automatic Assembly (AREA)
Abstract
本实用新型涉及一种高温气冷堆卸料设备的安装拆卸组合装置,属于高温气冷堆技术领域,包括接口法兰组件、导轨组件、螺旋驱动组件、接口定位组件、配重组件、具有可两个方向微调节的V型定位组件、水平调节组件、垂直调节组件,水平滑轨组件和手动摇杆及各部件之间的连接零件;接口法兰组件与卸料设备实现定位连接;导轨组件连接在接口法兰组件和接口定位组件之间;螺旋驱动组件一端与卸料设备的内部构件相固接,另一端与接口定位组件相螺合连接;V型定位组件连接在接口定位组件的底板上,接口定位组件的底板固定在水平调节组件上,垂直调节组件设置在水平滑轨组件上,同时与水平调节组件相连,能沿水平滑轨组件的滑轨移动,将内部构件移出或移进卸料设备。本组合装置的各组件均可灵活拆卸,便于组装,方便组合,准确定位,节省时间,操作容易掌控。
The utility model relates to a combination device for installation and disassembly of unloading equipment for a high-temperature gas-cooled reactor, which belongs to the technical field of high-temperature gas-cooled reactors, and includes an interface flange assembly, a guide rail assembly, a screw drive assembly, an interface positioning assembly, and a counterweight assembly. V-shaped positioning assembly for micro-adjustment in two directions, horizontal adjustment assembly, vertical adjustment assembly, horizontal slide rail assembly, manual rocker and connecting parts between various components; interface flange assembly and unloading equipment realize positioning connection; guide rail assembly Connected between the interface flange assembly and the interface positioning assembly; one end of the screw drive assembly is fixedly connected to the internal components of the unloading equipment, and the other end is screwed to the interface positioning assembly; the V-shaped positioning assembly is connected to the bottom plate of the interface positioning assembly Above, the bottom plate of the interface positioning assembly is fixed on the horizontal adjustment assembly, and the vertical adjustment assembly is set on the horizontal slide rail assembly and connected with the horizontal adjustment assembly at the same time, it can move along the slide rail of the horizontal slide rail assembly to move the internal components out or in Unloading equipment. Each component of the combination device can be flexibly disassembled, which is convenient for assembly and combination, accurate positioning, time saving, and easy operation control.
Description
技术领域 technical field
本实用新型属于高温气冷堆技术领域,特别涉及高温气冷堆卸料设备的安装拆卸组合装置的结构设计。The utility model belongs to the technical field of high-temperature gas-cooled reactors, in particular to the structural design of an installation and disassembly combination device for unloading equipment of high-temperature gas-cooled reactors.
背景技术 Background technique
高温气冷堆卸料设备是实现高温气冷堆不停堆换料运行的关键设备,虽然该设备采用了一用一备的设计,但是该设备一旦出现故障,需要快速更换维修其内部构件并及时准确安装。高温气冷堆卸料设备的内部构件,重量约在1100kg左右,高温气冷堆卸料设备为左右对称设计其结构如图1所示,包括检测组件02,连接在检测组件外周后端的屏蔽部件03,连接在检测组件后端的法兰及驱动机构04(右侧部分是去除04后的结构),其中屏蔽部件的部分外表面与堆卸料设备的承压外壳01内壁呈间隙配合;其屏蔽部件上留有三个螺纹孔作为与外部拆卸装置的接口。由于卸料设备悬挂于压力容器底部,并与一系列管道相连接,加之热膨胀等一系列因素,设备位置具有不确定性,并且其内部构件的重量较重,因此给其内部构件的在线安装更换造成了一定的难度,目前在初始安装时采用将卸料设备旋转90度然后将其内部构件分别垂直从两侧吊入,但是这种方式不适于在线更换;此外也采用吊钩和吊带将内部构件吊起然后逐渐对准向内移动的方式安装,但是不容易控制准确位置,拆卸难度就更大,且操作不容易掌控,因此造成安装拆卸的过程费时费力。The high-temperature gas-cooled reactor unloading equipment is the key equipment to realize the non-stop refueling operation of the high-temperature gas-cooled reactor. Although the equipment adopts the design of one use and one standby, once the equipment fails, its internal components need to be quickly replaced and repaired. Timely and accurate installation. The internal components of the high-temperature gas-cooled reactor unloading equipment weigh about 1100kg. The high-temperature gas-cooled reactor unloading equipment is designed symmetrically. 03, the flange connected to the rear end of the detection component and the drive mechanism 04 (the right part is the structure after removing 04), in which part of the outer surface of the shielding part is in clearance fit with the inner wall of the pressure-bearing
实用新型内容 Utility model content
本实用新型的目的是为克服已有技术的不足之处,设计出一种高温气冷堆卸料设备的安装拆卸组合装置,本组合装置的各组件采用了模块化设计,均可灵活拆卸,便于组装,方便组合,准确定位,节省时间,操作容易掌控。并可应用于类似的悬挂装备的安装与更换。The purpose of this utility model is to overcome the deficiencies of the prior art and design a combination device for installation and disassembly of high-temperature gas-cooled reactor unloading equipment. The components of the combination device adopt a modular design and can be flexibly disassembled. Easy to assemble, easy to combine, accurate positioning, save time, easy to control the operation. And it can be applied to the installation and replacement of similar suspension equipment.
本实用新型提出一种高温气冷堆卸料设备的安装拆卸组合装置,其特征在于,包括接口法兰组件、导轨组件、螺旋驱动组件、接口定位组件、配重组件、具有可两个方向微调节的V型定位组件、水平调节组件、垂直调节组件,水平滑轨组件和手动摇杆及各部件之间的连接零件;各部件的连接关系为:接口法兰组件通过卸料设备端部的连接螺栓与卸料设备实现定位连接;导轨组件连接在接口法兰组件和接口定位组件之间;螺旋驱动组件一端与卸料设备的内部构件相固接,另一端与接口定位组件相螺合连接;配重组件直接安放在接口定位组件的底板一端上;V型定位组件连接在接口定位组件的底板另一端上,接口定位组件的底板固定在水平调节组件上,实现接口定位组件垂直于卸料设备轴线的移动;垂直调节组件与水平调节组件相连,实现垂直方向的调整及位置的固定,垂直调节组件设置在水平滑轨组件上,能沿水平滑轨组件的滑轨移动,将内部构件移出或移进卸料设备。The utility model proposes a combination device for installation and disassembly of high-temperature air-cooled reactor unloading equipment, which is characterized in that it includes an interface flange assembly, a guide rail assembly, a screw drive assembly, an interface positioning Adjusted V-shaped positioning assembly, horizontal adjustment assembly, vertical adjustment assembly, horizontal slide rail assembly, manual rocker and connecting parts between each component; the connection relationship of each component is: the interface flange assembly passes through the end of the unloading equipment The connecting bolts are connected to the unloading equipment for positioning; the guide rail assembly is connected between the interface flange assembly and the interface positioning assembly; one end of the screw drive assembly is fixedly connected to the internal components of the unloading equipment, and the other end is screwed to the interface positioning assembly ;The counterweight component is directly placed on one end of the bottom plate of the interface positioning component; the V-shaped positioning component is connected to the other end of the bottom plate of the interface positioning component, and the bottom plate of the interface positioning component is fixed on the horizontal adjustment component, so that the interface positioning component is perpendicular to the discharge The movement of the equipment axis; the vertical adjustment assembly is connected with the horizontal adjustment assembly to achieve vertical adjustment and position fixation. The vertical adjustment assembly is set on the horizontal slide rail assembly and can move along the slide rail of the horizontal slide rail assembly to move the internal components out. Or move into unloading equipment.
本实用新型的特点及有益效果:Features and beneficial effects of the utility model:
本套安装拆卸组合装置的各组件均可灵活拆卸(采用了模块化设计),便于组装,方便组合,准确定位,节省时间,操作容易掌控。可实现接口位置三个方向的初步调整和两个方向的微调,通过一系列接口定位调整,和螺旋驱动可以准确地实现卸料设备内部构件的安装与拆卸,并具有运动限位控制功能。此外,本套安装拆卸组合装置可同时实现其中的所有功能也可将其各功能进行组合的实现,进行准确定位。既可专用于高温气冷堆卸料设备内部构件的安装与拆卸,也可用于类似装备的安装与拆卸。Each component of this set of installation and disassembly combination device can be flexibly disassembled (modular design is adopted), which is convenient for assembly, convenient combination, accurate positioning, time saving, and easy operation control. It can realize the preliminary adjustment of the interface position in three directions and the fine adjustment in two directions. Through a series of interface positioning adjustments and screw drive, the installation and disassembly of the internal components of the unloading equipment can be accurately realized, and it has the function of movement limit control. In addition, this set of installation and disassembly combination device can realize all the functions in it at the same time, and also realize the combination of its various functions, so as to carry out accurate positioning. It can be specially used for the installation and disassembly of the internal components of the high-temperature gas-cooled reactor unloading equipment, and can also be used for the installation and disassembly of similar equipment.
附图说明 Description of drawings
图1为高温气冷堆卸料设备结构示意图;Figure 1 is a schematic structural view of the unloading equipment for a high-temperature gas-cooled reactor;
图2为本实用新型的高温气冷堆卸料设备的安装拆卸组合装置总体结构示意图;Figure 2 is a schematic diagram of the overall structure of the installation and disassembly combination device of the high-temperature gas-cooled reactor unloading equipment of the present invention;
图3为图2的三维结构示意图;Fig. 3 is the three-dimensional structure schematic diagram of Fig. 2;
图4为本实用新型的接口法兰组件及导轨组件的实施例结构示意图;Fig. 4 is a structural schematic diagram of an embodiment of the interface flange assembly and the guide rail assembly of the present invention;
图5为本实用新型的螺旋驱动组件实施例结构示意图;Fig. 5 is a structural schematic diagram of an embodiment of a screw drive assembly of the present invention;
图6为本实用新型的接口定位组件和V型定位组件的实施例结构示意图;Fig. 6 is a structural schematic diagram of an embodiment of the interface positioning assembly and the V-shaped positioning assembly of the present invention;
图7为本实用新型的水平调节组件的和垂直调节组件的实施例结构示意图;Fig. 7 is a schematic structural diagram of an embodiment of the horizontal adjustment assembly and the vertical adjustment assembly of the present invention;
图8为本实用新型的水平滑轨组件的实施例结构示意图。Fig. 8 is a structural schematic diagram of an embodiment of the horizontal slide rail assembly of the present invention.
具体实施方式 Detailed ways
本实用新型设计的高温气冷堆卸料设备的安装拆卸组合装置结合附图及实施详细说明如下:The installation and disassembly combination device of the high-temperature air-cooled reactor unloading equipment designed by the utility model is described in detail as follows in conjunction with the accompanying drawings and implementation:
本套安装拆卸组合装置结构如图2和图3所示,包括接口法兰组件1、导轨组件2、螺旋驱动组件3、接口定位组件4、配重组件5、具有可两个方向微调节的V型定位组件6、水平调节组件7、垂直调节组件8,水平滑轨组件9和手动摇杆10及各部件之间的连接零件;上述各部件的连接关系为:接口法兰组件1通过卸料设备端部的连接螺栓与卸料设备实现定位连接;导轨组件2连接在接口法兰组件1和接口定位组件4之间;螺旋驱动组件3一端与卸料设备的内部构件相固接而另一端与接口定位组件4相螺合连接;配重组件5直接安放在接口定位组件4的底板上;V型定位组件6连接在接口定位组件4的底板上,接口定位组件4的底板固定在水平调节组件7上,实现接口定位组件4垂直于卸料设备轴线的移动;垂直调节组件8与水平调节组件7相连,实现垂直方向的调整及位置的固定,垂直调节组件8设置在水平滑轨组件9上,能沿水平滑轨组件9的滑轨移动,将内部构件移出或移进卸料设备。The structure of this set of installation and disassembly combination device is shown in Figure 2 and Figure 3, including
本组合装置还可在垂直调节组件8底板上设有吊环螺钉,以备手动或吊装操作。The combined device can also be provided with eyebolts on the bottom plate of the
本组合装置具有灵活(模块化设计),便于组装使用的特点。可实现接口位置三个方向的初步调整和两个方向的微调,通过一系列接口定位,和螺旋驱动可以准确地实现卸料设备内部构件的安装与拆卸,并具有运动限位控制功能。The combined device has the characteristics of flexibility (modular design) and convenient assembly and use. It can realize the preliminary adjustment of the interface position in three directions and the fine adjustment in two directions. Through a series of interface positioning and screw drive, the installation and disassembly of the internal components of the unloading equipment can be accurately realized, and it has the function of movement limit control.
本组合装置各部件的具体实施方式及功能分别说明如下:The specific implementation manner and the function of each part of this combination device are described as follows respectively:
接口法兰组件1:是与卸料设备直接相连的组件,其具体结构如图4所示,采用与卸料设备相应尺寸的环形法兰11,在环形法兰上开有多个定位孔12(用于方便地与卸料设备的外壳的螺纹孔对齐并通过螺钉或螺栓螺母与外壳固定),及为连接导轨组件2的二个定位导块13定位。Interface flange component 1: It is a component directly connected with the unloading equipment. Its specific structure is shown in Figure 4. An annular flange 11 corresponding to the size of the unloading equipment is adopted, and a plurality of positioning holes 12 are opened on the annular flange (for conveniently aligning with the threaded holes of the shell of the unloading device and fixing with the shell by screws or bolts and nuts), and for positioning the two positioning guide blocks 13 connecting the
导轨组件2:用于连接接口法兰组件1和接口定位组件4,并可控制卸料设备内部构件拆卸和安装的轨迹,可起到限位作用;具体实施例为采用二根槽钢2(可为标准件也可自行加工),如图4所示,两端分别插入接口法兰组件1和接口定位组件4的定位导块上即可定位固定,导轨组件可灵活拆卸,安装后两槽钢面组成v型对称的端面;该端面与检测组件的屏蔽部件外圆相切;用于检测组件移动时的导向和支承。Guide rail assembly 2: used to connect the
螺旋驱动组件3:具体实施例的结构如图5所示,由屏蔽连接件31、丝杠32、丝杠螺母33、端面轴承34、连接螺钉35和丝杠连接螺母36组成;屏蔽连接件31可加工为一端带有圆盘的空心圆柱体(空心圆柱体内可容纳内部构件突出的驱动轴),圆盘与检测组件的屏蔽部件通过螺钉35相连,圆柱体端面通过端面轴承34与丝杠32的一端相连,丝杠另一端与丝杠螺母33相连螺合,丝杠螺母33固定在接口定位组件4上,通过丝杠32的螺旋运动(可手动也可电动),带动卸料设备内部构件向内或向外运动到指定位置。Screw drive assembly 3: the structure of the specific embodiment is shown in Figure 5, which is composed of
还可在丝杠32的端部通过紧定螺钉连接一手动摇杆10,实现螺旋驱动的手动操作。A
接口定位组件4:与导轨组件相连,实现本组合装置的初步准确定位,同时用于固定螺旋驱动组件3和V型定位组件6。具体实施例结构如图6所示,包括底板43,安装在底板43一端的由多根槽钢组成的固定支架42,安装在底板43另一端的多个(图中为4个)用于给V型定位组件6导向定位的连接块46,分别安装在底板上位于固定支架两侧,且两两对应的多块(图中为4块)侧板44,安装在底板43下面的多个(图中为3个)加固底板的槽钢47;安装在固定支架42上的定位法兰41,以及设置在定位法兰41上的用于固定导轨组件2的定位块45。Interface positioning component 4: connected with the guide rail component to realize preliminary accurate positioning of the combined device, and is used to fix the
配重组件5:采用一系列重量不等的配重块,可直接安放在接口定位组件4的底板上与V型定位组件6相对的另一端,如图2、3所示,用于调节平衡,使卸料设备内部构件平稳地移进和移出。Counterweight component 5: A series of counterweights with different weights can be directly placed on the bottom plate of the
V型定位组件6:固定于接口定位组件4的连接块46上,用于支撑卸料设备内部构件;可实现纵向横向两个方向微调,以实现对内部构件的准确定位;具体实施例结构如图6所示,包括下面开有多个横向导向槽611,两端有立壁612的横向调节底板61;固定在底板61中部的由2个形状相同且相向放置的中空支撑块62组成的V型定位部件;固定在V型定位部件的V型表面上的聚四氟乙烯保护垫63(其它类似材料均可),用于保护检测组件外表面不被损坏;用于V型定位部件与横向调节底板固定的多个(图中为4个)横向微调固定通孔及螺钉64;用于分别调节两个支撑块62距离的多组(图中为4组)纵向调节螺钉螺母65;用于与调节螺钉螺母65同步调节两个支撑块62的多个(图中为4个)纵向微调固定通孔及螺钉66,该纵向调节螺钉螺母65一端固定在底板的立壁上,另一端固定在支撑块的侧壁上,该纵向微调固定通孔及螺钉66固定在底板61上。V-shaped positioning component 6: fixed on the
水平调节组件7:位于接口定位组件4的下面(可与接口定位组件为一体或分体连接),可实现位于其上面所有部件的整体水平位置调整(垂直于卸料设备的水平轴线)。具体实施例结构如图7所示,包括开有多个用于与下面的垂直调节组件8相连的通孔711的水平调节底板71,设置在底板71两侧边且两两对应的4块侧板712;安装在底板71上的水平调节固定导条72(使上面的接口定位组件4的槽钢47定位),将底板71的侧板712与接口组件4的侧板相连的水平调节螺钉73,以及与接口组件4的底板43相连的水平固定螺钉74。通过调节水平调节螺钉73,实现接口组件4垂直于卸料设备轴线的移动。Horizontal adjustment assembly 7: located below the interface positioning assembly 4 (can be integrally or separately connected with the interface positioning assembly), and can realize the overall horizontal position adjustment of all components above it (perpendicular to the horizontal axis of the unloading equipment). The structure of the specific embodiment is shown in Figure 7, which includes a horizontal
垂直调节组件8:位于水平调节组件7的下面,可实现位于其上面所有部件的整体垂直位置调整。具体实施例结构如图7所示,包括中空的垂直调节底板81(也可采用一块实心板),设置在底板81上四个角的4组垂直调节定位螺钉螺母组合82,用于与水平调节组件7的底板相连接,并可实现底板上所有部件沿垂直方向的调整及位置的固定;设置在底板81三边的3个导向柱83,该导向柱83上端插入水平调节组件7的底板的通孔711,使水平调节组件7与垂直调节组件8相互定位;固定在底板81下面的两侧的4个滚轮组件84,以及固定在底板81上的多个用于操作的吊环螺钉85;其中,滚轮组件84由滚柱841、具有凸台的轴承盖842、轴承座、一对轴承和固定螺钉组成。Vertical adjustment assembly 8: located below the
水平滑轨组件9:位于垂直调节组件8的下面,可实现垂直调节组件8及与其相连的所有部件沿卸料设备轴线的移动。具体实施例结构如图8所示,由滑轨底板91,横向固定在底板91上的多条槽钢92、和通过多个紧固螺钉或点焊固定在槽钢上的一对纵向铁轨93及定位螺钉94组成。垂直调节组件8中的具有凸台的轴承盖842卡入到铁轨93的凹槽内实现抱轨锁紧功能,并使滚轮组件84的滚柱841沿铁轨93(卸料设备轴线)移动。同时铁轨上根据需求在不同位置处留有一些列的定位孔,配以定位螺钉94用以对运动进行限位。Horizontal slide rail assembly 9: located below the
其中水平调节组件7、垂直调节组件8和水平滑轨组件9上下位置可互换。Wherein the
本组合装置的工作过程为:首先将连接在检测组件后端的法兰及驱动机构卸除,再将接口法兰组件1和螺旋驱动组件3分别与堆卸料设备的承压外壳端面和屏蔽部件的端面用螺钉或螺栓螺母固定,接着通过螺旋驱动组件的丝杠的旋转将检测组件和屏蔽部件一起沿导轨组件2移出堆卸料设备至接口定位组件4上,最后通过滚轮组件84的滚柱841沿水平滑轨组件9铁轨93(卸料设备轴线)移动,实现内部构件的拆卸,反之可实现安装操作。The working process of this combination device is: first remove the flange and the driving mechanism connected to the rear end of the detection component, and then connect the
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011205151211U CN202434210U (en) | 2011-12-12 | 2011-12-12 | Combined device for mounting and dismounting high-temperature gas cooled reactor discharging equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011205151211U CN202434210U (en) | 2011-12-12 | 2011-12-12 | Combined device for mounting and dismounting high-temperature gas cooled reactor discharging equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202434210U true CN202434210U (en) | 2012-09-12 |
Family
ID=46783638
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011205151211U Expired - Fee Related CN202434210U (en) | 2011-12-12 | 2011-12-12 | Combined device for mounting and dismounting high-temperature gas cooled reactor discharging equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202434210U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102568631A (en) * | 2011-12-12 | 2012-07-11 | 中核能源科技有限公司 | Assembly-disassembly combined device of high-temperature gas-cooled reactor unloading equipment |
| CN110148482A (en) * | 2019-05-31 | 2019-08-20 | 中核能源科技有限公司 | An escalator type fuel transfer device |
-
2011
- 2011-12-12 CN CN2011205151211U patent/CN202434210U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102568631A (en) * | 2011-12-12 | 2012-07-11 | 中核能源科技有限公司 | Assembly-disassembly combined device of high-temperature gas-cooled reactor unloading equipment |
| CN102568631B (en) * | 2011-12-12 | 2014-08-13 | 中核能源科技有限公司 | Assembly-disassembly combined device of high-temperature gas-cooled reactor unloading equipment |
| CN110148482A (en) * | 2019-05-31 | 2019-08-20 | 中核能源科技有限公司 | An escalator type fuel transfer device |
| CN110148482B (en) * | 2019-05-31 | 2024-03-26 | 中核能源科技有限公司 | Escalator type fuel transmission device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102568631B (en) | Assembly-disassembly combined device of high-temperature gas-cooled reactor unloading equipment | |
| CN202377986U (en) | Device for assembling and disassembling high-temperature gas cooled reactor unloading equipment | |
| CN202434210U (en) | Combined device for mounting and dismounting high-temperature gas cooled reactor discharging equipment | |
| WO2012163270A1 (en) | Longitudinal guide rail installation method and apparatus | |
| CN102513959B (en) | Installing and dismantling device of high temperature gas-cooled reactor discharging equipment | |
| CN102011353A (en) | Method for positioning track panel of double-block ballastless track | |
| CN221494986U (en) | A kind of installation and positioning tool for powder selection machine bearing cylinder | |
| CN202371994U (en) | Adjusting device for supporting seat of large rotary roller | |
| CN218533649U (en) | An adjustable tool | |
| CN219567326U (en) | Auxiliary fixture is dismantled to bank bridge crane cart running gear | |
| CN209076601U (en) | A kind of stirring tank deck one platform | |
| CN216780853U (en) | Welding bracket of header robot | |
| CN218800349U (en) | An oil pan replacement device for ultra-high speed reducers | |
| CN209614673U (en) | A kind of quick welding device of PC die station | |
| CN210997373U (en) | Tool for disassembling and assembling core package of double-cylinder multistage centrifugal pump | |
| CN214135883U (en) | Electromechanical device overhauls uses clamping device | |
| CN218556057U (en) | Tank container valve seat modularization positioning assembly device | |
| CN222498309U (en) | A hoist installation and disassembly device for shaft construction | |
| CN218891387U (en) | Vertical positioning welding tool for guide plate and sliding plate | |
| CN219005991U (en) | Horizontal adjusting assembly of lifting sliding table | |
| CN221799311U (en) | A building frame | |
| CN218204523U (en) | A box girder catenary column foundation positioning device | |
| CN220197404U (en) | An assembly fixture | |
| CN220301175U (en) | Bridge segment assembling jig frame | |
| CN221560383U (en) | Jacking transfer device for skeleton and wire harness assembly production line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120912 Termination date: 20141212 |
|
| EXPY | Termination of patent right or utility model |
