CN202359512U CN 201120491295 CN201120491295U CN202359512U CN 202359512 U CN202359512 U CN 202359512U CN 201120491295 CN201120491295 CN 201120491295 CN 201120491295 U CN201120491295 U CN 201120491295U CN 202359512 U CN202359512 U CN 202359512U
Authority
CN
China
Prior art keywords
ejection
iron
box culvert
jack
fore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120491295
Other languages
English (en)
Inventor
朱雷
高云仟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
SHANGHAI FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI FOUNDATION ENGINEERING Co Ltd filed Critical SHANGHAI FOUNDATION ENGINEERING Co Ltd
Priority to CN 201120491295 priority Critical patent/CN202359512U/zh
Application granted granted Critical
Publication of CN202359512U publication Critical patent/CN202359512U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

本实用新型涉及一种用于大型混凝土箱涵长距离顶进的装置,包括千斤顶,顶铁,顶柱,顶铁由钢轨焊接而成,顶铁的两端分别设有钢平板,两块钢平板之间通过钢轨固定连接;顶柱由预应力钢筋混凝土管桩构成,顶进时,千斤顶后靠背固定不动,前端通过各种组合的顶铁和顶柱与大型混凝土箱涵推进连接。顶铁长度为1m或2m;顶柱长度为4m或6m,顶柱为φ600PHC预应力钢筋混凝土管桩。本实用新型的千斤顶和后靠背装置固定不动,避免顶进动力装置的移动,结合顶铁和顶柱的不同组合,实现快速顶进。本装置顶铁顶柱小型装置移位快,组合简单,操作简便。

Description

用于大型混凝土箱涵长距离顶进的装置
技术领域
本实用新型涉及一种大型混凝土箱涵长距离顶进施工的装置。 
背景技术
大型混凝土箱涵长距离顶进施工,受到箱涵结构自身重量、顶进距离、顶进后靠、施工工期、经济因数等综合因数限制,除了千斤顶、后靠背的常规设置,需要使用特殊的措施来克服顶进距离长、顶进时间要求短的困难。 
发明内容
本实用新型是要解决大型混凝土箱涵长距离顶进的技术问题,而提供一种方便操作、适应长距离顶进的用于大型混凝土箱涵长距离顶进的装置。 
本实用新型的技术方案是:一种用于大型混凝土箱涵长距离顶进的装置,包括千斤顶,顶铁,顶柱,其特点是:顶铁由钢轨焊接而成,顶铁的两端分别设有钢平板,两块钢平板之间通过钢轨固定连接;顶柱由预应力钢筋混凝土管桩构成,顶进时,千斤顶后靠背固定不动,前端通过各种组合的顶铁和顶柱与大型混凝土箱涵推进连接。 
顶铁长度为1m或2m;顶柱长度为4m或6m,顶柱为φ600PHC预应力钢筋混凝土管桩。 
本实用新型的有益效果是:千斤顶和后靠背装置固定不动,避免顶进动力装置的移动,结合顶铁和顶柱的不同组合,实现快速顶进。本装置顶铁顶柱小型装置移位快,组合简单,操作简便。 
附图说明
图1是本实用新型的结构示意图; 
图2是顶铁结构主视图;
图3是图2的左剖视图;
图4是顶柱结构主视图;
图5是图4的左视图。
具体实施方式
下面结合具体实例,进一步阐述本实用新型专利的实施方式。应理解,这些实例仅用于说明本实用新型专利而不用于限制本实用新型专利的范围。此外应理解,在阅读了本实用新型专利讲授的内容之后,本领域技术人员可以对本实用新型作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。 
如图1所示,本实用新型的用于大型混凝土箱涵长距离顶进的装置,包括千斤顶1,顶铁2,顶柱3。 
顶铁2由钢轨焊接而成,顶铁2的两端分别设有钢平板,两块钢平板之间通过钢轨固定连接;顶柱3由预应力钢筋混凝土管桩构成, 
顶铁2长度为1m和2m二种规格;顶柱3长度为4m,6m二种规格,顶柱为φ600PHC预应力钢筋混凝土管桩。
千斤顶1后靠背固定不动,顶进过程中通过顶铁2和顶柱3的不同组合,进行长距离顶进。 
顶进时,首先根据混凝土箱涵4重量配置好相应的千斤顶1,根据箱涵4与后靠背间距尺寸以及千斤顶1的油缸顶程,在千斤顶1前放置相应长度的顶铁2,顶进距离超过4m后,更换顶柱3。顶铁2和顶柱3均由吊车吊装。随着顶进距离的增加,陆续增加顶铁2或顶柱3,直至箱涵4顶进到位。 
本实用新型的具体操作方法: 
1、顶进前,根据箱涵4与后靠背间距尺寸以及千斤顶1的油缸顶程,在千斤顶前放置相应长度的顶铁2。
2、顶程超过4m后,更换顶柱3。 
3、随着顶进距离的增加,陆续增加顶铁2或顶柱3,直至箱涵4顶进到位。 

Claims (3)

1.一种用于大型混凝土箱涵长距离顶进的装置,包括千斤顶(1),顶铁(2),顶柱(3),其特征在于:所述顶铁(2)由钢轨焊接而成,顶铁(2)的两端分别设有钢平板,两块钢平板之间通过钢轨固定连接;所述顶柱(3)由预应力钢筋混凝土管桩构成,顶进时,所述千斤顶(1)后靠背固定不动,前端通过各种组合的顶铁(2)和顶柱(3)与大型混凝土箱涵(4)推进连接。
2.根据权利要求1所述的用于大型混凝土箱涵长距离顶进的装置,其特征在于:所述顶铁(2)长度为1m或2m;所述顶柱(3)长度为4m或6m。
3.根据权利要求1所述的用于大型混凝土箱涵长距离顶进的装置,其特征在于:所述顶柱(3)为φ600PHC预应力钢筋混凝土管桩。
CN 201120491295 2011-12-01 2011-12-01 用于大型混凝土箱涵长距离顶进的装置 Expired - Lifetime CN202359512U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120491295 CN202359512U (zh) 2011-12-01 2011-12-01 用于大型混凝土箱涵长距离顶进的装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120491295 CN202359512U (zh) 2011-12-01 2011-12-01 用于大型混凝土箱涵长距离顶进的装置

Publications (1)

Publication Number Publication Date
CN202359512U true CN202359512U (zh) 2012-08-01

Family

ID=46570707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120491295 Expired - Lifetime CN202359512U (zh) 2011-12-01 2011-12-01 用于大型混凝土箱涵长距离顶进的装置

Country Status (1)

Country Link
CN (1) CN202359512U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089271A (zh) * 2013-02-07 2013-05-08 中铁三局集团有限公司 大型箱涵顶拉法用分配梁组成及完成的施工方法
CN104695343A (zh) * 2015-01-19 2015-06-10 中铁三局集团有限公司 一种基于后背墙推进技术的长距离顶进施工方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089271A (zh) * 2013-02-07 2013-05-08 中铁三局集团有限公司 大型箱涵顶拉法用分配梁组成及完成的施工方法
CN104695343A (zh) * 2015-01-19 2015-06-10 中铁三局集团有限公司 一种基于后背墙推进技术的长距离顶进施工方法

Similar Documents

Publication Publication Date Title
CN203998697U (zh) 可移动式龙门吊装架
CN202359512U (zh) 用于大型混凝土箱涵长距离顶进的装置
CN202544096U (zh) 用于钢结构建筑的柱间支撑机构
CN203257109U (zh) 便携式现浇楼板砼浇筑架空走道
CN202255583U (zh) 新型钢砼结构电子汽车衡
CN204397833U (zh) Vis型制砂机周护板的专用更换工具
CN204957303U (zh) 一种脚手架杆整理模具
CN203097116U (zh) 电力施工用钢筋笼子
CN204569341U (zh) 一种撬棍
CN201755591U (zh) 四线活套的横向移动装置
CN201864232U (zh) 柴油发电站组重载集装箱
CN203636979U (zh) 先张法预应力高强混凝土波形板桩的模具内接桩装置
CN204160427U (zh) 翻斗车平衡器轴连接销的专用拆装工具
CN202866284U (zh) 剪力墙模板钢筋龙骨加固装置
CN203347214U (zh) 高速铁路新型轻便爬梯
CN202544106U (zh) 用于钢结构建筑的翼梁机构
CN202241256U (zh) 一种锤头移动专用台车
CN202500328U (zh) 一种侧模支撑构造
CN202718043U (zh) 一种便梁起梁器
CN202706193U (zh) 用于建筑砼结构的顶面机构
CN202544098U (zh) 用于钢结构建筑的行车梁固定机构
CN201713828U (zh) 斗轮机独基基础
CN202831211U (zh) 用于基础钢结构的锚栓稳定机构
CN202706330U (zh) 用于建筑砼结构的梁侧面纵向钢筋机构
CN204370575U (zh) 钢结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: SHANGHAI FOUNDATION ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200433 Yangpu District, Shanghai Star Road, No. 231

Patentee after: Shanghai Foundation Engineering Group Co., Ltd.

Address before: 200433 Yangpu District, Shanghai Star Road, No. 231

Patentee before: Shanghai Foundation Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120801