CN202349232U - Dual-sealing butterfly valve with overhauling and sealing system - Google Patents

Dual-sealing butterfly valve with overhauling and sealing system Download PDF

Info

Publication number
CN202349232U
CN202349232U CN2011204582215U CN201120458221U CN202349232U CN 202349232 U CN202349232 U CN 202349232U CN 2011204582215 U CN2011204582215 U CN 2011204582215U CN 201120458221 U CN201120458221 U CN 201120458221U CN 202349232 U CN202349232 U CN 202349232U
Authority
CN
China
Prior art keywords
sealing
valve seat
valve
cavity
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204582215U
Other languages
Chinese (zh)
Inventor
桂新春
罗建群
殷建国
苏大明
唐爱华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUZHOU SOUTHERN VALVE CO Ltd
Original Assignee
ZHUZHOU SOUTHERN VALVE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUZHOU SOUTHERN VALVE CO Ltd filed Critical ZHUZHOU SOUTHERN VALVE CO Ltd
Priority to CN2011204582215U priority Critical patent/CN202349232U/en
Application granted granted Critical
Publication of CN202349232U publication Critical patent/CN202349232U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lift Valve (AREA)

Abstract

本实用新型提供了一种带检修密封系统的双密封蝶阀,包括密封蝶阀、进水控制装置及位置调整装置,密封蝶阀包括检修密封板和主密封板;主密封板可操作地闭合或者打开阀体;阀体还包括主密封阀座及可以沿着主密封阀座的内壁滑动的检修密封阀座;主密封阀座的内壁设有一腔体:检修密封阀座安装在主密封阀座内,且把腔体密闭起来,并将腔体分隔形成一个第一腔和一个第二腔;进水控制装置可控制地向第一腔内及第二腔内充水;其中,第一腔和第二腔内的水压差推动检修密封阀座靠近或远离检修密封板;位置调整装置包括一端固定在检修密封阀座上的螺纹拉杆、固定在螺纹拉杆上的限位套及与螺纹拉杆的外螺纹可转动地连接的螺母,螺母与限位套相互顶抵。

The utility model provides a double-seal butterfly valve with an inspection sealing system, which includes a sealing butterfly valve, a water inlet control device and a position adjustment device. The sealing butterfly valve includes an inspection sealing plate and a main sealing plate; the main sealing plate is operable to close or open the valve. body; the valve body also includes the main sealing valve seat and the maintenance sealing valve seat that can slide along the inner wall of the main sealing valve seat; the inner wall of the main sealing valve seat is provided with a cavity: the maintenance sealing valve seat is installed in the main sealing valve seat, And the cavity is sealed, and the cavity is separated to form a first cavity and a second cavity; the water inlet control device can controlly fill the first cavity and the second cavity; wherein, the first cavity and the second cavity The water pressure difference in the two chambers pushes the inspection sealing valve seat close to or away from the inspection sealing plate; the position adjustment device includes a threaded rod fixed on the inspection sealing valve seat, a limit sleeve fixed on the threaded rod and an outer connection with the threaded rod. The thread is rotatably connected to the nut, and the nut and the limit sleeve are pressed against each other.

Description

The double seals butterfly valve of band maintenance sealing system
Technical field
The utility model relates to the mechanical seal field, especially, relates to a kind of double seals butterfly valve with the maintenance sealing system.
Background technique
In the construction of existing medium waterpower generator station; A pipe two-shipper or the pipe multimachine arrangements of adopting: promptly utilize a pressure tunnel or large diameter water inlet manifold more; Before upper reaches water storage is incorporated into the power plant building; Be further divided into two or many diversion arms, and a water inlet butterfly valve is installed on each diversion arm.A cover hydraulic generator unit is installed in the downstream side of each water inlet butterfly valve.
When water turbine generated electricity, the water inlet butterfly valve was opened, and upstream pressure water gets into water turbine through butterfly valve, promoted the water turbine generating.Yet; In the time need sealing maintenance to the water inlet butterfly valve on a certain diversion arm; Press water in necessary this water inlet manifold of emptying; Generator set under inactive this water inlet manifold on all diversion arms could overhaul this butterfly valve of intaking, and the generator set on the waste of build-up of pressure water and other diversion arms is involved by the loss of forced-stopping machine.
The model utility content
The utility model purpose is to provide a kind of double seals butterfly valve with the maintenance sealing system, is involved by the technical problem of the loss of forced-stopping machine with the waste of build-up of pressure water and the generator set on other diversion arms in the solution existing technology.
For realizing above-mentioned purpose; An aspect according to the utility model; A kind of double seals butterfly valve with the maintenance sealing system is provided; Comprise seal butterfly valve and inlet control device, seal butterfly valve comprises valve body, position regulator and is installed in the butterfly plate in the valve body rotationally that butterfly plate comprises that the maintenance sealing plate that is arranged side by side at interval is with the primary seal plate; The operationally closed valve body of perhaps opening of primary seal plate; Valve body also comprises primary seal valve seat and the maintenance seal valve seat that can slide along the inwall of primary seal valve seat; The inwall of primary seal valve seat is provided with a cavity: the maintenance seal valve seat is installed in the primary seal valve seat, and gets up cavity airtight, and cavity is separated to form one first chamber and one second chamber; First chamber is provided with one first water intake and one first water outlet; Second chamber is provided with one second water intake and one second water outlet; Inlet control device is provided with first aqueduct that is connected with first water intake, and first aqueduct is water-filling in first chamber controllably; Inlet control device also is provided with second aqueduct that is connected with second water intake, and second aqueduct is water-filling in second chamber controllably; Wherein, the pressure difference that produces of the hydraulic pressure in first chamber and second chamber promote the maintenance seal valve seat near or away from the maintenance sealing plate; Position regulator comprises that an end is fixed on the thread of maintenance on the seal valve seat, the nut that is fixed on the stop collar on the thread and is connected rotationally with the outside thread of thread, the side of nut and stop collar push up each other to.
Further, stop collar is dismountable is fixed on the thread; Wherein, stop collar selectively is positioned at first side towards the maintenance seal valve seat of nut, perhaps is positioned at second side that nut overhauls seal valve seat dorsad.
Further, be connected with a coupling cock between first and second aqueduct; Be respectively equipped with the manually operated valve that makes first and second aqueduct open or close on first and second aqueduct.
Further, the double seals butterfly valve of band maintenance sealing system also comprises a water tank or a upstream line; The entrance point of first and second aqueduct is connected with water tank or upstream line; Also be provided with a hand increasing pressure pump at the entrance point place of first and second aqueduct.
Further, first water outlet is connected with first discharging valve; Second water outlet is connected with second discharging valve; The primary seal valve seat is provided with a through hole, and through hole is between maintenance sealing plate and primary seal plate, and through hole is connected with a drain valve.
Further, the primary seal valve seat is provided with a passage that connects with cavity, and butterfly plate is installed in rotation in the passage; The maintenance seal valve seat is slidably mounted in the passage, and the maintenance seal valve seat is provided with a maintenance seal ring towards the periphery of passage; The maintenance sealing plate periphery be provided with sealing rubber pad; The maintenance seal ring separates along with the maintenance seal valve seat pushes up to be against on the sealing rubber pad or with sealing rubber pad movably.
Further, the primary seal valve seat comprises first main body, second main body, retaining ring and coupling sleeve; Wherein, retaining ring is fixedly set in first end towards first main body of second main body; Coupling sleeve is fixedly set on the outer periphery of retaining ring, and coupling sleeve extends to the direction of first main body, and is fixedly connected on first end of first main body; Cavity is in passage, and cavity is formed by the end face of first end of first main body, the end face and common encirclement of coupling sleeve thereof of retaining ring; First water intake, first water outlet, second water intake and second water outlet all are located on the coupling sleeve, and all run through the barrel of coupling sleeve.
Further, the maintenance seal valve seat comprises and is sleeved in the passage slidably and the hydrodynamic reciprocating sealing tube and the dunnage of airtight cavity; Dunnage is formed along extending radially outwardly of hydrodynamic reciprocating sealing tube by the outer periphery of hydrodynamic reciprocating sealing tube; Wherein, dunnage is positioned at cavity, and the top be against on the internal face of coupling sleeve, cavity is divided into first chamber and second chamber.
Further, thread comprises fixing head and the thread rod part that is fixed on the dunnage, and wherein, thread rod part is fixed on a side of fixing head; Thread rod part is exposed at outside the valve body after the axial direction of passage passes retaining ring; The outer position of valve body that is exposed at of thread rod part is provided with scale; Stop collar and nut are installed in being exposed on the outer position of valve body of thread rod part.
The utlity model has following beneficial effect: the double seals butterfly valve of the band of the utility model maintenance sealing system utilizes hydraulic pressure and machinery type to unite driving, with realize the maintenance seal ring move reliably, put in place it is thus clear that and with overhaul the adjustable purpose of sealing plate sealing effect.In addition, the through hole between maintenance sealing plate and primary seal plate through valve body and be connected in the drain valve of through hole to keep watch on the leakage situation of maintenance seal ring, has improved the correctness and the validity of the sealing between maintenance seal ring and the maintenance sealing plate.
Except top described purpose, feature and advantage, the utility model also has other purpose, feature and advantage.To do further detailed explanation to the utility model with reference to figure below.
Description of drawings
The accompanying drawing that constitutes the application's a part is used to provide the further understanding to the utility model, and illustrative examples of the utility model and explanation thereof are used to explain the utility model, do not constitute the improper qualification to the utility model.In the accompanying drawings:
Fig. 1 is the schematic representation that the band of the utility model preferred embodiment overhauls the double seals butterfly valve of sealing system, and the sealing system comprises double seals butterfly valve, but does not show the valve plate of double seals butterfly valve in this schematic representation;
Fig. 2 is the structural representation of double seals butterfly valve in the time of water inlet among the utility model Fig. 1;
Fig. 3 is the amputated structure schematic representation of the double seals butterfly valve of Fig. 2;
Fig. 4 is the amputated structure schematic representation of double seals butterfly valve in the time of maintenance among the utility model Fig. 1; And
Fig. 5 is the schematic representation of other mode of execution of double seals butterfly valve of the band maintenance sealing system of the utility model preferred embodiment.
Embodiment
Embodiment to the utility model is elaborated below in conjunction with accompanying drawing, but the multitude of different ways that the utility model can be defined by the claims and cover is implemented.
Please referring to figs. 1 through Fig. 3, the double seals butterfly valve of the band of the utility model preferred embodiment maintenance sealing system comprises seal butterfly valve 1 that is installed on diversion arm (not shown) and the inlet control device 2 that seal butterfly valve 1 is supplied water.
Seal butterfly valve 1 comprises valve body 10, rotates the position regulator 30 that is installed on the butterfly plate 20 in the valve body 10 and is installed on valve body 10.Preferably, seal butterfly valve 1 also comprises the operating device that is installed in outside the valve body 10, and this operating device is connected with butterfly plate 20 through valve shaft.At this moment, through operating operation mechanism butterfly plate 20 is rotated, thereby butterfly plate 20 is opened or closed, to open or close seal butterfly valve 1.
Position regulator 30 comprises thread 31, stop collar 32 and nut 33.Thread 31 comprises fixing head 311 and is provided with externally threaded thread rod part 312.Thread rod part 312 is formed by the side extension of fixing head 311.Preferably, be carved with scale on the thread rod part 312,, can confirm whether the maintenance seal ring 135 of valve body 10 has arrived sealing station through the scale on the thread rod part 312.Stop collar 32 is installed on the thread rod part 312 with nut 33 is all dismountable, and nut 33 is replaced on stop collar 32.When rotating nut 33,, force thread rod part 312 to move through active force and the reaction force between nut 33 and the thread rod part 312.
Valve body 10 comprises primary seal valve seat 11 and is installed in the maintenance seal valve seat 13 in the primary seal valve seat 11 movably.The middle part of primary seal valve seat 11 is provided with a passage 111 that lets current pass through, and butterfly plate 20 is installed in the passage 111.Primary seal valve seat 11 comprise the feed-water end that is positioned at passage 111 first main body 113, be positioned at second main body 115, retaining ring 117 and the coupling sleeve 119 of the waterexit end of passage 111.Leave the gap between first end of first end of first main body 113 and second main body 115.The inwall of second main body 115 is provided with working seal circle 118 near the second end place fixed convex.Second main body 115 is provided with a through hole 12 at working seal circle 118 places, and installation is provided with a drain valve 14 in this through hole 12.Retaining ring 117 be fixedly set in second main body 115 on the outer periphery of first end of first main body 113.Preferably, between the inner circumference edge of the outer periphery of second main body 115 and retaining ring 117, also be arranged with seal ring, to prevent the outer seepage of current direction in the passage 111.Coupling sleeve 119 is fixedly set on the outer periphery of retaining ring 117, and coupling sleeve 119 is fixedly connected on first end of first main body 113 away from an end of retaining ring 117, so that first main body 113 is tightly connected into an integral body with second main body 115.At this moment, first end of the end face of coupling sleeve 119, retaining ring 117 and first main body 113 surrounds a cavity 116 that connects each other with passage 111 jointly.Be provided with to the sidewall spacers of coupling sleeve 119 first water intake 112 that connects cavity 116, second water intake 114 and respectively with first water intake 112, first water outlet 15 and second water outlet 16 that second water intake 114 is relative.First water outlet 15 and second water outlet 16 are connected with first discharging valve 18 and second discharging valve 19 respectively.
Maintenance seal valve seat 13 comprises hydrodynamic reciprocating sealing tube 131 and the dunnage 133 that is sleeved on slidably in the passage 111.Wherein, dunnage is formed along extending radially outwardly of hydrodynamic reciprocating sealing tube 131 by the outer periphery of hydrodynamic reciprocating sealing tube 131.Hydrodynamic reciprocating sealing tube 131 tops are against the inner circumference edge of passage 111, and the opening of cavity 116 towards passage 111 sealed.Hydrodynamic reciprocating sealing tube 131 operationally slides along the inwall of passage 111.Preferably, between the inner circumference edge of the outer periphery of hydrodynamic reciprocating sealing tube 131 and passage 111, be provided with seal ring.The inner circumference edge of hydrodynamic reciprocating sealing tube 131 is convexly equipped with maintenance seal ring 135.Dunnage 133 stretches in the cavity 116; The outer periphery top of dunnage 133 is against on the inwall of coupling sleeve 119; And dunnage 133 is between first water intake 112 and second water intake 114; Cavity 116 being divided into first chamber 132 and second chamber 134, and first chamber 132 near first main body, 113, the second chambeies 134 near second main body 115.Wherein, first water intake 112 and first water outlet 15 and first chamber 132 connect; Second water intake 114 and second water outlet 16 and second chamber 134 connect.
The fixing head 311 of the thread 31 of position regulator 30 is fixed on the dunnage 133, so that maintenance seal valve seat 13 is along with thread 31 moves together.The thread rod part 312 of thread 31 axially passes retaining ring 117 along passage 111, and is exposed at outward outside the cavity 116, and stop collar 32 and nut 33 all are fixed on outer being exposed on the outer thread rod part 312 of cavity 116.The face that stop collar 32 selectively is positioned at nut 33 is towards first side of the dunnage 133 of maintenance seal valve seat 13, perhaps at second side of the dunnage of overhauling seal valve seat 13 dorsad 133 of nut 33.
Butterfly plate 20 comprises and interconnecting, and the maintenance sealing plate 201 and primary seal plate 203 that are provided with at interval along the axis direction of butterfly plate 20.Through hole 12 on the valve body 10 is between maintenance sealing plate 201 and primary seal plate 203.The 203 manipulable working seal circle 118 mutual butt sealings with valve body 10 of primary seal plate perhaps interlock and open.Leave the gap between the outer periphery of maintenance sealing plate 201 and the inwall of passage 111, and maintenance sealing plate 201 is near maintenance seal ring 135.Preferably, first and the peripheral region of primary seal plate 201,203 be fixed with sealing rubber pad 291,292 respectively.
Inlet control device 2 comprises water tank 21, first aqueduct 22 and second aqueduct 23.Wherein, the entrance point of first aqueduct 22 is connected in the water tank 21, and the outlet end of first aqueduct 22 is connected to first water intake 112; And on first aqueduct 22 manually operated valve 221 is installed.The entrance point of second aqueduct 23 is connected in the water tank 21, and the outlet end of second aqueduct 23 is connected to second water intake 114; And on second aqueduct 23 manually operated valve 231 is installed.Can control first aqueduct 22 and second aqueduct 23 respectively through operation manually operated valve 221,231 opens into water or closes and prevent into water.Also be connected with a coupling cock 27 between first aqueduct 22 and second aqueduct 23, the pressure in the win aqueduct 22 and second aqueduct 23 equated through opening coupling cock 27.
When generating, operate butterfly plate 20, make working seal circle 118 interlaced the opening of primary seal plate 203 and valve body 10.At this moment, seal butterfly valve 1 is opened, and upstream pressure water advanced passage 111 and flows into water turbine, promoted the water turbine generating.When water turbine need overhaul or need generation outage, operation butterfly plate 20 made the sealing rubber pad 292 on the primary seal plate 203 support sealing with the working seal circle 118 mutual tops of valve body 10.At this moment, seal butterfly valve 1 is closed, thereby sealing channel 111 flows into water turbine to stop upstream pressure water through passage 111.Need overhaul or need in the process of generation outage at above-mentioned generating, water turbine, inlet control device 2 is in shutoff device always, in first or second chamber 132,134, does not discharge water.
Please combine with reference to Fig. 4, when needs itself seal maintenance to seal butterfly valve 1, when promptly being the sealing condition between the working seal circle 118 of primary seal plate 203 and valve body 10 of maintenance seal butterfly valve 1, specific operation process and method are following:
The first step: operation butterfly plate 20 is closed seal butterfly valve 1.Coupling cock 27, manually operated valve 221 and 231 are all closed, in first or second chamber 132,134, discharge water to prevent inlet control device 2.Open second discharging valve 19 again, make the whole emptyings of ponding in second chamber 134.
Second step: after the ponding emptying in second chamber 134, close second discharging valve 19.At this moment, open manually operated valve 221, make inlet control device 2 in first chamber 132, carry high pressure water through first aqueduct 22.In the journey of water-filling in first chamber 132, because first chamber, 132 interior and second chamber, 134 internal pressure differences force the direction of maintenance seal valve seat 13 to second chamber 134 to move.At this moment, the maintenance seal valve seat 13 maintenance seal ring 135 along with the maintenance seal valve seat 13 to the maintenance sealing plate 201 near.
Preferably, in first chamber 132 or on first aqueduct 22 pressure gauge 25 is installed also, with the water pressure conditions of monitoring conveying to first chamber 132 in.More preferably, also be provided with a hand increasing pressure pump 26, and hand increasing pressure pump 26 links to each other with second aqueduct 23 with first aqueduct 22, so that increase the pressure in first chambeies 132 or second chamber 134 through first aqueduct 22 or second aqueduct 23.More preferably, between water tank 21 and hand increasing pressure pump 26, be provided with two filtrating equipments 28, to guarantee to get into the clean free from admixture of press water in first chamber 132 or second chamber 134.
In other embodiments, if in the journey of water-filling in first chamber 132, when maintenance seal valve seat 13 is not moved; Explain that promptly the hydraulic pressure in first chamber 132 is not enough, at this moment, open hand increasing pressure pump 26; With supercharging in first chamber 132, thereby force maintenance seal valve seat 13 to move.
In the whole process in second step, can judge the displacement distance of overhauling seal ring 135 through the scale of observing on the thread rod part 312.When the sealing rubber pad 291 of the maintenance seal ring 135 of observing maintenance seal valve seat 13 and maintenance sealing plate 201 soon each other against the time, close manually operated valve 221, make first aqueduct 22 stop conveying high pressure water to first chamber 132 in.
The 3rd step:, thereby make the maintenance seal ring 135 of maintenance seal valve seat 13 and the sealing rubber pad 291 of maintenance sealing plate 201 replace sealing through adjustment position regulator 30.
Detailed process is: the stop collar 32 with position regulator 30 is fixed on the thread rod part 312 earlier; Nut 33 with position regulator 30 is installed on the thread rod part 312 again, and makes nut 33 be positioned at the outside of stop collar 32.Afterwards, screw nut 33, thus force thread rod part 312 to the direction in second chamber 314 near.At this moment, the maintenance seal ring 135 of maintenance seal valve seat 13 along with maintenance seal valve seat 13 to maintenance sealing plate 201 near, replace sealing until the maintenance seal ring 135 and the sealing rubber pad 291 of maintenance sealing plate 201.In this process; Open the drain valve 14 of valve body 10; If still there are flowing out in the through hole 12 of valve body 10, then the maintenance seal ring 135 of explanation maintenance seal valve seat 13 does not have good seal with the sealing rubber pad 291 of maintenance sealing plate 201, need continue to screw nut 33.If there is not water to flow out in the through hole 12 of valve body 10, then the maintenance seal ring 135 of explanation maintenance seal valve seat 13 has been replaced good seal each other with the sealing rubber pad 291 of maintenance sealing plate 201.At this moment; The maintenance man then can get in the manhole (not shown) of seal butterfly valve 1 in the diversion arm, the sealing condition between the working seal circle 118 of the primary seal plate 203 of seal butterfly valve 1 and valve body 10 is overhauled or changes sealing rubber pad 292 on the primary seal plate 203 etc.Like this, without the press water in this water inlet manifold of emptying, the generator set under this water inlet manifold of also need not stopping using simultaneously on all diversion arms can be avoided the waste of press water and stop the loss that all generator set cause simultaneously.
After maintenance or changing completion, open first discharging valve 18, make the high pressure water emptying in first chamber 132.Open manually operated valve 231, in second chamber 134, charging into high pressure water, thereby force the direction of maintenance seal valve seat 13 to move to first chamber 132.At this moment, the maintenance seal ring 135 of maintenance seal valve seat 13 is along with overhauling seal valve seat 13 away from maintenance sealing plate 201.At last, be installed in the inboard of stop collar 32 after nut 33 pulled down again, screw nut 33 again, thus force thread rod part 312 to the direction in first chamber 312 near, retreat until maintenance seal ring 135 and to put in place.At this moment, opening connecting valve 27, and closeall other valve, promptly is to close drain valve 14, first discharging valve 18, second discharging valve 19, manually operated valve 221 and 231.In this process, can judge whether maintenance seal ring 135 is retreated and put in place through the scale on the thread rod part 312.
From the above: the double seals butterfly valve of the band of the utility model maintenance sealing system can utilize hydraulic pressure and machinery type to unite driving, with realize maintenance seal ring 135 move reliably, put in place it is thus clear that and with overhaul the adjustable purpose of sealing plate 201 sealing effects.In addition; The through hole 12 between maintenance sealing plate 201 and primary seal plate 203 through valve body 10 and be connected in the drain valve 14 of through hole 12; To keep watch on the leakage situation of maintenance seal ring 13, improved the correctness and the validity of the sealing between maintenance seal ring 13 and the maintenance sealing plate 201.
Please with reference to Fig. 5; In other embodiments, the inlet control device 2 of the double seals butterfly valve of the band of the utility model maintenance sealing system is except carrying the high pressure water in first chamber 132 or second chamber 134 through water tank 21, first aqueduct 22 and second aqueduct 23.Can also directly in upstream line 40, extract high pressure water.Between the import of upstream line 40 and first and second aqueduct 22,23, be provided with total inlet valve 41, chamber inlet valve 43 and twin filter 45 successively.Water tank 21 also can be connected in upstream line 40 through tank intake valve of water 47, so that in upstream line 40, in water tank 21, carry high pressure water.
The preferred embodiment that the above is merely the utility model is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within the spirit and principle of the utility model, any modification of being done, be equal to replacement, improvement etc., all should be included within the protection domain of the utility model.

Claims (9)

1.一种带检修密封系统的双密封蝶阀,包括密封蝶阀及进水控制装置,所述密封蝶阀包括阀体、位置调整装置及转动地安装在所述阀体内的蝶板,所述蝶板包括间隔并排设置的检修密封板和主密封板;1. A double-sealed butterfly valve with an overhaul sealing system, comprising a sealed butterfly valve and a water inlet control device, said sealed butterfly valve comprising a valve body, a position adjustment device and a butterfly plate rotatably installed in said valve body, said butterfly plate Including the maintenance sealing plate and the main sealing plate arranged side by side at intervals; 所述主密封板可操作地闭合或者打开所述阀体;the main sealing plate is operable to close or open the valve body; 其特征在于,It is characterized in that, 所述阀体还包括主密封阀座及可以沿着所述主密封阀座的内壁滑动的检修密封阀座;The valve body also includes a main sealing valve seat and an inspection sealing valve seat that can slide along the inner wall of the main sealing valve seat; 所述主密封阀座的内壁设有一腔体:The inner wall of the main sealing valve seat is provided with a cavity: 所述检修密封阀座安装在所述主密封阀座内,且把所述腔体密闭起来,并将所述腔体分隔形成一个第一腔和一个第二腔;The maintenance sealing valve seat is installed in the main sealing valve seat, and seals the cavity, and separates the cavity to form a first cavity and a second cavity; 所述第一腔设有一个第一进水口和一个第一出水口;所述第二腔设有一个第二进水口和一个第二出水口;The first chamber is provided with a first water inlet and a first water outlet; the second chamber is provided with a second water inlet and a second water outlet; 所述进水控制装置设有一个与所述第一进水口连接的第一引水管,所述第一引水管可控制地向所述第一腔内充水;The water inlet control device is provided with a first water diversion pipe connected to the first water inlet, and the first water diversion pipe is controllable to fill the first chamber with water; 所述进水控制装置还设有一个与所述第二进水口连接的第二引水管,所述第二引水管可控制地向所述第二腔内充水;其中,所述第一腔和所述第二腔内的水压产生的压力差推动所述检修密封阀座靠近或远离所述检修密封板;The water inlet control device is also provided with a second water diversion pipe connected to the second water inlet, and the second water diversion pipe is controllable to fill the second chamber with water; wherein, the first chamber and the pressure difference generated by the water pressure in the second chamber pushes the inspection sealing valve seat close to or away from the inspection sealing plate; 所述位置调整装置包括一端固定在所述检修密封阀座上的螺纹拉杆、固定在所述螺纹拉杆上的限位套及与所述螺纹拉杆的外螺纹可转动地连接的螺母,所述螺母的侧端与所述限位套相互顶抵。The position adjusting device includes a threaded rod fixed at one end on the inspection sealing valve seat, a limit sleeve fixed on the threaded rod and a nut rotatably connected to the external thread of the threaded rod, and the nut The side end and the limit sleeve are against each other. 2.根据权利要求1所述的带检修密封系统的双密封蝶阀,其特征在于,所述限位套可拆卸的固定在所述螺纹拉杆上;2. The double-sealed butterfly valve with maintenance sealing system according to claim 1, characterized in that, the limit sleeve is detachably fixed on the threaded tie rod; 其中,所述限位套可选择地位于所述螺母的面向所述检修密封阀座的第一侧端,或者位于所述螺母背向所述检修密封阀座的第二侧端。Wherein, the limiting sleeve can be selectively located at the first side end of the nut facing the inspection sealing valve seat, or at the second side end of the nut facing away from the inspection sealing valve seat. 3.根据权利要求2所述的带检修密封系统的双密封蝶阀,其特征在于,所述第一及第二引水管之间连接设有一个联通阀;3. The double-sealed butterfly valve with maintenance sealing system according to claim 2, characterized in that, a connecting valve is connected between the first and second diversion pipes; 所述第一及第二引水管上分别设有使所述第一及第二引水管打开或者关闭的手动阀。The first and second water diversion pipes are respectively provided with manual valves for opening or closing the first and second water diversion pipes. 4.根据权利要求3所述的带检修密封系统的双密封蝶阀,其特征在于,所述带检修密封系统的双密封蝶阀还包括一个水箱或者一个上游管道;4. The double-seal butterfly valve with an inspection sealing system according to claim 3, wherein the double-seal butterfly valve with an inspection sealing system also includes a water tank or an upstream pipeline; 所述第一及第二引水管的进口端与所述水箱或者所述上游管道连接;The inlet ends of the first and second water diversion pipes are connected to the water tank or the upstream pipeline; 在所述第一及第二引水管的进口端处还设有一个手动增压泵。A manual booster pump is also provided at the inlet ends of the first and second water diversion pipes. 5.根据权利要求3所述的带检修密封系统的双密封蝶阀,其特征在于,所述第一出水口连接有第一放水阀;5. The double-sealed butterfly valve with maintenance sealing system according to claim 3, characterized in that, the first water outlet is connected with a first water discharge valve; 所述第二出水口连接有第二放水阀;The second water outlet is connected with a second water discharge valve; 所述主密封阀座设有一通孔,所述通孔位于所述检修密封板和所述主密封板之间,且所述通孔连接有一个排水阀。The main sealing valve seat is provided with a through hole, the through hole is located between the maintenance sealing plate and the main sealing plate, and a drain valve is connected to the through hole. 6.根据权利要求5所述的带检修密封系统的双密封蝶阀,其特征在于,所述主密封阀座设有一个与所述腔体贯通的通道,所述蝶板可转动地安装在所述通道内;6. The double-seal butterfly valve with maintenance sealing system according to claim 5, characterized in that, the main sealing valve seat is provided with a passage through the cavity, and the butterfly plate is rotatably installed on the within the passage; 所述检修密封阀座可滑动地安装在所述通道内,且所述检修密封阀座面向所述通道的周缘上设有一个检修密封圈;The inspection sealing valve seat is slidably installed in the passage, and an inspection sealing ring is provided on the periphery of the inspection sealing valve seat facing the passage; 所述检修密封板的周缘上设有密封橡胶垫;A sealing rubber pad is provided on the periphery of the maintenance sealing plate; 所述检修密封圈随着所述检修密封阀座移动地顶抵在所述密封橡胶垫上、或与所述密封橡胶垫分离。The inspection sealing ring abuts against the sealing rubber pad or is separated from the sealing rubber pad as the inspection sealing valve seat moves. 7.根据权利要求6所述的带检修密封系统的双密封蝶阀,其特征在于,所述主密封阀座包括第一主体、第二主体、固定环及连接套筒;7. The double-sealed butterfly valve with maintenance sealing system according to claim 6, wherein the main sealing valve seat comprises a first body, a second body, a fixing ring and a connecting sleeve; 其中,所述固定环固定套装在所述第二主体的面向所述第一主体的第一端;所述连接套筒固定套装在所述固定环的外周缘上,且所述连接套筒向所述第一主体的方向延伸,并固定连接在所述第一主体的第一端上;Wherein, the fixing ring is fixedly set on the first end of the second body facing the first body; the connecting sleeve is fixedly set on the outer peripheral edge of the fixing ring, and the connecting sleeve faces The direction of the first body extends and is fixedly connected to the first end of the first body; 所述腔体在所述通道内,且所述腔体由所述第一主体的第一端的端面、所述固定环的端面及其所述连接套筒共同包围而成;The cavity is in the channel, and the cavity is surrounded by the end surface of the first end of the first body, the end surface of the fixing ring and the connecting sleeve; 所述第一进水口、所述第一出水口、所述第二进水口和所述第二出水口均设在所述连接套筒上,并均贯穿所述连接套筒的筒壁。The first water inlet, the first water outlet, the second water inlet and the second water outlet are all arranged on the connecting sleeve, and all pass through the cylinder wall of the connecting sleeve. 8.根据权利要求7所述的带检修密封系统的双密封蝶阀,其特征在于,所述检修密封阀座包括滑动地套装在所述通道内并密闭所述腔体的移动密封筒及支撑板;8. The double-seal butterfly valve with maintenance sealing system according to claim 7, characterized in that, the maintenance sealing valve seat comprises a movable sealing cylinder and a support plate which are slidably fitted in the passage and seal the cavity ; 所述支撑板由所述移动密封筒的外周缘沿着所述移动密封筒的径向向外延伸而成;The support plate is formed by extending the outer peripheral edge of the moving sealing cylinder outward along the radial direction of the moving sealing cylinder; 其中,所述支撑板位于所述腔体内,且顶抵在所述连接套筒的内壁面上,以将所述腔体分割成所述第一腔和所述第二腔。Wherein, the support plate is located in the cavity and abuts against the inner wall surface of the connecting sleeve, so as to divide the cavity into the first cavity and the second cavity. 9.根据权利要求8所述的带检修密封系统的双密封蝶阀,其特征在于,所述螺纹拉杆包括固定在所述支撑板上的固定头部及螺纹杆部,其中,所述螺纹杆部固定在所述固头部的一侧;9. The double-sealed butterfly valve with overhaul sealing system according to claim 8, wherein the threaded pull rod includes a fixed head and a threaded rod fixed on the support plate, wherein the threaded rod fixed on one side of the fixed head; 所述螺纹杆部沿着所述通道的轴向方向穿过所述固定环后露在所述阀体外;The threaded rod part is exposed outside the valve body after passing through the fixing ring along the axial direction of the channel; 所述螺纹杆部的露在所述阀体外的部位上设有刻度;A scale is provided on the part of the threaded rod exposed outside the valve body; 所述限位套及所述螺母均安装在所述螺纹杆部的露在所述阀体外的部位上。Both the limiting sleeve and the nut are installed on the part of the threaded rod exposed outside the valve body.
CN2011204582215U 2011-11-17 2011-11-17 Dual-sealing butterfly valve with overhauling and sealing system Expired - Lifetime CN202349232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204582215U CN202349232U (en) 2011-11-17 2011-11-17 Dual-sealing butterfly valve with overhauling and sealing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204582215U CN202349232U (en) 2011-11-17 2011-11-17 Dual-sealing butterfly valve with overhauling and sealing system

Publications (1)

Publication Number Publication Date
CN202349232U true CN202349232U (en) 2012-07-25

Family

ID=46538239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204582215U Expired - Lifetime CN202349232U (en) 2011-11-17 2011-11-17 Dual-sealing butterfly valve with overhauling and sealing system

Country Status (1)

Country Link
CN (1) CN202349232U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102384274A (en) * 2011-11-17 2012-03-21 株洲南方阀门股份有限公司 Double-seal butterfly valve with maintenance sealing system
CN110529603A (en) * 2019-08-26 2019-12-03 安心 A kind of flow control valve

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102384274A (en) * 2011-11-17 2012-03-21 株洲南方阀门股份有限公司 Double-seal butterfly valve with maintenance sealing system
CN102384274B (en) * 2011-11-17 2014-04-09 株洲南方阀门股份有限公司 Double-seal butterfly valve with maintenance sealing system
CN110529603A (en) * 2019-08-26 2019-12-03 安心 A kind of flow control valve

Similar Documents

Publication Publication Date Title
CN201326869Y (en) Inflatable closure plug
CN102384274B (en) Double-seal butterfly valve with maintenance sealing system
CN202251966U (en) Oil-water separation sealing structure for hydraulic turbine cylinder valve servomotor
CN101614292B (en) Backflow preventer
CN101638275B (en) Novel water purifier
CN202280871U (en) Novel main seal structure of hydroelectric water inlet ball valve
CN201322127Y (en) Manual high-pressure sluice valve
CN201827393U (en) Special double-seal hydraulic control butterfly valve for hydroelectricity
CN204591661U (en) A kind of self-powering type automatic recirculating pump-protecting valve
CN115199341B (en) A steam inlet structure for a 3.2MW steam turbine
CN202171020U (en) Millstone type material conveying double-gate valve
CN205278451U (en) Tee bend flow divider
CN103363145A (en) Hard seal structure for high oil pressure operation of water inlet ball valve in hydropower station
CN203363259U (en) Hard seal structure for high oil pressure operation of water inlet ball valve in hydropower station
CN201301774Y (en) Floating-type main shaft sealing structure used for tubular turbine
CN204420141U (en) A kind of bidirectional metal sealing hydraulic butterfly valve
CN205226399U (en) Butterfly valve with overhaul mechanical locking mechanism
CN202118285U (en) Flow regulating device of slag flushing water circulation system
CN209196003U (en) A kind of wind power generating set fluid brake
CN208058030U (en) One kind is two-way to use machinery valve
CN2720201Y (en) Flush-free stop valve
CN201083269Y (en) Double-piston water turbine water-feeding hydraulic double-sealing butterfly valve
CN2505609Y (en) Intake hydraulic butterfly valve for water turbine
CN201485342U (en) Novel water purifier
CN223209138U (en) A self-cleaning mechanism for a pipe filter of an air source heat pump unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120725

Effective date of abandoning: 20140409

RGAV Abandon patent right to avoid regrant