CN202336763U - Structure of production line for producing aluminium pipes and aluminium bars - Google Patents

Structure of production line for producing aluminium pipes and aluminium bars Download PDF

Info

Publication number
CN202336763U
CN202336763U CN2011204666653U CN201120466665U CN202336763U CN 202336763 U CN202336763 U CN 202336763U CN 2011204666653 U CN2011204666653 U CN 2011204666653U CN 201120466665 U CN201120466665 U CN 201120466665U CN 202336763 U CN202336763 U CN 202336763U
Authority
CN
China
Prior art keywords
conveying arm
conveying
aluminium
deflector chute
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2011204666653U
Other languages
Chinese (zh)
Inventor
沙波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUOYANG RUIHENG METALLURGICAL EQUIPMENT MANUFACTURE CO Ltd
Original Assignee
LUOYANG RUIHENG METALLURGICAL EQUIPMENT MANUFACTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUOYANG RUIHENG METALLURGICAL EQUIPMENT MANUFACTURE CO Ltd filed Critical LUOYANG RUIHENG METALLURGICAL EQUIPMENT MANUFACTURE CO Ltd
Priority to CN2011204666653U priority Critical patent/CN202336763U/en
Application granted granted Critical
Publication of CN202336763U publication Critical patent/CN202336763U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Turning (AREA)

Abstract

The utility model relates to a production device for aluminium pipes and aluminium bars, in particular to a structure of a production line for producing the aluminium pipes and aluminium bars. The structure of the production line comprises a conveying device and a processing device, wherein the conveying device comprises three feed channels and conveying arms arranged between the three feed channels; rollers are arranged on the feed channels; lifting devices are arranged on the conveying arms; one end of the first feed channel in the three feed channels corresponds to a first charging platform; the other end of the first feed channel corresponds to the first conveying arm; one end of the second feed channel corresponds to the first conveying arm; a second charging platform corresponds to the middle part of the second feed channel; one end of the second conveying arm corresponds to the other end of the second feed channel; the other end of the second conveying arm corresponds to the third feed channel; the processing device comprises a lathe and a boring machine; the boring machine is arranged under the first conveying arm; and the lathe is arranged under the second conveying arm. The structure of the production line has the advantages: the production line is adopted for carrying out automatic production, manual labor is substantially saved, the aluminium pipe processing is combined with the aluminium bar processing, and the work site is saved.

Description

The production of aluminum pipe aluminium bar is with the structure of streamline
Technical field
The utility model relates to aluminum pipe aluminium bar process units, specifically, relates to the structure of aluminum pipe aluminium bar production with streamline.
Background technology
In the production of aluminum pipe aluminium bar, production stage in the past is aluminum pipe and aluminium bar separate machined, and the machined into cylindrical is used in aluminum pipe processing; Process endoporus with boring machine; The machined into cylindrical is used in the processing of aluminium bar, and these steps are separated from one another, in the conversion of work step back and forth; Just expend a large amount of production times in the transportation of part, reduced production efficiency.
The utility model content
The purpose of the utility model is to provide a kind of production structure of streamline to carry out the processing of aluminum pipe and aluminium bar, can enhance productivity.
The utility model comprises conveyer and processing unit (plant); Wherein conveyer comprises the conveying arm between three deflector chutes and three deflector chutes, and deflector chute is provided with roller, and the end that first deflector chute in three deflector chutes of boom hoisting is installed on the conveying arm is corresponding with first feeding platform; The other end of first deflector chute is corresponding with first conveying arm; One end of second deflector chute is corresponding with first conveying arm, and second feeding platform is corresponding with the middle part of second deflector chute, and an end of second conveying arm is corresponding with the other end of second deflector chute; The other end of second conveying arm is corresponding with the 3rd deflector chute; Processing unit (plant) comprises lathe and boring machine, and the positioned beneath of first conveying arm has boring machine, and the positioned beneath of second conveying arm has lathe.
Boom hoisting in the utility model is a manipulator.The upper surface of feeding platform is the inclined-plane of 5 ~ 45 degree, and a corresponding end with deflector chute is the low end of upper surface.Thin two is pluckings in the middle of the roller.
The advantage of the utility model is: 1, adopt production line automation production, significantly practice thrift manpower; 2. aluminum pipe processing and aluminium bar processing are combined in the production line, effectively save the work-yard.
Description of drawings
Fig. 1 is the general assembly sketch map of the utility model structure;
Fig. 2 be second feeding platform overlook the direction sketch map.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further explanation.
The utility model comprises conveyer and processing unit (plant); Wherein conveyer comprises the conveying arm between three deflector chutes and three deflector chutes, and deflector chute is provided with rod, and the end that first deflector chute 5 in three deflector chutes of boom hoisting is installed on the conveying arm is corresponding with first feeding platform 2; The other end of first deflector chute 5 is corresponding with first conveying arm 6; One end of second deflector chute 8 is corresponding with first conveying arm 6, and second feeding platform 9 is corresponding with the middle part of second deflector chute 8, and an end of second conveying arm 11 is corresponding with the other end of second deflector chute 8; The other end of second conveying arm 11 is corresponding with the 3rd deflector chute 13; Processing unit (plant) comprises that the positioned beneath of lathe 10 and boring machine 7, the first conveying arms 6 has the positioned beneath of boring machine 7, the second conveying arms 11 that lathe 10 is arranged.
Boom hoisting in the utility model is a manipulator.The upper surface of feeding platform is the inclined-plane of 5 ~ 10 degree, and a corresponding end with deflector chute is the low end of upper surface.Thin two is pluckings in the middle of the roller.
In the work, aluminium bar to be processed is tumbled to first feeding table 5 by first feeding platform 2 from being delivered to by suspension arm 1 on first feeding platform 2; By delivering to the assigned address of manipulator clamping workpiece to the boring machine 7 on first conveying arm, 6, the first conveying arms 6 by the rod of Electric Machine Control on first feeding table, 7 pairs of workpiece of boring machine 3 carry out hole processing; After the completion of processing, the manipulator on first conveying arm 6 is with piece-holder to the second feeding table 9, and workpiece 3 is delivered to second conveying arm 11 at second feeding table 9; Second conveying arm 11 carries out clamping with workpiece, is clamped to the Working position of lathe 10, and workpiece 3 is carried out cylindrical processing; After the cylindrical processing, second conveying arm 11 is adhered to workpiece to the three conveying arms 12, and whole streamline is advanced and finished; In the streamline, 4 is collecting box, collects the chip removal in boring machine 7 and lathe 10 processing.
Among Fig. 2; Include backgauge cylinder 13 and width adjusting handwheel 14, the processed workpiece 3 of backgauge cylinder 13 controls is from the feeding table speed of feeding down, and width adjusting handwheel 14 is regulated the working width of blanking bench; The position that workpiece 3 is fallen is not inclined to one side, so that next step processing.
If aluminium bar processing, only from second feeding table, 9 material loadings, workpiece 3 is delivered to second conveying arm 11 at second feeding table 9; Second conveying arm 11 carries out clamping with workpiece; Be clamped to the Working position of lathe 10, workpiece 3 is carried out cylindrical processing, after the cylindrical processing; Second conveying arm 11 is adhered to workpiece to the three conveying arms 12, and whole streamline is advanced and finished.

Claims (4)

1. the production of aluminum pipe aluminium bar is with the structure of streamline; It is characterized in that: described pipeline organization comprises conveyer and processing unit (plant); Wherein conveyer comprises the conveying arm between three deflector chutes and three deflector chutes, and deflector chute is provided with roller, and the end that first deflector chute (5) in three deflector chutes of boom hoisting is installed on the conveying arm is corresponding with first feeding platform (2); The other end of first deflector chute (5) is corresponding with first conveying arm (6); One end of second deflector chute (8) is corresponding with first conveying arm (6), and second feeding platform (9) is corresponding with the middle part of second deflector chute (8), and an end of second conveying arm (11) is corresponding with the other end of second deflector chute (8); The other end of second conveying arm (11) is corresponding with the 3rd deflector chute (13); Processing unit (plant) comprises lathe (10) and boring machine (7), and the positioned beneath of first conveying arm (6) has boring machine (7), and the positioned beneath of second conveying arm (11) has lathe (7).
2. aluminum pipe aluminium bar as claimed in claim 1 production is characterized in that with the structure of streamline: said boom hoisting is a manipulator.
3. aluminum pipe aluminium bar as claimed in claim 1 production is characterized in that with the structure of streamline: the upper surface of said feeding platform is the inclined-plane of 5 ~ 10 degree, and a corresponding end with deflector chute is the low end of upper surface.
4. aluminum pipe aluminium bar as claimed in claim 1 production is characterized in that with the structure of streamline: thin in the middle of said rod two ends are thick.
CN2011204666653U 2011-11-22 2011-11-22 Structure of production line for producing aluminium pipes and aluminium bars Withdrawn - After Issue CN202336763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204666653U CN202336763U (en) 2011-11-22 2011-11-22 Structure of production line for producing aluminium pipes and aluminium bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204666653U CN202336763U (en) 2011-11-22 2011-11-22 Structure of production line for producing aluminium pipes and aluminium bars

Publications (1)

Publication Number Publication Date
CN202336763U true CN202336763U (en) 2012-07-18

Family

ID=46485467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204666653U Withdrawn - After Issue CN202336763U (en) 2011-11-22 2011-11-22 Structure of production line for producing aluminium pipes and aluminium bars

Country Status (1)

Country Link
CN (1) CN202336763U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103128588A (en) * 2011-11-22 2013-06-05 洛阳瑞恒冶金成套设备制造有限公司 Structure of production line for production of aluminum tube and aluminum bar and utilization method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103128588A (en) * 2011-11-22 2013-06-05 洛阳瑞恒冶金成套设备制造有限公司 Structure of production line for production of aluminum tube and aluminum bar and utilization method thereof
CN103128588B (en) * 2011-11-22 2016-01-13 洛阳瑞恒冶金成套设备制造有限公司 Aluminum pipe aluminium bar production pipelining equipment and using method

Similar Documents

Publication Publication Date Title
CN202292086U (en) Automatic production line of container door plate
CN102490013A (en) Automatic production line for side plate or front wall plate of container
CN205165961U (en) Valve body processing equipment
CN202877656U (en) Pipeline prefabricated groove production line
CN102430656A (en) Automatic assembly device of captive nut
CN205465191U (en) Automated production system of container roof
CN202964252U (en) Feeding device of mechanical hand
CN201799615U (en) Automatic blanking device for excircle lathe of reverser
CN104226724B (en) A kind of tubing full-automation production system
CN108080660A (en) A kind of intermediate plate lathe automatic charging & discharging machine
CN202715551U (en) Big and small ball sorting device
CN202367438U (en) H-shaped steel numerical control punching and drilling production line
CN202716055U (en) Steel pipe production equipment
CN202336763U (en) Structure of production line for producing aluminium pipes and aluminium bars
CN201950381U (en) Section bar cutting production line
CN206455462U (en) Double automatic feeding device for machine tool
CN202964203U (en) Fixture used for processing engine connecting rod oil hole
CN202622334U (en) Automatic machine for machining pin shaft
CN202963867U (en) Positioning device for point loading of cross arms
CN208408416U (en) A kind of screw-rolling machine
CN203579300U (en) Feeding device for loop perforating machine
CN103128588B (en) Aluminum pipe aluminium bar production pipelining equipment and using method
CN207103650U (en) A kind of brazed joint feeding attachment of punch press
CN206065906U (en) A kind of trimming crimping equipment integrating of automatization's charging discharging
CN201783873U (en) Automatic conveying device for single-station automatic grinding machines

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120718

Effective date of abandoning: 20160113

C25 Abandonment of patent right or utility model to avoid double patenting