CN202323777U - Continuous traveling device for bridge suspension casting hanging basket - Google Patents

Continuous traveling device for bridge suspension casting hanging basket Download PDF

Info

Publication number
CN202323777U
CN202323777U CN2011204533933U CN201120453393U CN202323777U CN 202323777 U CN202323777 U CN 202323777U CN 2011204533933 U CN2011204533933 U CN 2011204533933U CN 201120453393 U CN201120453393 U CN 201120453393U CN 202323777 U CN202323777 U CN 202323777U
Authority
CN
China
Prior art keywords
hanging basket
rail
shaped steel
traveling device
continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204533933U
Other languages
Chinese (zh)
Inventor
卢治国
朱冠华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011204533933U priority Critical patent/CN202323777U/en
Application granted granted Critical
Publication of CN202323777U publication Critical patent/CN202323777U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a continuous traveling device for a bridge suspension casting hanging basket. The continuous traveling device comprises a triangular steel framework and an I-shaped steel rail, wherein a supporting sliding plate matched with the upper surface of the I-shaped steel rail in a sliding manner is arranged on the front section of the bottom of the triangular steel framework; a traveling trolley is arranged on the rear section of the bottom of the triangular steel framework; and rollers of the traveling trolley are matched with grooves on two sides of the I-shaped steel rail. The continuous traveling device has the characteristics that: the I-shaped steel is used as a hanging basket forward traveling rail; the rollers of the traveling trolley are reversely buckled on an upper flange of the I-shaped steel rail; therefore, rear anchoring reaction caused by swinging of the hanging basket can be born, and a balance weight is not required to be set; and the continuous traveling device can continuously move forwards along the rail in a rolling friction manner instead of a sliding friction manner. The device has a simple processing technology, definite structural stress and relatively high safety coefficient, is convenient to assemble and construct, and is quick and reliable.

Description

A kind of bridge suspended casting suspended basket continuous walking device
Technical field
The utility model belongs to bridge variable cross-section continuous box girder cantilever casting construction device, is specifically related to a kind of bridge suspended casting suspended basket continuous walking device.
Background technology
Bridge variable cross-section continuous box girder cantilever casting construction will adopt triangular shape skeleton Hanging Basket to carry out usually.Like Fig. 1, shown in 2; During construction, Hanging Basket 8 is connected through suspension rod 7 on the bottom girder steel 101 of triangular shape skeleton 1, and Hanging Basket 8 moves forward through running gear is sectional; Whenever move a segment distance; Hanging Basket 8 is fixed on the case beam 4 of having built, utilizes the Hanging Basket 8 anterior templates 5 that are provided with to carry out the concreting of next section case beam, treat to remake the fixed support that moves forward for Hanging Basket 8 after this section case beam reaches intensity.The running gear of existing Hanging Basket is steel support 102 to be set as supporting in triangular shape skeleton 1 bottom; All must loosen anchor pole 3 behind the main truss during each moving earlier; Join wire rope 2 as the anti-counterforce device that leans forward of Hanging Basket with the vertical smart bundle screw-thread steel or the 10T Chain block of case beam simultaneously, make Hanging Basket 8 whole reaches through index power.The every reach of Hanging Basket 20-40cm, because 10t cucurbit oblique loading, overturning or slip resistance analysis stressed (vertical force component) reduces, and needs to suspend Hanging Basket 8 reaches, anchoring again, adjustment cucurbit position gets into next walking circulation, puts in place until reach.About repeatedly 10 circulations of workflow, construction speed is slower, and is time-consuming, has big potential safety hazard.
The utility model content
The purpose of the utility model provides more convenient, quick, the reliable bridge suspended casting suspended basket of a kind of construction continuous walking device.
For realizing above-mentioned purpose; The utility model adopts following technical scheme: bridge suspended casting suspended basket continuous walking device comprises triangular shape skeleton, I-rail; Leading portion in said triangular shape skeleton bottom is provided with the support skid that cooperates with the bull headction slide; The back segment of triangular shape skeleton bottom is provided with walking dolly, and the roller of walking dolly cooperates with the bull headction grooves on two sides, and the leading portion of triangular shape skeleton bottom is provided with the support skid that cooperates with the bull headction slide.
Said walking dolly comprises a fixed head, and the both sides of fixed head below are provided with upper backup pad, are hinged with lower supporting plate on each upper backup pad, and said roller is located at the inboard of two lower supporting plates relatively.
The characteristics of the utility model are: with i iron as Hanging Basket reach walking track; Utilize walking dolly with the top flange of roller left-hand thread in bull headction; Anchor counter-force after both having born Hanging Basket and swinging when moving and balance weight need not be set, again can the rolling friction mode but not the sliding friction mode advance continuously along track.This device processing technology is simple, and structure stress is clear and definite, and is easy to assembly, and safety factor is higher, makes construction more convenient, quick, reliable.
Below in conjunction with accompanying drawing and embodiment the utility model is done and to be further described.
Description of drawings
Fig. 1, Fig. 2 move view when having cradle construction now.
Fig. 3 is the structural representation of the utility model.
Fig. 4 is the walking dolly structural representation in the utility model.
Fig. 5 is the left view of Fig. 4.
The specific embodiment
Like Fig. 3-shown in Figure 5; Bridge suspended casting suspended basket continuous walking device; Comprise triangular shape skeleton 1, bull headction 6; Back segment at said triangular shape skeleton 1 bottom girder steel 101 is provided with walking dolly 9, and the roller of walking dolly 9 cooperates with bull headction 6 grooves on two sides, and the leading portion of triangular shape skeleton 1 bottom girder steel 101 is provided with the support skid 102 that cooperates with bull headction 6 slide.Said walking dolly 9 comprises a fixed head 901; The both sides of fixed head 901 belows respectively are provided with two upper backup pads 902; Be hinged with a lower supporting plate 903 with axle 904 between two upper backup pads 902; The inboard of two lower supporting plates is provided with two groups of rollers 906 relatively with axle 905, and two rollers 906 in each group lay respectively at the interior left-hand thread of groove of bull headction 6 both sides on the top flange.
Operating principle: when Hanging Basket 8 moves forward through running gear, loosen when moving behind the main truss behind the anchor pole 3 at every turn, walking dolly 9 with roller 906 left-hand threads in bull headction 6 top flanges; Anchor counter-force after when bearing Hanging Basket 8 reaches; Back anchor or balance weight must be set in addition resist the load that topples, advance continuously along bull headction 6, need not interrupt repeatedly with the rolling friction mode; Accelerating construction progress has improved the construction safety coefficient.

Claims (2)

1. bridge suspended casting suspended basket continuous walking device; Comprise triangular shape skeleton, I-rail; It is characterized in that being provided with the support skid that cooperates with the bull headction slide at the leading portion of said triangular shape skeleton bottom; The back segment of triangular shape skeleton bottom is provided with walking dolly, and the roller of walking dolly cooperates with the bull headction grooves on two sides, and the leading portion of triangular shape skeleton bottom is provided with the support skid that cooperates with the bull headction slide.
2. bridge suspended casting suspended basket continuous walking device according to claim 1; It is characterized in that said walking dolly comprises a fixed head; The both sides of fixed head below are provided with upper backup pad; Be hinged with lower supporting plate on each upper backup pad, said roller is located at the inboard of two lower supporting plates relatively.
CN2011204533933U 2011-11-16 2011-11-16 Continuous traveling device for bridge suspension casting hanging basket Expired - Fee Related CN202323777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204533933U CN202323777U (en) 2011-11-16 2011-11-16 Continuous traveling device for bridge suspension casting hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204533933U CN202323777U (en) 2011-11-16 2011-11-16 Continuous traveling device for bridge suspension casting hanging basket

Publications (1)

Publication Number Publication Date
CN202323777U true CN202323777U (en) 2012-07-11

Family

ID=46435761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204533933U Expired - Fee Related CN202323777U (en) 2011-11-16 2011-11-16 Continuous traveling device for bridge suspension casting hanging basket

Country Status (1)

Country Link
CN (1) CN202323777U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866699A (en) * 2014-04-11 2014-06-18 四川川交路桥有限责任公司 Rail-free type walking hanging basket
CN105908626A (en) * 2016-04-15 2016-08-31 中铁五局集团有限公司 Self-balancing reverse locking wheel structure of suspension basket
CN107190651A (en) * 2017-05-17 2017-09-22 贵州路桥集团有限公司 A kind of Hanging Basket uses the traveling method of this device with slidingtype running gear and Hanging Basket
CN108149590A (en) * 2017-12-26 2018-06-12 中交路桥华南工程有限公司 The all-hydraulic continuous walking system of anchor point Hanging Basket and construction method afterwards
CN110029589A (en) * 2019-04-19 2019-07-19 中铁宝桥集团有限公司 Walking Hanging Basket and method for the construction of Steel Bridge cantilever
CN111794116A (en) * 2020-07-24 2020-10-20 中国十九冶集团有限公司 Construction method for driving hanging basket in bridge construction
CN112456327A (en) * 2020-12-11 2021-03-09 中铁二十三局集团第一工程有限公司 Riding wheel for assisting large-scale hanging basket to walk
CN113026571A (en) * 2021-03-30 2021-06-25 四川公路桥梁建设集团有限公司 Ultra-wide bridge hanging basket structure and implementation method
CN113585102A (en) * 2021-07-30 2021-11-02 中交隧道工程局有限公司 Hanging basket walking pushing device
CN119877404A (en) * 2025-03-17 2025-04-25 四川公路桥梁建设集团有限公司 Hanging basket hanging casting and steel beam hoisting integrated construction method and hanging basket structure used by same

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866699A (en) * 2014-04-11 2014-06-18 四川川交路桥有限责任公司 Rail-free type walking hanging basket
CN105908626A (en) * 2016-04-15 2016-08-31 中铁五局集团有限公司 Self-balancing reverse locking wheel structure of suspension basket
CN107190651A (en) * 2017-05-17 2017-09-22 贵州路桥集团有限公司 A kind of Hanging Basket uses the traveling method of this device with slidingtype running gear and Hanging Basket
CN108149590A (en) * 2017-12-26 2018-06-12 中交路桥华南工程有限公司 The all-hydraulic continuous walking system of anchor point Hanging Basket and construction method afterwards
CN110029589A (en) * 2019-04-19 2019-07-19 中铁宝桥集团有限公司 Walking Hanging Basket and method for the construction of Steel Bridge cantilever
CN110029589B (en) * 2019-04-19 2024-08-20 中铁宝桥集团有限公司 Walking type hanging basket and method for steel bridge hanging splicing construction
CN111794116A (en) * 2020-07-24 2020-10-20 中国十九冶集团有限公司 Construction method for driving hanging basket in bridge construction
CN112456327A (en) * 2020-12-11 2021-03-09 中铁二十三局集团第一工程有限公司 Riding wheel for assisting large-scale hanging basket to walk
CN112456327B (en) * 2020-12-11 2022-11-15 中铁二十三局集团第一工程有限公司 Riding wheel for assisting large-scale hanging basket to walk
CN113026571A (en) * 2021-03-30 2021-06-25 四川公路桥梁建设集团有限公司 Ultra-wide bridge hanging basket structure and implementation method
CN113585102A (en) * 2021-07-30 2021-11-02 中交隧道工程局有限公司 Hanging basket walking pushing device
CN119877404A (en) * 2025-03-17 2025-04-25 四川公路桥梁建设集团有限公司 Hanging basket hanging casting and steel beam hoisting integrated construction method and hanging basket structure used by same

Similar Documents

Publication Publication Date Title
CN105421249B (en) Dragging- hoisting combined type hanging basket structure and construction method
CN205223872U (en) Drag and hang novel string of basket structure of convolution
CN101446066B (en) Erection method of stiffening girder of suspension bridge and device thereof
CN204174541U (en) Continuous girder bridge suspended casting suspended basket push unit
CN202322177U (en) Portable carrier for heavy electrical equipment
CN103410093A (en) Reverse dragging device for construction of dragging large-span steel braced girder
CN109505268A (en) A kind of walking rail-free triangle hanging basket and construction method
CN201770945U (en) Synchronous cradle moving device for continuous rigid frame bridge construction cradle
CN102373674A (en) Triangular hanging basket traveling device
CN203346798U (en) Reverse dragging device for large span steel truss girder dragging construction
CN205527378U (en) Utilize slide rail cable system of section of jurisdiction loop wheel machine roof beam follow -up
CN201288308Y (en) Construction device for rope-suspension bridge stiff girder
CN203080418U (en) Segment assembly type bridge girder erection machine
CN203080427U (en) Gear running type suspended basket structure
CN103866699A (en) Rail-free type walking hanging basket
CN205804197U (en) Cast-in-place cantilever beam Hanging Basket moves anti-overturning devices
CN211713684U (en) Bridge overhauls platform
CN210340100U (en) Energy-saving electric single-beam crane
CN202543807U (en) Steel truss girder drag frame constructed by CRM crawler heavy carriers
CN215669078U (en) Hanging basket walking structure
CN102345273A (en) Synchronous cradle moving device for continuous rigid frame bridge construction cradle
CN206204802U (en) A kind of continuous beam Diamond-Shape Form Traveler traveling shifts the safeties of overturn-preventing
CN214648235U (en) Mine tunnel slide rail motor car
CN201105958Y (en) Rope holding carriage system of tower crane
CN202657861U (en) Pipeline assembly trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20141116