CN202323744U - Hoist device for bridge construction - Google Patents

Hoist device for bridge construction Download PDF

Info

Publication number
CN202323744U
CN202323744U CN2011204871658U CN201120487165U CN202323744U CN 202323744 U CN202323744 U CN 202323744U CN 2011204871658 U CN2011204871658 U CN 2011204871658U CN 201120487165 U CN201120487165 U CN 201120487165U CN 202323744 U CN202323744 U CN 202323744U
Authority
CN
China
Prior art keywords
bridge construction
hanging apparatus
bridge
vertical rod
strutting arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204871658U
Other languages
Chinese (zh)
Inventor
谭强
曾维亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Original Assignee
CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd filed Critical CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Priority to CN2011204871658U priority Critical patent/CN202323744U/en
Application granted granted Critical
Publication of CN202323744U publication Critical patent/CN202323744U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hoist device for bridge construction, which comprises a support device. A transverse frame arranged on the support device is provided with a cross bar, and the cross bar is provided with a hoist hook. The hoist device is reasonable in design, reliable in performance and suitable for hoist on site for construction of various bridges.

Description

The hanging apparatus that is used for bridge construction
Technical field
The utility model belongs to the apparatus field of building operations, particularly relates to the hanging apparatus that is used for bridge construction.
Background technology
Bridge refers to building natural for the road leap or that cultural obstacle is built.
Bridge is generally said by five big parts and five widgets and is formed; Five big parts are meant that bridge bears the spanning superstructure and the substructure of automobile or other vehicle transport loads; Be the assurance of bridge structure safe. comprise (1) bridge span structure (or title bridge opening structure; Superstructure), (2) support system, (3) bridge pier, (4) abutment, (5) pier basis. five widgets are meant the directly parts relevant with the bridge service function, are called the bridge floor structure in the past. comprise (1) deck paving, (2) waterproof and water drainage system, (3) railing, (4) shrinkage joint, (5) lighting.
The bridge construction construction is meant according to design content, builds the process of bridge; Mainly refer to bridge Construction Technology and construction organization.
Along with the development of bridge Construction Technology, also in continuous variation, therefore, need the hanging apparatus of research and development different performance and structure for the demand of the hanging apparatus that uses in the work progress.
The utility model content
The utility model technical problem to be solved provides the hanging apparatus that is used for bridge construction; This hanging apparatus is reasonable in design, dependable performance, and on-site hoisting uses when being applicable to the different types of rridges construction.
The technical scheme that the above-mentioned technical problem of the utility model device solves is adopted is:
Be used for the hanging apparatus of bridge construction, comprise bracing or strutting arrangement, transverse strands is provided with cross bar on the said bracing or strutting arrangement; Said cross bar is provided with suspension hook.
Said bracing or strutting arrangement comprises two vertical rods of vertically setting up, and the bottom of said vertical rod is provided with base.
Said base has upper surface upwards and the lower surface that contacts with ground; And extend projection on the said upper surface, the central dip of said projection forms screw; The bottom of said vertical rod is provided with the external screw thread with said screw coupling.
Said suspension hook is that ferrous materials is processed.
Said vertical rod is that ferrous materials is processed.
In sum, the utility model device compared with prior art has following advantage:
(1), the utility model is simple and compact for structure, low cost of manufacture.
(2), the base dependable performance of the utility model, and be suitable for using in that bridge construction is on-the-spot.
(3), the vertical rod of the utility model and base adopt and be threaded, if vertical rod or base damage, can change.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment 1.
The corresponding title of each parts among the figure: 1-bracing or strutting arrangement, 2-cross bar, 3-suspension hook, 4-base, 5-upper surface, 6-lower surface, 7-projection, 8-screw, 9-external screw thread.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing, the utility model device is done further to specify, but the embodiment of the utility model device is not limited thereto.
Embodiment 1
As shown in Figure 1, be used for the hanging apparatus of bridge construction, comprise bracing or strutting arrangement 1, transverse strands is provided with cross bar 2 on the said bracing or strutting arrangement; Said cross bar is provided with suspension hook 3.
Said bracing or strutting arrangement comprises two vertical rods of vertically setting up, and the bottom of said vertical rod is provided with base 4.
Said base has upper surface 5 upwards and the lower surface 6 that contacts with ground; And extend projection 7 on the said upper surface, the central dip of said projection forms screw 8; The bottom of said vertical rod is provided with the external screw thread 9 with said screw coupling.
Said suspension hook is that ferrous materials is processed.
Said vertical rod is that ferrous materials is processed.
As stated, just can realize the utility model device preferably.

Claims (5)

1. be used for the hanging apparatus of bridge construction, it is characterized in that, comprise bracing or strutting arrangement (1), transverse strands is provided with cross bar (2) on the said bracing or strutting arrangement; Said cross bar is provided with suspension hook (3).
2. the hanging apparatus that is used for bridge construction according to claim 1 is characterized in that, said bracing or strutting arrangement comprises two vertical rods of vertically setting up, and the bottom of said vertical rod is provided with base (4).
3. the hanging apparatus that is used for bridge construction according to claim 2 is characterized in that, said base has upper surface (5) upwards and the lower surface (6) that contacts with ground; And extend projection (7) on the said upper surface, the central dip of said projection forms screw (8); The bottom of said vertical rod is provided with the external screw thread (9) with said screw coupling.
4. according to each described hanging apparatus that is used for bridge construction of claim 1-3, it is characterized in that said suspension hook is that ferrous materials is processed.
5. according to each described hanging apparatus that is used for bridge construction of claim 1-3, it is characterized in that said vertical rod is that ferrous materials is processed.
CN2011204871658U 2011-11-30 2011-11-30 Hoist device for bridge construction Expired - Fee Related CN202323744U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204871658U CN202323744U (en) 2011-11-30 2011-11-30 Hoist device for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204871658U CN202323744U (en) 2011-11-30 2011-11-30 Hoist device for bridge construction

Publications (1)

Publication Number Publication Date
CN202323744U true CN202323744U (en) 2012-07-11

Family

ID=46435728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204871658U Expired - Fee Related CN202323744U (en) 2011-11-30 2011-11-30 Hoist device for bridge construction

Country Status (1)

Country Link
CN (1) CN202323744U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112265916A (en) * 2020-10-10 2021-01-26 中交一公局集团有限公司 Adjusting device is used in hoist and mount of assembled bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112265916A (en) * 2020-10-10 2021-01-26 中交一公局集团有限公司 Adjusting device is used in hoist and mount of assembled bridge
CN112265916B (en) * 2020-10-10 2024-04-26 中交一公局集团有限公司 An adjusting device for hoisting an assembled bridge

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN103174141B (en) Extraction equipment for steel pipe piles under the beam support in tidal flat area
CN202260192U (en) Derrick mast with adjustable height
CN105442453A (en) Construction method for suspension bridge tower crossbeam combination support
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN203334190U (en) Thin-wall hollow pillar integral elevation model turning device
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN202174638U (en) Steel strand paying off device for prestress of railway box-girder
CN203741690U (en) Pedestrian overcrossing assembling type steel truss girder
CN204252001U (en) A kind of cable stayed bridge and Sarasota thereof
CN202369929U (en) Temporary steel bridge navigation span lifting combination device
CN107021418B (en) A gantry crane with stable use and high safety performance
CN205421023U (en) Public road bridge roof beam strutting arrangement
CN205557290U (en) Monolithic purlin formula annular passenger footbridge
CN204876339U (en) A a superimposed sheet supporting beam for steel construction building
CN204252573U (en) Adjustable quick basement roof reinforcement support system
CN202730633U (en) Self-anchored suspension bridge for main cables in parallel spaces of one-column tower
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN201762664U (en) Bracket for mounting guardrail templates in bridge building
CN201877729U (en) Mobile type quick dismantlement spanning frame
CN207063371U (en) A kind of assembled stair
CN202327672U (en) Movement lighting device for bridge construction or engineering repair
CN211368376U (en) Guardrail for municipal bridge
CN204023603U (en) A kind of shearing resistance screw communication base station basis
CN203429852U (en) Factory-like produced roof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20121130