CN202317535U - Electric locomotive roof assembly welding fixture - Google Patents

Electric locomotive roof assembly welding fixture Download PDF

Info

Publication number
CN202317535U
CN202317535U CN2011204589799U CN201120458979U CN202317535U CN 202317535 U CN202317535 U CN 202317535U CN 2011204589799 U CN2011204589799 U CN 2011204589799U CN 201120458979 U CN201120458979 U CN 201120458979U CN 202317535 U CN202317535 U CN 202317535U
Authority
CN
China
Prior art keywords
gantry
cylinder
sides
base plate
top cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2011204589799U
Other languages
Chinese (zh)
Inventor
陈华
郭武冬
倪文武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou Lince Group Co Ltd
Original Assignee
Zhuzhou Lince Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou Lince Group Co Ltd filed Critical Zhuzhou Lince Group Co Ltd
Priority to CN2011204589799U priority Critical patent/CN202317535U/en
Application granted granted Critical
Publication of CN202317535U publication Critical patent/CN202317535U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T30/00Transportation of goods or passengers via railways, e.g. energy recovery or reducing air resistance

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及一种电力机车顶盖组焊工装,包括整体骨架、龙门和汽缸,该整体骨架由加强筋板、主梁、边梁、底板和侧墙板组成;侧墙板与底板形成倾斜角度,侧墙板外侧有用于安装龙门的滑动轨道;龙门上有可移动的汽缸固定架,龙门用于消除铝板与框架之间的焊接间隙,保证焊接质量;达到对铝板与框架形成刚性固定力量达到减少焊接变形的效果。边梁外侧有均布侧墙压紧悬臂,加强筋板上有变位机连接管,本实用新型利用移动压紧与固定压紧相结合的方式消除了产品与工装之间的干涉,使产品能一次全部在工装上焊接完成。提高了工作效率。所有定位装置都做到了快速准确的定位。有效的保证了工装的稳定性、满足了产品质量要求。

The utility model relates to a welding tool for the top cover of an electric locomotive, which comprises a whole skeleton, a gantry and a cylinder. Angle of inclination, there is a sliding track for installing the gantry on the outside of the side wall panel; there is a movable cylinder fixing frame on the gantry, and the gantry is used to eliminate the welding gap between the aluminum plate and the frame to ensure the welding quality; to achieve a rigid fixation of the aluminum plate and the frame The strength achieves the effect of reducing welding deformation. There are evenly distributed side wall compression cantilevers on the outside of the side beams, and there are positioner connecting pipes on the stiffener plate. The utility model eliminates the interference between the product and the tooling by using the combination of mobile compression and fixed compression, and makes the product All can be welded on the tooling at one time. Improve work efficiency. All positioning devices have achieved fast and accurate positioning. Effectively guarantee the stability of the tooling and meet the product quality requirements.

Description

一种电力机车顶盖组焊工装An electric locomotive roof assembly welding tool

技术领域: Technical field:

本实用新型涉及一种电力机车顶盖组焊工装,以保证焊缝质量及产品外形结构;属于机械制造领域。The utility model relates to a welding tool for the top cover of an electric locomotive to ensure the quality of the welding seam and the appearance structure of the product; it belongs to the field of mechanical manufacturing.

背景技术: Background technique:

现有顶盖工装在制造时,容易出现有刚性较差和工装出现下沉挠度现象而引起工装失效。所使用工装夹具、定位块等装置因焊接而引起的变形;出现夹紧方式的实用性与灵活方便性矛盾。很难把握产品的定位块与定位基准时的焊接变形特性。使得在实际运用过程中该定位的地方没有定位。经验性的数据没有通过试验来验证或试验时出错没有得到真实准确的数据。对下料工艺流程安排不合理。工装零部件实用性、可靠性、灵活性、经济性不能兼顾。气动设备的选型与计算往往与实际要求使用的相差太大。经常造成零部件返工甚至报废。而影响产品质量甚至造成产品的报废。During the manufacture of the existing top cover tooling, it is easy to have poor rigidity and sinking and deflection of the tooling, which will cause the tooling to fail. The deformation of the used fixtures, positioning blocks and other devices due to welding; there is a contradiction between the practicability and flexibility of the clamping method. It is difficult to grasp the welding deformation characteristics of the positioning block and positioning reference of the product. So that the location of the positioning is not positioned in the actual application process. Empirical data is not verified by experiments or errors are not obtained during experiments to obtain true and accurate data. Unreasonable arrangement of the blanking process. The practicability, reliability, flexibility and economy of tooling parts cannot be taken into account. The selection and calculation of pneumatic equipment are often too different from the actual requirements. It often results in parts rework or even scrapping. And affect the product quality and even cause the product to be scrapped.

发明内容: Invention content:

本实用新型的目的在于克服上述缺陷,提供一种工作效率高、安全可靠、实用、灵活、焊接不变形和确保焊缝质量及产品外形结构的电力机车顶盖组焊工装。The purpose of the utility model is to overcome the above-mentioned defects, and provide a welding tool for electric locomotive top cover with high working efficiency, safety, reliability, practicality, flexibility, no deformation during welding, and guaranteed weld seam quality and product shape structure.

本实用新型的技术方案:一种电力机车顶盖组焊工装,包括整体骨架、龙门和汽缸,特征是该顶盖组焊工装中的整体骨架是由均布的加强筋板、四根主梁、两边梁、一底板和两侧墙板组成凹形框架式结构;The technical scheme of the utility model: a welding tool for the top cover of an electric locomotive, including an overall skeleton, a gantry and a cylinder, and is characterized in that the overall skeleton in the welding tool for the top cover is composed of uniformly distributed reinforcing ribs, four main Beams, beams on both sides, a base plate and wall panels on both sides form a concave frame structure;

所述的四根主梁与两横杆呈井字形结构的底架,该底架两侧设置边梁,在底架上设置底板(4),底板(4)下表面设置均布的加强筋板(1),即底板(4)平行放在加强筋板(1)上用点焊固定,底板(4)的两侧设置用来组装顶盖侧墙的侧墙板(5),该侧墙板与底板的倾斜角度为119°,即两侧墙板设置在底板两侧并分别固定在两边梁上,两侧墙板外侧各设有一个滑动轨道;The four main beams and the two cross bars are a well-shaped underframe, side beams are arranged on both sides of the underframe, a bottom plate (4) is arranged on the bottom frame, and evenly distributed reinforcing ribs are arranged on the lower surface of the bottom plate (4) The plate (1), that is, the bottom plate (4) is placed parallel to the stiffener plate (1) and fixed by spot welding, and the two sides of the bottom plate (4) are provided with side wall panels (5) for assembling the side walls of the top cover. The inclination angle between the wall board and the bottom board is 119°, that is, the wall boards on both sides are arranged on both sides of the bottom board and fixed on the beams on both sides respectively, and there is a sliding track on the outside of the wall boards on both sides;

整体骨架两端各设有一个变位机连接管,整体骨架的两边梁的外侧各设有均布的用于加压的侧墙压紧悬臂;There is a positioner connecting pipe at both ends of the overall frame, and the outer sides of the two side beams of the overall frame are respectively equipped with side wall compression cantilevers for pressurization that are evenly distributed;

所述的龙门为两个滑动龙门,该滑动龙门是设置在整体骨架的滑动轨道上,滑动龙门是由龙门立柱、加强筋、横梁和滚动轴承组成,该加强筋设置于横梁的下端,滚动轴承安装在龙门立柱底座上并置于两侧墙板的滑动轨道内;由滚动轴承带动滑动龙门在侧墙上的滑动槽内活动。The gantry is two sliding gantry, the sliding gantry is arranged on the sliding track of the overall skeleton, the sliding gantry is composed of gantry columns, reinforcing ribs, beams and rolling bearings, the reinforcing ribs are arranged at the lower end of the beams, and the rolling bearings are installed on the The base of the gantry column is placed in the sliding tracks of the wall panels on both sides; the sliding gantry is driven by rolling bearings to move in the sliding grooves on the side walls.

所述的两个滑动龙门中的横梁上设有均布的用于固定汽缸的汽缸固定架,即汽缸固定在横梁的汽缸固定架上,每个滑动龙门上的汽缸固定架的数量至少二件。汽缸为外购件,其汽缸的工作压力为120Mpa。The beams in the two sliding gantry are provided with evenly distributed cylinder fixing frames for fixing the cylinders, that is, the cylinders are fixed on the cylinder fixing frames of the beams, and the number of cylinder fixing frames on each sliding gantry is at least two pieces . The cylinder is a purchased part, and the working pressure of the cylinder is 120Mpa.

本实用新型解决了工装因自重及使用时跨度较大产生的下沉挠度;利用底板与侧板的定位角度,保证焊接后产品角度;确定工装的装配顺序来保证工装整体有效性;确定工装侧墙板的外挠度定位尺寸保证顶盖产品侧墙的直线度、平面度;同确保了滑动龙门、汽缸、侧墙压紧悬臂等零部件的互换性;保证了工装与产品不出现干涉。对焊接变形量的数据进行试验根据试验所得数据确定工装反变形方向及尺寸。使得产品质量得到保证。The utility model solves the sinking deflection of the tooling due to its own weight and large span during use; uses the positioning angle of the bottom plate and the side plate to ensure the angle of the product after welding; determines the assembly sequence of the tooling to ensure the overall effectiveness of the tooling; determines the side of the tooling The external deflection positioning dimension of the wall panel ensures the straightness and flatness of the side wall of the top cover product; it also ensures the interchangeability of components such as sliding gantry, cylinder, and side wall compression cantilever; it ensures that the tooling does not interfere with the product. Test the data of welding deformation and determine the direction and size of the anti-deformation of the tooling according to the data obtained from the test. So that product quality is guaranteed.

本实用新型由于在设计时利用了刚性固定法克服了焊接收缩量及薄板的波浪变形。通过试验的形式对焊接产生的立弯曲变形、旁弯曲变形进行模拟试验,并对模拟试验的数据结合经验数据进行校正。根据数据使用反变形法预防焊接弯曲变形。利用移动压紧与固定压紧相结合的方式消除了产品与工装之间的干涉,使产品能一次全部在工装上焊接完成提高了工作效率。所有定位装置都做到了快速准确的定位。有效的保证了工装的稳定性、实用性确定了设计的合理性与经济性满足了产品质量要求。本实用新型是一种高效率、安全可靠、实用、灵活、及用以保证焊缝质量及产品外形结构的组装焊接工装。The utility model overcomes the welding shrinkage and the wave deformation of the thin plate due to the rigid fixing method used in the design. The vertical bending deformation and side bending deformation caused by welding are simulated by the form of the test, and the data of the simulation test combined with the empirical data are corrected. Use the anti-deformation method to prevent welding bending deformation according to the data. The combination of mobile pressing and fixed pressing eliminates the interference between the product and the tooling, so that all the products can be welded on the tooling at one time and the work efficiency is improved. All positioning devices have achieved fast and accurate positioning. Effectively guarantee the stability and practicability of the tooling, determine the rationality and economy of the design, and meet the product quality requirements. The utility model is a high-efficiency, safe, reliable, practical, flexible assembly and welding tool for ensuring the quality of weld seams and the appearance and structure of products.

附图说明: Description of drawings:

图1为电力机车顶盖特种装备立体结构示意图;Fig. 1 is a three-dimensional structural schematic diagram of special equipment on the top cover of an electric locomotive;

图2为电力机车顶盖特种装备左视结构示意图;Fig. 2 is a schematic diagram of the left view structure of the special equipment on the top cover of the electric locomotive;

图3为滑动龙门结构示意图;Fig. 3 is a structural schematic diagram of a sliding gantry;

图中:1-加强筋板,2-主梁,3-边梁,4-底板,5-侧墙板,6-滑动轨道,7-变位机连接管,8-龙门立柱,9-加强筋,10-横梁1,11-滚动轴承,12-汽缸固定架,13-侧墙压紧悬臂,14-横杆。In the figure: 1-reinforcing rib plate, 2-main beam, 3-side beam, 4-bottom plate, 5-side wall panel, 6-sliding track, 7-positioner connecting pipe, 8-gantry column, 9-reinforcement Rib, 10-beam 1,11-rolling bearing, 12-cylinder fixed frame, 13-side wall compression cantilever, 14-cross bar.

具体实施方式: Detailed ways:

参看图1、图2和图3一种电力机车顶盖组焊工装,包括整体骨架、龙门和汽缸,该顶盖组焊工装中的整体骨架是由均布的加强筋板1、四根主梁2、两个方管式边梁3、一块底板4和两侧墙板5组成凹形框架式结构;Referring to Fig. 1, Fig. 2 and Fig. 3, a roof assembly welding tool for an electric locomotive includes an overall skeleton, a gantry and a cylinder. The main beam 2, two square tube side beams 3, a bottom plate 4 and two side wall panels 5 form a concave frame structure;

四根主梁2与两横杆14呈井字形结构的底架,该底架两侧设置方管式边梁3,在底架上设置底板4,底板4下表面设置均布的加强筋板1,即底板4为一块20mm厚的整体钢板平行放在加强筋板1上用点焊固定,保证平面度0.5mm,同时还必须保证平面不能扭曲。利用整体钢板保证顶盖的底面平面度。底板4两侧设置用来组装顶盖侧墙的侧墙板5,该侧墙板5与底板4的倾斜角度为119°,即两侧墙板5设置在底板4两侧并分别固定在两边梁3上,两侧墙板5外侧各设有一个滑动轨道6;Four main beams 2 and two cross bars 14 form a well-shaped underframe. Square tube side beams 3 are arranged on both sides of the underframe. A bottom plate 4 is arranged on the underframe. The lower surface of the bottom plate 4 is provided with evenly distributed reinforcing ribs. 1. That is, the bottom plate 4 is a whole steel plate with a thickness of 20 mm, which is placed parallel to the stiffener plate 1 and fixed by spot welding to ensure a flatness of 0.5 mm, and at the same time ensure that the plane cannot be distorted. The whole steel plate is used to ensure the flatness of the bottom surface of the top cover. The side wall panels 5 for assembling the side walls of the top cover are arranged on both sides of the bottom plate 4. The inclination angle between the side wall panels 5 and the bottom plate 4 is 119°, that is, the side wall panels 5 are arranged on both sides of the bottom plate 4 and fixed on both sides respectively. On the beam 3, a sliding track 6 is provided on the outer sides of the wall panels 5 on both sides;

两侧墙板5设置在底板4两侧并分别固定在两边梁3上,两侧墙板5下部外侧各设有一个滑动轨道6;侧墙板5的作用是用来组装顶盖侧墙的,安装在加强筋的侧面保证与底板的倾斜角度,考虑侧墙的外挠度,提前预留好侧墙焊接反变形并用侧墙压紧悬臂压紧。Both side wall panels 5 are arranged on both sides of the base plate 4 and fixed on the two side beams 3 respectively, and a sliding track 6 is respectively provided on the outer side of the lower part of the two side wall panels 5; the side wall panels 5 are used to assemble the side walls of the top cover , Installed on the side of the rib to ensure the inclination angle with the bottom plate, considering the external deflection of the side wall, reserve the anti-deformation of the side wall welding in advance and use the side wall to compress the cantilever to compress.

整体骨架两端各设有一个变位机连接管7,整体骨架的两边梁3的外侧各设有均布的用于加压的侧墙压紧悬臂13;Both ends of the overall framework are provided with a positioner connecting pipe 7, and the outer sides of the two side beams 3 of the overall framework are respectively provided with side wall compression cantilevers 13 for pressurization that are evenly distributed;

龙门为两个滑动龙门,该滑动龙门是设置在整体骨架的滑动轨道6上,滑动龙门是由龙门方管式立柱8、钢条式加强筋9、方管式横梁10和滚动轴承11组成,该加强筋9设置于横梁10的下端,滚动轴承11安装在龙门立柱8底座上并置于两侧墙板5的滑动轨道6内;由滚动轴承11带动滑动龙门在侧墙上的滑动槽内活动。The gantry is two sliding gantry, the sliding gantry is set on the sliding track 6 of the overall skeleton, the sliding gantry is composed of a gantry square tube column 8, a steel bar reinforcing rib 9, a square tube beam 10 and a rolling bearing 11. Rib 9 is arranged on the lower end of crossbeam 10, and rolling bearing 11 is installed on the gantry column 8 base and is placed in the sliding track 6 of both side wall panels 5;

两个滑动龙门中的横梁10上设有均布的用于固定汽缸的汽缸固定架12,即汽缸固定在横梁10的汽缸固定架12上,每个滑动龙门上的汽缸固定架12的数量至少二件(本实施例汽缸固定架为四件)。汽缸为外购件,其汽缸的工作压力为120Mpa。The beams 10 in the two sliding gantry are provided with evenly distributed cylinder mounts 12 for fixing the cylinders, that is, the cylinders are fixed on the cylinder mounts 12 of the crossbeam 10, and the number of cylinder mounts 12 on each sliding gantry is at least Two pieces (the present embodiment cylinder holder is four pieces). The cylinder is a purchased part, and the working pressure of the cylinder is 120Mpa.

本实施例中In this example

加强筋板1数量为一十一件。The number of stiffener plates 1 is eleven pieces.

主梁2数量为四件。The number of main girders 2 is four.

边梁3数量为二件。Side beam 3 quantity is two pieces.

底板4数量为一件。The number of bottom plates 4 is one piece.

侧墙板5数量为二件,安装在加强筋板1的内斜边上形成119°角;The number of side wall panels 5 is two, which are installed on the inner hypotenuse of the stiffener panel 1 to form an angle of 119°;

滑动轨道6数量为二件,安装在边梁3外侧面上,用于安装滑动龙门。Sliding track 6 quantity is two pieces, is installed on side beam 3 lateral surfaces, is used for installing sliding gantry.

变位机连接管7数量为二件,即安装在工装两端头加强筋板1的外侧,用于承载工装及旋转工装用。Positioner connecting pipe 7 quantity is two pieces, promptly is installed on the outside of stiffener plate 1 at both ends of frock, and is used for carrying frock and rotating frock usefulness.

滑动龙门数量为二件,安装在滑动轨道6上,其龙门作用是对底板4上放置的铝板及铝型材框架进行压紧,消除铝板与框架之间的焊接间隙,保证焊接质量;同时利用龙门的支撑力与汽缸所产生的推力形成反作用力,达到对铝板与框架形成刚性固定力量达到减少焊接变形的效果。The number of sliding gantry is two pieces, which are installed on the sliding track 6. The function of the gantry is to compress the aluminum plate and the aluminum profile frame placed on the bottom plate 4, so as to eliminate the welding gap between the aluminum plate and the frame and ensure the welding quality; at the same time, the gantry is used to The supporting force and the thrust generated by the cylinder form a reaction force to form a rigid fixing force on the aluminum plate and the frame to reduce welding deformation.

龙门立柱8数量为四件。Gantry column 8 quantity is four pieces.

加强筋9数量为四件,安装在横梁10上起到加强作用。The number of reinforcing ribs 9 is four, and they are installed on the crossbeam 10 to play a reinforcing role.

横梁10数量为四件安装在龙门立柱8上。Crossbeam 10 quantity is installed on the gantry column 8 for four pieces.

滚动轴承11数量为八个,安装在龙门立柱8底座上(每个龙门立柱有二个滚动轴承)上起到固定轴承的作用。Rolling bearing 11 quantity is eight, is installed on the gantry column 8 bases (each gantry column has two rolling bearings) and plays the effect of fixed bearing.

汽缸固定架12数量为八件,安装在横梁10内起到托起汽缸固定的作用。即汽缸固定架12上装有轴承通过与横梁上的轨道来移动,固定架移动到确定位置后再将固定架上的定位销拧紧来约束固定架的移动。Cylinder fixed frame 12 quantity is eight, is installed in crossbeam 10 and plays the fixed effect of supporting cylinder. That is, bearing is housed on the cylinder fixed mount 12 and moves by the track on the beam, after the fixed mount moves to a certain position, the positioning pin on the fixed mount is tightened to restrain the movement of the fixed mount.

侧墙压紧悬臂13数量为一十八件,安装在边梁3的外侧,作用是对产品侧墙板进行加压。Side wall pressing cantilever 13 quantity is 18 pieces, is installed in the outside of edge beam 3, and effect is that product side wall board is pressed.

横梁14数量为二件,安装在主梁2的上面,作用是对产品两端进行夹紧时辅助夹具的支撑点。Crossbeam 14 quantity is two pieces, is installed on the main beam 2, and the effect is the supporting point of auxiliary fixture when product two ends are clamped.

汽缸数量为八件(外购件),安装在汽缸固定架12内。Cylinder quantity is eight (purchase parts), is installed in the cylinder fixed mount 12.

Claims (2)

1. an electric locomotive top cover assembly welding frock comprises whole skeleton, gantry and cylinder, it is characterized in that:
Whole skeleton in A, described this top cover assembly welding frock is formed the spill tower structure by strengthening gusset (1), four girders (2), two side bars (3), a base plate (4) and both sides wallboard (5);
Described four girders (2) and two cross bars (14) are the underframe of groined type structure; These underframe both sides are provided with side bar (3); Base plate (4) is set on underframe, the reinforcement gusset (1) that base plate (4) lower surface setting is uniformly distributed with, promptly the parallel reinforcement gusset (1) that is placed on of base plate (4) is upward fixed with spot welding; The both sides of base plate (4) are provided with the framed side wallboard (5) that is used for assembling the top cover side wall; This framed side wallboard (5) is 119 ° with the angle of inclination of base plate (4), and promptly both sides wallboard (5) is arranged on base plate (4) both sides and is separately fixed on two side bars (3), and both sides wallboard (5) outside respectively is provided with a sliding rail (6);
Whole skeleton two ends respectively are provided with a positioner tube connector (7), and the outside of two side bars (3) of whole skeleton respectively is provided with the side wall that is used to pressurize that is uniformly distributed with and compresses cantilever (13);
B, described gantry are two slip gantry; This slip gantry is arranged on the sliding rail (6) of whole skeleton; Slip gantry is made up of gantry upright post (8), reinforcement (9), crossbeam (10) and rolling bearing (11); This reinforcement (9) is arranged at the lower end of crossbeam (10), and rolling bearing (11) is installed on gantry upright post (8) base and places in the sliding rail (6) of both sides wallboard (5);
Crossbeam (10) in C, described two slip gantry is provided with the cylinder fixed mount (12) that is used for fixing cylinder that is uniformly distributed with, and promptly cylinder is fixed on the cylinder fixed mount (12) of crossbeam (10), at least two of the quantity of the cylinder fixed mount (12) on each slip gantry.
2. a kind of electric locomotive top cover assembly welding frock as claimed in claim 1, the operating pressure that it is characterized in that described cylinder is 120Mpa.
CN2011204589799U 2011-11-18 2011-11-18 Electric locomotive roof assembly welding fixture Withdrawn - After Issue CN202317535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204589799U CN202317535U (en) 2011-11-18 2011-11-18 Electric locomotive roof assembly welding fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204589799U CN202317535U (en) 2011-11-18 2011-11-18 Electric locomotive roof assembly welding fixture

Publications (1)

Publication Number Publication Date
CN202317535U true CN202317535U (en) 2012-07-11

Family

ID=46429532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204589799U Withdrawn - After Issue CN202317535U (en) 2011-11-18 2011-11-18 Electric locomotive roof assembly welding fixture

Country Status (1)

Country Link
CN (1) CN202317535U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102500985A (en) * 2011-11-18 2012-06-20 株洲联诚集团有限责任公司 Electric locomotive roof assembly and welding tool
CN103567617A (en) * 2012-08-01 2014-02-12 南车青岛四方机车车辆股份有限公司 Compressing device for single-side spot welding of stainless steel sidewall, spot welding machine and welding process
CN108747176A (en) * 2018-08-29 2018-11-06 国机智能科技有限公司 Frock clamp and fixture system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102500985A (en) * 2011-11-18 2012-06-20 株洲联诚集团有限责任公司 Electric locomotive roof assembly and welding tool
CN102500985B (en) * 2011-11-18 2014-04-16 株洲联诚集团有限责任公司 Electric locomotive roof assembly and welding tool
CN103567617A (en) * 2012-08-01 2014-02-12 南车青岛四方机车车辆股份有限公司 Compressing device for single-side spot welding of stainless steel sidewall, spot welding machine and welding process
CN103567617B (en) * 2012-08-01 2016-05-25 南车青岛四方机车车辆股份有限公司 Stainless steel curb wall is hold down gag, mash welder and welding procedure for indirect welding
CN108747176A (en) * 2018-08-29 2018-11-06 国机智能科技有限公司 Frock clamp and fixture system

Similar Documents

Publication Publication Date Title
CN102500985B (en) Electric locomotive roof assembly and welding tool
CN109909325B (en) A steel box girder edge straightening machine
CN108000034B (en) A locking device for welding of distribution box
CN101774100A (en) Adjustable position welding device of space truss structure
CN103143828B (en) Assembling and spot-welding integral tooling for side wall skeleton of track vehicle
CN202317535U (en) Electric locomotive roof assembly welding fixture
CN212169493U (en) Ultra-light aircraft fuselage steel pipe skeleton welding frock
CN110773934A (en) Welding tool for front and back assembly of car roof
CN201586853U (en) A T-shaped structure welding experiment fixture
CN207464571U (en) Side wall automatic welding tooling
CN108436371A (en) A kind of rail welding positioning clamping device
CN207771191U (en) Subway Body sleeper beam welding group is to tooling
CN116493817B (en) Floating type photovoltaic structure welding method
CN204235031U (en) Locomotive underframe ventilating duct assembly welding frock
CN204747870U (en) Low -floor bogie outside roof beam assembly welding frock
CN218904083U (en) Railway vehicle single-layer thin-wall aluminum profile roof assembly welding tool
CN201931107U (en) Large-sized drilling device
CN205201034U (en) Longmen machining center's lathe bed structure
CN204735895U (en) Roof boundary beam assembly welding frock
CN202053044U (en) H-shaped steel welding fixture
CN206925497U (en) A kind of quick assembly-welding device of supporting leg connecting seat
CN203679624U (en) Tool for welding upper plate of side beam of bogie
CN216325966U (en) A concave bottom flat car middle beam composition welding tool
CN210677337U (en) A curved plate friction stir welding frock for taking gusset
CN204603639U (en) Air-spring type full loading carriage leading portion skeleton welding fixture special

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120711

Effective date of abandoning: 20140416

AV01 Patent right actively abandoned

Granted publication date: 20120711

Effective date of abandoning: 20140416

RGAV Abandon patent right to avoid regrant