CN202247673U - Lightning preventing highway bridge - Google Patents
Lightning preventing highway bridge Download PDFInfo
- Publication number
- CN202247673U CN202247673U CN2011204128720U CN201120412872U CN202247673U CN 202247673 U CN202247673 U CN 202247673U CN 2011204128720 U CN2011204128720 U CN 2011204128720U CN 201120412872 U CN201120412872 U CN 201120412872U CN 202247673 U CN202247673 U CN 202247673U
- Authority
- CN
- China
- Prior art keywords
- steel bar
- grounding
- bridge
- reinforcing steel
- highway bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 22
- 239000010959 steel Substances 0.000 claims abstract description 22
- 239000000463 material Substances 0.000 abstract description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 8
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种公路桥梁,尤其是一种防雷击公路桥梁。The utility model relates to a road bridge, in particular to a lightning protection road bridge.
背景技术 Background technique
随着我国人民生活水准的不断增长,公路建设也进入了日新月异快速发展的时代。高等级公路电气化已经接近普及。高速公路基本配置路灯、应急电话、电气化警示牌、电子摄像机等设备。桥梁构造物上遇到雷击容易对破坏电子设备。With the continuous growth of people's living standards in our country, highway construction has also entered an era of rapid development. Electrification of high-grade highways is close to universalization. The highway is basically equipped with street lamps, emergency telephones, electrified warning signs, electronic cameras and other equipment. Lightning strikes on bridge structures can easily damage electronic equipment.
目前高等级公路桥梁方面采用简单的外桥梁外侧外挂单根钢筋接地的方式,能起到接地的效果。此种设计能起到防雷击接地的效果,但是既不美观又浪费材料。At present, high-grade highway bridges adopt a simple method of grounding a single steel bar outside the outer bridge, which can achieve the effect of grounding. This design can play the effect of lightning protection grounding, but it is not beautiful and wastes materials.
实用新型内容 Utility model content
本实用新型提供了一种节约材料、无外挂设施,不影响外观的防雷击公路桥梁。The utility model provides a lightning protection highway bridge which saves materials, has no external facilities and does not affect the appearance.
实现本实用新型目的的防雷击公路桥梁,包括桥墩、承台和基桩,所述桥墩内有至少一根接地钢筋,所述接地钢筋一端连接墩帽上的接地端子,另一端连接承台中的环接钢筋;所述基桩内设有一根通长接地钢筋,所述连接通长接地钢筋的上端与所述环接钢筋相连。The anti-lightning road bridge for realizing the purpose of the utility model comprises bridge piers, caps and foundation piles. There is at least one grounding steel bar in the bridge piers. The ring-connected steel bar; the foundation pile is provided with a full-length grounded steel bar, and the upper end of the connected full-length grounded steel bar is connected with the ring-connected steel bar.
所述桥墩内设有两根接地钢筋。Two grounding steel bars are arranged inside the bridge pier.
所述接地端子为桥隧型接地端子,设置在桥墩终点侧立面附近。The grounding terminal is a bridge-tunnel type grounding terminal, which is arranged near the side facade of the end point of the pier.
所述接地端子距离桥墩终点侧立面的距离为10cm。The distance between the grounding terminal and the side facade of the end point of the pier is 10cm.
本实用新型的防雷击公路桥梁的有益效果如下:The beneficial effects of the lightning protection highway bridge of the present utility model are as follows:
本实用新型利用桥梁现有结构不参与承重的构造钢筋作为接地钢筋,不浪费材料、无外挂设施、不影响外观、安全可靠。The utility model utilizes the structural steel bar of the existing structure of the bridge that does not participate in the load-bearing as the grounding steel bar, does not waste materials, has no external facilities, does not affect the appearance, and is safe and reliable.
附图说明 Description of drawings
图1为本实用新型防雷击公路桥梁的结构示意图。Fig. 1 is the structural representation of the utility model lightning protection road bridge.
图2为图1的左视图。Fig. 2 is a left side view of Fig. 1 .
图3为图1的俯视图。FIG. 3 is a top view of FIG. 1 .
图4为图2的I-I视图。Fig. 4 is an I-I view of Fig. 2 .
具体实施方式 Detailed ways
如图1-4所示,本实用新型的防雷击公路桥梁,包括桥墩1、承台4和基桩5,所述桥墩1内有两根接地钢筋2,所述接地钢筋2一端连接墩帽上的接地端子3,另一端连接承台4中的环接钢筋6;所述基桩5内设有一根通长接地钢筋7,所述连接通长接地钢筋7的上端与所述环接钢筋6相连。As shown in Figures 1-4, the lightning protection highway bridge of the present invention includes a
所述接地端子3为桥隧型接地端子,设置在桥墩终点侧立面8附近。The
所述接地端子3与桥墩终点侧立面8的距离为10cm。The distance between the
上面所述的实施例仅仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的范围进行限定,在不脱离本实用新型设计精神前提下,本领域普通工程技术人员对本实用新型技术方案做出的各种变形和改进,均应落入本实用新型的权利要求书确定的保护范围内。The above-mentioned embodiments are only descriptions of preferred implementations of the present utility model, and are not intended to limit the scope of the present utility model. The various deformations and improvements made should fall within the protection scope determined by the claims of the present utility model.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204128720U CN202247673U (en) | 2011-10-26 | 2011-10-26 | Lightning preventing highway bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204128720U CN202247673U (en) | 2011-10-26 | 2011-10-26 | Lightning preventing highway bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202247673U true CN202247673U (en) | 2012-05-30 |
Family
ID=46108935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204128720U Expired - Fee Related CN202247673U (en) | 2011-10-26 | 2011-10-26 | Lightning preventing highway bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202247673U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853368A (en) * | 2019-04-09 | 2019-06-07 | 浙江省交通规划设计研究院有限公司 | Lightning protection structure and bridge pier |
CN114892497A (en) * | 2022-03-25 | 2022-08-12 | 中国建筑土木建设有限公司 | Lightning protection grounding device of fabricated bridge and construction method thereof |
-
2011
- 2011-10-26 CN CN2011204128720U patent/CN202247673U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853368A (en) * | 2019-04-09 | 2019-06-07 | 浙江省交通规划设计研究院有限公司 | Lightning protection structure and bridge pier |
CN114892497A (en) * | 2022-03-25 | 2022-08-12 | 中国建筑土木建设有限公司 | Lightning protection grounding device of fabricated bridge and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204238948U (en) | A kind of shed hole structure being applicable to be close to tunnel along the river, mountain | |
CN202247673U (en) | Lightning preventing highway bridge | |
CN203782544U (en) | Combined bracket for river-crossing section of elevated bridge | |
CN203878452U (en) | Novel gallery bridge | |
CN203080491U (en) | Dam crest wave wall structure of earth and rockfill dam | |
CN201981549U (en) | Precast electric pole pile | |
CN104120649A (en) | End-girder-free V-shaped rigid-frame bridge with bridgehead anti-thrust protection wall | |
CN102493326A (en) | Solar overbridge | |
CN202577131U (en) | Urban viaduct pier with prestressed concrete big cantilever bent cap | |
CN201296896Y (en) | Pedestrian bridge for glass curtain wall vertical elevator | |
CN103334630B (en) | Buffer type tower and stay wire crash bearer | |
CN204728227U (en) | The special snow hurdle of a kind of railway | |
CN203373671U (en) | Hanging basket walking rail with small curve radius | |
CN207047694U (en) | A kind of environmentally friendly anticollision Bridge guardrail | |
CN203257163U (en) | Buffer type tower and stay anti-collision pier | |
CN204919300U (en) | Public road bridge of view | |
CN204386143U (en) | A kind of railroad bridge high pier construction safety climbing ladder | |
CN203700954U (en) | Bridge guard railing | |
CN205741939U (en) | A kind of power grid construction self-anchored type prestressed reinforced concrete skateboard | |
CN101638880A (en) | Road cornerstone | |
CN202492794U (en) | Anti-seismic connecting rod beam fall-proof structure | |
CN207999115U (en) | A kind of novel concrete electric pole | |
CN205205880U (en) | Underpass polyurethane composite waterproof structure | |
CN204343122U (en) | Power grid construction self-anchoring type prestressed reinforced concrete skateboard | |
CN222375114U (en) | Highway subgrade protective structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120530 Termination date: 20151026 |
|
EXPY | Termination of patent right or utility model |