CN202246112U - Preheater on ammonium sulphate section - Google Patents
Preheater on ammonium sulphate section Download PDFInfo
- Publication number
- CN202246112U CN202246112U CN2011203405177U CN201120340517U CN202246112U CN 202246112 U CN202246112 U CN 202246112U CN 2011203405177 U CN2011203405177 U CN 2011203405177U CN 201120340517 U CN201120340517 U CN 201120340517U CN 202246112 U CN202246112 U CN 202246112U
- Authority
- CN
- China
- Prior art keywords
- preheater
- pipe
- flange
- blow
- preheater body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Air Supply (AREA)
Abstract
A preheater on an ammonium sulphate section comprises a preheater body, wherein a gas inlet pipe is connected to the lower part of the preheater body; a gas exhaust pipe is connected to the upper part of the preheater body; a blow-off pipe is arranged at the bottom of the preheater body; a flange is arranged at the upper end of the preheater; an end cover is assembled with the preheater body; and a large-discharge capacity valve is arranged on the blow-off pipe. Through the adoption of the technical scheme, the preheater has the advantages that as the flange is mounted on the preheater body, the end cover at the upper end of the preheater body can be assembled on the preheater body through the flange. When cleaning is required, all that is needed is to dismount the end cover at the upper end of the preheater body, so as to clean the preheater conveniently without hoisting and dismounting the preheater. Therefore, the labor intensity is reduced; the production cost is saved; and the safety factor is improved.
Description
Technical field
The utility model relates to a kind of preheater, relates in particular to a kind of preheater of ammonium sulfate workshop section.
Background technology
In ammonium sulfate workshop section, to pass through the gas preheating device from the raw gas of desulfurization workshop section, with getting into multiple saturex after the raw gas preheating.Because entrained oil coke powder in the coal gas causes pipe choking in the preheater, thereby cause the coal gas resistance to increase, blower pressure increases; Therefore preheater needs periodic cleaning, but preheater is an one, need lift dismounting during cleaning; Program is complicated, and labour intensity is big, and coefficient of injury is high.
Summary of the invention
The purpose of the utility model is to overcome above-mentioned deficiency a kind of sulphur ammonium work preheater is provided.
The purpose of the utility model realizes through following technical scheme:
A kind of ammonium sulfate workshop section preheater comprises preheater, is connected with gas inlet pipe in the bottom of preheater; Be connected with the coal gas vapor pipe on the top of preheater; Bottom at preheater is provided with blow-off pipe, and the upper end of preheater is provided with flange, and end cap is assembled together through flange and preheater.
Above-mentioned ammonium sulfate workshop section preheater is provided with a big discharge capacity valve on the said blow-off pipe.
Adopt technique scheme, the utility model has following advantage: because a flange is installed on preheater, the upper end cover of preheater and preheater just assemble through flange like this; When needing cleaning,, just can clear up preheater easily as long as pull down the end cap of flange upper end; Need not lift the dismounting preheater; Alleviate labour intensity, saved production cost, also strengthened SF simultaneously.
Description of drawings
Fig. 1 is traditional ammonium sulfate workshop section preheater structural representation.
Fig. 2 is the structural representation of the utility model.
Embodiment
A kind of ammonium sulfate workshop section preheater as shown in Figure 2; Comprise preheater 2; Be connected with gas inlet pipe 1 in the bottom of preheater, be connected with coal gas vapor pipe 3, be provided with blow-off pipe 4 in the bottom of preheater on the top of preheater; Be provided with flange 5 in the upper end of preheater, end cap 6 is solidly installed through flange 5 and preheater 2.One big discharge capacity valve 7 is set, blowdown fast during easy cleaning on the said blow-off pipe.
Claims (2)
1. ammonium sulfate workshop section preheater; Comprise preheater (2); Be connected with gas inlet pipe (1) in the bottom of preheater, be connected with coal gas vapor pipe (3) on the top of preheater, be provided with blow-off pipe (4) in the bottom of preheater; It is characterized in that: be provided with flange (5) in the upper end of preheater, end cap (6) is assembled together through flange (5) and preheater (2).
2. ammonium sulfate workshop section preheater according to claim 1 is characterized in that: a big discharge capacity valve (7) is set on the said blow-off pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203405177U CN202246112U (en) | 2011-09-13 | 2011-09-13 | Preheater on ammonium sulphate section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203405177U CN202246112U (en) | 2011-09-13 | 2011-09-13 | Preheater on ammonium sulphate section |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202246112U true CN202246112U (en) | 2012-05-30 |
Family
ID=46107385
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203405177U Expired - Fee Related CN202246112U (en) | 2011-09-13 | 2011-09-13 | Preheater on ammonium sulphate section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202246112U (en) |
-
2011
- 2011-09-13 CN CN2011203405177U patent/CN202246112U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202246112U (en) | Preheater on ammonium sulphate section | |
CN203227383U (en) | Flue dust removal device | |
CN105126485A (en) | Novel framework for installing filter bag | |
CN203916898U (en) | A kind of electric cleaner | |
CN201783423U (en) | High-pressure spray gun device | |
CN203303676U (en) | Metalaxyl production rectifying tower | |
CN203763946U (en) | Sealing rubber sleeve installed in filter plate washing hole | |
CN203744267U (en) | Garbage incineration vacuum suction ash removal device | |
CN205042282U (en) | Novel a skeleton for installing filter bag | |
CN205919674U (en) | Improve fluidized bed furnace and handle ore quantity's device | |
CN203507752U (en) | Full-automatic dust removing equipment | |
CN102182592A (en) | Anti-explosion diesel engine tank | |
CN203899416U (en) | Multifunctional waste gas purification tower | |
CN204582697U (en) | Steam boiler feeding-distribution device | |
CN204779640U (en) | Blast furnace gas diffuses tower | |
CN204943044U (en) | A kind of device removed for gas pipe line impurity | |
CN202346779U (en) | Dust collector of chlorination furnace | |
CN204107182U (en) | A kind of gas-liquid separator | |
CN204082399U (en) | Many filter cores air filter for diesel engine | |
CN203222256U (en) | Multifunctional oil storage tank device | |
CN204619733U (en) | Half dry type reaction tower | |
CN202807540U (en) | Ammonia water storage tank with cooling device | |
CN203442457U (en) | Lubricating oil tank with air exhaust device | |
CN203605727U (en) | Water jacket device of fuming furnace | |
CN203672161U (en) | Dust collection device for coal series kaolinite calcinator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120530 Termination date: 20140913 |
|
EXPY | Termination of patent right or utility model |