CN202227584U - 非焊接高强螺栓剪力键构造 - Google Patents
非焊接高强螺栓剪力键构造 Download PDFInfo
- Publication number
- CN202227584U CN202227584U CN2011202291520U CN201120229152U CN202227584U CN 202227584 U CN202227584 U CN 202227584U CN 2011202291520 U CN2011202291520 U CN 2011202291520U CN 201120229152 U CN201120229152 U CN 201120229152U CN 202227584 U CN202227584 U CN 202227584U
- Authority
- CN
- China
- Prior art keywords
- strength bolt
- steel
- welding high
- steel beam
- shear connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003466 welding Methods 0.000 title claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 abstract description 33
- 239000010959 steel Substances 0.000 abstract description 33
- 230000002787 reinforcement Effects 0.000 abstract description 6
- 239000000463 material Substances 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 238000010008 shearing Methods 0.000 description 3
- 210000000282 Nails Anatomy 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 2
- 230000002929 anti-fatigue Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000003014 reinforcing Effects 0.000 description 1
Abstract
本实用新型公开了一种非焊接高强螺栓剪力键构造,针对组合结构采用剪力连接件使钢梁与混凝土两种材料接合时,钢梁腹板1和对称开孔的钢梁翼缘板2制作成钢梁,在将高强螺栓3沿着作用力方向设置于钢翼缘。本构造的改进措施,如图5所示,只需在螺栓3上焊接横向钢筋。
Description
非焊接高强螺栓剪力键构造
技术领域
[0001] 本实用新型涉及一种新型非焊接高强螺栓剪力键构造,用来连接组合结构桥梁的钢梁和混凝土桥面,属桥梁建设领域。
背景技术
[0002] 组合梁恰当地将钢、混凝土两种不同材料结合起来,提高了结构的稳定性、强度及材料的使用效率。剪力连接件是保证钢-混凝土组合结构中两种不同材料共同工作最为关键的受力构件之一,它能防止弹性模量有很大差别的钢结构和混凝土结构之间的水平相互滑移,使两者构成一个整体使两者的作用而共同工作,可充分发挥材料性能。它直接关系到整个组合梁的承载能力。其中的难点是利用合理的连接件有效地控制钢材和混凝土材料之间发生的纵向水平剪力。
[0003] 圆柱头焊钉与角钢、槽钢等型钢连接件是目前混凝土结构中最常用的连接件之一,其根部焊接处的疲劳问题也比较突出。连接件通过栓接,使钢梁与混凝土有效接合,可避免焊接出现的各种问题。
[0004] 本实用新型提出一种新型非焊接高强螺栓剪力连接件构造,具有安全可靠、施工方便高效和免焊的技术特点。
实用新型内容
[0005] 本实用新型要解决的技术问题是非焊接高强螺栓剪力键构造,使钢材与混凝土两种材料之间的连接安全可靠、施工更加方便。
[0006] 所谓非焊接高强螺栓剪力键构造,钢板预先钻孔或冲孔,再将高强螺栓沿着作用力方向设置于钢翼缘并埋设在混凝土中,使混凝土与钢梁成为整体承受荷载。
[0007] 非焊接高强螺栓剪力键,是将钢梁中的翼缘板,经加工制作成工字梁或H型钢,再将高强螺栓设置于钢翼缘,浇筑桥面板后形成的一种抗疲劳剪力连接键构造。在翼缘板对称开孔,螺栓的长度、螺母尺寸和翼缘板厚度、开孔面积、间距及数量可经计算确定。非焊接高强螺栓剪力键构造,不需要特别进行加工,仅在钢板上设置圆形孔并栓接高强螺栓;减少了以往大量的焊接工序;当板厚、孔距设置妥当时,其破坏是孔中混凝土的剪切,不受疲劳的影响。
[0008] 不同于现有的摩擦型连接,非焊接高强螺栓剪力键不会出现伴随着高轴力施加后轴力会因混凝土收缩变形、徐变的影响而降低的情况。
[0009] 与现有的圆柱头焊钉连接件、角钢、槽钢等型钢连接件相比,非焊接高强螺栓剪力键,免去剪力键的焊接,避免了焊接出现的问题,确实可行,为大跨度混凝土箱梁桥腹板开裂加固提供了新途径。
[0010] 作为本构造的进一步改进,该连接件可增焊横向钢筋。横向钢筋将钢梁上同一横截面的螺栓形成整体,特别适用于连接件上有抗拉拔力要求的情况,显著加强非焊接高强螺栓剪力键的抗拉拔力。横向钢筋在螺栓上的焊接位置可灵活处理,可经计算布置于螺栓
3高度方向上应力较小的地方。
[0011] 本实用新型是通过以下技术方案来实现的:非焊接高强螺栓剪力键构造,组成中包括钢翼缘板、钢腹板、翼缘板开孔和高强螺栓。
[0012] 本实用新型取得的技术进步是:非焊接高强螺栓剪力键安全可靠,施工方便。 附图说明
[0013] 图1、非焊接高强螺栓剪力键构造剖面图
[0014] 图2、非焊接高强螺栓剪力键构造立面图
[0015] 图3、非焊接高强螺栓剪力键构造平面图
[0016] 图4、本构造的另一种非焊接高强螺栓剪力键构造剖面图
[0017] 图5、本构造的另一种非焊接高强螺栓剪力键构造平面图
[0018] 其中:1、钢梁腹板,2、钢梁翼缘板,3、翼缘板中的高强螺栓,4、横向钢筋
具体实施方式
[0019] 下面结合附图对本实用新型做进一步详细说明:
[0020] 针对如图1、2、3、4所示的非焊接高强螺栓剪力键构造,钢梁腹板1和对称开孔的钢梁翼缘板2制作成钢梁,在将高强螺栓3沿着作用力方向设置于钢翼缘。本构造的改进措施,如图5所示,只需在螺栓3上焊接横向钢筋。
[0021] 如上所述,便可实现本实用新型。
Claims (1)
1. 一种非焊接高强螺栓剪力键构造,其特征在于:螺栓设置于对称开孔的翼缘板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202291520U CN202227584U (zh) | 2011-06-30 | 2011-06-30 | 非焊接高强螺栓剪力键构造 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202291520U CN202227584U (zh) | 2011-06-30 | 2011-06-30 | 非焊接高强螺栓剪力键构造 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202227584U true CN202227584U (zh) | 2012-05-23 |
Family
ID=46078173
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202291520U Expired - Fee Related CN202227584U (zh) | 2011-06-30 | 2011-06-30 | 非焊接高强螺栓剪力键构造 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202227584U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590322A (zh) * | 2013-11-05 | 2014-02-19 | 上海市政工程设计研究总院(集团)有限公司 | 一种剪力连接件、含该剪力连接件的组合梁及其施工方法 |
CN103924674A (zh) * | 2014-04-29 | 2014-07-16 | 东南大学 | 一种高强螺栓剪力键构造及其建造施工方法 |
-
2011
- 2011-06-30 CN CN2011202291520U patent/CN202227584U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590322A (zh) * | 2013-11-05 | 2014-02-19 | 上海市政工程设计研究总院(集团)有限公司 | 一种剪力连接件、含该剪力连接件的组合梁及其施工方法 |
CN103590322B (zh) * | 2013-11-05 | 2019-04-05 | 上海市政工程设计研究总院(集团)有限公司 | 一种剪力连接件、含该剪力连接件的组合梁及其施工方法 |
CN103924674A (zh) * | 2014-04-29 | 2014-07-16 | 东南大学 | 一种高强螺栓剪力键构造及其建造施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202108134U (zh) | 一种新型截面钢板剪力墙 | |
CN101818478B (zh) | 圆钢管混凝土墩柱与混凝土盖梁的连接结构 | |
CN203129439U (zh) | 钢-混凝土组合梁 | |
CN103306214A (zh) | 一种钢筋混凝土梁与楼板的新型加固装置及其施工方法 | |
CN110924552A (zh) | 一种预制双钢板混凝土组合耗能连梁 | |
CN202131564U (zh) | 钢-混凝土组合梁pbl+焊接钢筋剪力连接件构造 | |
CN209397475U (zh) | 一种新型的板-桁结合梁 | |
CN102296725A (zh) | 蜂窝形截面钢板剪力墙 | |
CN205527446U (zh) | 一种用于角钢式标准节的抱箍 | |
CN202227584U (zh) | 非焊接高强螺栓剪力键构造 | |
CN207244899U (zh) | 一种水平波纹钢板剪力墙 | |
CN201224927Y (zh) | 钢结构梁柱长圆孔转型高强螺栓连接延性节点 | |
CN102704492A (zh) | 一种型钢支撑与混凝土支撑的连接结构及施工方法 | |
CN204385883U (zh) | 一种装配式阳台 | |
CN202157418U (zh) | 柱脚基础连接件及其轻钢结构 | |
CN202247667U (zh) | 波纹板剪力连接件构造 | |
CN103437547B (zh) | 一种铝模板 | |
CN202672484U (zh) | 钢管独柱结构 | |
CN202706508U (zh) | 脚手架的悬挑承力钢梁构件 | |
CN212295329U (zh) | 一种高层建筑钢梁结构 | |
CN202247666U (zh) | 翼缘板pbl剪力键构造 | |
CN203257121U (zh) | 一种钢筋混凝土梁与楼板的新型加固装置 | |
CN207828758U (zh) | 一种新型装配式组合梁 | |
CN208965581U (zh) | 一种非落地式塔吊基础平台 | |
CN202247665U (zh) | 栓接l型钢嵌入式连接键构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120523 Termination date: 20140630 |
|
EXPY | Termination of patent right or utility model |