CN202218023U - New-energy distributed type energy-storage application control system - Google Patents

New-energy distributed type energy-storage application control system Download PDF

Info

Publication number
CN202218023U
CN202218023U CN 201120330982 CN201120330982U CN202218023U CN 202218023 U CN202218023 U CN 202218023U CN 201120330982 CN201120330982 CN 201120330982 CN 201120330982 U CN201120330982 U CN 201120330982U CN 202218023 U CN202218023 U CN 202218023U
Authority
CN
China
Prior art keywords
energy storage
energy
power generation
control unit
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120330982
Other languages
Chinese (zh)
Inventor
汤能文
朱昌亚
洪光岱
姜靖
李松
黄先伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ten Pao Electronics Huizhou Co Ltd
Original Assignee
Ten Pao Electronics Huizhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ten Pao Electronics Huizhou Co Ltd filed Critical Ten Pao Electronics Huizhou Co Ltd
Priority to CN 201120330982 priority Critical patent/CN202218023U/en
Application granted granted Critical
Publication of CN202218023U publication Critical patent/CN202218023U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model relates to a distributed type energy-storage application control system comprising a new-energy generating device, an energy storage unit, a generating/energy storage control unit, an inverter unit and the like, and a system main control unit, wherein the generating/energy storage control unit is connected with the new-energy generating device, the energy storage unit, the inverter unit and a power grid and communicates with the system main control unit and the energy storage unit. Under the control of the system main control unit, the generating/energy storage control unit can convert electricity generated by the new-energy generating device or alternating-current power of a power grid, then the electricity or the alternating-current power is stored in the energy storage unit and also can be directly inverted into the alternating-current power which is supplied to the power grid or alternating-current loads; and the electricity stored in the energy storage unit also can be inverted into alternating-current power which is supplied to the power grid or the alternating-current loads. According to the distributed type energy-storage application control system, the generating efficiency of the new-energy generating device can be furthest improved under the actual practical environment, and the peak and valley adjusting functions also can be realized, so that the electricity of the power grid is reasonably utilized, and the waste of the electricity is reduced.

Description

新能源分布式储能应用控制系统New energy distributed energy storage application control system

技术领域 technical field

本实用新型涉及电能的储存以及离网、并网逆变发电等领域,具体是指将太阳能、电网电能储存在储能器件(如电池组)中,在需要的时候再离网或并网逆变发电的一种控制系统。 The utility model relates to the fields of electric energy storage, off-grid and grid-connected inverter power generation, etc., specifically refers to storing solar energy and grid electric energy in energy storage devices (such as battery packs), and then off-grid or grid-connected inverters when needed. A control system for variable power generation.

背景技术 Background technique

在光伏发电领域,目前常用的太阳能的利用模式主要有附图1的小型离网发电的光伏利用模式,附图2的大型光伏电站并网发电的光伏利用模式和附图3的大型储能电站的光伏利用模式等几种。 In the field of photovoltaic power generation, currently commonly used solar energy utilization modes mainly include the photovoltaic utilization mode of small off-grid power generation in Figure 1, the photovoltaic utilization mode of large-scale photovoltaic power station grid-connected power generation in Figure 2, and the large-scale energy storage power station in Figure 3 There are several types of photovoltaic utilization modes.

附图1的小型光伏离网发电利用模式适合应用在路灯、广告牌、小型光伏建筑一体化、住所屋顶发电等场合,因未接受电网的调度,储存的电能可能会因为长时间无负载消耗掉而使太阳能电池阵列不能向电池组储能或向负载供电,造成很大的浪费,系统经济性不高。 The utilization mode of small-scale photovoltaic off-grid power generation in Figure 1 is suitable for applications such as street lamps, billboards, small-scale photovoltaic building integration, and roof power generation of residences. Because the dispatch of the grid is not accepted, the stored electric energy may be consumed due to no load for a long time However, the solar battery array cannot store energy for the battery pack or supply power to the load, which causes a lot of waste and the system economy is not high.

附图2的大型光伏电站的并网发电利用模式,应用较多。目前,这种光伏电站规模还比较小,并网发电对电网造成的影响还比较小,当大型光伏电站建设达到一定规模,势必会对电网造成很大的困扰。因为,光伏发电是极不稳定的,白天有,晚上没有,即使白天也是极不稳定的,因此,供电系统很难调度管理。大型光伏电站需要铺设很多块太阳能电池板,多块太阳能电池板串联后再经汇流箱并联汇流,然后输入到多台并联的几百千瓦甚至兆瓦级的逆变器,经逆变器并网发电。很多块太阳能电池板串并联的缺点是整个太阳能电池阵列的输出是以发电效果最差的那串太阳能电池为基准的,太阳能电池阵列还受到所处环境的云层、建筑物阴影、灰尘、温度、线路分布阻抗等的影响严重,太阳能电池阵列可能会形成多个不断变化的最大功率点。一般,太阳能电池的最大功率追踪功能都是集成在逆变器中,因此,逆变器有可能不是工作在实际最佳的最大功率点上,造成光伏电站发电效率不高,光伏电站投资效益不高。 The grid-connected power generation utilization mode of large-scale photovoltaic power plants in Figure 2 is widely used. At present, the scale of this kind of photovoltaic power station is still relatively small, and the impact of grid-connected power generation on the power grid is still relatively small. When the construction of large-scale photovoltaic power stations reaches a certain scale, it will inevitably cause great trouble to the power grid. Because photovoltaic power generation is extremely unstable, it is available during the day and not at night, and it is extremely unstable even during the day, so it is difficult to dispatch and manage the power supply system. Large-scale photovoltaic power plants need to lay many solar panels. After connecting multiple solar panels in series, they are connected in parallel through a combiner box, and then input to multiple parallel-connected inverters of hundreds of kilowatts or even megawatts. The inverters are connected to the grid. generate electricity. The disadvantage of connecting many solar panels in series and parallel is that the output of the entire solar array is based on the string of solar cells with the worst power generation effect. The solar array is also affected by the cloud cover, building shadows, dust, temperature, The impact of line distribution impedance and so on is serious, and the solar cell array may form multiple constantly changing maximum power points. Generally, the maximum power tracking function of solar cells is integrated in the inverter. Therefore, the inverter may not work at the actual best maximum power point, resulting in low power generation efficiency of photovoltaic power plants and low investment returns of photovoltaic power plants. high.

附图3的大型储能电站是为了缓解供电调度问题而形成的。在电网负荷重的时候,可以将大型储能单元阵列储存的电能或者是太阳能电池阵列所产生的电能经逆变器并网发电,在电网负荷轻的时候,可以将电网多余的电能暂时储存在大型储能单元阵列中,以备急需。此种利用模式能起到缓解供电调度问题,但是投资建造这种大型储能电站,需要大块土地和许多大型储能用电池,与当前土地资源日趋紧张的局面形成冲突,大型储能用电池集中配置的安全性也需要考虑,而且,当储能电站其中某个太阳能电池板、某个蓄电池或某台大功率设备出现问题,将使储能电站中大片设备停机待修,无法执行电网调度指令,造成极大浪费,投资收益降低。 The large-scale energy storage power station in Figure 3 is formed to alleviate the problem of power supply scheduling. When the grid load is heavy, the electrical energy stored in the large energy storage unit array or the electrical energy generated by the solar cell array can be connected to the grid for power generation through the inverter. When the grid load is light, the excess electrical energy of the grid can be temporarily stored in the Large energy storage unit array in case of emergency. This utilization mode can alleviate the problem of power supply scheduling, but investing in the construction of such a large-scale energy storage power station requires a large piece of land and many large-scale energy storage batteries, which conflicts with the current situation of increasingly tense land resources. Large-scale energy storage batteries The security of centralized configuration also needs to be considered. Moreover, when a solar panel, a certain battery or a certain high-power equipment in the energy storage power station has a problem, a large part of the equipment in the energy storage power station will be shut down for repair, and the grid dispatching command cannot be executed. , resulting in great waste and reduced return on investment.

因此,有必要研究新的储能逆变发电系统来解决上述问题。 Therefore, it is necessary to study a new energy storage inverter power generation system to solve the above problems.

发明内容 Contents of the invention

本实用新型需解决的技术问题是: The technical problem that the utility model needs to solve is:

(1)、解决光伏发电系统因太阳能电池的短板效应而使太阳能利用率降低的问题;  (1) Solve the problem that the photovoltaic power generation system reduces the utilization rate of solar energy due to the short board effect of solar cells;

(2)、解决现有储能电站占用大量土地资源,维护成本高,效益低的问题; (2) Solve the problems of existing energy storage power stations occupying a large amount of land resources, high maintenance costs and low benefits;

(3)、解决现有光伏发电系统无电网调峰调谷功能的问题; (3) Solve the problem that the existing photovoltaic power generation system does not have the function of power grid peak regulation and valley regulation;

(4)、解决富余电能储存的问题。 (4) Solve the problem of surplus electric energy storage.

为解决上述技术问题,本实用新型电路所采取的技术方案是: In order to solve the above technical problems, the technical solution adopted by the utility model circuit is:

提供一种新能源分布式储能应用控制系统,包括一系统总控单元及一个或多个受总控单元控制的子系统。每个子系统分别包括一个或多个数量对应设置的下列功能单元:新能源发电装置,采用太阳能电池阵列或风力发电机组或二者结合,与发电/储能控制单元连接受该单元控制;储能单元,由蓄电池或者超级电容等储能器件串并联组成,与发电/储能控制单元连接受该单元控制实现电能的存储;发电/储能控制单元,与系统总控单元通讯,接受系统总控单元命令实现系统内电能的转换;所述电能的转换包括电网与储能单元之间双向的电能变换、新能源发电装置向电网、新能源发电装置向交流负载、新能源发电装置向储能单元、储能单元向交流负载的电能转换;并将储能单元及自身的状态信息发送给系统总控单元;逆变器单元,采用双向逆变电路,与发电/储能控制单元连接,受系统总控单元控制完成电网与储能单元之间双向的电能变换及新能源发电装置向电网、新能源发电装置向交流负载、储能单元向交流负载的电能转换的电能转换;离网/并网控制单元,连接于逆变器单元与交流负载之间,受系统总控单元控制实现交流负载与电网的供用电切换。每个子系统可配置于一独立建筑区域内。 A new energy distributed energy storage application control system is provided, which includes a system master control unit and one or more subsystems controlled by the master control unit. Each subsystem includes one or more of the following functional units with a corresponding number: new energy power generation device, using solar cell array or wind power generator set or a combination of the two, connected to the power generation/energy storage control unit and controlled by the unit; energy storage The unit is composed of energy storage devices such as batteries or supercapacitors connected in series and parallel. It is connected to the power generation/energy storage control unit and controlled by the unit to store electric energy; the power generation/energy storage control unit communicates with the system master control unit and accepts the system master control unit. The unit command realizes the conversion of electric energy in the system; the conversion of electric energy includes two-way electric energy conversion between the power grid and the energy storage unit, the new energy power generation device to the power grid, the new energy power generation device to the AC load, and the new energy power generation device to the energy storage unit , The energy storage unit converts the electric energy to the AC load; and the energy storage unit and its own status information are sent to the system master control unit; the inverter unit adopts a bidirectional inverter circuit, connected with the power generation/energy storage control unit, and is controlled by the system The master control unit completes the two-way power conversion between the grid and the energy storage unit, and the power conversion of the new energy power generation device to the power grid, the new energy power generation device to the AC load, and the energy storage unit to the AC load; off-grid/grid-connected The control unit is connected between the inverter unit and the AC load, and is controlled by the system master control unit to realize the power supply switching between the AC load and the grid. Each subsystem can be configured in an independent building area.

进一步的,所述系统总控单元与电网监控调度系统通讯,受电网监控调度系统调度协调控制系统内电能的走向。 Further, the system master control unit communicates with the power grid monitoring and dispatching system, and is dispatched and coordinated by the power grid monitoring and dispatching system to control the trend of electric energy in the system.

进一步的,所述储能单元内部带有电池管理系统(BMS);所述发电/储能控制单元还与储能单元的电池管理系统(BMS)通讯,实现储能单元状态监控。 Further, the energy storage unit has a battery management system (BMS) inside; the power generation/energy storage control unit also communicates with the battery management system (BMS) of the energy storage unit to monitor the status of the energy storage unit.

或者,本实用新型采用另一种近似方案:所述新能源分布式储能应用控制系统包括一系统总控单元及一逆变器单元、一离网/并网控制单元,另外包括一个或多个新能源发电装置、对应新能源发电装置数量的储能单元、对应新能源发电装置数量的发电/储能控制单元。上述新能源发电装置、储能单元、发电/储能控制单元为一组,每组设置在一区域内,上述三个功能模块共用一路逆变器单元及一路离网/并网控制单元,通过连接线路汇集至逆变器单元。 Alternatively, the utility model adopts another approximate solution: the new energy distributed energy storage application control system includes a system master control unit, an inverter unit, an off-grid/grid-connected control unit, and one or more new energy generators, energy storage units corresponding to the number of new energy generators, and power generation/energy storage control units corresponding to the number of new energy generators. The above-mentioned new energy power generation device, energy storage unit, and power generation/energy storage control unit form a group, and each group is arranged in an area. The above-mentioned three functional modules share one inverter unit and one off-grid/grid-connected control unit. The connection lines are brought together to the inverter unit.

其中各个模块的功能与上一方案类似,即:新能源发电装置采用太阳能电池阵列或风力发电机组或二者结合,与发电/储能控制单元连接受该单元控制;储能单元由蓄电池或者超级电容等储能器件串并联组成,与发电/储能控制单元连接受该单元控制实现电能的存储;发电/储能控制单元与系统总控单元通讯,接受系统总控单元命令实现系统内电能的转换;所述电能的转换包括电网与储能单元之间双向的电能变换、新能源发电装置向电网、新能源发电装置向交流负载、新能源发电装置向储能单元、储能单元向交流负载的电能转换;并将储能单元及自身的状态信息发送给系统总控单元。逆变器单元采用双向逆变电路,与各个发电/储能控制单元连接,受系统总控单元控制完成电网与储能单元之间双向的电能变换及新能源发电装置向电网、新能源发电装置向交流负载、储能单元向交流负载的电能转换的电能转换。离网/并网控制单元,连接于逆变器单元与交流负载之间,受系统总控单元控制实现交流负载与电网的供用电切换。每个子系统可配置于一独立建筑区域内。 The functions of each module are similar to the previous scheme, that is, the new energy power generation device adopts solar cell array or wind power generator set or a combination of the two, and is connected with the power generation/energy storage control unit to be controlled by the unit; the energy storage unit is controlled by the battery or super Capacitors and other energy storage devices are connected in series and parallel, connected with the power generation/energy storage control unit and controlled by the unit to realize the storage of electric energy; the power generation/energy storage control unit communicates with the system master control unit, and accepts the system master control unit to realize the power storage in the system Conversion; the conversion of electric energy includes two-way electric energy conversion between the grid and the energy storage unit, from the new energy power generation device to the power grid, from the new energy power generation device to the AC load, from the new energy power generation device to the energy storage unit, and from the energy storage unit to the AC load power conversion; and send the energy storage unit and its own status information to the system master control unit. The inverter unit adopts a bidirectional inverter circuit, which is connected to each power generation/energy storage control unit, and is controlled by the system master control unit to complete the bidirectional power conversion between the grid and the energy storage unit and the new energy power generation device to the grid and new energy power generation device Electric energy conversion to AC loads, energy storage units to AC loads. The off-grid/grid-connected control unit is connected between the inverter unit and the AC load, and is controlled by the system master control unit to realize the power supply switching between the AC load and the grid. Each subsystem can be configured in an independent building area.

进一步的,所述系统总控单元与电网监控调度系统通讯,受电网监控调度系统调度协调控制系统内电能的走向。 Further, the system master control unit communicates with the power grid monitoring and dispatching system, and is dispatched and coordinated by the power grid monitoring and dispatching system to control the trend of electric energy in the system.

进一步的,所述储能单元内部带有电池管理系统(BMS);所述发电/储能控制单元还与储能单元的电池管理系统(BMS)通讯,实现储能单元状态监控。 Further, the energy storage unit has a battery management system (BMS) inside; the power generation/energy storage control unit also communicates with the battery management system (BMS) of the energy storage unit to monitor the status of the energy storage unit.

相对于现有技术,本实用新型的有益效果在于: Compared with the prior art, the beneficial effects of the utility model are:

1)、本实用新型所述系统能实现多种富余电能的储存利用,进而实现电网的调峰调谷的功能;其各模块功能设计独立、完善,各模块功能相辅相成,应用在大型储能电站中,某个单元设备出现故障时,只与此设备直接相关的储能及发电单元不能正常工作,不会对整个系统造成很大影响,维修及维护的工程和造价都比较小;  1), the system described in this utility model can realize the storage and utilization of various surplus electric energy, and then realize the function of peak regulation and valley regulation of the power grid; the function design of each module is independent and perfect, and the functions of each module complement each other, and it is applied in large-scale energy storage power stations Among them, when a certain unit equipment fails, only the energy storage and power generation unit directly related to this equipment cannot work normally, which will not have a great impact on the entire system, and the repair and maintenance project and cost are relatively small;

2)、本实用新型所述系统中新能源发电装置、储能单元、发电/储能控制单元、逆变器单元等关键组成部件可以分散布置在某个区域内建筑的屋顶、幕墙、闲置地块上,无需另外开辟土地来安装这些发电设备,节省资源; 2) Key components such as new energy power generation devices, energy storage units, power generation/energy storage control units, and inverter units in the system described in this utility model can be scattered and arranged on the roofs, curtain walls, and idle areas of buildings in a certain area. On the block, there is no need to open up additional land to install these power generation equipment, saving resources;

3)、采用本实用新型所述系统可以取消现有太阳能发电逆变系统中必须配置的防雷汇流箱,并可取消逆变器单元的最大功率点跟踪功能,而改由发电/储能控制单元完成这些功能,可以最大限度保证各个新能源发电装置都工作在各自的最大功率点附近,提高新能源发电装置发电效率。 3) Adopting the system described in this utility model can cancel the lightning protection combiner box that must be configured in the existing solar power generation inverter system, and can cancel the maximum power point tracking function of the inverter unit, and instead use power generation/energy storage control The unit completes these functions, which can ensure that each new energy power generation device works near its respective maximum power point, and improve the power generation efficiency of the new energy power generation device.

附图说明 Description of drawings

图1是现有技术中小型离网发电的光伏利用模式原理示意框图; Fig. 1 is a schematic block diagram of the principle of photovoltaic utilization mode of small and medium-sized off-grid power generation in the prior art;

图2是现有技术中大型光伏电站并网发电的光伏利用模式原理示意图; Fig. 2 is a schematic diagram of the principle of photovoltaic utilization mode of grid-connected power generation of large-scale photovoltaic power plants in the prior art;

图3是现有技术中大型储能电站的光伏利用模式示意图; Fig. 3 is a schematic diagram of a photovoltaic utilization mode of a large-scale energy storage power station in the prior art;

图4是本实用新型所述新能源分布式储能应用控制系统组成原理示意图; Fig. 4 is a schematic diagram of the composition principle of the new energy distributed energy storage application control system described in the utility model;

图5是本实用新型所述新能源分布式储能应用控制系统另一实施例组成原理示意图。 Fig. 5 is a schematic diagram of the composition principle of another embodiment of the new energy distributed energy storage application control system of the utility model.

具体实施方式 Detailed ways

为了便于本领域的技术人员理解,下面结合具体实施例及附图对本实用新型作进一步的详细描述。 In order to facilitate the understanding of those skilled in the art, the utility model will be further described in detail below in conjunction with specific embodiments and accompanying drawings.

如图4,该实施例所述新能源分布式储能应用控制系统包括新能源发电装置、发电/储能控制单元、储能单元、逆变器单元、离网/并网控制单元、系统总控单元、电网监控调度系统。 As shown in Figure 4, the new energy distributed energy storage application control system described in this embodiment includes a new energy power generation device, a power generation/energy storage control unit, an energy storage unit, an inverter unit, an off-grid/grid-connected control unit, a system master Control unit, power grid monitoring and dispatching system.

其应用于大型储能电站应用系统中,所述的发电/储能控制单元和新能源发电装置、储能单元、交流电网、系统总控单元相连接,发电/储能控制单元通过通讯线和储能单元的电池管理系统(BMS)通讯,监控储能单元状态,还通过通讯线和系统总控单元通讯,接收系统总控单元指令和向系统总控单元发送储能单元、新能源发电装置的状态信息。新能源发电装置1、储能单元1、发电/储能控制单元1被配置在区域一;新能源发电装置2、储能单元2、发电/储能控制单元2被配置在区域二内;新能源发电装置n、储能单元n、发电/储能控制单元n被配置在区域N内,配置在区域一、二、…N的发电/储能控制单元1、2、…n的输出并联在一起,作为逆变器单元的输入,逆变器单元和系统总控单元、交流电网以及离网/并网控制单元相连接。逆变器单元和离网/并网控制单元接收系统总控单元指令, 在负载需要时,工作在向负载供电的离网模式,当新能源发电装置可以发电且电网有调度需求时,工作在向电网发电的并网模式,在新能源发电装置发不出电的时候,发电/储能控制单元1、2、…n可以接收系统总控单元指令,将电网电能经整流和功率因数校正以及高频变换后向储能单元1、2、…n储能,通过电网监控调度系统的合理调度,可以实现对交流电网的调峰调谷的功能。逆变器单元不再集成最大功率追踪的功能,而将最大功率追踪的功能加入到发电/储能控制单元中,使得新能源发电装置都按各自最大功率来发电,使整个新能源发电装置系统发电效率最大化。 It is applied in the application system of large-scale energy storage power stations. The power generation/energy storage control unit is connected with the new energy power generation device, the energy storage unit, the AC power grid, and the system master control unit. The power generation/energy storage control unit communicates with the The battery management system (BMS) communication of the energy storage unit monitors the status of the energy storage unit, and communicates with the system master control unit through the communication line, receives the system master control unit instructions and sends the energy storage unit and new energy power generation device to the system master control unit status information. The new energy power generation device 1, the energy storage unit 1, and the power generation/energy storage control unit 1 are arranged in area 1; the new energy power generation device 2, the energy storage unit 2, and the power generation/energy storage control unit 2 are arranged in area 2; the new Energy generating device n, energy storage unit n, and power generation/energy storage control unit n are arranged in area N, and the outputs of power generation/energy storage control units 1, 2,...n arranged in areas 1, 2, ... N are connected in parallel to Together, as the input of the inverter unit, the inverter unit is connected with the system master control unit, the AC grid and the off-grid/grid-connected control unit. The inverter unit and off-grid/grid-connected control unit receive instructions from the system master control unit. When the load needs it, it works in the off-grid mode that supplies power to the load. In the grid-connected mode of generating power to the grid, when the new energy power generation device fails to generate electricity, the power generation/energy storage control units 1, 2, ... n can receive instructions from the system master control unit, rectify and correct the power factor of the grid power and After high-frequency conversion, the energy storage units 1, 2, ...n store energy, and through the reasonable dispatch of the power grid monitoring and dispatching system, the function of peak regulation and valley regulation of the AC power grid can be realized. The inverter unit no longer integrates the function of maximum power tracking, but adds the function of maximum power tracking to the power generation/energy storage control unit, so that the new energy power generation devices can generate electricity according to their respective maximum power, so that the entire new energy power generation device system Maximize power generation efficiency.

上述分布式储能逆变系统至少有六种工作模式,下面将结合附图4加以详细说明。 The above-mentioned distributed energy storage and inverter system has at least six working modes, which will be described in detail below with reference to FIG. 4 .

模式一:新能源发电装置所发电能储存模式。在新能源发电装置发电正常、储能单元电量不足、电网监控调度系统未发调度指令、交流负载不工作的条件下,新能源发电装置所发电能经发电/储能控制单元控制向储能单元储能,发电/储能控制单元和储能单元的BMS系统通讯,实时智能监控储能单元状态,保证储能安全可靠进行。 Mode 1: The storage mode of the power generated by the new energy power generation device. Under the conditions of normal power generation of the new energy power generation device, insufficient power of the energy storage unit, no dispatching command issued by the grid monitoring and dispatching system, and no working of the AC load, the power generated by the new energy power generation device is controlled by the power generation/energy storage control unit to the energy storage unit. Energy storage, power generation/energy storage control unit communicates with the BMS system of the energy storage unit, intelligently monitors the status of the energy storage unit in real time to ensure safe and reliable energy storage.

模式二:电网电能储存模式。在新能源发电装置不能发电、储能单元电量不足、且电网负荷不重的情况下,电网监控调度系统发出指令,发电/储能控制单元内部充电控制模块开始工作,电网电能储存在储能单元中。 Mode 2: grid electric energy storage mode. When the new energy power generation device cannot generate electricity, the power of the energy storage unit is insufficient, and the grid load is not heavy, the grid monitoring and dispatching system issues an instruction, the internal charging control module of the power generation/energy storage control unit starts to work, and the grid power is stored in the energy storage unit middle.

模式三:新能源发电装置所发电能既储存同时又并网逆变发电的模式。在有新能源发电装置发电正常、储能单元电量不足、电网监控调度系统有调度指令、交流负载不工作的条件下,新能源发电装置产生的电能经发电/储能控制单元控制向储能单元储能的同时,发电/储能控制单元输出稳定直流电经逆变器单元并网发电。 Mode 3: The mode in which the power generated by the new energy power generation device is stored and simultaneously connected to the grid for inverter power generation. Under the conditions of normal power generation of the new energy power generation device, insufficient power of the energy storage unit, dispatching instructions of the grid monitoring and dispatching system, and the failure of the AC load, the electric energy generated by the new energy power generation device is controlled by the power generation/energy storage control unit to the energy storage unit. At the same time of energy storage, the power generation/energy storage control unit outputs stable direct current through the inverter unit to be connected to the grid for power generation.

模式四:新能源发电装置所发电能既储存同时又离网逆变发电的模式。此模式和模式三不同的是逆变器单元不并网,只向区域内的交流负载供电。 Mode 4: The mode in which the power generated by the new energy power generation device is stored while off-grid inverter power generation. The difference between this mode and mode 3 is that the inverter unit is not connected to the grid, but only supplies power to the AC loads in the area.

模式五:储存的电能并网逆变发电的模式。在新能源发电装置不能发电、储能单元电量充足、且电网负荷重的情况下,电网监控调度系统发出指令,储存的电能经发电/储能控制单元和逆变器单元并网发电。 Mode 5: The mode in which the stored electric energy is connected to the grid for inverter generation. When the new energy power generation device cannot generate power, the energy storage unit has sufficient power, and the grid load is heavy, the grid monitoring and dispatching system issues an instruction, and the stored electric energy is connected to the grid for power generation through the power generation/energy storage control unit and the inverter unit.

模式六:储存的电能离网逆变发电的模式。此模式和模式五不同的是逆变器单元不并网,只向区域内的交流负载供电。 Mode 6: The stored electric energy off-grid inverter power generation mode. The difference between this mode and mode five is that the inverter unit is not connected to the grid, and only supplies power to the AC loads in the area.

分布式储能逆变系统中分布在某个区域的新能源发电装置1,发电/储能控制单元1、储能单元1与分布在另一区域的新能源发电装置2、发电/储能控制单元2、储能单元2或者分布在其他区域的新能源发电装置n、发电/储能控制单元n、储能单元n何时工作在储能状态,何时工作在发电状态,完全由系统总控单元根据采集的新能源发电装置、储能单元、交流电网及其它设备的当前状态来决定。 In the distributed energy storage inverter system, the new energy power generation device 1 distributed in a certain area, the power generation/energy storage control unit 1, the energy storage unit 1 and the new energy power generation device 2 distributed in another area, the power generation/energy storage control unit When unit 2, energy storage unit 2 or new energy power generation device n distributed in other areas, power generation/energy storage control unit n, and energy storage unit n work in the energy storage state and when they work in the power generation state, it is completely determined by the system general manager. The control unit decides according to the collected current status of the new energy power generation device, energy storage unit, AC power grid and other equipment.

图5为本实用新型所述系统另一实施例组成框图。其比较适合应用于小型新能源发电系统。图5所示实施例与图4所示实施例不同的是,各个发电/储能控制单元的直流输出不是并联在一起,而是各自连接小型逆变器单元,逆变器单元连接离网/并网控制单元,然后离网或并网发电。一个新能源发电装置配置一个发电/储能控制单元、一个储能单元、一个逆变器单元、一个离网/并网控制单元,这些模块为一组,配置在同一区域,其工作模式与原理与图4所示实施例类似,在此不再赘述。 Fig. 5 is a block diagram of another embodiment of the system described in the present invention. It is more suitable for application in small new energy power generation systems. The difference between the embodiment shown in Figure 5 and the embodiment shown in Figure 4 is that the DC output of each power generation/energy storage control unit is not connected in parallel, but is connected to a small inverter unit, and the inverter unit is connected to the off-grid/ Grid-connected control unit, then off-grid or grid-connected power generation. A new energy power generation device is equipped with a power generation/energy storage control unit, an energy storage unit, an inverter unit, and an off-grid/grid-connected control unit. These modules are a group and are arranged in the same area. Their working mode and principle Similar to the embodiment shown in FIG. 4 , details are not repeated here.

本实用新型中未具体描述的功能单元均可采用现有技术中的成熟功能模块,在此不再赘述。 The functional units not specifically described in the utility model can adopt the mature functional modules in the prior art, and will not be repeated here.

需要说明的是,上述实施方式仅为本实用新型较佳的实施方案,不能将其理解为对本实用新型保护范围的限制,在未脱离本实用新型构思前提下,对本实用新型所做的任何均等变化与修饰均属于本实用新型的保护范围。 It should be noted that the above-mentioned embodiment is only a preferred embodiment of the utility model, and it cannot be understood as a limitation on the scope of protection of the utility model. Changes and modifications all belong to the protection scope of the present utility model.

Claims (10)

1.一种新能源分布式储能应用控制系统,其特征在于,包括一系统总控单元,及一个或多个数量对应设置的下列功能单元: 1. A new energy distributed energy storage application control system, characterized in that it includes a system master control unit, and one or more of the following functional units corresponding to the number: 新能源发电装置,采用太阳能电池阵列或风力发电机组或二者结合,与发电/储能控制单元连接受该单元控制; New energy power generation devices, using solar cell arrays or wind turbines or a combination of the two, connected to the power generation/energy storage control unit and controlled by the unit; 储能单元,由蓄电池或者超级电容等储能器件串并联组成,与发电/储能控制单元连接受该单元控制实现电能的存储; The energy storage unit is composed of energy storage devices such as batteries or supercapacitors connected in series and parallel, connected with the power generation/energy storage control unit and controlled by the unit to realize the storage of electric energy; 发电/储能控制单元,与系统总控单元通讯,接受系统总控单元命令实现系统内电能的转换;所述电能的转换包括电网与储能单元之间双向的电能变换、新能源发电装置向电网、新能源发电装置向交流负载、新能源发电装置向储能单元、储能单元向交流负载的电能转换;并将储能单元及自身的状态信息发送给系统总控单元;      The power generation/energy storage control unit communicates with the system master control unit, accepts the command of the system master control unit to realize the conversion of electric energy in the system; the conversion of electric energy includes two-way power conversion between the power grid and the energy storage unit, Electric energy conversion from power grid, new energy power generation device to AC load, new energy power generation device to energy storage unit, and energy storage unit to AC load; and send the status information of the energy storage unit and itself to the system master control unit; 逆变器单元,采用双向逆变电路,与发电/储能控制单元连接,受系统总控单元控制完成电网与储能单元之间双向的电能变换及新能源发电装置向电网、新能源发电装置向交流负载、储能单元向交流负载的电能转换的电能转换; The inverter unit adopts a bidirectional inverter circuit, connected with the power generation/energy storage control unit, and is controlled by the system master control unit to complete the bidirectional electric energy conversion between the grid and the energy storage unit and the new energy power generation device to the power grid and new energy power generation device Electric energy conversion to AC loads, energy storage units to AC loads; 离网/并网控制单元,连接于逆变器单元与交流负载之间,受系统总控单元控制实现交流负载与电网的供用电切换。 The off-grid/grid-connected control unit is connected between the inverter unit and the AC load, and is controlled by the system master control unit to realize the power supply switching between the AC load and the grid. 2.根据权利要求1所述的新能源分布式储能应用控制系统,其特征在于,所述系统总控单元与电网监控调度系统通讯,受电网监控调度系统调度协调控制系统内电能的走向。 2. The new energy distributed energy storage application control system according to claim 1, wherein the system master control unit communicates with the grid monitoring and dispatching system, and is dispatched by the grid monitoring and dispatching system to coordinate and control the direction of electric energy in the system. 3.根据权利要求2所述的新能源分布式储能应用控制系统,其特征在于,所述储能单元内部带有电池管理系统(BMS)。 3. The new energy distributed energy storage application control system according to claim 2, wherein the energy storage unit has a battery management system (BMS) inside. 4.根据权利要求3所述的新能源分布式储能应用控制系统,其特征在于,所述发电/储能控制单元还与储能单元的电池管理系统(BMS)通讯,实现储能单元状态监控。 4. The new energy distributed energy storage application control system according to claim 3, wherein the power generation/energy storage control unit also communicates with the battery management system (BMS) of the energy storage unit to realize the status of the energy storage unit monitor. 5.根据权利要求4所述的新能源分布式储能应用控制系统,其特征在于,所述系统以对应设置的一组新能源发电装置、储能单元、发电/储能控制单元、逆变器单元、离网/并网控制单元以及交流负载为子系统,每个子系统配置于一独立建筑区域内。 5. The new energy distributed energy storage application control system according to claim 4, characterized in that, the system uses a corresponding set of new energy power generation devices, energy storage units, power generation/energy storage control units, and inverters The switch unit, off-grid/grid-connected control unit and AC load are subsystems, and each subsystem is configured in an independent building area. 6.一种新能源分布式储能应用控制系统,其特征在于,包括: 6. A new energy distributed energy storage application control system, characterized in that it includes: 一系统总控单元; A system master control unit; 一个或多个新能源发电装置,采用太阳能电池阵列或风力发电机组或二者结合,与发电/储能控制单元连接受该单元控制; One or more new energy power generation devices, using solar cell arrays or wind turbines or a combination of both, connected to the power generation/energy storage control unit and controlled by the unit; 对应新能源发电装置数量的储能单元,由蓄电池或者超级电容等储能器件串并联组成,与发电/储能控制单元连接受该单元控制实现电能的存储; The energy storage unit corresponding to the number of new energy power generation devices is composed of energy storage devices such as batteries or super capacitors connected in series and parallel, connected with the power generation/energy storage control unit and controlled by the unit to realize the storage of electric energy; 对应新能源发电装置数量的发电/储能控制单元,与系统总控单元通讯,接受系统总控单元命令实现系统内电能的转换;所述电能的转换包括电网与储能单元之间双向的电能变换、新能源发电装置向电网、新能源发电装置向交流负载、新能源发电装置向储能单元、储能单元向交流负载的电能转换;并将储能单元及自身的状态信息发送给系统总控单元;       The power generation/energy storage control unit corresponding to the number of new energy power generation devices communicates with the system master control unit, and receives the system master control unit command to realize the conversion of electric energy in the system; the conversion of electric energy includes two-way electric energy between the grid and the energy storage unit Conversion, electric energy conversion from new energy generators to the grid, from new energy generators to AC loads, from new energy generators to energy storage units, and from energy storage units to AC loads; and send the status information of the energy storage units and themselves to the system master control unit; 一逆变器单元,采用双向逆变电路,与各个发电/储能控制单元连接,受系统总控单元控制完成电网与储能单元之间双向的电能变换及新能源发电装置向电网、新能源发电装置向交流负载、储能单元向交流负载的电能转换的电能转换; An inverter unit, which uses a bidirectional inverter circuit, is connected to each power generation/energy storage control unit, and is controlled by the system master control unit to complete the two-way power conversion between the grid and the energy storage unit and the new energy power generation device to the grid, new energy Electric energy conversion of power generation device to AC load, energy storage unit to AC load; 一离网/并网控制单元,连接于上述逆变器单元与交流负载之间,受系统总控单元控制实现交流负载与电网的供用电切换。 An off-grid/grid-connected control unit, which is connected between the inverter unit and the AC load, and is controlled by the system master control unit to switch between the AC load and the power grid. 7.根据权利要求6所述的新能源分布式储能应用控制系统,其特征在于,所述系统总控单元与电网监控调度系统通讯,受电网监控调度系统调度协调控制系统内电能的走向。 7. The new energy distributed energy storage application control system according to claim 6, wherein the system master control unit communicates with the power grid monitoring and dispatching system, and is dispatched and coordinated by the power grid monitoring and dispatching system to control the direction of electric energy in the system. 8.根据权利要求7所述的新能源分布式储能应用控制系统,其特征在于,所述储能单元内部带有电池管理系统(BMS)。 8. The new energy distributed energy storage application control system according to claim 7, wherein the energy storage unit has a battery management system (BMS) inside. 9.根据权利要求8所述的新能源分布式储能应用控制系统,其特征在于,所述发电/储能控制单元还与储能单元的电池管理系统(BMS)通讯,实现储能单元状态监控。 9. The new energy distributed energy storage application control system according to claim 8, characterized in that, the power generation/energy storage control unit also communicates with the battery management system (BMS) of the energy storage unit to realize the status of the energy storage unit monitor. 10.根据权利要求9所述的新能源分布式储能应用控制系统,其特征在于,所述系统以对应设置的新能源发电装置、储能单元、发电/储能控制单元为一组,每组设置在一区域内,通过连接线路汇集至逆变器单元。 10. The new energy distributed energy storage application control system according to claim 9, characterized in that the system is composed of correspondingly set new energy power generation devices, energy storage units, and power generation/energy storage control units. The groups are arranged in an area and are brought together to the inverter units by connecting lines.
CN 201120330982 2011-09-06 2011-09-06 New-energy distributed type energy-storage application control system Expired - Lifetime CN202218023U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120330982 CN202218023U (en) 2011-09-06 2011-09-06 New-energy distributed type energy-storage application control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120330982 CN202218023U (en) 2011-09-06 2011-09-06 New-energy distributed type energy-storage application control system

Publications (1)

Publication Number Publication Date
CN202218023U true CN202218023U (en) 2012-05-09

Family

ID=46017251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120330982 Expired - Lifetime CN202218023U (en) 2011-09-06 2011-09-06 New-energy distributed type energy-storage application control system

Country Status (1)

Country Link
CN (1) CN202218023U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102280940A (en) * 2011-09-06 2011-12-14 天宝电子(惠州)有限公司 new energy distributed energy storage application control system
CN103124069A (en) * 2012-11-30 2013-05-29 赵磊 Integrated intelligent control power supply system and control method thereof
EP2680389A1 (en) * 2012-06-25 2014-01-01 LG Electronics, Inc. Energy storage device, server, and method for controlling the same
WO2014067046A1 (en) * 2012-10-29 2014-05-08 广东西电动力科技股份有限公司 Distributed power supply intelligent grid-connected power generation system
CN104218598A (en) * 2014-09-15 2014-12-17 浙江大学 Decentralized and autonomous control method for plurality of distributive energy storing systems
CN104238471A (en) * 2013-06-17 2014-12-24 苏州新华软智能装备有限公司 Distributed energy storage control system
TWI505061B (en) * 2013-11-15 2015-10-21 Inst Information Industry Power generation control system, method and non-transitory computer readable storage medium of the same
CN105356842A (en) * 2015-10-30 2016-02-24 哈尔滨工程大学 Modular device combining photovoltaic cells and energy storage device
CN106374516A (en) * 2016-09-23 2017-02-01 国网河南节能服务有限公司 Establishing method for generalized polymerization distributed type energy storage system
CN114172193A (en) * 2021-11-19 2022-03-11 重庆欣网逸通科技有限公司 Heterogeneous distributed energy storage control system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102280940A (en) * 2011-09-06 2011-12-14 天宝电子(惠州)有限公司 new energy distributed energy storage application control system
US9478990B2 (en) 2012-06-25 2016-10-25 Lg Electronics Inc. Energy storage device, and server and method for controlling the same
EP2680389A1 (en) * 2012-06-25 2014-01-01 LG Electronics, Inc. Energy storage device, server, and method for controlling the same
US10355488B2 (en) 2012-06-25 2019-07-16 Lg Electronics Inc. Energy storage device, and server and method for controlling the same
WO2014067046A1 (en) * 2012-10-29 2014-05-08 广东西电动力科技股份有限公司 Distributed power supply intelligent grid-connected power generation system
CN103124069A (en) * 2012-11-30 2013-05-29 赵磊 Integrated intelligent control power supply system and control method thereof
CN104238471A (en) * 2013-06-17 2014-12-24 苏州新华软智能装备有限公司 Distributed energy storage control system
TWI505061B (en) * 2013-11-15 2015-10-21 Inst Information Industry Power generation control system, method and non-transitory computer readable storage medium of the same
CN104218598A (en) * 2014-09-15 2014-12-17 浙江大学 Decentralized and autonomous control method for plurality of distributive energy storing systems
CN105356842A (en) * 2015-10-30 2016-02-24 哈尔滨工程大学 Modular device combining photovoltaic cells and energy storage device
CN105356842B (en) * 2015-10-30 2018-07-31 哈尔滨工程大学 The modular unit that photovoltaic cell is combined with energy storage device
CN106374516A (en) * 2016-09-23 2017-02-01 国网河南节能服务有限公司 Establishing method for generalized polymerization distributed type energy storage system
CN106374516B (en) * 2016-09-23 2019-02-19 国网河南节能服务有限公司 A Construction Method of Generalized Aggregated Distributed Energy Storage System
CN114172193A (en) * 2021-11-19 2022-03-11 重庆欣网逸通科技有限公司 Heterogeneous distributed energy storage control system

Similar Documents

Publication Publication Date Title
CN102280940A (en) new energy distributed energy storage application control system
CN211790784U (en) An integrated charging station for optical storage and charging
CN202651785U (en) AC/DC mixed type micro-grid system
CN103441531B (en) Area high-permeability photovoltaic energy storage system and energy management method thereof
CN102931653B (en) Comprehensive coordination control method of wind-solar direct current micro-grid
CN106505615A (en) A power supply system for electric vehicle charging station based on independent microgrid
CN205429725U (en) Many generating lines residential block power supply system based on little electric wire netting of direct current
CN103457514B (en) Dual-mode solar photovoltaic power generation system
Jia et al. Architecture design for new AC-DC hybrid micro-grid
CN203690940U (en) Nested-type microgrid system
CN102931672A (en) Power distribution type energy storage device and control system thereof
CN105811458A (en) Microgrid energy storage system and energy management method thereof
CN107026447A (en) A kind of green data center electric power system based on many direct-current grids
CN102361323A (en) Microgrid experiment system based on Agent technology
CN111740439A (en) A control method based on the integrated microgrid system of optical storage and charging
CN220652988U (en) A decentralized light storage AC and DC system suitable for small pig houses
CN104795881A (en) Wind-light complementary power supply controller, microgrid system and microgrid system power supply method
WO2014059948A9 (en) Distributed electrical-energy storage device and control system for same
CN204205617U (en) A kind of power conversion is generated electricity by way of merging two or more grid systems electric power system
CN203406827U (en) Dual-mode solar photovoltaic power generation device
CN203706540U (en) Intelligent microgrid operation training platform based on clean energy and commercial power complementation application
Li et al. Micro-grid resource allocation based on multi-objective optimization in cloud platform
CN209545169U (en) One kind storing up the self-powered storehouse formula energy-storage system of complementary micro-capacitance sensor based on light
CN213185533U (en) A multi-mode energy storage microgrid
CN202513586U (en) Intelligent micro-grid using renewable energy for generating power

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120509