CN202217151U - Electrical control device of large power locomotive wheel set running-in testing stand - Google Patents

Electrical control device of large power locomotive wheel set running-in testing stand Download PDF

Info

Publication number
CN202217151U
CN202217151U CN2011203066322U CN201120306632U CN202217151U CN 202217151 U CN202217151 U CN 202217151U CN 2011203066322 U CN2011203066322 U CN 2011203066322U CN 201120306632 U CN201120306632 U CN 201120306632U CN 202217151 U CN202217151 U CN 202217151U
Authority
CN
China
Prior art keywords
electrical control
running
wheel set
power locomotive
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203066322U
Other languages
Chinese (zh)
Inventor
王志全
王利群
马玉山
李印戈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sheenline Technology Co Ltd
Original Assignee
Beijing Sheenline Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sheenline Technology Co Ltd filed Critical Beijing Sheenline Technology Co Ltd
Priority to CN2011203066322U priority Critical patent/CN202217151U/en
Application granted granted Critical
Publication of CN202217151U publication Critical patent/CN202217151U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model provides an electrical control device of a large power locomotive wheel set running-in testing stand. The electrical control device can carry out the running-in test for an assembled wheel set and an assembled gear case after the wheel set and the gear case are assembled of a large power locomotive and provides data for the next overhaul operation. The electrical control device includes a pedestal and a cantilever column. The two ends of the pedestal are fixed with two wheel set installing supports. The pedestal is also fixed with a traction motor support between the two wheel set installing supports. The cantilever column is provided with an acquisition box which is connected with a plurality of test sensors. The acquisition box is connected with an acquisition computer via the cantilever column. The acquisition computer is connected with a control module. The electrical control device of the large power locomotive wheel set running-in testing stand can test the assembling quality of an axle and a gear after the wheel set and the gear case of the large power locomotive are assembled, and provide data for the next overhaul operation.

Description

The high-power locomotive wheel is to running-in testing table electrical control gear
Technical field
The utility model relates to a kind of locomotive inspection and repair equipment, and especially a kind of high-power locomotive wheel is to running-in testing table electrical control gear.
Background technology
Syntonic type series high-power electric locomotive is to have world-class freight locomotive; Use in busy trunk lines in enormous quantities; In order to guarantee that the syntonic type locomotive uses, increase operation rate, just must improve the detection of syntonic type locomotive, test, test and mantenance data accuracy.Must be through high-new, advanced technology and good equipment could effectively guarantee the rapid of locomotive maintenance and detection, accurately.Could embody the high-tech modernization of modernized railway.At present, China has developed polytypic syntonic type series high-power electric locomotive, and progressively enters into the maintenance maintenance stage.Therefore the Ministry of Railways has proposed very high requirement to high-power electric locomotive inspection and repair technology; Syntonic type series high-power electric locomotive inspection and repair is a new industry; Technology and conventional locomotive have very big-difference, and also do not have the equipment like above-mentioned design proposal in high-power locomotive maintenance field at present.
The utility model content
The utility model provides a kind of and can take turns after assembling is accomplished with gear case at high-power locomotive, and the wheel after the assembling to carrying out the running-in test with gear case, is taken turns running-in testing table electrical control gear for next step service work provides the high-power locomotive of data.
The high-power locomotive wheel of realizing the utility model purpose is to running-in testing table electrical control gear; Comprise pedestal and cantilever column; Be fixed with two wheels to mounting bracket at the two ends of said pedestal, on the said pedestal, be positioned at two wheels also being fixed with the traction electric machine support on the centre of mounting bracket; Be fixed with vasculum on the said cantilever column, be connected with a plurality of testing sensors on the said vasculum, said vasculum links to each other with collecting computer through the cantilever column, and said collecting computer is connected with control module.
Said testing sensor involving vibrations sensor, temperature rise sensor, seal sensor.
Described high-power locomotive wheel also comprises driving power to running-in testing table electrical control gear, and said driving power drives AC traction electric motor through transformer and frequency converter, and said frequency converter links to each other with said control module.
Said transformer is an isolating transformer.
This practical novel high-power locomotive wheel is following to the beneficial effect of running-in testing table electrical control gear:
Realized the high-power locomotive wheel to after assembling is accomplished with gear case, the test axletree is with the assembling quality of gear, for next step service work provides data.
Description of drawings
Fig. 1 is the structural representation of the utility model high-power locomotive wheel to running-in testing table electrical control gear.
Embodiment
As shown in Figure 1, the high-power locomotive of the utility model wheel comprises pedestal 11 to running-in testing table electrical control gear, is fixed with two wheels at the two ends of said pedestal 11 to mounting bracket 8, is used for the wheel of traction electric machine unsettled fixingly to 6, and can rotate freely; On the said pedestal 11, be positioned at two wheels, high-power electric locomotive AC traction electric motor wheel is fixed on the experiment pedestal 11 group also being fixed with traction electric machine support 9 on the centre of mounting bracket 8; Driving power adopts electrical source of power civil power 3 phase 380V, through transformer 380V voltage is risen to 690V and improves driving voltage, adopting the direct driving electric locomotive of 690V high voltage converter AC traction electric motor, makes its running, drives gearbox gear and wheel to running.Be fixed with vasculum 5 on the said cantilever column 7, be connected with a plurality of testing sensors on the said vasculum 5, said vasculum 5 links to each other with collecting computer 1 through cantilever column 7, and said collecting computer 1 is connected with control module 12.Said testing sensor involving vibrations sensor, temperature rise sensor, seal sensor etc.Taken turns after the group running by examination; At key position installation testing sensors such as axletree and assembling rear gear box, axle box and traction electric machines; Technical parameters such as test vibration, temperature rise, sealing; It is interior by the acquisition module collection that acquisition parameter gets into vasculum 5, and the utilization connection gets into collecting computers 1 through cantilever column 7 and carries out parameter acquisition analysis and record.Equipment operation is by control module 12 control test processs.Frequency converter is tested control through connection and control module 12 communications to traction electric machine.
The said fixing wheel changes multi-form and structure based on the traction electric machine wheel to group to mounting bracket 8 and fixed traction electric machine support 9.Above-mentioned transformer is replaced isolating transformer by autotransformer.Above-mentioned transformer value of boosting can change according to the frequency converter rated voltage, the highlyest can not be higher than the traction electric machine rated voltage.
The high-power locomotive wheel of the utility model is following to the principle of work of running-in testing table electrical control gear:
As shown in Figure 1, the principle of work of the device of the utility model embodiment is following: before the experiment, wheel is fixed the traction electric machine wheel mounting bracket 8 to unsettled.Fixed traction electric machine support 9 fixed traction motors are fixed on high-power electric locomotive AC traction electric motor wheel on the experiment pedestal 11 to group, and keep traction electric machine, and gear case gear and wheel are to rotating freely.Preliminary work finishes before the experiment, with equipment energising utilization control module 12 control experimentations.And start civil power three-phase 380V through communication line control and rise to 690V drive variable frequency device rear drive traction electric machine through step-up transformer and make traction electric machine according to the requirement of experiment rotary speed working.Traction electric machine running overall process; At key position installation testing sensors such as axletree and assembling rear gear box, axle box and traction electric machines; Technical parameters such as test vibration, temperature rise, sealing; It is interior by the acquisition module collection that acquisition parameter gets into vasculum 5, and the utilization connection gets into collecting computers 1 through cantilever column 7 and carries out parameter acquisition analysis and record.
Embodiment recited above describes the preferred implementation of the utility model; Be not that scope to the utility model limits; Design under the spiritual prerequisite not breaking away from the utility model; Various distortion and improvement that the common engineering technical personnel in this area make the utility model technical scheme all should fall in the protection domain that claims of the utility model confirm.

Claims (4)

1. a high-power locomotive wheel is to running-in testing table electrical control gear; It is characterized in that: comprise pedestal and cantilever column; Be fixed with two wheels to mounting bracket at the two ends of said pedestal, on the said pedestal, be positioned at two wheels also being fixed with the traction electric machine support on the centre of mounting bracket; Be fixed with vasculum on the said cantilever column, be connected with a plurality of testing sensors on the said vasculum, said vasculum links to each other with collecting computer through the cantilever column, and said collecting computer is connected with control module.
2. high-power locomotive wheel according to claim 1 is characterized in that: said testing sensor involving vibrations sensor, temperature rise sensor, seal sensor running-in testing table electrical control gear.
3. high-power locomotive wheel according to claim 1 and 2 is to running-in testing table electrical control gear; It is characterized in that: described high-power locomotive wheel also comprises driving power to running-in testing table electrical control gear; Said driving power drives AC traction electric motor through transformer and frequency converter, and said frequency converter links to each other with said control module.
4. high-power locomotive wheel according to claim 3 is to running-in testing table electrical control gear, and it is characterized in that: said transformer is an isolating transformer.
CN2011203066322U 2011-08-22 2011-08-22 Electrical control device of large power locomotive wheel set running-in testing stand Expired - Lifetime CN202217151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203066322U CN202217151U (en) 2011-08-22 2011-08-22 Electrical control device of large power locomotive wheel set running-in testing stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203066322U CN202217151U (en) 2011-08-22 2011-08-22 Electrical control device of large power locomotive wheel set running-in testing stand

Publications (1)

Publication Number Publication Date
CN202217151U true CN202217151U (en) 2012-05-09

Family

ID=46016399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203066322U Expired - Lifetime CN202217151U (en) 2011-08-22 2011-08-22 Electrical control device of large power locomotive wheel set running-in testing stand

Country Status (1)

Country Link
CN (1) CN202217151U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122104A (en) * 2014-08-15 2014-10-29 南车戚墅堰机车有限公司 Wheel set running-in test device
CN107290663A (en) * 2017-06-12 2017-10-24 武汉黎赛科技有限责任公司 One kind wheel is to group of motors run-in stand and test method
CN108204893A (en) * 2016-12-19 2018-06-26 中车大同电力机车有限公司 A kind of 200km locomotive drives unit is run and the new structure device of experiment
CN112362112A (en) * 2021-01-12 2021-02-12 中车常州车辆有限公司 Wheel set ultrasonic detection system and imaging method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122104A (en) * 2014-08-15 2014-10-29 南车戚墅堰机车有限公司 Wheel set running-in test device
CN108204893A (en) * 2016-12-19 2018-06-26 中车大同电力机车有限公司 A kind of 200km locomotive drives unit is run and the new structure device of experiment
CN107290663A (en) * 2017-06-12 2017-10-24 武汉黎赛科技有限责任公司 One kind wheel is to group of motors run-in stand and test method
CN112362112A (en) * 2021-01-12 2021-02-12 中车常州车辆有限公司 Wheel set ultrasonic detection system and imaging method thereof

Similar Documents

Publication Publication Date Title
CN202305185U (en) Rail vehicle bogie dynamic load testing stand brake test device
CN203870219U (en) Motor testbed measurement and control system
CN202217151U (en) Electrical control device of large power locomotive wheel set running-in testing stand
CN103558003B (en) A kind of rotor torsion oscillation excitation and vibration analysis experimental system
CN202255903U (en) Locomotive wheel set testing apparatus
CN102680892A (en) Universal test bench for detecting performance of permanent magnet generator
CN202216851U (en) Wheel set running-in test stand for rail communication locomotive and vehicle
CN107870133A (en) Blade fatigue strength test method and equipment
CN102175451B (en) Dynamic load test bed for shaft coupler
CN108388839A (en) A kind of strong fluctuation of speed feature extracting method based on second order sync extraction transformation
CN208012873U (en) A kind of mixed dynamic gearbox test-bed of new energy
CN105527568A (en) Fault testing stand of wind generating set
CN202330039U (en) Locomotive wheelset running test device
CN109143069A (en) A kind of motor driven systems of pure electric coach are test bed
CN105890893A (en) Transmission running-in test bench
CN107677561A (en) A kind of rail milling experimental rig
CN107515128A (en) A dynamic test system for rail engineering vehicles
CN109725222A (en) A kind of towing tank complete machine intelligent load test equipment and its method
CN203720245U (en) System for automatically measuring counter electromotive force of motor
CN214237009U (en) Stepless wheel set press-fitting withdrawal machine tool
CN206960621U (en) A kind of multifunction teaching type electric motor intelligent test system
CN215616921U (en) Full-automatic grinding device for axle of bullet train
CN201107392Y (en) Asynchronous traction electric motor four dimensional movement integrative test stand
CN217883147U (en) Maintenance tool of new energy automobile PMSM
CN202886112U (en) Vehicle speed analog device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100089 Beijing city Haidian District gaoliangqiao oblique Street No. 11 Building No. 1 room 410 Fu Xuan

Patentee after: Beijing Sheenline Technology Co., Ltd.

Address before: 100089 Beijing city Haidian District gaoliangqiao oblique Street No. 11 Building No. 1 room 410 Fu Xuan

Patentee before: Beijing Sheenline Technology Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20120509

CX01 Expiry of patent term