CN202190028U - A live-replacing 220kV linear insulator series movable pin remover - Google Patents
A live-replacing 220kV linear insulator series movable pin remover Download PDFInfo
- Publication number
- CN202190028U CN202190028U CN 201120320749 CN201120320749U CN202190028U CN 202190028 U CN202190028 U CN 202190028U CN 201120320749 CN201120320749 CN 201120320749 CN 201120320749 U CN201120320749 U CN 201120320749U CN 202190028 U CN202190028 U CN 202190028U
- Authority
- CN
- China
- Prior art keywords
- rod
- connecting rod
- crank arm
- handle
- fork plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种电力作业工具,具体是一种带电更换220kV直线绝缘子串连动式取销器。The utility model relates to an electric power operation tool, in particular to a series-connected pin remover for live replacement of 220kV linear insulators.
背景技术 Background technique
随着用电负荷的不断增长,区域电网建设发展迅速,随即各种形式型号的杆塔、导地线、绝缘子串以及相关附属装置相继出现。以往的高压线路带电作业比如带电更换直线合成绝缘子等对作业工器具的需求已发生了很大改变,常规的作业工器具已经不能满足更换某些特殊形式绝缘子串以及连接金具的作业。With the continuous increase of electricity load, the construction of regional power grid has developed rapidly, and then various types of towers, ground wires, insulator strings and related accessories have appeared one after another. The previous live work on high-voltage lines, such as live replacement of linear composite insulators, has greatly changed the demand for working tools. Conventional working tools can no longer meet the needs of replacing some special forms of insulator strings and connecting hardware.
高压输电线路合成绝缘子悬挂在输电线路杆塔上,通过球头、碗头合成绝缘子与杆塔的横担、导线相联,合成绝缘子具有很高的电气和机械强度,保证了输电线路的可靠运行。运行过程中由于雷击、污闪、劣化等原因,需随时进行更换。为不因更换绝缘子而将线路停电,就需要在高压输电线路上进行带电作业,由操作人直接接触高压导线或借助于绝缘工具进行作业,把劣化的合成绝缘子更换。作业过程基本分为:1、安装卡具;2、安装提线器;3、取出绝缘子串球头和线夹碗头之间的弹簧销(取销子);4、收紧丝杠,使导线上升,使绝缘子串呈松弛状态;5、进行更换。由于目前杆塔形式繁多,就出现了由于杆塔横担长度过长而导致地电位电工无法独立使用过长长度的操作杆进行上述步骤3的取销作业。目前都是横担侧电工与杆塔侧电工配合进行取销作业,即杆塔侧电工将取销器对准弹簧销,横担侧电工使用绝缘杆敲击弹簧销,才能完成作业。作业过程繁琐,而且存在一定安全隐患,大大的延长了作业时间。The composite insulator of the high-voltage transmission line is suspended on the transmission line tower, and is connected with the cross arm and wire of the tower through the ball-end and bowl-head composite insulator. The composite insulator has high electrical and mechanical strength, which ensures the reliable operation of the transmission line. Due to lightning strikes, pollution flashover, deterioration and other reasons during operation, it needs to be replaced at any time. In order not to cut off the line power due to the replacement of insulators, it is necessary to carry out live work on the high-voltage transmission line. The operator directly contacts the high-voltage wires or works with the help of insulating tools to replace the deteriorated synthetic insulators. The operation process is basically divided into: 1. Install the fixture; 2. Install the wire lifter; 3. Take out the spring pin between the insulator string ball head and the clamp bowl head (take the pin); 4. Tighten the screw to make the wire Rise to make the insulator string loose; 5. Replace it. Due to the various forms of pole towers at present, it has occurred that the ground potential electrician cannot independently use the too long operating rod to perform the canceling operation of the
发明内容 Contents of the invention
本实用新型提供一种带电更换220kV直线绝缘子串联动式取销器,可以使电工一人独立完成取销作业。The utility model provides a series movable canceler for live replacement of 220kV linear insulators, which can enable an electrician to complete the canceling operation independently.
本实用新型是通过如下技术方案实现的:一种带电更换220kV直线绝缘子串连动式取销器,它包括操作头、绝缘操作杆、连杆和手柄,操作头通过绝缘操作杆、连杆与手柄连接;所述的操作头包括壳体,安装在壳体中的曲臂、曲臂连杆、顶杆和固定在壳体一端两侧上的上叉板和下叉板;所述的上叉板为U型、下叉板为L形,所述的曲臂通过曲臂连杆与顶杆的一端活动连接,在所述的壳体的前端有顶杆孔,所述的顶杆的另一端穿过顶杆孔并能在顶杆孔中前后活动。The utility model is realized through the following technical scheme: a live replacement 220kV linear insulator series linkage type pin remover, which includes an operating head, an insulating operating rod, a connecting rod and a handle, and the operating head passes through the insulating operating rod, connecting rod and handle. connection; the operating head includes a housing, a crank arm installed in the housing, a crank arm connecting rod, a push rod and an upper fork plate and a lower fork plate fixed on both sides of one end of the housing; the upper fork The plate is U-shaped, and the lower fork plate is L-shaped. The crank arm is movably connected to one end of the ejector rod through the crank arm connecting rod. There is a ejector rod hole at the front end of the housing. The other end of the ejector rod One end passes through the mandrel hole and can move back and forth in the mandrel hole.
原理是:通过控制取销器操作杆上的手柄,使取销器操作头中的顶杆探出,将弹簧销推出连接点。与现有用于取弹簧销用操作杆相比较,增加了连动系统,作业人员不必用自身力量或双人配合将弹簧销砸出,只需通过操作连动装置,就可将弹簧销轻松地推出。The principle is: by controlling the handle on the operating rod of the pin remover, the ejector rod in the operating head of the pin remover is protruded, and the spring pin is pushed out of the connection point. Compared with the existing operating lever used to take out the spring pin, the linkage system is added. The operator does not need to use his own strength or the cooperation of two people to smash out the spring pin, but only needs to operate the linkage device to push the spring pin out easily. .
本实用新型的有益效果是:结构简单,一个人即可操作,操作方便,大大减少了作业劳动强度以及作业时间,并有利于线路检修作业的安全性。The beneficial effects of the utility model are: the structure is simple, one person can operate, the operation is convenient, the working labor intensity and working time are greatly reduced, and it is beneficial to the safety of the line maintenance operation.
附图说明 Description of drawings
图1是本实用新型结构示意图;Fig. 1 is a structural representation of the utility model;
图2是上叉板和下叉板安装示意图。Figure 2 is a schematic diagram of the installation of the upper fork plate and the lower fork plate.
图中:1、连杆,2、顶杆,3、拉杆接头,4、曲臂,5、绝缘操作杆,6、连杆,7、上叉板,8、下叉板,9、手柄,91、活动手把,92、固定手把,10、壳体。In the figure: 1, connecting rod, 2, ejector rod, 3, tie rod joint, 4, curved arm, 5, insulating operating rod, 6, connecting rod, 7, upper fork plate, 8, lower fork plate, 9, handle, 91, movable handle, 92, fixed handle, 10, housing.
具体实施方式 Detailed ways
如图1和图2所示,一种带电更换220kV直线绝缘子串连动式取销器它包括操作头、绝缘操作杆5、连杆6和手柄9,操作头通过绝缘操作杆5、连杆6与手柄9连接;所述的操作头包括壳体10,安装在壳体中的曲臂4、曲臂连杆1、顶杆2和固定在壳体10一端两侧上的上叉板7和下叉板8;所述的上叉板7为U型、下叉板8为L形,所述的曲臂4通过曲臂连杆1与顶杆2的一端活动连接,在所述的壳体10的前端有顶杆孔,所述的顶杆2的另一端穿过顶杆孔并能在顶杆孔中前后活动。操作手柄9由活动手把91和固定手把92组成,活动手把91弹性安装在绝缘操作杆5上,本实施例活动手把91用销轴安装在绝缘操作杆5上,并通过连杆6与曲臂4活动链接,所述的固定手把92固定在绝缘操作杆5上,绝缘操作杆5另一端固定连接在壳体10上。活动手把91位于固定手把92的内侧。As shown in Figure 1 and Figure 2, a live replacement 220kV linear insulator series linkage type pin remover includes an operating head, an
所述的连杆6和活动手把91,连杆6与曲臂4铰接或通过销轴连接。曲臂4与曲臂连杆1、曲臂连杆1与顶杆2铰接或通过销轴连接。The connecting
操作方法是,将上叉板7和下叉板8卡在直线绝缘子串上,顶杆2对准弹簧销,手握操作手柄9,扳动活动手把91,使连杆6带动操作头部分的曲臂4,曲臂4带动曲臂连杆1、进而使顶杆2探出,达到将弹簧销顶出的目的,从而解决了在面对横担过长的带电更换220kV直线绝缘子作业中无法由一名电工独立完成取弹簧销作业步骤的问题。The operation method is to clamp the
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201120320749 CN202190028U (en) | 2011-08-24 | 2011-08-24 | A live-replacing 220kV linear insulator series movable pin remover |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201120320749 CN202190028U (en) | 2011-08-24 | 2011-08-24 | A live-replacing 220kV linear insulator series movable pin remover |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202190028U true CN202190028U (en) | 2012-04-11 |
Family
ID=45921462
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201120320749 Expired - Lifetime CN202190028U (en) | 2011-08-24 | 2011-08-24 | A live-replacing 220kV linear insulator series movable pin remover |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202190028U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102290743A (en) * | 2011-08-24 | 2011-12-21 | 江苏省电力公司徐州供电公司 | Electrified linkage pin-pulling device for replacing 220kV linear insulator string |
| CN104505770A (en) * | 2014-12-16 | 2015-04-08 | 国家电网公司 | Bowl head replacer with straight pole for earth potential working |
-
2011
- 2011-08-24 CN CN 201120320749 patent/CN202190028U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102290743A (en) * | 2011-08-24 | 2011-12-21 | 江苏省电力公司徐州供电公司 | Electrified linkage pin-pulling device for replacing 220kV linear insulator string |
| CN102290743B (en) * | 2011-08-24 | 2013-09-25 | 江苏省电力公司徐州供电公司 | Electrified linkage pin-pulling device for replacing 220kV linear insulator string |
| CN104505770A (en) * | 2014-12-16 | 2015-04-08 | 国家电网公司 | Bowl head replacer with straight pole for earth potential working |
| CN104505770B (en) * | 2014-12-16 | 2017-04-26 | 国家电网公司 | Bowl head replacer with straight pole for earth potential working |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102290743B (en) | Electrified linkage pin-pulling device for replacing 220kV linear insulator string | |
| CN204103316U (en) | For the charged insulation eagle's beak pliers action bars disconnected of isolated circuit breaker | |
| CN102025035A (en) | Insulated conductor grounding potentiometer | |
| CN103427370B (en) | The live replacing device of ultra-high-tension power transmission line strain insulator string | |
| CN203233099U (en) | Tool for mounting bird scarer on live-line | |
| CN201717384U (en) | High and low pressure ground wire hook capable of adjusting direction | |
| CN201508917U (en) | Fire hook for ground potential of insulated wire | |
| CN103066530B (en) | A kind of insulating clamp erector | |
| CN202084843U (en) | Screw type insulation fixed support for locking fallen upper pile head lead by leads | |
| CN202384516U (en) | Secondary voltage drop live-line wiring device | |
| CN201060780Y (en) | Insulation operating arm with electroscope | |
| CN103996469A (en) | One-time forming pressing device for composite insulators | |
| CN203690508U (en) | Ground wire earthing device used for 750kV live line | |
| CN201742027U (en) | Special tool for replacing insulators in electriferous state for 110kV single tower double circuit | |
| CN102185261A (en) | Locked-screw-rod-type insulating fixing support for upper pile head lead of falling fuse | |
| CN203931680U (en) | A kind of composite insulator one-shot forming compression bonding apparatus | |
| CN201570811U (en) | Live Replacement Horizontal Split Wire Insulator Tool | |
| CN204320695U (en) | A kind of high voltage device of transformer station clearing apparatus | |
| CN203289003U (en) | Multifunctional insulating operating lever of transformer station | |
| CN203135277U (en) | Nest dismantling apparatus | |
| CN203039294U (en) | Working tool for live-line replacement of three-hole single connection plate linear insulator string | |
| CN202474705U (en) | Electrified installation tool for bird scarer | |
| CN202076727U (en) | Pin removing operation rod for insulators of high-voltage power transmission line | |
| CN203013576U (en) | Combined spindle sleeve installing tool for disconnecting switch | |
| CN206834353U (en) | Ultra-high-tension power transmission line assembly and disassembly ground wire servicing unit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20120411 Effective date of abandoning: 20130925 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20120411 Effective date of abandoning: 20130925 |
|
| RGAV | Abandon patent right to avoid regrant |