CN202156887U - Column type hoisting frame for electrical construction - Google Patents

Column type hoisting frame for electrical construction Download PDF

Info

Publication number
CN202156887U
CN202156887U CN2011201791933U CN201120179193U CN202156887U CN 202156887 U CN202156887 U CN 202156887U CN 2011201791933 U CN2011201791933 U CN 2011201791933U CN 201120179193 U CN201120179193 U CN 201120179193U CN 202156887 U CN202156887 U CN 202156887U
Authority
CN
China
Prior art keywords
pole
jack
electrical construction
support
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201791933U
Other languages
Chinese (zh)
Inventor
王宝传
李伟
陶建保
郑运红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2011201791933U priority Critical patent/CN202156887U/en
Application granted granted Critical
Publication of CN202156887U publication Critical patent/CN202156887U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a column type hoisting frame for electrical construction, which comprises a main support, a rotary support, a bottom support and a jack which are arranged from top to bottom, wherein the bottom support is fixedly connected with a bottom board (4) at the lower portion of a supporting rod (9) of the main support through a connecting board (8) of the bottom support and a bolt and in sleeved connection with a top protruding portion of the jack through a connecting rod (6) of the bottom support. The near end of the rotary support is movably connected with the supporting rod (9) through two sleeve pipes connected with the rotary support, and the far end of the rotary support is used for hanging a hoisting ring of a hand chain hoist. The upper end of the supporting rod (9) is provided with a top board (1) connected with the supporting rod fixedly. The supporting rod (9) is provided with a stopping block (10) for preventing the sleeve pipes from sliding down. The column type hoisting frame for the electrical construction has the advantages of being convenient in construction, high in work efficiency, wide in application range and the like, and is suitable for hoisting a bus, a bus bridge, an enclosed bus, a disc cabinet or heavy equipment, materials, machines and tools.

Description

The pillar mast-up that is used for electrical construction
Technical field
The utility model relates to the pillar mast-up that is used for electrical construction.
Background technology
In the electrical construction process, run into the lifting situation of installation of dish cabinet and bus bridge thereof through regular meeting.In narrow electric panel room, the bus bridge crane of hundreds of kilogram is moving to two meters or higher dish cabinet top, owing to receive the restriction in space and place; Be difficult to find suitable facility; Common way is to rely on manpower, utilizes rope to lift, and this is a very thing of labor intensive; Have a lot of safety hazard, and production efficiency is low.
Summary of the invention
The utility model technical matters to be solved is: in order to overcome the deficiency of existing construction means, provide a kind of and be convenient to electrical construction and increase work efficiency and the pillar mast-up that is used for electrical construction of workmanship.
The technical scheme that its technical matters that solves the utility model adopts is: main support, swinging strut, bottom bracket and jack by arranging are from top to bottom formed.Wherein: bottom bracket is captiveed joint with the base plate of the pole bottom of main support with bolt through its connecting panel, and bottom bracket is stretched part through the top of its pipe link and jack and interlocked; Said swinging strut, its near-end is movably connected through two sleeve pipes and the said pole that is attached thereto, and its far-end is provided with the suspension ring that are used to hang bottle gouard moved by hands; The upper end of said pole is provided with the top board of captive joint with it; Pole being provided with prevents the block that sleeve pipe glides.
Described swinging strut can be made up of stay bearing plate, hound that an end is weldingly connected.The other end of said stay bearing plate and hound interlocks through the strut bar activity of two sleeve pipes and main support; The other end of said stay bearing plate is useful on the suspension ring of suspension bottle gouard moved by hands.
Described block has 4, and they are symmetrically distributed and are weldingly connected with pole.
The utility model is compared with existing construction method, has following main beneficial effect:
1. easy construction:
In when lifting, the inconvenience in the time of can avoiding artificial lifting, to the place require for a short time, do not receive the restriction in place.
2. can increase work efficiency:
When lifting, not only can reduce personnel's use amount, accelerated construction speed, and can raise labour productivity.
3. applied range:
Can be used for: the lifting of bus, the lifting of bus bridge, the lifting of enclosed busbar, the lifting of dish cabinet, other reset be equipped with, the lifting of material, facility.Pass through and in the bus bridge lifting construction, test, the pillar mast-up that originally is used for electrical construction can lift the enclosed busbar bridge more than a ton easily, and only need three get final product to four-player, and speed is very fast.
Description of drawings
Fig. 1 is used for the structural representation of the pillar mast-up of electrical construction for the utility model.
Among the figure: 1. top board; 2. stay bearing plate; 3. lead chain; 4. base plate; 5. bolt; 6. pipe link; 7. jack; 8. connecting panel; 9. pole; 10. block; 11. hound; 12. sleeve pipe.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing the utility model is described further.
The pillar mast-up that is used for electrical construction that the utility model provides (being called for short the pillar mast-up); Its structure is as shown in Figure 1; Main support, swinging strut, bottom bracket and jack by arranging are from top to bottom formed; Wherein: bottom bracket is captiveed joint with the base plate 4 of pole 9 bottoms of main support through its connecting panel 8 usefulness bolts, and bottom bracket is stretched part through its pipe link 6 and the top of jack and interlocked; Said swinging strut, its near-end is movably connected through two sleeve pipes and the said pole 9 that is attached thereto, and its far-end is provided with the suspension ring that are used to hang bottle gouard moved by hands; The upper end of said pole 9 is provided with the top board 1 of captive joint with it; Pole 9 is provided with the block 10 that prevents that sleeve pipe from gliding.
Said main support is made up of the top board that is weldingly connected successively 1, pole 9 and base plate 4, and wherein, top board 1 and base plate 4 are the thick steel plate of 10mm of 200mm * 200mm.
Said swinging strut is made up of stay bearing plate 2, hound 11 and sleeve pipe 12, and wherein: sleeve pipe 12 has two, and they and pole 9 activities interlock, and the bottom of each sleeve pipe is provided with the block 10 that contact with it links to each other, and this block links to each other with pole 9; A sleeve pipe 12 on one end of stay bearing plate 2 and top is weldingly connected, and the other end of stay bearing plate 2 is welded with and is used to hang the suspension ring of leading chain 3; A sleeve pipe 12 of one end of hound 11 and bottom is weldingly connected, and the bottom of the other end of hound 11 and stay bearing plate 2 is weldingly connected.
Above-mentioned stay bearing plate 2 is that No. 10 channel-section steels are processed.
Above-mentioned pole 9 is the steel pipe of long 3.1m diameter 80mm.
Above-mentioned block 10, its effect are to prevent that sleeve pipe 12 from gliding along pole 9.This block has 4, and they are symmetrically distributed and are weldingly connected with pole 9.Said block is an arc, so that link to each other with pole 9 better.
Above-mentioned hound 11 can be processed by No. 6 channel-section steels, and its effect is stay bearing plate 2 to be formed support.
Said bottom bracket by connecting panel 8 and with it the pipe link 6 that is weldingly connected of bottom forms, the top of the bottom of pipe link 6 and jack 7 is stretched partly and is interlocked, connecting panel 8 is fixedly linked by a plurality of bolts (for example 4 bolts) and base plate 4.Pipe link 6 can be processed by the steel pipe of a segment length 0.1m diameter 50mm, and it is inserted in and can prevents the main support accidental slide after part is stretched on the jack top.Connecting panel 8 can be processed by steel plate, and its size is measure-alike with base plate 4 at least; This connecting panel and base plate 4 all are drilled with 4 circular holes of being convenient to bolted diameter 10mm, connecting panel and base plate are linked together through these circular holes with bolt 5 during use.
Because the chain 3 of leading of jack 7 and bottle gouard moved by hands is conventional equipment, so in Fig. 1, do not draw.
The length of above-mentioned each parts can be according to its length of situation decision of reality, and purpose is convenient and practical.The length that present embodiment is described is to suppose that the bottom surface is 3.6m apart from the height of top ceiling, and the jack height is 0.3m.
The above-mentioned pillar mast-up that the utility model provides can be used for: the lifting of bus, the lifting of bus bridge, the lifting of enclosed busbar, the lifting of dish cabinet, other reset be equipped with, the lifting of material, facility.Be not under the good situation at narrow space and state of ground especially, it is especially convenient to use.When two this pillar of cover mast-ups are used, can conveniently solve the lifting difficult problem of disjunctor dish cabinet.
The utility model utilizes above-mentioned pillar mast-up to realize that the method for weight lifting is: before the lifting; Earlier bottom bracket is connected with main support through bolt; Jack is supported on the bottom, and the rising through jack makes main support top and top ceiling closed contact again, and the pillar mast-up is fixedly secured.After treating that simple and easy pillar mast-up fixedly secures, just get into the lifting stage, at this moment, on the suspension ring of swinging strut, hang earlier lifting appliance (bottle gouard moved by hands), through the bottle gouard moved by hands weight of slinging, rotate to the position that needs and place then.
The utility model utilizes above-mentioned pillar mast-up to realize the lifting of weight, and its step comprises:
1. dead work:
The top board 1 on main support top is withstood on the ceiling, and the base plate 4 of main support bottom and the connecting panel 8 of bottom bracket are connected through the bolt 5 of 4 diameter 10mm, and the lower end of the pipe link 6 of bottom bracket and the top of jack 7 are stretched part and interlocked.During the jack jacking, top board 1 and top ceiling leak-tight joint are accomplished the fixing of simple and easy pillar mast-up, and chain 3 (leading chain for 5 tons) is led in suspension on the suspension ring of stay bearing plate 2 then, accomplishes the assembling of whole simple and easy pillar mast-up.
2. lifting work:
Through the bottle gouard moved by hands weight of slinging; Rotating to the position that needs places; Specifically: the hook of leading chain 3 (being called chain block again) is hung up weight, and the height that chain rises to be needed is led in pulling, promotes weight and swinging strut and rotates to assigned address; Pulling is led chain 3 declines and is put down weight, accomplishes the lifting of weight.
After the utility model is accomplished the weight lifting; When needing split keeping and transportation, can fall jack 7 earlier, back out bolt 5 again; Main support is separated with bottom bracket; Up promote bottom bracket then, bottom bracket and jack 7 are broken away from, can main support, bottom bracket and jack 7 taken care of respectively or transport.
The protection domain of the utility model is not limited to above-mentioned description, and obviously, those skilled in the art can carry out various changes and distortion and not break away from the scope and the spirit of the utility model the utility model.If these changes and distortion belong in the scope of the utility model claim and equivalent technologies thereof, then the intention of the utility model also comprises these changes and is out of shape interior.

Claims (3)

1. pillar mast-up that is used for electrical construction; It is characterized in that forming by main support, swinging strut, bottom bracket and the jack arranged from top to bottom; Wherein: bottom bracket is captiveed joint with the base plate (4) of pole (9) bottom of main support with bolt through its connecting panel (8), and bottom bracket is stretched part through its pipe link (6) and the top of jack and interlocked; Said swinging strut, its near-end is movably connected through two sleeve pipes and the said pole (9) that is attached thereto, and its far-end is provided with the suspension ring that are used to hang bottle gouard moved by hands; The upper end of said pole (9) is provided with the top board of captive joint (1) with it; Pole (9) is provided with the block (10) that prevents that sleeve pipe from gliding.
2. the pillar mast-up that is used for electrical construction according to claim 1; It is characterized in that: the stay bearing plate that said swinging strut is weldingly connected by an end (2), hound (11) are formed, and the other end of said stay bearing plate and hound interlocks through strut bar (9) activity of two sleeve pipes and main support; The other end of said stay bearing plate is useful on the suspension ring of suspension bottle gouard moved by hands.
3. the pillar mast-up that is used for electrical construction according to claim 1 is characterized in that: described block (10) has 4, and they are symmetrically distributed and are weldingly connected with pole (9).
CN2011201791933U 2011-05-31 2011-05-31 Column type hoisting frame for electrical construction Expired - Fee Related CN202156887U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201791933U CN202156887U (en) 2011-05-31 2011-05-31 Column type hoisting frame for electrical construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201791933U CN202156887U (en) 2011-05-31 2011-05-31 Column type hoisting frame for electrical construction

Publications (1)

Publication Number Publication Date
CN202156887U true CN202156887U (en) 2012-03-07

Family

ID=45764529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201791933U Expired - Fee Related CN202156887U (en) 2011-05-31 2011-05-31 Column type hoisting frame for electrical construction

Country Status (1)

Country Link
CN (1) CN202156887U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105058028A (en) * 2015-07-22 2015-11-18 成都福立盟钻采设备有限公司 Support device used for fixing throttle valve gland

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105058028A (en) * 2015-07-22 2015-11-18 成都福立盟钻采设备有限公司 Support device used for fixing throttle valve gland

Similar Documents

Publication Publication Date Title
CN201460182U (en) Construction trolley on trolley line of bridge crane
CN204624970U (en) Indoor hoisting simple lifting tool
CN202296842U (en) Hanger special for universal shaft of vertical rolling mill
CN203845689U (en) Indoor assembled large-type equipment lifting device
CN202542676U (en) Special lifting tool used for guide plate rotary cylinder device in hot rolled coil furnace
CN202785364U (en) Movable dual-door-type mast hoisting device
CN201793330U (en) Gantry hanger frame device
CN105822132A (en) Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN202156887U (en) Column type hoisting frame for electrical construction
CN201762035U (en) Simple crane movable arm
CN102241368A (en) Columnar hoisting frame
CN103318745A (en) Lightweight special-purposed spreader and mounting method thereof
CN102275830A (en) Pillar type hoisting method
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN107628543A (en) A kind of multi-faceted lifting machine
CN203638979U (en) Device for mounting tank floor in low-temperature storage tank
CN202912565U (en) Special hanger for large-scale disk-shaped members
CN206476708U (en) A kind of device that lifting is moved suitable for narrow space
CN202170231U (en) Mobile pulling bar
CN205099232U (en) Hanging flower basket formula hoisting apparatus
CN205151577U (en) Fix small -size hoisting machine on steel support of groove
CN201238159Y (en) GW4-110 type isolation switch examination stand
CN2454348Y (en) Rotary lifting platform for operation in large ball pot
CN204038883U (en) A kind of shoulder pole girder with swivel hook
CN204185153U (en) A kind of electric power lifting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120307

Termination date: 20180531

CF01 Termination of patent right due to non-payment of annual fee