CN202149473U - Heat-pipe residual-heat boiler system arranged in large flue and small flue of sintering machine - Google Patents
Heat-pipe residual-heat boiler system arranged in large flue and small flue of sintering machine Download PDFInfo
- Publication number
- CN202149473U CN202149473U CN201120229136U CN201120229136U CN202149473U CN 202149473 U CN202149473 U CN 202149473U CN 201120229136 U CN201120229136 U CN 201120229136U CN 201120229136 U CN201120229136 U CN 201120229136U CN 202149473 U CN202149473 U CN 202149473U
- Authority
- CN
- China
- Prior art keywords
- flue
- water
- preheater
- small
- steam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000005245 sintering Methods 0.000 title claims abstract description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 136
- 239000002918 waste heat Substances 0.000 claims abstract description 16
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract description 10
- 206010022000 influenza Diseases 0.000 abstract description 7
- 229910000831 Steel Inorganic materials 0.000 abstract description 5
- 229910052742 iron Inorganic materials 0.000 abstract description 5
- 239000010959 steel Substances 0.000 abstract description 5
- 238000003723 Smelting Methods 0.000 abstract description 2
- 239000007789 gas Substances 0.000 description 10
- 238000010248 power generation Methods 0.000 description 6
- 229920006395 saturated elastomer Polymers 0.000 description 6
- 239000000203 mixture Substances 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000003546 flue gas Substances 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 238000002485 combustion reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006477 desulfuration reaction Methods 0.000 description 1
- 230000023556 desulfurization Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000010819 recyclable waste Substances 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 239000002912 waste gas Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/25—Process efficiency
Landscapes
- Manufacture And Refinement Of Metals (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
一种内置于烧结机大小烟道上的热管余热锅炉系统,属于钢铁冶炼设备技术领域,包括大烟道、小烟道、蒸汽过热器、大烟道蒸发器、小烟道蒸发器、一级水预热器和二级水预热器、汽包、热力除氧器、水处理及给水系统,水处理及给水系统的出水端连接一级水预热器的进水端,一级水预热器的出水端连接热力除氧器的进水端,热力除氧器的出水端连接二级水预热器的进水端,二级水预热器的出水端连接汽包的进水端,汽包的出水端分别连接大烟道蒸发器的进水端和小烟道蒸发器的进水端,大烟道蒸发器的出水端和小烟道蒸发器的出水端连接汽包,汽包的出气端连接蒸汽过热器的进气端,蒸汽过热器的出气端连接减温器。本实用新型占地面积小、投资少和运行费用低。
A heat pipe waste heat boiler system built in large and small flues of a sintering machine, belonging to the technical field of iron and steel smelting equipment, including a large flue, a small flue, a steam superheater, a large flue evaporator, a small flue evaporator, a primary water Preheater and secondary water preheater, steam drum, thermal deaerator, water treatment and water supply system, the water outlet of water treatment and water supply system is connected to the water inlet of primary water preheater, and primary water preheating The water outlet of the thermal deaerator is connected to the water inlet of the thermal deaerator, the water outlet of the thermal deaerator is connected to the water inlet of the secondary water preheater, and the water outlet of the secondary water preheater is connected to the water inlet of the steam drum. The water outlet of the steam drum is respectively connected to the water inlet of the large flue evaporator and the water inlet of the small flue evaporator, and the water outlet of the large flue evaporator and the water outlet of the small flue evaporator are connected to the steam drum. The outlet end of the steam superheater is connected to the inlet end of the steam superheater, and the outlet end of the steam superheater is connected to the desuperheater. The utility model has the advantages of small occupied area, low investment and low operation cost.
Description
技术领域 technical field
本实用新型涉及一种内置于烧结机大、小烟道上使用的蒸汽发生装置,属于钢铁冶炼设备技术领域。 The utility model relates to a steam generating device built in large and small flues of a sintering machine and belongs to the technical field of iron and steel smelting equipment.
背景技术 Background technique
现有钢铁生产设备中,烧结机的带冷机或环冷机的废气余热,已普遍回收利用以产生过热蒸汽,用以发电或作它用。但烧结机本身的废气余热尚未普遍回收利用,只有少数钢铁企业采用了外置式余热回收装置(余热锅炉、翅片管式蒸汽发生器、热管式蒸汽发生器等)。众所周知,烧结机在点火后,随着烧结台车由机头往机尾移动,利用烟道上的引风机抽吸助燃空气进行反烧,其燃烧后的废气经由十几对风管通入烟道排向烟囱。一般情况下,处于机头的1#~4#个风管及处于机尾的2~3个风管的废气SO2含量少,其废气不需要脱硫,直接经由小烟道排走,而其余风管的废气SO2含量较多,其废气需要脱硫,则经由大烟道排向除尘器及脱硫装置。如图1所示,所谓烧结机外置式余热回收装置,烧结机1下面的大烟道2及小烟道3分别用电动阀门4、7隔断,将烧结机1下的11#、12#、13#、14#、15#风管内的废气经由旁通烟道10、11、阀门5、8引出至蒸汽过热器12、14及蒸汽发生器13、15,再经由阀门6、9、旁通烟道16、17回到烟道2及烟道3。大、小烟道的蒸汽过热器和蒸汽发生器共用1个汽包18、共用1台给水除氧器19、共用1套水处理及给水系统20。
In the existing iron and steel production equipment, the waste heat of exhaust gas from the belt cooler or ring cooler of the sintering machine has been generally recycled to generate superheated steam for power generation or other purposes. However, the exhaust heat of the sintering machine itself has not been widely recycled, and only a few iron and steel enterprises have adopted external waste heat recovery devices (waste heat boilers, finned tube steam generators, heat pipe steam generators, etc.). As we all know, after the sintering machine is ignited, as the sintering trolley moves from the nose to the tail, the induced draft fan on the flue is used to suck the combustion-supporting air for back-burning, and the exhaust gas after combustion is passed into the flue through more than a dozen pairs of air pipes. to the chimney. Under normal circumstances, the SO 2 content of exhaust gas from 1# to 4# air ducts at the nose and 2 to 3 air ducts at the tail is low, and the exhaust gas does not need to be desulfurized, and is directly discharged through the small flue, while the rest The SO 2 content of the exhaust gas from the air duct is relatively high, and the exhaust gas needs to be desulfurized, so it is discharged to the dust collector and desulfurization device through the large flue. As shown in Figure 1, the so-called sintering machine external waste heat recovery device, the large flue 2 and the small flue 3 under the
在工作时,关闭阀门4、7,打开阀门5、6、8、9,分别将大烟道2上的11#、12#、13#风管内的废气及小烟道3上的14#、15#风管内的废气引向蒸汽过热器12、14及蒸汽发生器13、15,13、15所产生的汽、水混合物经汽包18汽、水分离后的饱和蒸汽引向蒸汽过热器12、14,加热到所需温度后外供发电或外供它用。
When working, close the valves 4 and 7, open the valves 5, 6, 8, and 9, and respectively discharge the waste gas in the 11#, 12#, and 13# air ducts on the large flue 2 and the 14#, 13# air ducts on the small flue 3. The exhaust gas in the 15# air pipe is led to the
这种烧结机外置式余热发电装置存在的缺点是: The disadvantages of this sintering machine external waste heat power generation device are:
(1) 外置式布置增加了占地面积,对于烧结厂而言,多数企业不具备外置式布置的条件; (1) The external layout increases the floor area. For sintering plants, most enterprises do not have the conditions for external layout;
(2) 所增加的旁通烟道难于布置; (2) The increased bypass flue is difficult to arrange;
(3) 增加了6个烟道阀门,增加了设备投资; (3) Added 6 flue valves and increased equipment investment;
对于未被引出的其它一些风管的具有余热回收价值的废气,不能累加利用,即不能做到能源梯级利用。 For the exhaust gas that has the value of waste heat recovery from other air ducts that has not been led out, it cannot be accumulated and utilized, that is, energy cascade utilization cannot be achieved.
发明内容 Contents of the invention
本实用新型的目的是为了克服现有技术的不足,提供一种内置于烧结机大小烟道上的热管余热锅炉系统,做到能源梯级、有效、合理利用、设备布置合理、占地面积小、金属消耗少,投资少和运行费用低。 The purpose of this utility model is to overcome the deficiencies of the prior art, to provide a heat pipe waste heat boiler system built in the large and small flue of the sintering machine, to achieve energy cascade, effective, rational utilization, reasonable equipment layout, small footprint, metal Less consumption, less investment and lower operating costs.
本实用新型的目的是这样实现的:一种内置于烧结机大小烟道上的热管余热锅炉系统,包括烧结机的大烟道、小烟道、蒸汽过热器、大烟道蒸发器、小烟道蒸发器、汽包、热力除氧器、水处理及给水系统,所述大烟道包括第一大烟道和第二大烟道,所述蒸汽过热器和大烟道蒸发器连接在第一大烟道与第二大烟道之间;所述小烟道包括第一小烟道和第二小烟道,所述小烟道蒸发器连接在第一小烟道与第二小烟道之间,在第一小烟道与第二小烟道之间还连接预热器,预热器包括一级水预热器和二级水预热器;所述水处理及给水系统的出水端连接一级水预热器的进水端,一级水预热器的出水端连接热力除氧器的进水端,热力除氧器的出水端连接二级水预热器的进水端,二级水预热器的出水端连接汽包的进水端,汽包的出水端分别连接大烟道蒸发器的进水端和小烟道蒸发器的进水端,大烟道蒸发器的出水端和小烟道蒸发器的出水端连接所述汽包,汽包的出气端连接蒸汽过热器的进气端,蒸汽过热器的出气端连接减温器。 The purpose of this utility model is achieved as follows: a heat pipe waste heat boiler system built in the large and small flue of the sintering machine, including the large flue, small flue, steam superheater, large flue evaporator, and small flue of the sintering machine Evaporator, steam drum, thermal deaerator, water treatment and water supply system, the large flue includes the first large flue and the second large flue, the steam superheater and the large flue evaporator are connected in the first Between the large flue and the second large flue; the small flue includes a first small flue and a second small flue, and the small flue evaporator is connected between the first small flue and the second small flue Between the first small flue and the second small flue, a preheater is also connected, and the preheater includes a primary water preheater and a secondary water preheater; the effluent of the water treatment and water supply system connected to the water inlet of the primary water preheater, the water outlet of the primary water preheater is connected to the water inlet of the thermal deaerator, and the water outlet of the thermal deaerator is connected to the water inlet of the secondary water preheater , the water outlet of the secondary water preheater is connected to the water inlet of the steam drum, and the water outlet of the steam drum is respectively connected to the water inlet of the large flue evaporator and the water inlet of the small flue evaporator, and the large flue evaporator The water outlet of the small flue evaporator and the water outlet of the small flue evaporator are connected to the steam drum, the gas outlet of the steam drum is connected to the inlet of the steam superheater, and the outlet of the steam superheater is connected to the desuperheater.
本实用新型采用现有技术中已有的装置,通过不同于以往的连接方式构成一个新的内置于烧结机大小烟道上的热管余热锅炉系统。正常使用时,来自于水处理系统的低温给水(约30~40℃),进入装置在小烟道上的一级水预热器21',被预热到一定温度(约80~95℃)送至除氧器19',水在大气式热力除氧器中进行热力除氧后,水温升高到104℃左右,送往二级水预热器22'再被预热到更高的温度(约170~190℃)。二级预热器的出水送入汽包18',汽包18'分别将水送入蒸发器13'、15'。蒸发器13'、15'所产生的饱和汽、水混合物进入汽包18'进行汽、水分离,饱和蒸汽送入合并蒸汽过热器12',饱和水可通过汽包18'上的下降管直接返回到蒸发器13'、15'。合并过热器12'所产生的过热蒸汽直接送往减温器23',然后外供进行发电。 The utility model adopts the existing devices in the prior art, and forms a new heat pipe waste heat boiler system built in the large and small flues of the sintering machine through a connection mode different from the past. In normal use, the low-temperature feed water (about 30-40°C) from the water treatment system enters the first-stage water preheater 21' installed on the small flue, and is preheated to a certain temperature (about 80-95°C) and sent to To the deaerator 19', after the water is thermally deoxidized in the atmospheric thermal deaerator, the water temperature rises to about 104°C, and is sent to the secondary water preheater 22' to be preheated to a higher temperature (about 170-190°C). The outlet water of the secondary preheater is sent to the steam drum 18', and the steam drum 18' sends the water to the evaporators 13' and 15' respectively. The saturated steam and water mixture produced by the evaporators 13' and 15' enter the steam drum 18' for steam and water separation, and the saturated steam is sent to the combined steam superheater 12', and the saturated water can be directly discharged through the downcomer on the steam drum 18'. Return to evaporator 13', 15'. The superheated steam generated by the combined superheater 12' is directly sent to the desuperheater 23', and then supplied externally for power generation.
本实用新型因将热管式余热锅炉直接装置在烧结机大、小烟道上,充分利用了可回收的烧结机余热资源、做到了能源合理、有效、梯级利用,设备投资省、占地面积小,所产生的过热蒸汽用于发电,具有显著的经济效益和社会效益。本实用新型可广泛应用于钢铁企业烧结机行业。 The utility model directly installs the heat pipe waste heat boiler on the large and small flue of the sintering machine, fully utilizes the recyclable waste heat resource of the sintering machine, achieves reasonable, effective and cascade utilization of energy, saves equipment investment, and occupies a small area. The generated superheated steam is used for power generation, which has significant economic and social benefits. The utility model can be widely used in the sintering machine industry of iron and steel enterprises.
本实用新型的所述大烟道蒸发器的一端连接第二大烟道,大烟道蒸发器的另一端连接所述蒸汽过热器,蒸汽过热器的另一端连接第一大烟道。 One end of the large flue evaporator of the utility model is connected to the second large flue, the other end of the large flue evaporator is connected to the steam superheater, and the other end of the steam superheater is connected to the first large flue.
本实用新型的一级水预热器的一端连接所述第二小烟道,一级水预热器的另一侧设置所述二级水预热器,二级水预热器的另一端连接所述小烟道蒸发器,小烟道蒸发器的另一端连接所述第一小烟道。 One end of the primary water preheater of the utility model is connected to the second small flue, the other side of the primary water preheater is provided with the secondary water preheater, and the other end of the secondary water preheater The small flue evaporator is connected, and the other end of the small flue evaporator is connected to the first small flue.
附图说明 Description of drawings
图1为现有技术的结构示意图。 Fig. 1 is a schematic structural diagram of the prior art.
图2为本实用新型的一种结构示意图。 Fig. 2 is a structural schematic diagram of the utility model.
图3为图2中A-A向视图。 Fig. 3 is a view along A-A in Fig. 2 .
图4为图2中B-B向视图。 Fig. 4 is a view along B-B in Fig. 2 .
其中:1、1′烧结机;2、2′大烟道;2′-1第一大烟道,2′-2第二大烟道,3、3′小烟道;3′-1第一小烟道,3′-2第二小烟道,4大烟道烟气电动阀;5大烟道旁通入口电动阀;6大烟道旁通出口电动阀、7小烟道烟气电动阀;8小烟道旁通入口电动阀;9小烟道旁通出口电动阀;10大烟道的旁通烟道(1);11小烟道的旁通烟道(1);12、12′大烟道蒸汽过热器;13、13′大烟道蒸发器;14小烟道蒸汽过热器;15、15'小烟道蒸发器;16大烟道的旁通烟道(2);17小烟道的旁通烟道(2);18、18′汽包;19、19'热力除氧器;20、20'水处理及给水系统;21'一级水预热器;22'二级水预热器;23'减温器。 Among them: 1, 1' sintering machine; 2, 2' large flue; 2'-1 first large flue, 2'-2 second large flue, 3, 3' small flue; 3'-1 first One small flue, 3′-2 second small flue, 4 large flue gas electric valves; 5 large flue bypass inlet electric valves; 6 large flue bypass outlet electric valves, 7 small flue gas smoke Electric valve; 8 Small flue bypass inlet electric valve; 9 Small flue bypass outlet electric valve; 10 Large flue bypass flue (1); 11 Small flue bypass flue (1); 12 , 12' large flue steam superheater; 13, 13' large flue evaporator; 14 small flue steam superheater; 15, 15' small flue evaporator; 16 large flue bypass flue (2) ;17 Bypass flue of small flue (2); 18, 18' steam drum; 19, 19' thermal deaerator; 20, 20' water treatment and water supply system; 21' primary water preheater; 22 'Secondary water preheater; 23' desuperheater.
具体实施方式 Detailed ways
如图2、3、4所示,为内置于烧结机大小烟道上的热管余热锅炉系统,包括烧结机的大烟道2'、小烟道3'、汽包18'、热力除氧器19'和水处理及给水系统20'。大烟道2'包括第一大烟道2'-1和第二大烟道2'-2,第二大烟道2'-2的一端连接大烟道蒸发器13',大烟道蒸发器13'的另一端连接蒸汽过热器12',蒸汽过热器12'的另一端连接第一大烟道2'-1。 As shown in Figures 2, 3 and 4, it is a heat pipe waste heat boiler system built in the large and small flues of the sintering machine, including the large flue 2' of the sintering machine, the small flue 3', the steam drum 18', and the thermal deaerator 19 'and water treatment and water supply system 20'. The large flue 2' includes a first large flue 2'-1 and a second large flue 2'-2, one end of the second large flue 2'-2 is connected to the large flue evaporator 13', and the large flue evaporates The other end of the steam superheater 13' is connected to the steam superheater 12', and the other end of the steam superheater 12' is connected to the first large flue 2'-1.
小烟道3'包括第一小烟道3'-1和第二小烟道3'-2,第二小烟道3'-2的一端连接预热器,预热器包括一级水预热器21'和二级水预热器22',一级水预热器21'与第二小烟道3'-2连接,一级水预热器21'的另一侧设置二级水预热器22',二级水预热器22'的另一端连接小烟道蒸发器15',小烟道蒸发器15'另一端连接第一小烟道3'-1。 The small flue 3' includes a first small flue 3'-1 and a second small flue 3'-2, one end of the second small flue 3'-2 is connected to a preheater, and the preheater includes a primary water preheater The heater 21' and the secondary water preheater 22', the primary water preheater 21' is connected to the second small flue 3'-2, and the other side of the primary water preheater 21' is provided with secondary water The other end of the preheater 22', the secondary water preheater 22' is connected to the small flue evaporator 15', and the other end of the small flue evaporator 15' is connected to the first small flue 3'-1.
水处理及给水系统20'的出水端连接一级水预热器21'的进水端,一级水预热器21'的出水端连接热力除氧器19'的进水端,热力除氧器19'的出水端连接二级水预热器22'的进水端,二级水预热器22'的出水端连接汽包18'的进水端,汽包18'的出水端分别连接大烟道蒸发器13'的进水端和小烟道蒸发器15'的进水端,大烟道蒸发器13'的出水端和小烟道蒸发器15'的出水端连接汽包18',汽包18'的出气端连接蒸汽过热器12'的进气端,蒸汽过热器12'的出气端连接减温器23'。 The water outlet of the water treatment and water supply system 20' is connected to the water inlet of the primary water preheater 21', and the water outlet of the primary water preheater 21' is connected to the water inlet of the thermal deaerator 19'. The water outlet end of the device 19' is connected to the water inlet end of the secondary water preheater 22', the water outlet end of the secondary water preheater 22' is connected to the water inlet end of the steam drum 18', and the water outlet end of the steam drum 18' is respectively connected to The water inlet end of the large flue evaporator 13' and the water inlet end of the small flue evaporator 15', the water outlet end of the large flue evaporator 13' and the water outlet end of the small flue evaporator 15' are connected to the steam drum 18' , the outlet end of the steam drum 18' is connected to the inlet end of the steam superheater 12', and the outlet end of the steam superheater 12' is connected to the desuperheater 23'.
本实用新型的工作原理是:来自于水处理及给水系统20'的低温给水(约30~40℃),进入装置在小烟道上的一级水预热器21',被预热到一定温度(约80~95℃)送至除氧器19',水在大气式热力除氧器中进行热力除氧后,水温升高到104℃左右,送往二级水预热器22'再被预热到更高的温度(约170~190℃)。二级预热器22'的出水送入汽包18',汽包18'分别将水送入蒸发器13'、15'。蒸发器13'、15'所产生的饱和汽、水混合物进入汽包18'进行汽、水分离,饱和蒸汽送入合并蒸汽过热器12',饱和水可通过汽包18'上的下降管直接返回到蒸发器13'、15',也可返回到除氧器19'。合并过热器12'所产生的过热蒸汽直接送往减温器23',然后外供进行发电。 The working principle of the utility model is: the low-temperature feed water (about 30-40°C) from the water treatment and water supply system 20' enters the primary water preheater 21' installed on the small flue, and is preheated to a certain temperature (about 80-95°C) to the deaerator 19', after the water is thermally deoxidized in the atmospheric thermal deaerator, the water temperature rises to about 104°C, and then sent to the secondary water preheater 22' It is preheated to a higher temperature (about 170-190°C). The water output from the secondary preheater 22' is sent to the steam drum 18', and the steam drum 18' sends the water to the evaporators 13' and 15' respectively. The saturated steam and water mixture produced by the evaporators 13' and 15' enter the steam drum 18' for steam and water separation, and the saturated steam is sent to the combined steam superheater 12', and the saturated water can be directly discharged through the downcomer on the steam drum 18'. Return to the evaporators 13', 15' and possibly to the deaerator 19'. The superheated steam generated by the combined superheater 12' is directly sent to the desuperheater 23', and then supplied externally for power generation. the
本实用新型并不局限于上述实施例,一种内置于烧结机大小烟道上的热管余热锅炉系统,也可在大、小烟道上同时装置蒸汽过热器,也可视现场情况,在大、小烟道的风管之间分段装置过热器、蒸发器及水预热器。 The utility model is not limited to the above-mentioned embodiments. A heat pipe waste heat boiler system built in the large and small flues of the sintering machine can also be equipped with steam superheaters on the large and small flues at the same time. The superheater, evaporator and water preheater are installed in sections between the air pipes of the flue.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201120229136U CN202149473U (en) | 2011-07-01 | 2011-07-01 | Heat-pipe residual-heat boiler system arranged in large flue and small flue of sintering machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201120229136U CN202149473U (en) | 2011-07-01 | 2011-07-01 | Heat-pipe residual-heat boiler system arranged in large flue and small flue of sintering machine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202149473U true CN202149473U (en) | 2012-02-22 |
Family
ID=45590531
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201120229136U Withdrawn - After Issue CN202149473U (en) | 2011-07-01 | 2011-07-01 | Heat-pipe residual-heat boiler system arranged in large flue and small flue of sintering machine |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202149473U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102278735A (en) * | 2011-07-01 | 2011-12-14 | 江苏中天能源设备有限公司 | Heat pipe exhaust-heat boiler internally built on big and small flues of sintering machine |
| CN103615908A (en) * | 2013-12-11 | 2014-03-05 | 北京志能祥赢节能环保科技有限公司 | Combined waste heat recycling system for stepping-type flat-burning sintering machine |
| CN104832900A (en) * | 2015-05-11 | 2015-08-12 | 江苏中天能源设备有限公司 | Finned tube type residual heat boiler system besides large flue of sintering machine |
-
2011
- 2011-07-01 CN CN201120229136U patent/CN202149473U/en not_active Withdrawn - After Issue
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102278735A (en) * | 2011-07-01 | 2011-12-14 | 江苏中天能源设备有限公司 | Heat pipe exhaust-heat boiler internally built on big and small flues of sintering machine |
| CN103615908A (en) * | 2013-12-11 | 2014-03-05 | 北京志能祥赢节能环保科技有限公司 | Combined waste heat recycling system for stepping-type flat-burning sintering machine |
| CN103615908B (en) * | 2013-12-11 | 2015-03-11 | 北京志能祥赢节能环保科技有限公司 | Combined waste heat recycling system for stepping-type flat-burning sintering machine |
| CN104832900A (en) * | 2015-05-11 | 2015-08-12 | 江苏中天能源设备有限公司 | Finned tube type residual heat boiler system besides large flue of sintering machine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202993868U (en) | Closed electric furnace flue gas waste heat recovery power generation system with vaporization flue | |
| CN103644743B (en) | Combination system for efficiently using waste heat in iron mine sintering cooling process | |
| CN201218660Y (en) | Sintering production waste heat power generation device | |
| CN106288830A (en) | A kind of smelting furnace waste heat boiler | |
| CN204438718U (en) | Residual heat from boiler fume drying brown coal system and boiler smoke system | |
| CN202691998U (en) | A self-cleaning waste heat boiler | |
| CN102410740B (en) | A multi-stage exhaust gas waste heat power generation device for sintering machines and coolers in iron and steel plants | |
| CN204593353U (en) | A kind of integrated system of deep exploitation residual heat from boiler fume | |
| CN103557532B (en) | Phase-change heat-exchange is utilized to avoid the system and method for low-temperature corrosion of air preheater | |
| CN103471084A (en) | Low-pressure hot-water smoke cooling system and method for avoiding low-temperature corrosion of air pre-heater | |
| CN202149473U (en) | Heat-pipe residual-heat boiler system arranged in large flue and small flue of sintering machine | |
| CN203130172U (en) | Power generation system comprehensively utilizing redundant blast-furnace gas and redundant saturated vapor of steel mill | |
| CN104406144A (en) | Double-medium waste heat boiler | |
| CN101832718A (en) | Double-working substance heat source sintering cogeneration-type boiler system | |
| CN203238215U (en) | Power generation device utilizing coke oven raw gas afterheat | |
| CN110186298A (en) | The recycling of coal steam-electric plant smoke waste heat and eliminating white smoke device | |
| CN204665224U (en) | A kind of Water pipe heating pipe afterheat boiler system be built on sintering machine flue | |
| CN205606515U (en) | Industrial silicon stove exhaust -heat boiler | |
| CN204372879U (en) | A kind of two medium waste heat boiler | |
| CN201819573U (en) | Sintering machine exhaust gas waste heat power generation system | |
| CN101871369A (en) | Superheated steam turbine power generation system for recovery of converter gas sensible heat | |
| CN201858899U (en) | Improved Power Generation System for Cement Industry | |
| CN204665225U (en) | A kind of fin pipe waste heat boiler system being placed on sintering machine large flue side | |
| CN104832899B (en) | A kind of Water pipe heating pipe afterheat boiler system being built on sintering machine flue | |
| CN211782808U (en) | Sodium sulfide exhaust-heat boiler |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20120222 Effective date of abandoning: 20130320 |
|