CN202127209U - Portable overhead ground wire lifter - Google Patents
Portable overhead ground wire lifter Download PDFInfo
- Publication number
- CN202127209U CN202127209U CN201120252119XU CN201120252119U CN202127209U CN 202127209 U CN202127209 U CN 202127209U CN 201120252119X U CN201120252119X U CN 201120252119XU CN 201120252119 U CN201120252119 U CN 201120252119U CN 202127209 U CN202127209 U CN 202127209U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- overhead ground
- ground wire
- steel
- shaped bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
所属技术领域:Technical field:
本实用新型涉及一种输电线路维护工具,更确切的说涉及一种提升输电线路架空地线的承力装置。The utility model relates to a power transmission line maintenance tool, in particular to a load-bearing device for lifting overhead ground wires of a power transmission line.
现有技术:current technology:
目前,用于提升输电线路架空地线较多的工器具是扒杆手拉链条葫芦组合、DYQ12型和DTG型架空地线提升器。采用扒杆手拉链条葫芦组合工具更换架空地线悬垂线夹时,因链条葫芦自身比较重、链条长度等原因,上下杆塔不便携带,在带电线路上方作业的安全风险比较高,高空作业时劳动强度也比较大,且作业效率低下;DYQ12型架空地线提升器操作简单,造型相对复杂,自身较重,上下杆塔携带不便,且在杆塔上安装不方便,增加了带电作业劳动强度和安全风险,影响工作效率;DTG型架空地线提升器结构比较简单,外形美观,比较轻便,操作起来也很简单,可以降低带电作业劳动强度、安全风险和提高工作效率,但是它只能用于自立塔上,无法在水泥杆上使用。At present, the tools used to lift the overhead ground wire of the transmission line are more tools such as picker rod, hand chain chain hoist combination, DYQ12 type and DTG type overhead ground wire lifter. When using the hand-pull chain hoist combination tool to replace the suspension clamp of the overhead ground wire, due to the weight of the chain hoist itself and the length of the chain, etc., it is inconvenient to carry the upper and lower towers, and the safety risk of working above the live line is relatively high. The strength is also relatively high, and the operation efficiency is low; the DYQ12 type overhead ground wire lifter is easy to operate, relatively complicated in shape, heavy in itself, inconvenient to carry up and down the tower, and inconvenient to install on the tower, which increases the labor intensity and safety risks of live work , affecting work efficiency; DTG type overhead ground wire lifter has a relatively simple structure, beautiful appearance, relatively light weight, and easy operation, which can reduce the labor intensity of live work, safety risks and improve work efficiency, but it can only be used for self-supporting towers , cannot be used on concrete poles.
发明内容:Invention content:
本实用新型的目的在于克服现有输电线路架空地线提升工器具携带不便、受杆塔型式限制、安全风险高、劳动强度大和作业效率低的不足,提供一种便携式架空地线提升器,结构简单,比较轻便,便于携带,容易操作。The purpose of the utility model is to provide a portable overhead ground wire lifter with a simple structure to overcome the shortcomings of the existing overhead ground wire hoist equipment for transmission lines, which are inconvenient to carry, limited by the type of pole tower, high safety risk, high labor intensity and low operating efficiency. , relatively light, easy to carry, easy to operate.
本实用新型的特征在于:包括U型支架、钢管、棘轮扳手、钢丝绳,在U型支架的上部中间设置吊钩,在U型支架的两边挡板打孔固定连接两个滚动轴承,钢管水平穿过两个滚动轴承;U型支架两边挡板之间的钢管固定连接两个带调节器的棘轮扳手,在钢管靠近两端的位置开有出绳小槽,钢丝绳从出绳小槽穿过钢管;所述的钢丝绳末端设有挂钩。The utility model is characterized in that it includes a U-shaped bracket, a steel pipe, a ratchet wrench, and a steel wire rope. A hook is arranged in the middle of the upper part of the U-shaped bracket, and two rolling bearings are fixedly connected to the baffles on both sides of the U-shaped bracket. The steel pipe passes through it horizontally. Two rolling bearings; the steel pipe between the baffles on both sides of the U-shaped bracket is fixedly connected with two ratchet wrenches with regulators, and there is a small rope outlet groove at the position near the two ends of the steel pipe, and the steel wire rope passes through the steel pipe through the small rope outlet groove; There is a hook at the end of the wire rope.
所述的出绳小槽打磨光滑。The small rope outlet groove is polished smoothly.
所述的钢管两端设置固定螺帽和并帽。Both ends of the steel pipe are provided with fixing nuts and parallel caps.
所述的挂钩带有反锁勾。Described hook has anti-lock hook.
如上所述,本实用新型为便于上下杆塔过程中携带和减小带电作业活动范围,采用棘轮扳手替代传统承力提升工具,所述的棘轮扳手带有调节器,不但可提升架空地线,还可通过调节器翻转180度降低架空地线;为保证每次掰动棘轮扳手时有效控制架空地线只上升不回落,设置了两个棘轮扳手,一个棘轮扳手在掰动时,另一个棘轮扳手进行反锁,可有效控制好架空地线自身向下的重力,防止掰动的棘轮扳手随中间钢管轴反转致使架空地线回落;为减小中间钢管随棘轮扳手转动时与支架左右两边挡板之间的阻力,分别在U型支架左右两边挡板与钢管的接触部分各焊接一个滚动轴承;为防止架空地线在受力提升时从挂钩里滑出,挂钩设置了反锁勾;为保证起吊钢丝绳有足够强度,同时对吊起的架空地线起到二次保护的作用,钢丝绳两端均设置了挂钩,采用双挂点的形式提升架空地线;为减小钢丝绳受力时与钢管之间的摩擦,减少钢丝绳的磨损,延长使用寿命,将钢管穿出钢丝绳的两个出绳槽口打磨光滑;为了防止收紧的钢丝绳滑脱钢管,在钢管的两端设置了固定螺母和并帽。As mentioned above, the utility model adopts a ratchet wrench to replace the traditional force-bearing lifting tool in order to facilitate carrying and reduce the range of live work in the process of going up and down the pole tower. The ratchet wrench is equipped with a regulator, which can not only lift the overhead ground wire, but also The overhead ground wire can be lowered by flipping 180 degrees through the regulator; in order to ensure that the overhead ground wire only rises and does not fall back effectively when the ratchet wrench is turned each time, two ratchet wrenches are set. When one ratchet wrench is turned, the other ratchet wrench Anti-locking can effectively control the downward gravity of the overhead ground wire itself, and prevent the ratchet wrench from turning with the middle steel pipe shaft to cause the overhead ground wire to fall back; To prevent the resistance between the baffles and steel pipes on the left and right sides of the U-shaped bracket, a rolling bearing is respectively welded; in order to prevent the overhead ground wire from slipping out of the hook when it is lifted under force, the hook is equipped with an anti-lock hook; in order to ensure that the lifting wire rope It has sufficient strength, and at the same time plays a role of secondary protection for the hoisted overhead ground wire. Both ends of the steel wire rope are equipped with hooks, and the overhead ground wire is lifted in the form of double hanging points; in order to reduce the force between the steel wire rope and the steel pipe. In order to reduce the friction of the steel wire rope and prolong the service life, the two outlet grooves where the steel pipe passes through the steel wire rope are polished and smooth; in order to prevent the tightened steel wire rope from slipping off the steel pipe, fixed nuts and union caps are set at both ends of the steel pipe.
工作原理:利用双挂点钢丝绳挂钩钩住输电线路架空地线,通过转动棘轮扳手的手柄收紧钢丝绳来向上提升架空地线。Working principle: Use the double hanging point wire rope hook to hook the overhead ground wire of the transmission line, and tighten the wire rope by turning the handle of the ratchet wrench to lift the overhead ground wire upward.
本实用新型的有益效果:不受杆塔类型的限制,可适用于各类杆塔上;作业中省时省力、操作简便;使用的棘轮扳手体积较小,重量轻,可装入工具包便于随身携带,并且可以单人操作;经过反复的现场试验和改进优化证明,可以降低劳动强度、安全风险,提高工作效率。The beneficial effect of the utility model: it is not limited by the type of pole tower, and can be applied to various pole towers; it saves time and effort in operation, and is easy to operate; the ratchet wrench used is small in size and light in weight, and can be put into a tool bag for easy carrying , and can be operated by a single person; after repeated field tests and improvement and optimization, it can reduce labor intensity, safety risks and improve work efficiency.
附图说明:Description of drawings:
图1是本实用新型的结构结构图。Fig. 1 is a structural diagram of the utility model.
图2是本实用新型U型支架与钢管连接的侧视图。Fig. 2 is a side view of the connection between the U-shaped bracket and the steel pipe of the utility model.
图3是本实用新型棘轮扳手与钢管连接的侧视图。。Fig. 3 is a side view of the connection between the ratchet wrench of the present invention and the steel pipe. .
图中,1.吊钩,2.U型支架,3.滚动轴承,4.固定螺帽,5.并帽,6.钢管,7.出绳小槽,8.钢丝绳,9.挂钩,10.反锁勾,11.棘轮扳手,12.调节器。In the figure, 1. Hook, 2. U-shaped bracket, 3. Rolling bearing, 4. Fixed nut, 5. Combined cap, 6. Steel pipe, 7. Small groove for the rope, 8. Steel wire rope, 9. Hook, 10. Anti-lock hook, 11. ratchet wrench, 12. regulator.
具体实施方式:Detailed ways:
如图1所示,本实用新型包括U型支架2、钢管6、棘轮扳手11、钢丝绳8,在U型支架2的上部中间设置吊钩1,以便挂在电线杆的横担上。As shown in Figure 1, the utility model comprises
在U型支架2的两边挡板打孔固定连接两个滚动轴承3,钢管6水平穿过两个滚动轴承3;U型支架2两边挡板之间的钢管6固定连接两个带调节器12的棘轮扳手11,在钢管6靠近两端的位置开有出绳小槽7,钢丝绳8从出绳小槽7穿过钢管6;所述的钢丝绳8末端设有挂钩9。The baffles on both sides of the U-shaped
所述的棘轮扳手11带有调节器12,且一个棘轮扳手11在掰动时,另一个棘轮扳手11进行反锁。The
所述的出绳小槽7打磨光滑,减少钢丝绳8的磨损。The small
所述的钢管6两端设置固定螺帽4和并帽5,防止卷缠在钢管6上的钢丝绳8滑脱。The two ends of the
所述的挂钩9带有反锁勾10,以防止架空地线在受力提升时从挂钩里滑出。The hook 9 is provided with an
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201120252119XU CN202127209U (en) | 2011-07-15 | 2011-07-15 | Portable overhead ground wire lifter |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201120252119XU CN202127209U (en) | 2011-07-15 | 2011-07-15 | Portable overhead ground wire lifter |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202127209U true CN202127209U (en) | 2012-01-25 |
Family
ID=45490271
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201120252119XU Expired - Lifetime CN202127209U (en) | 2011-07-15 | 2011-07-15 | Portable overhead ground wire lifter |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202127209U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102263391A (en) * | 2011-07-15 | 2011-11-30 | 安徽省电力公司淮北供电公司 | Portable overhead grounding-wire raiser |
| CN103928865A (en) * | 2014-04-10 | 2014-07-16 | 国家电网公司 | Manual wire lifting device for stringing construction |
| CN107069533A (en) * | 2016-12-30 | 2017-08-18 | 国家电网公司 | A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool |
| CN111668746A (en) * | 2019-07-10 | 2020-09-15 | 国网黑龙江省电力有限公司伊春供电公司 | Auxiliary device for maintenance and maintenance of overhead high-voltage direct current transmission line and its use method |
-
2011
- 2011-07-15 CN CN201120252119XU patent/CN202127209U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102263391A (en) * | 2011-07-15 | 2011-11-30 | 安徽省电力公司淮北供电公司 | Portable overhead grounding-wire raiser |
| CN102263391B (en) * | 2011-07-15 | 2014-09-17 | 国网安徽省电力公司淮北供电公司 | Portable overhead grounding-wire raiser |
| CN103928865A (en) * | 2014-04-10 | 2014-07-16 | 国家电网公司 | Manual wire lifting device for stringing construction |
| CN107069533A (en) * | 2016-12-30 | 2017-08-18 | 国家电网公司 | A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool |
| CN111668746A (en) * | 2019-07-10 | 2020-09-15 | 国网黑龙江省电力有限公司伊春供电公司 | Auxiliary device for maintenance and maintenance of overhead high-voltage direct current transmission line and its use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102237655A (en) | Method and tool for lifting overhead ground wire | |
| CN202127209U (en) | Portable overhead ground wire lifter | |
| CN201882804U (en) | Hoisting tool for maintenance of electric power line | |
| CN204237493U (en) | A kind of substation equipment maintenance Simple hanger | |
| CN201171148Y (en) | Machine for supporting overhead pround wire | |
| CN102263391B (en) | Portable overhead grounding-wire raiser | |
| CN202474703U (en) | Overhead ground wire lifting mechanism | |
| CN203998746U (en) | Portable suspension installation | |
| CN104362544A (en) | Pulley type tower head clamp | |
| CN202134855U (en) | Wire lifting device for overhead ground wire | |
| CN202190018U (en) | An overhead ground wire ratchet wrench carrying wire tool | |
| CN202190019U (en) | Aerial earth wire ratchet wrench type two-point lifting tool | |
| CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
| CN204342257U (en) | A kind of large-scale component turning device | |
| CN202488034U (en) | Lifting device for electric transmission line of angle iron tower | |
| CN201887378U (en) | Auxiliary working rack for transmission line pole or tower maintenance | |
| CN202594699U (en) | Power transmission line lifting device for steel pipe tower | |
| CN202373939U (en) | Live-working double-conductor lifting device | |
| CN202268668U (en) | Operating device of line lifter lead screw for transmission line | |
| CN202268651U (en) | Fixing device of transmission wire lifter | |
| CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
| CN203295025U (en) | Clamping tool for hoisting single H beam | |
| CN204068046U (en) | Electric power line pole tower article carrying device | |
| CN205023787U (en) | Electric power hoist and mount are from locking fixed pulley | |
| CN203699783U (en) | Hanging bracket fixed with wire pole |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: HUAIBEI POWER SUPPLY COMPANY, STATE GRID ANHUI ELECTRIC POWER COMPANY Effective date: 20140213 Owner name: HUAIBEI POWER SUPPLY COMPANY, STATE GRID ANHUI ELE Effective date: 20140213 |
|
| C56 | Change in the name or address of the patentee |
Owner name: HUAIBEI POWER SUPPLY COMPANY, STATE GRID ANHUI ELE Free format text: FORMER NAME: HUAIBEI POWER SUPPLY COMPANY OF ANHUI ELECTRIC POWER COMPANY |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 235000 HUAIBEI, ANHUI PROVINCE TO: 100031 XICHENG, BEIJING |
|
| CP01 | Change in the name or title of a patent holder |
Address after: 235000 No. 110 Huaihai Middle Road, phase mountain, Huaibei, Anhui Patentee after: HUAIBEI POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Co. Address before: 235000 No. 110 Huaihai Middle Road, phase mountain, Huaibei, Anhui Patentee before: HUAIBEI POWER SUPPLY COMPANY OF ANHUI ELECTRIC POWER Co. |
|
| CP03 | Change of name, title or address | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20140213 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Patentee after: State Grid Corporation of China Patentee after: HUAIBEI POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Co. Address before: 235000 No. 110 Huaihai Middle Road, phase mountain, Huaibei, Anhui Patentee before: HUAIBEI POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Co. |
|
| TR01 | Transfer of patent right | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20120125 Effective date of abandoning: 20140917 |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20120125 Effective date of abandoning: 20140917 |
|
| RGAV | Abandon patent right to avoid regrant |