CN202117903U - Real time monitoring system for central air conditioner room - Google Patents

Real time monitoring system for central air conditioner room Download PDF

Info

Publication number
CN202117903U
CN202117903U CN2011202025170U CN201120202517U CN202117903U CN 202117903 U CN202117903 U CN 202117903U CN 2011202025170 U CN2011202025170 U CN 2011202025170U CN 201120202517 U CN201120202517 U CN 201120202517U CN 202117903 U CN202117903 U CN 202117903U
Authority
CN
China
Prior art keywords
module
acquisition module
data
central air
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202025170U
Other languages
Chinese (zh)
Inventor
陈才炜
陆春民
刘宇峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU GUOWANG ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
SUZHOU GUOWANG ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU GUOWANG ELECTRONIC TECHNOLOGY Co Ltd filed Critical SUZHOU GUOWANG ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN2011202025170U priority Critical patent/CN202117903U/en
Application granted granted Critical
Publication of CN202117903U publication Critical patent/CN202117903U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a real time monitoring system for a central air conditioner room, which comprises the central air conditioner room provided with a refrigeration pump, a sensor module, an opening-closing state quantity acquisition module, a temperature acquisition module, a humid acquisition module, a data acquisition module, a data conversion module, a data transmission module, a personal computer (PC) and a client module. A power supply and a power supply switch which are connected together are arranged on the refrigeration pump. The sensor module, the opening-closing state quantity acquisition module, the temperature acquisition module and the humid acquisition module are respectively connected with the data acquisition module which is connected with the data conversion module. The data conversion module is connected with the data transmission module which is connected with the PC. The PC is connected with the client module. The sensor module is connected with the power supply on the refrigeration pump. The opening-closing state quantity acquisition module is connected with the power supply switch on the refrigeration pump.

Description

Central air-conditioner machine room real-time monitoring system
Technical field
The utility model relates to a kind of central air-conditioner machine room real-time monitoring system.
Background technique
The machine room of central air-conditioner becomes an important step of control central air-conditioning system at present.And to the monitoring of the refrigeration pump in the central Air Conditioning Facilities, what often adopt now is the mode of manual metering.Promptly need the attendant to arrive the numerical value that the voltmeter that is installed on the refrigeration pump, ammeter, wattmeter or the like are removed to copy down in the machine room scene, take numerical value back again and analyze, draw the situation of refrigeration pump at last.
Such method wastes time and energy, and promptly will spend manpower and ceaselessly go to check meter; And because also will taking back to analyze, the numerical value of copying make the attendant can not obtain various parameters, the working state of the refrigeration pump of the very first time, so thereby can not find that fault influences the work of central air-conditioner in the very first time.
The model utility content
In order to overcome the defective of existing technology; The utility model discloses a kind of central air-conditioner machine room real-time monitoring system; It is time saving and energy saving, and can realize the situation of attendant's " online patrolling and examining " refrigeration pump on PC, is implemented in " very first time " veritably to find fault and report to the police with short message mode.
The technological scheme of the utility model is following:
A kind of central air-conditioner machine room real-time monitoring system comprises the central air-conditioner machine room that includes refrigeration pump, and said refrigeration pump is provided with power supply and the power supply switch that links together; Said system also comprises sensor assembly, on off state amount acquisition module, temperature collect module, humidity acquisition module, data acquisition module, data conversion module, data transmission module, PC, client modules;
Said sensor assembly, on off state amount acquisition module, temperature collect module, humidity acquisition module are connected with data acquisition module respectively; Said data acquisition module is connected with said data conversion module; Said data conversion module is connected with said data transmission module; Said data transmission module is connected with said PC; Said PC is connected with said client modules;
Said sensor assembly is connected with power supply on the said refrigeration pump; Said on off state amount acquisition module is connected with power supply switch on the said refrigeration pump.
Preferably, also comprise on-the-spot three-dimensional image acquisition device, said on-the-spot three-dimensional image acquisition device is connected with said PC.
Preferably, also comprise the onsite alarming module, said onsite alarming module is connected with said data acquisition module.
Preferably, also comprise supply module, said supply module is connected with said data acquisition module, data conversion module, data transmission module respectively.
Preferably, said client modules is a mobile phone.
Compared with prior art, the beneficial effect of the utility model is following:
The first, the utility model can realize that the attendant passes through the situation of PC " online patrolling and examining " refrigeration pump, is implemented in " very first time " discovery fault veritably; And report to the police with short message mode.
Second; The utility model has adopted on-the-spot three-dimensional image acquisition device; It can the collection in worksite machine room on-the-spot three-dimensional view; Itself and real time information are carried out alternately, are let on the repair and maintenance personnel that the are presented in computer screen that data parameters can be three-dimensional, conveniently let the repair and maintenance personnel from the rational faculty to the understanding on the sense organ is arranged.
The 3rd, the utility model both can realize that the online of long-range PC patrolled and examined, and also can report to the police at the scene through the onsite alarming module.
Description of drawings
Fig. 1 is the structural representation of the utility model specific embodiment.
Embodiment
The below combines accompanying drawing and specific embodiment that the utility model is described.
Embodiment
Like Fig. 1; A kind of central air-conditioner machine room monitoring in real time is 100, comprises central air-conditioner machine room, sensor assembly 21, on off state amount acquisition module 22, temperature collect module 23, humidity acquisition module 24, data acquisition module 31, data conversion module 32, data transmission module 33, PC 34, client modules 61, supply module 51 and the onsite alarming module 41 that includes refrigeration pump, on-the-spot three-dimensional image acquisition device 71.
Wherein, refrigeration pump is provided with the power supply 11 and power supply switch 12 that links together; This is stated sensor assembly 21 and is connected with power supply 11 on the refrigeration pump; On off state amount acquisition module 22 is connected with power supply switch 12 on the refrigeration pump.
Sensor assembly 21, on off state amount acquisition module 22, temperature collect module 23, humidity acquisition module 24 are connected with data acquisition module 31 respectively; Data acquisition module 31 is connected with data conversion module 32; Data conversion module 32 is connected with data transmission module 33; Data transmission module 33 is connected with PC 34; PC 34 is connected with client modules 61.
Onsite alarming module 41 is connected with data acquisition module 31.Supply module 51 is connected 33 with data acquisition module 31, data conversion module 32, data transmission module respectively.
In the present embodiment, client modules 61 is a mobile phone.
And data transmission module 33 earlier logical GSM networks are again through Internet network and PC wireless connections.PC and client modules 61 wireless connections.It is to sending note as client modules 61.
Sensor assembly 21 adopts the non-intrusion type current transformer to gather the operating current signal of the power supply of refrigeration pump.Adopt the non-intrusion type data acquisition modes, do not destroy existing systems work, cabling, layout type.
On off state amount acquisition module 22 is used for the switching value signal of power supply switch of collection in worksite refrigeration pump.
Temperature collect module 23 is used for the temperature signal around the collection in worksite refrigeration pump.
Humidity acquisition module 24 is used for the moisture signal around the collection in worksite refrigeration pump.
In this enforcement, loaded IBMS intelligent monitoring platform on the PC 34 and come input data are wherein carried out statistics and analysis.
On-the-spot three-dimensional image acquisition device 71 is connected with PC 34 through the Internet network, and the Placement of the two can be wired, also can be wireless.In the present embodiment, adopt on-the-spot three-dimensional image acquisition device 71 and PC 34 wireless connections, more convenient attendant's remote monitoring.
On-the-spot three-dimensional image acquisition device 71 can the on-the-spot three-dimensional view of collection in worksite machine room, and its and real time information are carried out alternately, let data parameters can the repair and maintenance personnel that the be presented in computer screen of solid on, conveniently let the repair and maintenance personnel from the rational faculty to the understanding on the sense organ is arranged.
The below specifies the using process of the utility model:
S11: on-the-spot at the central air-conditioner machine room, the signal of the operating current of the power supply of sensor assembly 21 collection in worksite refrigeration pumps.
The switching value signal of the power supply switch of on off state amount acquisition module 22 collection in worksite refrigeration pumps:.
Temperature signal around the temperature collect module 23 collection in worksite refrigeration pumps.
Moisture signal around the humidity acquisition module 24 collection in worksite refrigeration pumps.
Simultaneously, on-the-spot three-dimensional image acquisition device 71 is gathered the on-the-spot three-dimensional view information of central air-conditioner machine room, and is transferred to PC 34 to this information through the Internet network wireless.
S12: after accomplishing above-mentioned collection, collected operating current signal, switching value signal, temperature signal and moisture signal are input in the data acquisition module 31 together.Data acquisition module 31 can carry out simple processing and analysis to those signal datas; If note abnormalities or fault; Start onsite alarming module 41 immediately, the attendant who aligns at the scene reports to the police, and the mode of warning can adopt modes such as buzzing, bright lamp.
S13: the signal data that data acquisition module 31 is crossed its simple processing is transferred to data conversion module 32.Data conversion module 32 is mainly done the conversion of RA232 signal type to the RS485 signal type to those signal datas.
S14: data conversion module 32 is input to data transmission module 33 to wherein signal data again.Data transmission module 33 earlier logical GSM networks are given PC 34 data transmission through the Internet network again.PC 34 utilizes the IBMS intelligent monitoring platform that loads on it to come input data are wherein carried out statistics and analysis.IBMS intelligent monitoring platform can quantize the state of every day, each hour even the per minute of system to be recorded on the server, for operational maintenance and breakdown maintenance provide the data support.IBMS intelligent monitoring platform has not only ensured the reliable operation of system, and also senior general reduces property management and maintenance cost, the specific aim of the equipment routing inspection of raising.
Like this, the attendant just can be at working state and the real-time parameter of realizing each unit, node on " online patrolling and examining " on-the-spot refrigeration pump on the PC 34 of office.The attendant can carry out the work whether real-time online formula monitoring power supply system runnability, each pump work situation of real-time online formula monitoring, real-time online formula supervisory system work overloadingly or the like.
Simultaneously; PC 34 is carrying out alternately from 71 theres three-dimensional view information that obtains and the real time information that obtains from data transmission module 33 of on-the-spot three-dimensional image acquisition device; Let on the screen that is presented in repair and maintenance personnel PC that data parameters can be three-dimensional, conveniently let the repair and maintenance personnel from the rational faculty to the understanding on the sense organ is arranged.
S15:, can warn to PC 34 other attendants if IBMS intelligent monitoring platform finds that refrigeration pump breaks down.Realize the all-weather intelligent alarm system through the GSM network simultaneously, the very first time is informed the custom system alarm condition, sends alarming short message to the mobile phone as client modules 61.
Can find out from top process; The system that the utility model is corresponding; Realized: the attendant can be at working state and the real-time parameter of realizing each unit, node on " online patrolling and examining " on-the-spot refrigeration pump on the PC 34 of office, and real realization " very first time " is found fault and reported to the police with way of short messages.IBMS intelligent monitoring platform can quantize the state of every day, each hour even the per minute of system to be recorded on the server, for operational maintenance and breakdown maintenance provide the data support.IBMS intelligent monitoring platform has not only ensured the reliable operation of system, and also senior general reduces property management and maintenance cost, the specific aim of the equipment routing inspection of raising.
The utility model preferred embodiment just is used for helping to set forth the utility model.Preferred embodiment does not have all details of detailed descriptionthe, does not limit this model utility yet and is merely described embodiment.Obviously, according to the content of this specification, can do a lot of modifications and variation.These embodiments are chosen and specifically described to this specification, is principle and practical application in order to explain the utility model better, thereby person skilled can be utilized the utility model well under making.The utility model only receives the restriction of claims and four corner and equivalent.More than the disclosed several specific embodiments that are merely the application, but the application is not limited thereto, any those skilled in the art can think variation, all should drop in the application's the protection domain.

Claims (5)

1. a central air-conditioner machine room real-time monitoring system comprises the central air-conditioner machine room that includes refrigeration pump, and said refrigeration pump is provided with power supply and the power supply switch that links together, and it is characterized in that:
Also comprise sensor assembly, on off state amount acquisition module, temperature collect module, humidity acquisition module, data acquisition module, data conversion module, data transmission module, PC, client modules;
Said sensor assembly, on off state amount acquisition module, temperature collect module, humidity acquisition module are connected with data acquisition module respectively; Said data acquisition module is connected with said data conversion module; Said data conversion module is connected with said data transmission module; Said data transmission module is connected with said PC; Said PC is connected with said client modules;
Said sensor assembly is connected with power supply on the said refrigeration pump; Said on off state amount acquisition module is connected with power supply switch on the said refrigeration pump.
2. central air-conditioner machine room real-time monitoring system according to claim 1 is characterized in that, also comprises on-the-spot three-dimensional image acquisition device, and said on-the-spot three-dimensional image acquisition device is connected with said PC.
3. central air-conditioner machine room real-time monitoring system according to claim 1 is characterized in that, also comprises the onsite alarming module, and said onsite alarming module is connected with said data acquisition module.
4. central air-conditioner machine room real-time monitoring system according to claim 1 is characterized in that, also comprises supply module, and said supply module is connected with said data acquisition module, data conversion module, data transmission module respectively.
5. central air-conditioner machine room real-time monitoring system according to claim 1 is characterized in that said client modules is a mobile phone.
CN2011202025170U 2011-06-16 2011-06-16 Real time monitoring system for central air conditioner room Expired - Fee Related CN202117903U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202025170U CN202117903U (en) 2011-06-16 2011-06-16 Real time monitoring system for central air conditioner room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202025170U CN202117903U (en) 2011-06-16 2011-06-16 Real time monitoring system for central air conditioner room

Publications (1)

Publication Number Publication Date
CN202117903U true CN202117903U (en) 2012-01-18

Family

ID=45458975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202025170U Expired - Fee Related CN202117903U (en) 2011-06-16 2011-06-16 Real time monitoring system for central air conditioner room

Country Status (1)

Country Link
CN (1) CN202117903U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102608939A (en) * 2012-01-19 2012-07-25 山西省电力公司电力通信中心 Three-dimensional machine room monitoring system and method
CN103388882A (en) * 2013-07-19 2013-11-13 上海东大自动化工程有限公司 Data acquisition processing system of air conditioning unit
CN105223834A (en) * 2015-09-23 2016-01-06 国网上海市电力公司 A kind of machine room current information real-time dynamic display equipment and application thereof
CN106322691A (en) * 2016-10-28 2017-01-11 安徽南国机电科技发展有限公司 Monitoring service platform for multiple central air conditioners of building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102608939A (en) * 2012-01-19 2012-07-25 山西省电力公司电力通信中心 Three-dimensional machine room monitoring system and method
CN103388882A (en) * 2013-07-19 2013-11-13 上海东大自动化工程有限公司 Data acquisition processing system of air conditioning unit
CN105223834A (en) * 2015-09-23 2016-01-06 国网上海市电力公司 A kind of machine room current information real-time dynamic display equipment and application thereof
CN106322691A (en) * 2016-10-28 2017-01-11 安徽南国机电科技发展有限公司 Monitoring service platform for multiple central air conditioners of building

Similar Documents

Publication Publication Date Title
CN103679556B (en) The intelligent diagnosing method of distribution transformer terminals power failure alarm
CN106655522A (en) Master station system suitable for operation and maintenance management of secondary equipment of power grid
CN102830673A (en) GPRS (General Packet Radio Service) communication-based remote online monitoring system and method for sewage treatment equipment
CN202117903U (en) Real time monitoring system for central air conditioner room
CN107807593B (en) Power distribution room master control device, master control system and detection control method
CN202210709U (en) Distribution transformer real time monitoring system
CN101826756A (en) System and method for realizing fault positioning of power distributing substation equipment
CN105262210A (en) System and method for analysis and early warning of substation network security
CN202837985U (en) GPRS-communication based remote online monitoring system for sewage treatment equipment
CN111007433A (en) Intelligent electricity utilization safety supervision system based on Internet of things
CN207216878U (en) Signal lamp failure detection means
CN202661863U (en) Remote monitoring system for reliability test
CN102621959A (en) Non-electricity monitoring terminal equipment, management equipment and monitoring device for distribution transformer room
CN206440987U (en) Property installations and facilities remote monitoring platform
CN107340747A (en) A kind of concrete mixer intelligent remote monitoring system
CN105740993A (en) Transformer station operation and maintenance inspection system and realization method thereof
CN209282929U (en) A kind of electric power box intelligent monitoring protection management system
CN110032152A (en) A kind of intelligent workshop management system and application method based on Internet of Things
CN202282841U (en) Monitoring system for crossing circuit operation and environment
CN201796281U (en) Streetlamp intelligent monitoring terminal and streetlamp wide-area monitoring system
CN201629036U (en) Power resource energy consumption monitoring system for teaching areas
CN206742968U (en) A kind of switchgear house intelligence attended computer device people's system
CN108008679A (en) A kind of air-conditioning real-time monitoring system with automatic control function
CN206115680U (en) Use electric information collection device
CN104898567B (en) Disintegrating machine remotely monitor management platform

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20140616

EXPY Termination of patent right or utility model