CN202059665U
CN202059665U CN2011200858349U CN201120085834U CN202059665U CN 202059665 U CN202059665 U CN 202059665U CN 2011200858349 U CN2011200858349 U CN 2011200858349U CN 201120085834 U CN201120085834 U CN 201120085834U CN 202059665 U CN202059665 U CN 202059665U
Authority
CN
China
Prior art keywords
ion blower
blower fan
network connector
novel
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200858349U
Other languages
Chinese (zh)
Inventor
张文奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Haixin Electromechanics Industry Equipment Co Ltd
Original Assignee
Suzhou Haixin Electromechanics Industry Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Haixin Electromechanics Industry Equipment Co Ltd filed Critical Suzhou Haixin Electromechanics Industry Equipment Co Ltd
Priority to CN2011200858349U priority Critical patent/CN202059665U/en
Application granted granted Critical
Publication of CN202059665U publication Critical patent/CN202059665U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a novel ion blower fan. The ion blower fan (3) is provided with two or more than two network connectors (2). The network connectors (2) are arranged below the fan of the ion blower fan (3). The network connectors (2) are mounted on the ion blower fan (3) via a PCB main board (1). According to the novel ion blower fan of the utility model, two or more than two ion blower fans connected in a series manner can be fully utilized for using, thereby improving the work efficiency of the ion blower fan.

Description

Novel ion blower
Technical field
The utility model relates to a kind of novel ion blower.
Background technology
Now in the equipment that factory uses, ion blower all is being enclosed in the equipment of a dispersion, this method makes the difficulty of arranging of its power line, brought very big workload to the millworker simultaneously, but, the used ion blower of present factory in the equipment of being linked into, therefore can not effectively utilize ion blower because can not being cascaded.
The utility model content
The purpose of this utility model is: a kind of novel ion blower is provided, can makes full use of two or several ion blower series connection uses, improve the operating efficiency of ion blower.
The technical solution of the utility model is: a kind of novel ion blower, described ion blower is provided with network connector.
Below technique scheme is further explained:
Described ion blower is provided with two or more network connectors.
Described network connector is arranged on the fan below of ion blower.
Described network connector is attached on the ion blower by the PCB mainboard.
Described network connector is the computer network connector, perhaps telephone network connector, the perhaps connector of other form models.
The utility model has the advantages that: novel ion blower of the present utility model, on ion blower, install network connector, be convenient to connect simultaneously one or several ion blowers are increased work efficiency it.
Description of drawings
The utility model will be further described below in conjunction with drawings and Examples:
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the network connector of the utility model embodiment and the installing schematic diagram of PCB mainboard;
Schematic diagram when Fig. 3 is the novel ion blower tandem working of many playscripts with stage directions utility model embodiment.
Wherein: the 1PCB mainboard; 2 network connectors; 3 ion blowers.
Embodiment
Embodiment: as shown in Figure 1 and Figure 2, a kind of novel ion blower, the fan below of ion blower 3 is provided with two network connectors 2, and network connector 2 is attached on the ion blower 3 by connection PCB mainboard 1.Network connector 2 is the computer network connector.
As shown in Figure 3, by network connector 2 and grid line can connect simultaneously one or several ion blowers.Thereby the ion blower working range is enlarged, also guarantee the electrostatic charge on the effective neutralized product simultaneously.
During use, its network connector 2 is given in 1 power supply of the PCB mainboard of an ion blower 3, by its network connector 2 of network connector 2 other ion blowers 3 of series connection, makes power delivery, makes other ion blowers 3 obtain electric power and works.
That is to say that many ion blowers can be constituted a network system by network connector 2, as long as wherein an ion blower is connected to power supply, other ion blowers have all been connected power supply.
Should be pointed out that for the utility model also to have the embodiment of multiple conversion and remodeling, be not limited to the specific embodiment of above-mentioned execution mode through proving absolutely.The foregoing description is as just explanation of the present utility model, rather than restriction.In a word, protection range of the present utility model should comprise those conspicuous to those skilled in the art conversion or substitute and remodeling.

Claims (6)

1. novel ion blower, it is characterized in that: described ion blower (3) is provided with network connector (2).
2. novel ion blower according to claim 1 is characterized in that: described ion blower (3) is provided with two or more network connectors (2).
3. novel ion blower according to claim 1 is characterized in that: described network connector (2) is arranged on the fan below of ion blower (3).
4. novel ion blower according to claim 1 is characterized in that: described network connector (2) is attached on the ion blower (3) by PCB mainboard (1).
5. novel ion blower according to claim 1 is characterized in that: described network connector (2) is the computer network connector.
6. novel ion blower according to claim 1 is characterized in that: described network connector (2) is the telephone network connector.
CN2011200858349U 2011-03-29 2011-03-29 Novel ion blower fan Expired - Fee Related CN202059665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200858349U CN202059665U (en) 2011-03-29 2011-03-29 Novel ion blower fan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200858349U CN202059665U (en) 2011-03-29 2011-03-29 Novel ion blower fan

Publications (1)

Publication Number Publication Date
CN202059665U true CN202059665U (en) 2011-11-30

Family

ID=45019627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200858349U Expired - Fee Related CN202059665U (en) 2011-03-29 2011-03-29 Novel ion blower fan

Country Status (1)

Country Link
CN (1) CN202059665U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102186302A (en) * 2011-03-29 2011-09-14 苏州市海新机电工业设备有限公司 Novel ionizing air blower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102186302A (en) * 2011-03-29 2011-09-14 苏州市海新机电工业设备有限公司 Novel ionizing air blower

Similar Documents

Publication Publication Date Title
CN202059665U (en) Novel ion blower fan
CN205960375U (en) A keysets for surveying test panel is to board connector
CN211928952U (en) LED display panel with power supply looped out and power supply framework
CN102164449B (en) Ion fan system
CN203941449U (en) A safety and stability control device for electric power test and research system
CN202059666U (en) Ion fan system
CN206323098U (en) A kind of anti-seismic flexible bus duct
CN202019100U (en) Easily assembled and disassembled power switch socket
CN102186302A (en) Novel ionizing air blower
CN204205110U (en) Wiring board assembly
CN204069003U (en) A kind of communication cabinet PDU device that can far control
CN102722232A (en) Control system and method for electrifying ATCA (advanced telecom computing architecture) blade
CN204392164U (en) A kind of controller for solar
CN206506544U (en) An intelligent maintenance device for network equipment
CN204374719U (en) Electric-automation control system
CN204537048U (en) A kind of computer power adapter
CN204304920U (en) A kind of photovoltaic combiner box and supervising device thereof
CN204231294U (en) A kind of remote monitoring device of solar power system
CN203618275U (en) Cabinet air-conditioner with rapid hot-plug air-supply blower fans
CN202424180U (en) Three-phase low-voltage asynchronous motor reactive terminal compensation energy-saving device
CN203607707U (en) High voltage switch cabinet with centrally installed switchgear body structure being separately manufactured
CN203013740U (en) Photovoltaic assembly capable of realizing cable reduction
CN202659443U (en) Integrated heat energy recovery switch
CN201985484U (en) Temporary distribution box
CN209488174U (en) Power control circuit improves

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111130