CN202025638U - Suspension frame for on-load voltage regulation switch of transformer - Google Patents
Suspension frame for on-load voltage regulation switch of transformer Download PDFInfo
- Publication number
- CN202025638U CN202025638U CN2011201556365U CN201120155636U CN202025638U CN 202025638 U CN202025638 U CN 202025638U CN 2011201556365 U CN2011201556365 U CN 2011201556365U CN 201120155636 U CN201120155636 U CN 201120155636U CN 202025638 U CN202025638 U CN 202025638U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- mast
- base
- suspension ring
- suspension frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及变压器领域,尤其涉及一种变压器有载调压开关吊装架。The utility model relates to the field of transformers, in particular to a hoisting frame for an on-load voltage regulating switch of a transformer.
背景技术 Background technique
针对变压器有载调压开关在工作时,需要将有载调压开关的芯子吊出进行试验检查、检修清洗后回装,因有载调压开关内部结构非常精密紧凑,因此在芯子吊出和回装过程中必须小心谨慎、平稳吊装,以避免触指与绝缘筒触头发生碰撞导致开关损坏。现有对有载调压开关芯子吊装工作经常采用吊车与手拉葫芦配合来完成,由于吊车的稳定性不好,吊车吊钩与开关中心难以对正,吊臂吊绳受外部影响等诸多因素都会对有载调压开关芯子吊装工作产生一定的影响,甚至发生过由于吊车稳定性不好导致有载调压开关触头在起吊过程中卡死变形,造成不应有的损失,给检修工作带来很大困难而且延误了送电时间,给电力用户带来不便同时也造成了难以估计的经济损失,而且由于此项工作都在变电站内现场进行,周围均是高压带电设备,作业环境复杂,吊车作业危险很大。When the on-load tap changer of the transformer is working, the core of the on-load tap changer needs to be hoisted out for test inspection, maintenance and cleaning, and then reassembled. Because the internal structure of the on-load tap changer is very precise and compact, it is necessary to hang the core of the on-load tap changer Care must be taken during unloading and reinstalling to avoid damage to the switch due to collision between the contact fingers and the contacts of the insulating barrel. The existing hoisting work of the on-load tap changer core is often completed by the cooperation of a crane and a chain block. Due to the poor stability of the crane, it is difficult to align the crane hook with the switch center, and the boom rope is affected by external influences, etc. Factors will have a certain impact on the hoisting work of the on-load tap changer core, and even the contact of the on-load tap changer has been stuck and deformed during the hoisting process due to the poor stability of the crane, causing undue losses and giving The maintenance work brings great difficulties and delays the power transmission time, which brings inconvenience to power users and also causes inestimable economic losses. Moreover, since this work is carried out on-site in the substation, surrounded by high-voltage live equipment, the operation The environment is complex and the crane operation is very dangerous.
采用吊车与手拉葫芦对有载调压开关芯子吊装工作的稳定性很难把握;吊车吊钩与开关中心难以对正;不但稳定性难以控制,而且租用吊车费用很高、作业现场局限性大,更重要的是易导致设备损坏事故,造成不必要的经济损失。It is difficult to grasp the stability of the hoisting work of the on-load tap changer core by using a crane and a chain hoist; it is difficult to align the crane hook with the switch center; not only the stability is difficult to control, but also the cost of renting a crane is high, and the work site is limited More importantly, it is easy to cause equipment damage accidents and cause unnecessary economic losses.
实用新型内容Utility model content
本实用新型针对上述现有技术的不足,提供一种变压器有载调压开关吊装架,确保吊装工作的稳定性,结构简单易操作。The utility model aims at the deficiencies of the above-mentioned prior art, and provides a hoisting frame for a transformer on-load tap changer, which ensures the stability of the hoisting work, and has a simple structure and is easy to operate.
为解决上述技术问题,本实用新型采用如下技术方案:一种变压器有载调压开关吊装架,包括有底座、立柱、横梁和吊环装置,所述立柱一端与底座固定连接,另一端与横梁中部旋转连接;所述吊环装置悬挂在横梁的一侧。In order to solve the above-mentioned technical problems, the utility model adopts the following technical scheme: a hoisting frame for a transformer on-load tap changer, including a base, a column, a beam and a ring device, one end of the column is fixedly connected to the base, and the other end is connected to the middle of the beam Swivel connection; the suspension ring device is suspended on one side of the beam.
优选的,该吊装架还包括旋转式支座,所述旋转式支座下部固定连接在立柱的另一端上,所述横梁与旋转式支座上部连接。Preferably, the suspension frame further includes a rotary support, the lower part of the rotary support is fixedly connected to the other end of the column, and the beam is connected to the upper part of the rotary support.
优选的,所述旋转式支座为承力轴承。Preferably, the rotary support is a force-bearing bearing.
优选的,所述横梁与旋转式支座的上部为滑动式连接。Preferably, the beam is connected to the upper part of the rotary support in a sliding manner.
优选的,该吊装架包括有限位装置,所述限位装置设在横梁的另一侧,限制横梁在旋转式支座上的滑动距离。Preferably, the suspension frame includes a limiting device, which is arranged on the other side of the beam to limit the sliding distance of the beam on the rotary support.
优选的,所述吊环装置包括吊环和起降器,所述吊环悬挂在横梁上,所述起降器与吊环固定连接。Preferably, the lifting ring device includes a lifting ring and a lifter, the lifting ring is suspended on the beam, and the lifting device is fixedly connected with the lifting ring.
优选的,所述起降器为手扳葫芦。Preferably, the lifter is a lever block.
与现有技术相比,本实用新型变压器有载调压开关吊装架是通过在现有的有载调压开关上的法兰作为吊装架的底座临时固定,将吊装架通过螺栓与其连接牢固。再在底座上固定支柱,支柱上部装有旋转式可调节横梁。横梁上配有可调节的吊环与手拉葫芦及专用吊钩配合,以保证其重心对正,确保吊装工作的稳定性,结构简单易操作。不工作时横梁可自由拆卸,便于保管。Compared with the prior art, the hoisting frame of the transformer on-load tap changer of the utility model is temporarily fixed by the flange on the existing on-load tap changer as the base of the hoisting frame, and the hoisting frame is firmly connected with it by bolts. Then the pillar is fixed on the base, and the upper part of the pillar is equipped with a rotary adjustable beam. The beam is equipped with adjustable lifting rings to cooperate with chain hoists and special hooks to ensure that its center of gravity is aligned and the stability of hoisting work is ensured. The structure is simple and easy to operate. The beam can be disassembled freely when not working, which is convenient for storage.
由于本实用新型吊装架固定在现有的有载调压开关上,解决了有载调压开关芯子吊装工作的不稳定性和作业现场的局限性,避免造成设备损坏事故,变压器有载调压开关吊装架灵活方便、适用,安全、稳定易于操作。节省人力、物力,具有很好的经济效益。Since the hoisting frame of the utility model is fixed on the existing on-load tap changer, it solves the instability of the hoisting work of the on-load tap-changer core and the limitations of the work site, and avoids equipment damage accidents. The pressure switch lifting bracket is flexible, convenient, applicable, safe, stable and easy to operate. It saves manpower and material resources and has good economic benefits.
附图说明 Description of drawings
图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
附图标记说明:Explanation of reference signs:
1-底座;1 - Base;
2-立柱;2-column;
3-旋转式支座;3-rotary support;
4-限位钉;4- limit nail;
5-横梁;5 - Beam;
6-吊环;6-rings;
7-手扳葫芦。7- Lever block.
具体实施方式 Detailed ways
下面结合附图和实施例对本实用新型作进一步的说明。Below in conjunction with accompanying drawing and embodiment the utility model is described further.
如图1所示的一种变压器有载调压开关吊装架,包括有底座1、立柱2、旋转式支座3、横梁5、限位钉4、吊环6和手扳葫芦7,立柱2一端与底座1固定连接,另一端与横梁5中部旋转连接;旋转式支座3下部固定连接在立柱2的另一端上,横梁5与旋转式支座3上部连接,且为滑动式连接,限位钉4设在横梁5的另一侧,限制横梁5在旋转式支座3上的滑动距离。吊环6悬挂在横梁5上,手扳葫芦7与吊环6固定连接。As shown in Figure 1, a transformer OLTC hoisting frame includes a
其中:in:
底座1根据现有的有载调压开关的上盖结构设计,利用上盖螺栓将本吊装架的底座1固定在上盖上,使之固定牢固。The
立柱2与底座1牢固连接,起到支撑横梁5和其它吊具,以及提供起重力,因此立柱2采用高强度厚壁钢管制作。The
旋转式支座3为可拆卸的,旋转式支座3为承力轴承,其下部与立柱2连接,可绕立柱2的轴旋转;轴承上部与横梁连接部分带有导向滚轮,方便横梁拉伸运动。The
横梁5的前部配有吊环装置作起重之用,横梁5通过旋转式支座3可沿横梁5轴线做直线拉伸运动以调节起吊中心位置,同时也可将吊起的物件送出一定距离,方便工作。The front part of the
限位钉4作为横梁5滑动的最大移动距离限位之用。The
吊环6挂在横梁5的前部与小型起降器,如手扳葫芦7配合使用,完成有载调压开关芯子的起降吊装工作。The
利用有载调压开关上部法栏制作可拆卸吊装架灵活方便、适用,易于操做稳定性好,可由一人独立完成吊装芯子工作,节省人力、物力,具有很好的经济效益。The detachable hoisting frame made by using the upper part of the on-load tap changer is flexible, convenient, applicable, easy to operate and stable, and can be hoisted by one person independently, saving manpower and material resources, and has good economic benefits.
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made, these improvements and Retouching should also be regarded as the scope of protection of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011201556365U CN202025638U (en) | 2011-05-16 | 2011-05-16 | Suspension frame for on-load voltage regulation switch of transformer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011201556365U CN202025638U (en) | 2011-05-16 | 2011-05-16 | Suspension frame for on-load voltage regulation switch of transformer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202025638U true CN202025638U (en) | 2011-11-02 |
Family
ID=44850582
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011201556365U Expired - Lifetime CN202025638U (en) | 2011-05-16 | 2011-05-16 | Suspension frame for on-load voltage regulation switch of transformer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202025638U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102651276A (en) * | 2012-06-05 | 2012-08-29 | 江苏中容科技有限公司 | Three-dimensional rolling iron core coil turnover support frame |
| CN102910540A (en) * | 2012-11-01 | 2013-02-06 | 宁波电业局 | Hoisting device for on-load tap-changer of transformer |
| CN109279526A (en) * | 2018-11-23 | 2019-01-29 | 国网青海省电力公司黄化供电公司 | A combined lifting device for transformer on-load tap-changer |
-
2011
- 2011-05-16 CN CN2011201556365U patent/CN202025638U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102651276A (en) * | 2012-06-05 | 2012-08-29 | 江苏中容科技有限公司 | Three-dimensional rolling iron core coil turnover support frame |
| CN102910540A (en) * | 2012-11-01 | 2013-02-06 | 宁波电业局 | Hoisting device for on-load tap-changer of transformer |
| CN102910540B (en) * | 2012-11-01 | 2015-06-17 | 宁波电业局 | Hoisting device for on-load tap-changer of transformer |
| CN109279526A (en) * | 2018-11-23 | 2019-01-29 | 国网青海省电力公司黄化供电公司 | A combined lifting device for transformer on-load tap-changer |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103613031B (en) | Voltage transformer simple and easy hoisting device | |
| CN102433898B (en) | Manhole cover opening and closing movement device | |
| CN203998708U (en) | A kind of simple and easy controller switching equipment lifting appliance | |
| CN202967920U (en) | Hanging overhaul device of load switch of transformer | |
| CN201817223U (en) | Suspension device for on-load tapping switches of transformers | |
| CN204369468U (en) | A kind of lifting device for 220kV tension-resistant china bottle replacement | |
| CN204281061U (en) | A kind of can the combined sling of automatic releasing hook | |
| CN202025638U (en) | Suspension frame for on-load voltage regulation switch of transformer | |
| CN103523704A (en) | Detachable support applied to lifting of small-sized electric power device and construction method thereof | |
| CN204802882U (en) | Transformer on -load voltage regulating switch lifts by crane instrument | |
| CN205838332U (en) | I-beam wheel end face hoisting sling | |
| CN205687433U (en) | A kind of on-load tap changers of transformers boom hoisting | |
| CN203889988U (en) | Electric hoisting device for disconnecting switch | |
| CN204040598U (en) | The two rocker pole of a kind of remote control hydraulic | |
| CN107069508B (en) | Auxiliary tool for replacing post insulator of isolating switch under 110kV | |
| CN206051406U (en) | The disconnecting switch hoisting apparatus of tiltable section | |
| CN203553744U (en) | An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus | |
| CN204265419U (en) | A kind of upset of the Novel hanging for circuit breaker car | |
| CN203497984U (en) | Detachable support applied to hoisting of small electrical equipment | |
| CN102570325B (en) | A kind of light hoisting device for converting station | |
| CN205100568U (en) | Movable straining means fixed bolster | |
| CN205381883U (en) | Novel big arm of tower crane segmentation demolish supplementaryly device | |
| CN218708673U (en) | Climbing-rod-free auxiliary lifting device for installing grounding wire | |
| CN104003333A (en) | Movable type inspection operation platform of vertical hydraulic oil cylinder | |
| CN2759024Y (en) | 35KV-110KV high-voltage switch overhauling stand |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20111102 |