CN202000679U - 钢梁跨闸室推移抬吊装置 - Google Patents
钢梁跨闸室推移抬吊装置 Download PDFInfo
- Publication number
- CN202000679U CN202000679U CN2011201210371U CN201120121037U CN202000679U CN 202000679 U CN202000679 U CN 202000679U CN 2011201210371 U CN2011201210371 U CN 2011201210371U CN 201120121037 U CN201120121037 U CN 201120121037U CN 202000679 U CN202000679 U CN 202000679U
- Authority
- CN
- China
- Prior art keywords
- steel beam
- steel
- lock chamber
- crane
- steel girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 82
- 239000010959 steel Substances 0.000 title claims abstract description 82
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 230000001360 synchronised effect Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
钢梁跨闸室推移抬吊装置,包含第一吊车、第二吊车,设有多个吊耳的钢梁,钢梁底部和端部设有滑块,钢梁的端部安装有液压爬行机,钢梁下方设有轨道,所述滑块、液压爬行机位于轨道上,钢梁设有配重块。所述滑块两侧设有挡块。本实用新型装置钢梁底部铺钢轨,顶部加配重块,用液压爬行机推移钢梁到闸室对面吊车接钩的幅度范围内,然后用布置在闸室两侧吊车抬吊跨闸就位。解决了采用大型吊车也难以将大型钢梁吊起跨越闸室的难题;确保了闸室在通航安全的前提下钢梁横跨闸室。制作安装方便,钢梁推移吊装安全。
Description
技术领域
本实用新型涉及一种钢梁吊装装置,特别是一种钢梁跨闸室推移抬吊装置。
背景技术
在三峡永久船闸完建工程中,为了提升大型人字闸门,设计了两根跨闸梁、两根提升梁、四根钢支柱,是闸门提升过程中的承重系统,其中上游跨闸梁长50.2米,重250吨,需在确保通航安全的前提下横跨闸室(闸室宽34m),现有的大型起吊设备不能满足起吊要求,且存在较大安全风险。
发明内容
本实用新型所要解决的技术问题是提供一种钢梁跨闸室推移抬吊装置,解决大型吊车难以将钢梁直接吊起跨越闸室的难题,特别是在不影响闸室正常通航的条件下,将大型钢梁安全跨过闸室难度大的问题。
为解决上述技术问题,本实用新型采取的技术方案是:钢梁跨闸室推移抬吊装置,包含第一吊车、第二吊车,设有多个吊耳的钢梁,钢梁底部和端部设有滑块,钢梁的端部安装有液压爬行机,钢梁下方设有轨道,所述滑块、液压爬行机位于轨道上,钢梁设有配重块。
所述滑块两侧设有挡块。
所述吊耳孔为镗孔且同心。
本实用新型钢梁跨闸室推移抬吊装置,为方便钢梁吊装,根据钢梁吊装方案、钢梁重量的分配,沿钢梁长度方向焊接多个吊耳;为方便钢梁滑移,在钢梁底部估算中心位置和梁端部安装有滑块;轨道安装在闸室一侧,作为钢梁推移轨道;同步液压爬行机安装在钢梁一端,作为钢梁推移动力;钢梁推移到指定位置时,两台吊车分步抬吊将钢梁就位;配重块放置在钢梁顶部一端,调整钢梁中心,增加钢梁可推移距离,以满足吊车方便抬吊。
本实用新型装置钢梁底部铺钢轨,顶部加配重块,用液压爬行机推移钢梁到闸室对面吊车接钩的幅度范围内,然后用布置在闸室两侧的吊车抬吊跨闸就位。解决了采用大型吊车也难以将大型钢梁吊起跨越闸室的难题;确保了闸室在通航安全的前提下钢梁横跨闸室。制作安装方便,钢梁推移吊装安全。
附图说明
下面结合附图和实施例对本实用新型作进一步说明:
图1为本实用新型装置结构示意图。
具体实施方式
钢梁跨闸室推移抬吊装置,包含第一吊车6、第二吊车7,设有多个吊耳的钢梁1,钢梁1底部和端部设有滑块2,钢梁1的端部安装有液压爬行机4,钢梁1下方设有轨道3,所述滑块2、液压爬行机4位于轨道3上,钢梁1设有配重块5。
实施例:
根据钢梁1重量长度、闸室8宽度、第一吊车6、第二吊车7,最大起吊重量幅度,详细设计钢梁1跨闸室8的推移详细方案。首先根据第一吊车6、第二吊车7的起吊能力,确定钢梁1必须推移的距离;根据钢梁1的推移距离设置钢梁1一端加设配重块5重量,确定推移钢梁1的总重量、同步液压爬行机4的型号、轨道3型号长度、滑块2位置尺寸等,最后根据第一吊车6、第二吊车7起吊能力幅度、吊车站位等确定在钢梁1上设置吊耳的数量及吊耳位置等。
将轨道3铺设在闸室8一侧放置钢梁1位置,并将轨道3固定牢固,钢梁1放置在轨道3上拼装。滑块2与钢梁1下翼沿板焊接牢固,并在滑块2两侧设置挡块。钢梁1上焊接吊耳,设置配重块5。
在钢梁1设焊接吊耳,吊耳孔要镗孔,保证同心,焊缝要求熔透焊接,100%UT,一级合格。将配重块5放置在钢梁1一端,安装牢固。同步液压爬行机4推移钢梁1,各项工序准备到位,采用两台同步液压爬行机4推移钢梁1,使钢梁1沿铺设的轨道3移动,当钢梁移1到设计位置(一般将钢梁推移到其设计中心距闸室边80~120cm左右位置),两台吊车第一吊车6、第二吊车7在起吊重量可以覆盖的范围内,停止推移。钢梁1推移到指定位置时,第一吊车6、第二吊车7根据设计方案分配的荷载将吊钩挂到吊点,然后将钢梁1抬吊过闸室8;钢梁1过闸室8后放置在闸室8两侧的支墩上,两台吊车重新调整吊点,将钢梁1抬吊到设计位置。
Claims (3)
1.钢梁跨闸室推移抬吊装置,包含第一吊车(6)、第二吊车(7),设有多个吊耳的钢梁(1),其特征在于:钢梁(1)底部和端部设有滑块(2),钢梁(1)的端部安装有液压爬行机(4),钢梁(1)下方设有轨道(3),所述滑块(2)、液压爬行机(4)位于轨道(3)上,钢梁(1)设有配重块(5)。
2.根据权利要求1所述钢梁跨闸室推移抬吊装置,其特征在于:所述滑块(2)两侧设有挡块。
3.根据权利要求1所述钢梁跨闸室推移抬吊装置,其特征在于:所述吊耳的孔为镗孔且同心。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011201210371U CN202000679U (zh) | 2011-04-22 | 2011-04-22 | 钢梁跨闸室推移抬吊装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011201210371U CN202000679U (zh) | 2011-04-22 | 2011-04-22 | 钢梁跨闸室推移抬吊装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202000679U true CN202000679U (zh) | 2011-10-05 |
Family
ID=44703424
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011201210371U Expired - Fee Related CN202000679U (zh) | 2011-04-22 | 2011-04-22 | 钢梁跨闸室推移抬吊装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202000679U (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2532036C1 (ru) * | 2013-03-01 | 2014-10-27 | Федеральное Государственное Бюджетное Образовательное Учреждение Высшего Профессионального Образования "Государственный Университет Морского И Речного Флота Имени Адмирала С.О. Макарова" | Предохранительное устройство судоходного шлюза |
| CN112211412A (zh) * | 2020-10-26 | 2021-01-12 | 中建四局第三建设有限公司 | 一种重心可调的悬挑卸料平台 |
| CN114368695A (zh) * | 2021-12-06 | 2022-04-19 | 中建钢构工程有限公司 | 一种吊装方法 |
-
2011
- 2011-04-22 CN CN2011201210371U patent/CN202000679U/zh not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2532036C1 (ru) * | 2013-03-01 | 2014-10-27 | Федеральное Государственное Бюджетное Образовательное Учреждение Высшего Профессионального Образования "Государственный Университет Морского И Речного Флота Имени Адмирала С.О. Макарова" | Предохранительное устройство судоходного шлюза |
| CN112211412A (zh) * | 2020-10-26 | 2021-01-12 | 中建四局第三建设有限公司 | 一种重心可调的悬挑卸料平台 |
| CN112211412B (zh) * | 2020-10-26 | 2022-03-29 | 中建四局第三建设有限公司 | 一种重心可调的悬挑卸料平台 |
| CN114368695A (zh) * | 2021-12-06 | 2022-04-19 | 中建钢构工程有限公司 | 一种吊装方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201962607U (zh) | 高架桥挑臂吊装用可移动式提升装置 | |
| CN105421249A (zh) | 一种拖吊结合式新型挂篮结构及施工方法 | |
| CN105484162B (zh) | 悬索桥施工岸上加劲梁二次荡移装置及方法 | |
| CN102139832A (zh) | 具备纵横向行走功能的门式起重装置及吊装方法 | |
| CN103967284B (zh) | 预留柱头对接的钢柱安装方法 | |
| CN202000679U (zh) | 钢梁跨闸室推移抬吊装置 | |
| CN202240228U (zh) | 大跨度圆柱筒体精确对接控制装置 | |
| CN102041781B (zh) | 一种基于龙门吊机的内湖梁式钢桥安装法 | |
| CN202391104U (zh) | 便捷式有轨滑模 | |
| CN102323100A (zh) | 集成小车式电动葫芦试验台 | |
| CN203382408U (zh) | 一种桥梁板面铺设用门式起重机 | |
| CN104762881B (zh) | 一种移动模架主梁整体横移的方法 | |
| CN102776840B (zh) | 用于弯曲桥梁的桁架梁异位拼装就位方法 | |
| CN210001467U (zh) | 用于受限空间车间内吊装装置 | |
| CN203878479U (zh) | 架桥机横移支撑 | |
| CN104150373A (zh) | 一种可移动桅杆式起重机 | |
| CN102583162A (zh) | 一种卧式试验台台面重物十字形起吊装置 | |
| CN202518953U (zh) | 卧式试验台台面重物十字形起吊装置 | |
| CN202864733U (zh) | 一种用于船坞及港池码头的组合型起重机 | |
| CN203782573U (zh) | 一种架设钢管拱桥用拖拉跑道结构 | |
| CN206319262U (zh) | 自带运输和吊装系统的菱形挂篮 | |
| CN203960753U (zh) | 一种预制桥面板的安装装置 | |
| CN212561199U (zh) | 一种用于钢箱梁吊装的多维变向调整体系 | |
| CN108217448A (zh) | 一种用于叠合梁施工的一体化桥面吊装置 | |
| CN210049078U (zh) | 一种钢栈桥通航孔桥面提升装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111005 Termination date: 20180422 |