CN201982111U - Novel tunnel water-proof structure - Google Patents
Novel tunnel water-proof structure Download PDFInfo
- Publication number
- CN201982111U CN201982111U CN2011200889756U CN201120088975U CN201982111U CN 201982111 U CN201982111 U CN 201982111U CN 2011200889756 U CN2011200889756 U CN 2011200889756U CN 201120088975 U CN201120088975 U CN 201120088975U CN 201982111 U CN201982111 U CN 201982111U
- Authority
- CN
- China
- Prior art keywords
- splash guard
- layer
- secondary lining
- concrete
- proof structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a novel tunnel water-proof structure which can prevent a waterproof board from being damaged and cavities on the back part and does not affect the thickness of secondary lining concrete. The novel tunnel water-proof structure comprises a sprayed concrete layer and a secondary lining concrete layer, the waterproof board is arranged between the sprayed concrete layer and the secondary lining concrete layer, and a packing layer is arranged between the waterproof board and the sprayed concrete layer.
Description
One, technical field:
The utility model relates to a kind of buildings waterproof structure, especially relates to a kind of novel tunnel waterproof construction.
Two, background technology:
In the background technology, the supporting and protection structure in tunnel adopts composite lining usually, and separation layer (splash guard) promptly is set between supporting in the early stage and the secondary lining.From point of theory, this composite lining form of structure can be ended the water resistance in the country rock beyond splash guard effectively, guarantees that tunnel lining is water-tight, does not seep water.Yet, in the work progress, be difficult to guarantee tunnel preliminary bracing section rule, smooth-going at the scene, often because rough surface layer causes splash guard breakage and back generation to be come to nothing.Splash guard will lose water-proof function, and coming to nothing of splash guard back can form natural water space in case appearance is damaged.The immediate cause that these all can become tunnel lining percolating water has a strong impact on workmanship, and operation brings potential safety hazard to the tunnel.
Three, utility model content:
The utility model provides a kind of novel tunnel waterproof construction in order to solve the weak point in the above-mentioned background technology, and it can avoid splash guard breakage and back to come to nothing, and does not influence the concrete thickness of secondary lining.
For achieving the above object, the technical solution adopted in the utility model is:
A kind of novel tunnel waterproof construction comprises shotcrete layer and secondary lining layer of concrete, it is characterized in that: be provided with splash guard between shotcrete layer and secondary lining layer of concrete, be provided with packing layer between splash guard and the shotcrete layer.
Compared with prior art, the advantage and the effect that the utlity model has are as follows:
The utility model can not only effectively avoid splash guard to break, and makes splash guard and sprayed mortar closely connected, avoids the splash guard back to come to nothing, and does not influence the concrete thickness of secondary lining, thereby makes that the waterproof effect of composite lining is given full play to.
Four, description of drawings:
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is construction process figure of the present utility model.
Among the figure, 1-shotcrete layer, 2-splash guard, 3-secondary lining layer of concrete, 4-packing layer.
Five, the specific embodiment:
Referring to Fig. 1, the utility model comprises shotcrete layer 1 and secondary lining layer of concrete 3, is provided with splash guard 2 between shotcrete layer 1 and lining concrete layer 3, is provided with packing layer 4 between splash guard 2 and the shotcrete layer 1.Referring to Fig. 2, during actual fabrication, pressure injection has the filler of cementing agent effect between the jog of pneumatically placed concrete and splash guard, form packing layer, splash guard can be arranged on the level and smooth preliminary bracing surface, tunnel, then lateral irrigation is annotated lining concrete within it, realizes having the high-durability tunnel water proofing structure of " do not hinder concrete filling, and the water proof structure closely connected with concrete ".Concrete steps are: be width that the splash guard of 1.5m is processed into wide 6.0m(long span earlier) splash guard.Along the periphery of traveling formwork chassis splash guard is launched then, and good in the fixed-site of regulation, between splash guard and sprayed mortar, pour into the filler of backfill then.At last, side form is built the secondary lining concrete outside splash guard.Adopt pressure injection equipment respectively the curing compound that solidifies of force feed and accelerating admixture to the pressure injection place, mix the back on abutment wall top, left tunnel right side, haunch and vault 5 places are provided with the pressure injection pipe, pressure injection successively from bottom to top.
The utlity model has following characteristics:
1, improve water proofing property:
1.5m width waterproof plank factory process is become wide 6.0m(long span) move into, reduced the field Welding operation; The setting of packing layer has reduced the outstanding breakage to splash guard of rock bolt head; Study for a second time courses one has flunked simple and convenient after the splash guard breakage.And splash guard and sprayed mortar are closely connected, can really play the effect of waterproof barrier.
2, improve the concrete quality of secondary lining:
Sprayed mortar and secondary lining concrete are fully isolated, and guarantee that the secondary lining concrete is not subjected to that country rock is phreatic to be influenced.And the traveling formwork chassis can strictly be controlled the preliminary bracing profiled outline, guarantees that the secondary lining concrete thickness is even, and meets design requirement.Simultaneously, the packing layer in the secondary lining concrete and the splash guard outside is closely connected, forms overall structure.
3, reduce cost:
The quality of reduction splash guard because not torn and puncture to wait, splash guard influences, even also can satisfy the requirement of waterproof; Position for the sprayed mortar surface irregularity does not need to repair, and has saved the construction operation time.The waterproof requirement that can adapt to simultaneously, different situations (full section, half section etc.).
4, reduce the load of operating environment, surrounding enviroment:
Splash guard can adopt manpower or machinery to lay, and operation intensity is low; In the construction, can recover the groundwater table of tunnel perimeter.
Claims (1)
1. novel tunnel waterproof construction, comprise shotcrete layer (1) and secondary lining layer of concrete (3), it is characterized in that: between shotcrete layer (1) and secondary lining layer of concrete (3), be provided with splash guard (2), be provided with packing layer (4) between splash guard (2) and the shotcrete layer (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200889756U CN201982111U (en) | 2011-03-30 | 2011-03-30 | Novel tunnel water-proof structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200889756U CN201982111U (en) | 2011-03-30 | 2011-03-30 | Novel tunnel water-proof structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201982111U true CN201982111U (en) | 2011-09-21 |
Family
ID=44609574
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200889756U Expired - Fee Related CN201982111U (en) | 2011-03-30 | 2011-03-30 | Novel tunnel water-proof structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201982111U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102140921A (en) * | 2011-03-30 | 2011-08-03 | 长安大学 | Novel tunnel waterproof structure |
-
2011
- 2011-03-30 CN CN2011200889756U patent/CN201982111U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102140921A (en) * | 2011-03-30 | 2011-08-03 | 长安大学 | Novel tunnel waterproof structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102758509B (en) | Horizontal seam waterproof plate of prefabricated exterior wall cladding | |
CN203834739U (en) | End steel board connection, positioning and assembly type shear wall structure | |
CN104963689A (en) | Three-step seven-procedure excavation method for tunnel | |
CN2883532Y (en) | Partition board connection structure-centipede type locking tenon | |
CN203334473U (en) | Tooth socket type connecting structure of upper layer interior wall plate and lower layer interior wall plate of assembling type shear wall | |
CN102140921A (en) | Novel tunnel waterproof structure | |
CN105421810B (en) | Prefabricated wallboard reinforced masonry structure and construction method thereof | |
CN102251606A (en) | Outer partition wall built by adopting light concrete partition wall boards and construction method thereof | |
CN203891031U (en) | Steel pipe pile continuous wall and assistant construction pile frame thereof | |
CN207998854U (en) | The cushion cap foundation beam form of precast hollow slab composition | |
CN207003634U (en) | A kind of balcony slab installs node | |
CN105369826A (en) | Basement bearing platform side mold construction method | |
CN102002950B (en) | Liquid division slip casting reinforcing method for subsurface structure construction joints | |
CN202851009U (en) | Tunnel buffering multilayer waterproof-drainage structure | |
CN203685208U (en) | End-shaping steel template for double-lining trolley for tunnel | |
CN201982111U (en) | Novel tunnel water-proof structure | |
CN104594389A (en) | Post-cast strip external wall plugging structure with elastic water stoppers | |
CN202347534U (en) | Force transferring structure between foundation ditch support pile and basement outer wall | |
CN101469559A (en) | Composite heat insulating walling and mounting method thereof | |
CN204662715U (en) | A kind of reinforced type fabricated shear wall structure with shear key | |
CN103437349B (en) | The construction method of steel concrete perfusion shaped pile | |
CN103243913B (en) | The method for blocking of fabricated shear wall architectural lower floor junction grout blanket | |
CN203347182U (en) | Water-impermeable structural layer for toilet | |
CN205000360U (en) | Basement structure with waterproof structure | |
CN205206055U (en) | Basement outer wall post -cast strip thickening anti -seepage waterstop structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110921 Termination date: 20130330 |