CN201943574U - Drilling device capable of moving automatically - Google Patents

Drilling device capable of moving automatically Download PDF

Info

Publication number
CN201943574U
CN201943574U CN2011200429644U CN201120042964U CN201943574U CN 201943574 U CN201943574 U CN 201943574U CN 2011200429644 U CN2011200429644 U CN 2011200429644U CN 201120042964 U CN201120042964 U CN 201120042964U CN 201943574 U CN201943574 U CN 201943574U
Authority
CN
China
Prior art keywords
suspension bracket
foundation pile
operation suspension
main
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200429644U
Other languages
Chinese (zh)
Inventor
成涛宇
Original Assignee
成涛宇
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 成涛宇 filed Critical 成涛宇
Priority to CN2011200429644U priority Critical patent/CN201943574U/en
Application granted granted Critical
Publication of CN201943574U publication Critical patent/CN201943574U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a drilling device capable of moving automatically, consisting of a main foundation pile (1), an auxiliary foundation pile I (4a), an auxiliary foundation pile II (4b), a main winch (2), an auxiliary winch I (5a), an auxiliary winch II (5b), a main steel wire lifting rope pair (3), an auxiliary steel wire lifting rope pair I (6a), an auxiliary steel wire lifting rope pair II (6b) and an operation hanger (8). When the drilling device is used, according to the distribution positions of drilling points, the positions of the main foundation pile (1) and the auxiliary foundation piles (4a and 4b) are selected, and the main foundation pile (1) and the auxiliary foundation piles (4a and 4b) are firmly embedded in the bathylith; according to terrain, the main winch and the auxiliary winches are supported on the ground and are respectively connected with the corresponding foundation piles or directly suspended on the foundation piles; and the main steel wire lifting rope pair is connected with the operation hanger (8), and the two auxiliary steel wire lifting rope pairs are respectively connected with two sides of the operation frame.

Description

A kind of automatic mobile drilling equipment
Technical field
The utility model relates to a kind of automatic mobile drilling equipment, belongs to civil engineering machinery and equipment field.
Background technology
The present domestic railway of building, highway, in the engineerings such as water channel, on Shan Yan limit or cliff wall, during drilling construction, often adopt scaffolding, then drilling machine (or claiming hidden hole drilling) is brought up to scaffold, behind the intact hole of every brill, by manually with hidden hole drilling along on the scaffold or down, a left side or move right to next bore position, and then bore next hole; In the crag bore operation, the construction hole of safe edge slope usefulness for example, the hole is many and divide cloth cover big, and difficulty of construction is big.By traditional form of construction work, need set up large-area scaffold, after finishing, construction also need tear scaffold open.This form of construction work long construction period, the cost of production height.When carrying out bore operation, need a plurality of workmans, drilling tool is moved to the boring point along scaffold in the high-altitude, and installs drilling tool.Its auxiliary bore hole activity duration is long, and the high-altitude a dead lift is dangerous big.The present invention's " a kind of automatic mobile drilling equipment " can substitute traditional mountain region crag scaffolding, and the job practices of drilling tool is moved in artificial high-altitude.Realize that with machinery or electrical means the drilling tool high-altitude is automatically moved to the position, realize the ground bore operation fast, huge shortening construction period reduces production costs, and ensures operating worker safety.
Summary of the invention
The purpose of this utility model is to provide a kind of automatic mobile drilling equipment at the deficiencies in the prior art.Be characterized in being hung on respectively the auxiliary hoist engine of two auxiliary foundation piles on the rock ground of mountain by main winch on the main foundation pile of hitching on the Yushan Hill rock ground and two covers; the operation suspension bracket that hidden hole drilling is housed through one of king wire lifting rope traction is realized moving up and down; the auxiliary wire sling of two covers; except auxiliary (or protection) king wire lifting rope work; can also be in the operation suspension bracket moves differently one receive one and put simultaneously; the realization left and right directions moves; substitute fully and rely on scaffold, the artificial mobile drilling tool in high-altitude and the operational method of holing.Owing to adopt electric winch (or claiming electric hoist), can move with electric controller or remote controller operation task suspension bracket automatic lifting and position, the left and right sides, drilling tool is moved steadily, quick, safety.Alleviate workman's manual labor widely.
The purpose of this utility model is realized by following technical measures:
Automatic mobile drilling equipment is by main foundation pile and two secondary foundation piles and main winch and two secondary hoist engines and the king wire lifting rope is secondary and two secondary wire sling pairs, and the operation suspension bracket is formed, in the crag drilling construction, according to boring point distributing position, choose main foundation pile and secondary foundation pile position, and embed in the batholith securely, to lead, secondary three hoist engines support on the ground, and be connected or directly hang on foundation pile with foundation pile separately, be connected with the operation suspension bracket with the king wire lifting rope is secondary then, two secondary wire sling pairs are connected with operation frame both sides respectively.
Hidden hole drilling and the drilling tool case that drilling tool is housed are installed on the operation suspension bracket.
The operation suspension bracket is by G, H, J, K, L, the multiple pattern joint of M type connecting rod beam is combined into the shaped as frame structure of operation suspension bracket, the drill point groove of clamping hidden hole drilling is set, framework face and drill center line parallel on framework, framework face and be parallel between the framework face of rock wall surface angle α=70-75 °, the operation suspension bracket is regulated along the length direction of steel pipe pole beam by K type joint, along the rotation of steel pipe pole beam, realizes the adjusting at α angle by G type joint; Two main suspension ring are connected with two secondary wire slings with the king wire lifting rope respectively with two secondary suspension ring, are hung by the major-minor hoist engine and move the operation suspension bracket; Form under the framework face by the steel pipe pole beam, four universal caster wheels with brake gear are installed, support the operation suspension bracket on crag by it, when being convenient to hoist engine mobile operating suspension bracket, suspension bracket can be rolled on crag easily to be moved, after the operation suspension bracket moves into place, brake gear by castor, suspension bracket is fixed in the boring point, and the swing steel tubular beam on the suspension bracket is put down, and is supported on the scar, play the supplemental support positioning action, when making bore operation, the operation suspension bracket can not produce drift or displacement, after bore operation is intact, unclamp omnipotent castor brake, lift fork, start the hoist engine mobile operating suspension bracket that just can roll and hole a little, realize the work cycle that boring---moving---is holed again in the next one.
The present invention has the following advantages
1 " automatic mobile drilling equipment " of the present utility model can substitute the scaffolding of traditional long construction period, and the job practices of drilling tool is moved in artificial high-altitude.And the ground of can suiting measures to local conditions, automatically operation suspension bracket fast moving is put in place and hole.Realize rapid construction, shorten duty cycle, reduce production costs (particularly setting up large tracts of land scaffold cost) is a kind of many, and be fast, good, the construction equipment of province.
2 the utility model are safe and reliable devices in the construction, it adopts main, the wire sling pair of secondary three independent tractions is come the mobile operating suspension bracket, can not cause major accident because of the fault of a certain wire sling wherein, and ensure whole bore operation safety, operation suspension bracket in this device adopts steel pipe or section steel manufacture and is connected combination with the various joint of bar beam and steel has very high structural strength, its load-bearing capacity (contains the operator much larger than the suspension bracket deadweight, the weight of hidden hole drilling and drilling tool), the combining ability of wind-force and ground boring active force.The frame construction good rigidly, not yielding, whole framework is from heavy and light, is convenient to open hang mobilely, constructs on the most suitable crag.
3 automatic mobile drilling equipments of the present utility model, by some standarized components such as hoist engine, the wire sling external member, hidden hole drilling, foundation pile constitutes.Wherein the operation suspension bracket is different with use hidden hole drilling model for adapting to construction requirement, and its operation suspension bracket has multiple size combinations to form series of products, can also can the shipment of loose mail case make up behind the building site in factory-assembled.Be convenient to make, the job site transportation also is convenient in combination and application, installs, and uses.
Description of drawings
Fig. 1. automatic mobile drilling equipment structural representation
The secondary two 7-hidden hole drilling 8-operation suspension bracket 9-of the secondary wire sling of the secondary 6b-of the secondary wire sling of secondary hoist engine two 6a-of secondary hoist engine one 5b-of secondary foundation pile two 5a-of secondary foundation pile one 4b-of secondary 4a-of 1-master's foundation pile 2-main winch 3-king wire lifting rope are equipped with the drilling tool case of drilling tool
Fig. 2. operation hanger structure schematic diagram
10-master's suspension ring 11-G type joint 12-installs drilling tool case junction plate 13-the auxiliary suspension ring 18-steel pipe pole beam B 19-J type joint 20-steel pipe pole beam C 21-steel pipe pole beam D 22-K type joint 23-steel pipe pole beam E 24-L type joint 25-steel pipe pole beam F 26-M type joint 27-swing of hidden hole drilling clip slot 14 steel pipe pole beam A 15-universal caster wheel 16-H type joint 17-steel tubular beam is installed
The specific embodiment
Below by embodiment the present invention is carried out concrete description, can not be interpreted as limiting the scope of the invention.
Embodiment
Automatic mobile drilling equipment has simple in structure, easily manufactured characteristics, shown in Fig. 1~2.This device is by main foundation pile 1 and two secondary foundation pile 4a and 4b, main winch 2 and two secondary hoist engine 5a and 5b, secondary 3 and two secondary secondary 6a of wire sling of king wire lifting rope and 6b, and operation suspension bracket 8 is formed, in the crag drilling construction, at first according to boring point distributing position, choose main foundation pile 1 and secondary foundation pile 4a, the 4b position, and embed securely in the batholith, will lead according to landform, secondary three hoist engines support on the ground, and be connected or directly hang on foundation pile with foundation pile separately, being connected with operation suspension bracket 8 with the king wire lifting rope is secondary then, two secondary wire sling pairs are connected with operation frame both sides respectively.
Hidden hole drilling 7 and the drilling tool case 9 that drilling tool is housed are installed on the operation suspension bracket 8.
Operation suspension bracket 8 is by multiple pattern (G, H, J, K, L, M type) joint (11,16,19,22,24,26) the connecting rod beam (14,18,20,21,23,25) be combined into the shaped as frame structure of operation suspension bracket, the drill point groove 13 of clamping hidden hole drilling is set on framework, framework face and drill center line parallel, framework face and be parallel between the framework face of rock wall surface angle α=70-75 ° because that α angle and working design require is relevant, needs adjusting at the scene, the operation suspension bracket is to regulate along the length direction of steel pipe pole beam 23 by K type joint 22, rotate along steel pipe pole beam 14 by G type joint 11 simultaneously, realize the adjusting at α angle, two main suspension ring 10 and two secondary suspension ring 17, be connected with two secondary wire slings with the king wire lifting rope respectively, hang by the major-minor hoist engine and move the operation suspension bracket; Form under the framework face by steel pipe pole beam 14 and 25, four universal caster wheels 15 with brake gear are installed, support the operation suspension bracket on crag by it, when being convenient to hoist engine mobile operating suspension bracket, suspension bracket can be rolled on crag easily to be moved, after the operation suspension bracket moves into place, by the brake gear of castor, suspension bracket is fixed in the boring point, meanwhile, swing steel tubular beam 27 on the suspension bracket is put down, and be supported on the scar, play the supplemental support positioning action, when making bore operation, the operation suspension bracket can not produce drift or displacement, after bore operation is intact, unclamp omnipotent castor brake, lift fork 27, start the hoist engine mobile operating suspension bracket that just can roll and hole a little, realize the work cycle that boring---moving---is holed again in the next one.
Automatic mobile drilling equipment is to realize like this
In drilling construction, according to boring point distributing position, choose main foundation pile 1 and secondary foundation pile 4a, the 4b position, and embed in the batholith securely, to lead, secondary three hoist engines support on the ground, and are connected or directly hang on foundation pile with foundation pile separately, are connected with operation suspension bracket 8 with king wire lifting rope pair then, two secondary wire sling pairs are connected with operation frame both sides respectively, start main winch operation suspension bracket 8 is hung from top to bottom or from bottom to top to the setting locality, two secondary wire slings should the folding and unfolding with the lifting of operation suspension bracket 8, realizes lifting moving, during move left and right, with two secondary hoist engines, put rope for one, another receives rope, and cooperate main rope suitably to receive or put, even rise or fall operation and realize, after operation suspension bracket 8 moves on to the boring point, start the hidden hole drilling 7 that is loaded on the frame by operating worker the hole drill on the crag is gone out, need to change or during the lengthening drilling tool, take out corresponding drilling tools and be loaded on hidden hole drilling from drilling tool case 9 and finish.

Claims (3)

1. automatic mobile drilling equipment, it is characterized in that this device is by main foundation pile (1) and secondary foundation pile one (4a) and secondary foundation pile two (4b), main winch (2) and secondary hoist engine one (5a) and secondary hoist engine two (5b), king wire lifting rope pair (3) and secondary wire sling pair one (6a) and secondary wire sling pair two (6b), and operation suspension bracket (8) is formed, according to boring point distributing position, choose main foundation pile (1) and secondary foundation pile one (4a) and secondary foundation pile two (4b) position, and embed in the batholith securely, to lead, secondary three hoist engines support on the ground, and be connected or directly hang on foundation pile with foundation pile separately, use king wire lifting rope pair to be connected with operation suspension bracket (8) then, two secondary wire sling pairs are connected with operation frame both sides respectively.
2. automatic according to claim 1 mobile drilling equipment is characterized in that the operation suspension bracket (8) of this device is gone up the drilling tool case (9) of hidden hole drilling (7) being installed and drilling tool being housed.
3. automatic according to claim 1 mobile drilling equipment, the operation suspension bracket (8) that it is characterized in that this device is by G, H, J, K, L, the multiple pattern joint (11 of M type, 16,19,22,24,26) the connecting rod beam (14,18,20,21,23,25) be combined into the shaped as frame structure of operation suspension bracket, the drill point groove (13) of clamping hidden hole drilling is set on framework, framework face and drill center line parallel, the framework face becomes α=70-75 ° with the framework face that is parallel to rock wall surface, and the operation suspension bracket is regulated along the length direction of steel pipe pole beam (23) by K type joint (22), rotates along steel pipe pole beam (14) by G type joint (11), realize the adjusting at α angle, two main suspension ring (10) are connected with two secondary wire slings with the king wire lifting rope respectively with two secondary suspension ring (17), and the major-minor hoist engine hangs and moves the operation suspension bracket, is formed under the framework face by steel pipe pole beam (14) and (25), four universal caster wheels (15) with brake gear are installed, support the operation suspension bracket on crag by it, the operation suspension bracket is rolled on crag easily move, by the brake gear of castor, the operation suspension bracket is fixed in the boring point, establish swing steel tubular beam (27) on the operation suspension bracket, and be supported on the scar, play the supplemental support positioning action.
CN2011200429644U 2011-02-21 2011-02-21 Drilling device capable of moving automatically Expired - Fee Related CN201943574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200429644U CN201943574U (en) 2011-02-21 2011-02-21 Drilling device capable of moving automatically

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200429644U CN201943574U (en) 2011-02-21 2011-02-21 Drilling device capable of moving automatically

Publications (1)

Publication Number Publication Date
CN201943574U true CN201943574U (en) 2011-08-24

Family

ID=44470923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200429644U Expired - Fee Related CN201943574U (en) 2011-02-21 2011-02-21 Drilling device capable of moving automatically

Country Status (1)

Country Link
CN (1) CN201943574U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080499A (en) * 2011-02-21 2011-06-01 成涛宇 Automatically moving drilling device and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080499A (en) * 2011-02-21 2011-06-01 成涛宇 Automatically moving drilling device and construction method thereof

Similar Documents

Publication Publication Date Title
CN202299464U (en) Steel column rapid hoisting and in-position correcting device
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN102251483A (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN102080499A (en) Automatically moving drilling device and construction method thereof
CN201801319U (en) Crane for pipe pile production
CN205046827U (en) Mobilizable slope operation construction platform
CN201943574U (en) Drilling device capable of moving automatically
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN204876631U (en) Assembled steel structure installation uses interim support frame
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN203238967U (en) Large steel structure frame whole lifting device
CN107059654A (en) The compound overlength Hanging basket on front support of single cable plane and its installation method
CN204982628U (en) Horizontal drawing cable bridge
CN201722937U (en) Sliding platform for installation of net rack
CN202744232U (en) Tower crane long suspension arm lifting steel rope supporting device
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN204802903U (en) Safe tower crane
CN104499706A (en) Elevator well template platform and construction method thereof
CN109205475A (en) Truss connection beam type door machine assembling and disassembling device and method in tunnel
CN204151787U (en) Pile driving system for building
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN204199271U (en) A kind of filling pile cage of reinforcement hangs fastening devices
CN203401104U (en) Beam slab bottom drilling tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824