CN201909843U - Wiring device for automatic verification of three-phase electric energy meter - Google Patents

Wiring device for automatic verification of three-phase electric energy meter Download PDF

Info

Publication number
CN201909843U
CN201909843U CN2011200195800U CN201120019580U CN201909843U CN 201909843 U CN201909843 U CN 201909843U CN 2011200195800 U CN2011200195800 U CN 2011200195800U CN 201120019580 U CN201120019580 U CN 201120019580U CN 201909843 U CN201909843 U CN 201909843U
Authority
CN
China
Prior art keywords
electric energy
energy meter
termination
slide plate
phase electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200195800U
Other languages
Chinese (zh)
Inventor
李敏虹
陈宇茜
陈铭杰
张彤
李媛媛
徐辉辉
郭志坤
刘慧敏
夏振超
陈宁
钟蔚
高秀娟
戴敬文
郭斌
刘金涛
余义宙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU SMS ELECTRIC CO Ltd
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
ZHENGZHOU SMS ELECTRIC CO Ltd
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU SMS ELECTRIC CO Ltd, Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical ZHENGZHOU SMS ELECTRIC CO Ltd
Priority to CN2011200195800U priority Critical patent/CN201909843U/en
Application granted granted Critical
Publication of CN201909843U publication Critical patent/CN201909843U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a wiring device for the automatic verification of a three-phase electric energy meter. The wiring device comprises a transmission line for transporting an electric energy meter and further comprises jack platforms, a baffle and a slide plate, an electric energy meter positioning device and a wiring device, wherein the jack platforms are arranged on two sides of the X-axis direction of the transmission line and connected with a Z-axis driving mechanism below; the baffle and the slide plate are arranged on two sides of the X-axis direction of the transmission line respectively and are positioned above the sides of the jack platforms, which are back to the transport line, and the slide plate is connected with a Y-axis driving mechanism; the electric energy meter positioning device is fixed on the slide plate; and the wiring device comprises a wiring seat fixed on the slide plate and a group of elastic wiring terminals fixed on the wiring seat and parallel with the Y-axis. By adopting the wiring device provided by the utility model, the electric energy meter is sent by the transmission line, and receives automatic positioning, wiring and wire disconnection. Therefore, the wiring device can be used together with detection equipment to realize full automatic verification operation to the three-phase electric energy meters and improve the verification efficiency of the three-phase electric energy meters.

Description

A kind of termination that is used for the three-phase electric energy meter automatic Verification
Technical field
The utility model relates to the device that is used for electric energy meter calibration, especially a kind of termination that is used for the three-phase electric energy meter automatic Verification.
Background technology
The production of three-phase electric energy meter, install and use in the process, need examine and determine according to the relevant rules of country with industry, traditional three-phase electric energy meter calibrating installation generally has one or more meter hanging frames that independently comprise a plurality of test epi-positions, during calibrating, need manually electric energy meter to be hung on the meter hanging frame, wiring is finished calibrating by calibrating installation again, also needs manually to pull down after calibrating finishes.At present verification test has been realized automation mechanized operation, and wiring, the need of work manually-operated of taking out stitches take great amount of manpower and time, inefficiency.
Summary of the invention
The purpose of this utility model is, a kind of termination that is used for the three-phase electric energy meter automatic Verification is provided, to improve the efficient of calibrating three-phase electric energy meter.
A kind of termination that is used for the three-phase electric energy meter automatic Verification that the utility model provides, it comprises the transmission line that is used to transport electric energy meter, this transmission line limits the X-Y-Z axle system, this X-Y-Z axle system comprise level and with the parallel X-axis of described transmission line direction of motion, level and with the Y-axis of X-axis quadrature and vertical Z axle, also comprise: lifting platform, it is located at the both sides of the described X-direction of described transmission line, this lifting platform is connected with the Z axle driving mechanism of its below, is the benchmark to-and-fro movement by the drive of this Z axle driving mechanism along described Z-direction and with the plane at the surperficial place of described transmission line; Baffle plate and slide plate, this baffle plate and this slide plate be located at respectively described transmission line described X-direction both sides and be positioned at the top back to described supply line one side of described lifting platform, this slide plate is connected with the Y-axis driving mechanism, and is driven along described Y direction to-and-fro movement by this Y-axis driving mechanism; The electric energy meter locating device, it is fixed on the described slide plate, is used for the X-axis and the Y direction of described electric energy meter are positioned; Termination, it comprises and is fixed on the junction block on the described slide plate and is fixed on the one group elasticity connection terminal parallel with described Y-axis on this junction block.
Preferably, described electric energy meter locating device comprises is located at described termination both sides and two register pins parallel with described Y-axis, and these two register pins are wedge shape and form " V " shape opening near an end of described supply line.
Preferably, also comprise and be located at the support platform that described slide plate below is used to support described slide plate.
Preferably, between described slide plate and described support platform, be provided with slide rail and the chute that matches.
Preferably, described Z axle driving mechanism is a cylinder.
Preferably, described Y-axis driving mechanism is a cylinder.
Preferably, also comprise the retaining stop mechanism of being located on the described baffle plate.
Preferably, described termination and described electric energy meter locating device are a plurality of, and these a plurality of terminations and a plurality of electric energy meter locating device are provided with at interval along described X-direction.
Compared with prior art, the utlity model has following advantage: can realize sending into electric energy meter with the form of transmission line by termination of the present utility model, finish automatic location, wiring and take out stitches, therefore, termination of the present utility model cooperates checkout equipment, can realize the full-automatic calibrating operation of three-phase electric energy meter, improve the efficient of calibrating three-phase electric energy meter.
Description of drawings
Fig. 1 is the structural representation of the termination of one of them embodiment of the utility model.
Fig. 2 is the vertical view of Fig. 1.
Description of reference numerals: 1-frame, 2-transmission line; 3-carries the table pallet; The 4-three-phase electric energy meter; 5-keeps off stop mechanism; The 6-lifting platform; The 7-slide plate; The 8-register pin; The 9-junction block; 10-Z axle cylinder; The 11-slide rail; The 12-support platform; The 13-plate washer; 14-elasticity connection terminal; 15-Y axle cylinder.
Embodiment
One of them embodiment of termination of the present utility model as shown in Figure 1, 2, termination comprises frame 1, chain-plate type transmission line 2, lifting platform 6, baffle plate 13, slide plate 7, electric energy meter locating device and termination.
Transmission line 2 passes from frame 1, and the table of carrying pallet 3 is arranged on the transmission line 2, and each carries three-phase electric energy meter 4 of table pallet 3 placements, and termination be sent carrying table pallet 3 and three-phase electric energy meter 4 into and be sent to transmission line 2 can.Transmission line is provided with retaining stop mechanism 5, can stop carrying table pallet 3 retainings, operates so that accurately locate with wiring.In order to narrate conveniently, with the X-Y-Z axle system of giving a definition, the X-Y-Z axle system comprise level and parallel with transmission line 2 direction of motion X-axis, level and with the Y-axis of X-axis quadrature and vertical Z axle.
Lifting platform 6 is located at the both sides of the X-direction of transmission line 2, and this lifting platform 6 is connected with the Z axle cylinder 10 of its below, is the benchmark to-and-fro movement by 10 drives of this Z axle cylinder along Z-direction and with the plane at the surperficial place of transmission line 2.Lifting platform 6 is used for breaking away from transmission line with carrying table pallet 3 and three-phase electric energy meter 4 jack-up, and realizes the Z-direction location.
Baffle plate 13 and slide plate 7 be located at respectively transmission line 2 X-direction both sides and be positioned at the top back to supply line one side of lifting platform 6.This slide plate 7 is positioned on the support platform 12, and it is connected with Y-axis cylinder 15, and is driven along the Y direction to-and-fro movement by this Y-axis cylinder 15.Preferably, between slide plate 7 and support platform 12, be provided with slide rail 11 and the chute that matches.
Termination is fixed on the slide plate 7, the one group elasticity connection terminal 14 parallel with described Y-axis on it comprises junction block 9 and is installed in junction block 9.Elasticity connection terminal 14 inserts in the connection terminal hole of three-phase electric energy meter 4, finishes automatic connection.In the present embodiment, termination is four.
It comprises the electric energy meter locating device and is located at each termination both sides and two register pins 8 parallel with Y direction, and these two register pins 8 are wedge shape and form " V " shape opening near an end of supply lines.X-axis and Y-axis that electric energy meter locating device and baffle plate 13 1 are used from three-phase electric energy meter 4 position.
The principle of work of location of the present utility model termination is as follows: transmission line 2 will carry table pallet 3 and three-phase electric energy meter 4 is sent into termination, and accurately locate by retaining stop mechanism 5; After three-phase electric energy meter 4 put in place, Z axle cylinder 10 promoted lifting platform 6 and moves upward, and will carry table pallet 3 and three-phase electric energy meter 4 jack-up and break away from transmission line 2, and realize Z axle location; After three-phase electric energy meter 4 jackings, slide plate 7 is done rectilinear motion along slide rail 11 under Y-axis cylinder 15 promotes, and the register pin 8 on the slide plate 7 is contact three-phase electric energy meter 4 earlier, under the acting force in opposite directions of register pin 8 and baffle plate 13, with X-axis, the Y-axis location of three-phase electric energy meter 4.After register pin 8 motion positions, slide plate 7 moves forward, and elasticity connection terminal 14 is accurately inserted in the connection terminal hole, finishes automatic connection.
After calibrating finishes; the complete automatic clearing operation of above-mentioned action backward; be that slide plate 7 retreats earlier; unclamp elasticity connection terminal 14; unclamp register pin 8 again, the lifting platform 6 that carries table pallet 3 belows then falls, and will carry table pallet 3 and drop on the transmission line 2; retaining stop mechanism 5 unclamps, and a year table pallet 3 carries three-phase electric energy meter 4 and sends wiring units.
Only be specific embodiment of the utility model below, do not limit protection domain of the present utility model with this, the quantity of carrying table pallet and three-phase electric energy meter of locating wiring as a mechanism simultaneously can be 1 ~ 6; Any replacement and the improvement done on the basis of not violating the utility model design all belong to protection domain of the present utility model.

Claims (8)

1. termination that is used for the three-phase electric energy meter automatic Verification, it comprises the transmission line that is used to transport electric energy meter, this transmission line limits the X-Y-Z axle system, this X-Y-Z axle system comprise level and parallel with described transmission line direction of motion X-axis, level and with the Y-axis of X-axis quadrature and vertical Z axle, it is characterized in that described termination also comprises:
Lifting platform, it is located at the both sides of the described X-direction of described transmission line, and this lifting platform is connected with the Z axle driving mechanism of its below, is the benchmark to-and-fro movement by the drive of this Z axle driving mechanism along described Z-direction and with the plane at the surperficial place of described transmission line;
Baffle plate and slide plate, this baffle plate and this slide plate be located at respectively described transmission line described X-direction both sides and be positioned at the top back to described supply line one side of described lifting platform, this slide plate is connected with the Y-axis driving mechanism, and is driven along described Y direction to-and-fro movement by this Y-axis driving mechanism;
The electric energy meter locating device, it is fixed on the described slide plate, is used for the X-axis and the Y direction of described electric energy meter are positioned;
Termination, it comprises and is fixed on the junction block on the described slide plate and is fixed on the one group elasticity connection terminal parallel with described Y-axis on this junction block.
2. the termination that is used for the three-phase electric energy meter automatic Verification according to claim 1, it is characterized in that: described electric energy meter locating device comprises is located at described termination both sides and two register pins parallel with described Y-axis, and these two register pins are wedge shape and form " V " shape opening near an end of described supply line.
3. the termination that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: also comprise and be located at the support platform that described slide plate below is used to support described slide plate.
4. the termination that is used for the three-phase electric energy meter automatic Verification according to claim 3 is characterized in that: be provided with slide rail and the chute that matches between described slide plate and described support platform.
5. the termination that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described Z axle driving mechanism is a cylinder.
6. the termination that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: described Y-axis driving mechanism is a cylinder.
7. the termination that is used for the three-phase electric energy meter automatic Verification according to claim 1 is characterized in that: also comprise the retaining stop mechanism of being located on the described baffle plate.
8. according to each described termination that is used for the three-phase electric energy meter automatic Verification of claim 1 to 7, it is characterized in that: described termination and described electric energy meter locating device are a plurality of, and these a plurality of terminations and a plurality of electric energy meter locating device are provided with at interval along described X-direction.
CN2011200195800U 2011-01-21 2011-01-21 Wiring device for automatic verification of three-phase electric energy meter Expired - Lifetime CN201909843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200195800U CN201909843U (en) 2011-01-21 2011-01-21 Wiring device for automatic verification of three-phase electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200195800U CN201909843U (en) 2011-01-21 2011-01-21 Wiring device for automatic verification of three-phase electric energy meter

Publications (1)

Publication Number Publication Date
CN201909843U true CN201909843U (en) 2011-07-27

Family

ID=44302044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200195800U Expired - Lifetime CN201909843U (en) 2011-01-21 2011-01-21 Wiring device for automatic verification of three-phase electric energy meter

Country Status (1)

Country Link
CN (1) CN201909843U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298133A (en) * 2011-09-13 2011-12-28 浙江省电力公司 Automatic wire connecting device for primary winding of bus type transformer
CN102556575A (en) * 2012-02-23 2012-07-11 科瑞自动化技术(苏州)有限公司 O-shaped conveyor belt device for precisely locating, conveying and transferring jig
CN102662153A (en) * 2012-05-23 2012-09-12 四川电力科学研究院 Three-phase smart electricity meter alternating voltage impulse voltage test tool
CN102736054A (en) * 2012-06-11 2012-10-17 深圳市科陆电子科技股份有限公司 Multi-meter-position automatic connection device and connection method for electric energy meter checking device
CN103885024A (en) * 2012-12-20 2014-06-25 西安亮丽仪器仪表有限责任公司 Calibration stand for electric energy meter
CN104134341A (en) * 2014-07-31 2014-11-05 国家电网公司 Concentrator uplink channel detection method special for automated verification system
CN104135405A (en) * 2014-07-31 2014-11-05 国家电网公司 A testing method for a special transformer III communication module dedicated to automatic verification system
CN104198835A (en) * 2014-07-31 2014-12-10 国家电网公司 Metering type special change acquisition terminal upstream channel detection method special for automatic calibration system
CN104459599A (en) * 2014-11-21 2015-03-25 国家电网公司 Wire connecting and disconnecting device
CN104459602A (en) * 2014-12-16 2015-03-25 国家电网公司 Intelligent detection device for electric energy meters returned back through disassembly
CN104960919A (en) * 2015-06-30 2015-10-07 国网甘肃省电力公司电力科学研究院 Electric energy meter robot feeding and discharging system and working process thereof
CN108802460A (en) * 2017-05-04 2018-11-13 郑州三晖电气股份有限公司 A kind of Campatible electric energy meter meter adapting-seat and realize compatible method
CN108802661A (en) * 2017-05-04 2018-11-13 国网江西省电力公司电力科学研究院 Campatible watt-hour meter automatic verification device with belt line and method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298133A (en) * 2011-09-13 2011-12-28 浙江省电力公司 Automatic wire connecting device for primary winding of bus type transformer
CN102556575A (en) * 2012-02-23 2012-07-11 科瑞自动化技术(苏州)有限公司 O-shaped conveyor belt device for precisely locating, conveying and transferring jig
CN102662153A (en) * 2012-05-23 2012-09-12 四川电力科学研究院 Three-phase smart electricity meter alternating voltage impulse voltage test tool
CN102736054A (en) * 2012-06-11 2012-10-17 深圳市科陆电子科技股份有限公司 Multi-meter-position automatic connection device and connection method for electric energy meter checking device
CN103885024B (en) * 2012-12-20 2016-09-28 西安亮丽仪器仪表有限责任公司 A kind of electric energy meter calibrating platform
CN103885024A (en) * 2012-12-20 2014-06-25 西安亮丽仪器仪表有限责任公司 Calibration stand for electric energy meter
CN104134341A (en) * 2014-07-31 2014-11-05 国家电网公司 Concentrator uplink channel detection method special for automated verification system
CN104135405A (en) * 2014-07-31 2014-11-05 国家电网公司 A testing method for a special transformer III communication module dedicated to automatic verification system
CN104198835A (en) * 2014-07-31 2014-12-10 国家电网公司 Metering type special change acquisition terminal upstream channel detection method special for automatic calibration system
CN104135405B (en) * 2014-07-31 2017-07-28 国家电网公司 A kind of special communication module method of testing of special change III of automatic calibration system
CN104459599A (en) * 2014-11-21 2015-03-25 国家电网公司 Wire connecting and disconnecting device
CN104459602A (en) * 2014-12-16 2015-03-25 国家电网公司 Intelligent detection device for electric energy meters returned back through disassembly
CN104960919A (en) * 2015-06-30 2015-10-07 国网甘肃省电力公司电力科学研究院 Electric energy meter robot feeding and discharging system and working process thereof
CN104960919B (en) * 2015-06-30 2017-03-22 国网甘肃省电力公司电力科学研究院 Electric energy meter robot feeding and discharging system and working process thereof
CN108802460A (en) * 2017-05-04 2018-11-13 郑州三晖电气股份有限公司 A kind of Campatible electric energy meter meter adapting-seat and realize compatible method
CN108802661A (en) * 2017-05-04 2018-11-13 国网江西省电力公司电力科学研究院 Campatible watt-hour meter automatic verification device with belt line and method
CN108802460B (en) * 2017-05-04 2024-01-30 郑州三晖电气股份有限公司 Compatible electric energy meter base and method for realizing compatibility

Similar Documents

Publication Publication Date Title
CN201909843U (en) Wiring device for automatic verification of three-phase electric energy meter
CN103792507B (en) Electric energy meter is located connection and ripping device automatically
CN204184924U (en) For the lever disengagement gear of irony workpiece
CN203132509U (en) Dimension testing device
CN204228064U (en) A kind of connector height measurer
CN202995022U (en) Electric energy meter wiring and disconnecting device
CN101923151B (en) Locating and wiring system for pipeline electric energy meters
CN206313275U (en) USB joint automatic assembling and test system
CN205210300U (en) Novel ammeter tray
CN202093107U (en) Aging testing jig
CN208596850U (en) The iron-clad of power interface assembling test equipment assembles shift mechanism
CN204772519U (en) Be applied to PCB test carrying platform's manipulator
CN209279820U (en) Auto parts and components hole location automatic detection device
CN109342894A (en) A kind of overpressure resistance detecting device and method
CN209247950U (en) A kind of overpressure resistance detecting device
CN205192465U (en) Verifying attachment that accumulator plate cast joint utmost point ear was surely brushed
CN201438215U (en) Pipelined electric energy meter locating wiring system
CN202471954U (en) Bidirectional multiple-pass docking detecting device of electric energy meter terminal
CN209416818U (en) More test positions mechanical arm for wiring board voltage-withstand test
CN207623426U (en) A kind of host computer automatic high pressure testing station
CN206248684U (en) A kind of circuit board detecting fixture
CN204855780U (en) A 0. 02 grade of standard table for inserting system stability is experimental for examination of formula three -phase table
CN204718803U (en) A kind of sprocket wheel proving installation
CN206105237U (en) Centre gripping frock is used in IGBT welding
CN213053948U (en) Device with exchangeable work units

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110727